Você está na página 1de 4

Saudi Aramco 2616-ENG (3/99)

OPERNS.


SAUDI ARAMCO OIL COMPANY
SECTION 10441 SIGNAGE
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ENGG

CERT

PMT

PART 1 - GENERAL 1.01 DESCRIPTION OF WORK This Section of the Specifications describes requirements pertaining to the fabrication and installation of all signs and sign mounting. All units and mounting procedures shall conform to drawings and descriptions referred to by this Section. Any proposed changes shall be submitted in writing for approval by SAUDI ARAMCO. 1.02 STANDARDS A. B. C. Saudi Aramco Standard Interior and Exterior sign program. UBC Uniform Building Code.

REV. NO.

DATE JOB/EWO

DESCRIPTION

CABO/ANSI A117.1-92 Accessible and Useable Buildings and Facilities.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

1.03

RELATED SECTIONS A. B. Section 15190 Section 16195 Mechanical Identification. Electrical Identification.

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

1.04

SUBMITTALS A. Submit shop drawings, samples and certificates under provisions of Saudi Aramco Contract Document. Shop Drawings: One complete set of prints and sepias of shop drawings on all signs, mounting and related details shall be submitted to SAUDI ARAMCO and no work shall be done on signage fabrication until written instruction to proceed is provided by SAUDI ARAMCO.

CONSTRUCTION AGENCY
________________ DATE:

B.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

C.

Samples: Complete sample of the materials and finish colors to be utilized in the construction of the signs and mounting devices in the project including but not limited to, prototype example of injection molded plastic signs, directories, message panels and parts, aluminum sign frames and
SECTION 10441

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55 SAUDI ARABIA

VE-417361 BI-25-00002

RABIGH

14-Sep-07

JOB/EWO#

1 OF 4

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
panels and mounting brackets, shall be submitted to SAUDI ARAMCO for approval prior to sign fabrication. D. Certificates: The fabricator shall certify that all units will conform to this specification, and will replace, without cost, all units which fail to meet this requirement. E. Manufacturers Instructions: Submit manufacturers installation instructions under provision of Saudi Aramco Contract Documents. Template: Include installation template.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

F. 1.05

DELIVERY, STORAGE AND HANDLING A. Deliver, store and protect products to site under provisions of Saudi Aramco Contract Documents. Package signs, labeled in name groups. Store adhesive tape at ambient room temperatures. Finished units and mounting shall exhibit careful workmanship throughout. Shipping method shall insure undamaged arrival at the site.

DATE JOB/EWO

B. C. D.

REV. NO.

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

1.06

ENVIRONMENTAL REQUIREMENTS A. Do not install signs when ambient temperature is below 70 degrees F (21 deg. C). Maintain this minimum during and after installation of signs.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

PART 2 - PRODUCTS 2.01 MANUFACTURERS A. 1. Products supplied from the following manufacturers are acceptable: Adart Medyan Signs Riyadh Tel: 01 498 1203 Desert Decal Co. Tel: 03 857 9329/857 9435 Fax: 03 857 5390 Substitutions: Under provisions of Saudi Aramco Contract Documents.
SECTION 10441

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

2.

B.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55 SAUDI ARABIA

VE-417361 BI-25-00002

RABIGH

14-Sep-07

JOB/EWO#

2 OF 4

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

2.02

MATERIALS A. Building signs shall be constructed of suitable metallic components to withstand high temperatures, resist sun (UV), fading and deterioration, and wind driven sand blasting.

ENGG

CERT

B.
DESCRIPTION

Exterior room signs shall be aluminum panels with vinyl graphics on plaque. Interior room signs shall be assembled from the MSS 0.5 sign system. SIGNAGE GRAPHIC CRITERIA A. Type Face: The standard type face shall be Basrah bold letters, Arabic font. Numbers shall be Bagdad in accordance with Saudi Aramco Standard Sign Program. All type is to be photo screened from original art which is at least 50% of the final size. Letter size shall be determined by the vertical, straight, unaccented initial letter form. B. Symbols: Directional arrow forms shall be sized and oriented as indicated on plans. Color of arrows & backgrounds shall be decided by SAUDI ARAMCO Representative. Symbols shall be photo screen printed from artwork which is at least 50% of the final required size.

C. 2.03

REV. NO.

DATE JOB/EWO

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

C.

Size and Layout: See architectural drwings for locations, sizes, and graphic layouts for each type of signage.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

2.04

LETTERING A. Size and Style: As selected by SAUDI ARAMCO Representative & accordingly to the following:. Minimum letter height for required accessible sign shall be 25mm. Exterior building sign: Refer to architectural drawings. Rooms sings: Refer to Saudi Aramco Standard sign program & Architectural drawings.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

B.

Colors: As selected by SAUDI ARAMCO Representative.

SECTION 10441

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55 SAUDI ARABIA

VE-417361 BI-25-00002

RABIGH

14-Sep-07

JOB/EWO#

3 OF 4

00

Saudi Aramco 2616-ENG (3/99)


OPERNS.


SAUDI ARAMCO OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

PMT

2.05 A. B.

ACCESSORIES Mounting Hardware: Concealed mounting hardware for building signs. Mechanical fastening for exterior signs. C. Tape Adhesive: Double sided tape for interior signs.

ENGG

CERT

PART 3 - EXECUTION
DESCRIPTION

3.01

EXAMINATION A. Verify that surfaces are ready to receive work.

3.02

INSTALLATION A. Install in accordance with manufacturer's instructions. Install signs after surfaces are finished, in locations as directed. Clean and polish.

DATE JOB/EWO

B. C. 3.03

REV. NO.

SCHEDULES A. Refer to architectural drawings & Saudi Aramco Sign Program. END OF SECTION

DISCIPLINE ENGINEER

__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Date:

SECTION 10441

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55 SAUDI ARABIA

VE-417361 BI-25-00002

RABIGH

14-Sep-07

JOB/EWO#

4 OF 4

00

Você também pode gostar