Você está na página 1de 7

Supply Management Facilities Portfolio

Facilities Construction Category Management Center


Western Facilities Construction CMT

Attachment 11 - Schedule of Values

Solicitation 072382-13-A-0023

Solicitation Number eFMS Project Number Project Description Facility ID (from eFMS) Facility Name (from eFMS) Facility Size (sf)

072382-13-A-0023 E74258 Interior Improvements 497795-011

Solicitation Issue Date Solicitation Due Date Offering Firm Contact Name

August 2, 2013 September 05, 2013 (unless amended)

Contact Telephone SALT LAKE CITY AUXILIARY SERVICE FACILITY Contact Email Address

Item Division 01 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8

Description of Work General Conditions Overhead Profit Bonds & Insurance Building Permits Testing O.& M. manuals / As Builts Training Commissioning Support for USPS CxA

Material

Labor

Total

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 02 2.0 2.1 2.2

Existing Conditions Miscellaneous Demolition - Adjust. at plumbing Miscellaneous Demolition - Adjust. temp. cap Phasing / Adjusts. in Concurrent Construct. 0.00 0.00 0.00

Division 03 3.0 3.1 3.2 3.3 3.4

Concrete Concrete Footings - Entry / break canopies Concrete Sign Base / Footing Concrete Slab on Grade adjustments Concrete column protection Bollard / Frame Grouting 0.00 0.00 0.00 0.00 0.00

Division 04 4.0

Masonry NA 0.00

Division 05 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8

Metals Structural Steel for canopies Steel stair to roof Misc. metal frames / lintels Metal guard / equipment protection Metal guardrail Metal bollards Metal Bracing - Walls Light Gauge Metal Framing at Administration Light Gauge Metal Framing at Support 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 06 6.0

Wood, Plastics, and Composites Rough Carpentry


Page 1 of 7

0.00

Supply Management Facilities Portfolio


Facilities Construction Category Management Center
Western Facilities Construction CMT

Attachment 11 - Schedule of Values


6.1 6.2 6.3 6.4 Finish Carpentry (Bumpers, etc) Casework / Millwork Adjustable Shelving FRP wall protection / Trim

Solicitation 072382-13-A-0023

0.00 0.00 0.00 0.00

Division 07 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10 7.11 7.12 7.13

Thermal & Moisture Single Ply Roofing System - Canopies Rigid insulation / cover board Tapered insulation Walk pads Pipe supports Wood blocking EIFS / Sheathing / Framing System Prefabricated equipment supports Sealants Counterflashing / Caps Firestopping Batt insulation Rigid wall insulation with prefin. mtl skins (below 12') Metal coping at canopies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 08 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8

Doors & Windows Aluminum Doors / Frame / Glass Aluminum Storefront / Glass Hollow Metal Doors / Frames Hollow Metal Frames / Glass SC Wood Doors / Hollow Metal Frames Door Hardware HM Door lights / temp. glass Access Doors Exit Alarm Devices 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 09 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 9.9 9.10 9.11 9.12 9.13

Finishes Metal studs / Gyp. Bd. (2 sides) Metal Stud Furring Wall / Gyp. Bd. (1 side) Tape, bed, float & paint Acoustical Insulation Concrete Sealer / Hardener - final prep Resilient Flooring Resilient Base Epoxy Flooring / Base Suspended Acoustical Tile Ceiling Suspended Gypsum Board Ceiling Soffit canopy suspension system Seismic Bracing / suspension - ceiling /walls Metal wall cap Metal EJ Cover 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 2 of 7

Supply Management Facilities Portfolio


Facilities Construction Category Management Center
Western Facilities Construction CMT

Attachment 11 - Schedule of Values


Division 10 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.9 10.10 10.11 Specialties Toilet partitions / urinal screens Toilet accessories Fire Extinguishers Site Directional / DOT Signage Site Facility ID Signage Exterior Facility ID Signage Interior Signage Wire mesh enclosures Miscellaneous Accessories Marker boards / accessories Metal lockers Corner Guards

Solicitation 072382-13-A-0023

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 11 11.0 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8

Equipment Dock seals Dock signal lights / chocks / integr. controls Dock Bumpers Dock Lights Exhaust hood galvanized Haz Mat Table / Container - SS Air compressors/dryers/filters - MPE/Maint Eye wash / emergency shower Miscellaneous equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 12 12.0 12.1

Furnishings Clocks Window coverings - blinds / curtains 0.00 0.00

Division 13 13.0

Special Construction NA 0.00

Division 14 14.0

Conveying Systems NA 0.00

Division 21 21.0 21.1 21.2 21.3

Fire Suppression Fire sprinkler mods. - ESFR heads / drops Fire sprinkler mods. - Admin. Support System Fire sprinkler mods. - Inspectors Test / Drains / Valves Pre-action fire sprinkler system for CCR 0.00 0.00 0.00 0.00

Page 3 of 7

Supply Management Facilities Portfolio


Facilities Construction Category Management Center
Western Facilities Construction CMT

Attachment 11 - Schedule of Values


Division 22 22.0 22.1 22.2 22.3 22.4 22.5 22.6 22.7 22.8 22.9 22.10 22.11 22.12 22.13 22.14 22.15 22.16 Plumbing General Plumbing submittals / adjustments / preparation Plumbing fixtures - Toilets Plumbing fixtures - Urinals Plumbing fixtures - Lavatories / Sinks Plumbing fixtures - Service Sinks Plumbing fixtures - EWCs Plumbing fixtures - EWH / Instant. WH Floor Drain Adjustments Roof FPHBs Roof drains at canopies / Heat trace Compressed Air System Piping Compressed Air System valves Compressed Air System Piping accessories Condensate Piping System Gas piping system / regul. Piping insulation - vents / condensate Seismic Bracing / suspension

Solicitation 072382-13-A-0023

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 23 23.0 23.1 23.2 23.3 23.4 23.5 23.6 23.7 23.8 23.9 23.10 23.11 23.12 23.13 23.14 23.15 23.16 23.17 23.18 23.19 23.20 23.21 23.22 23.23 23.24 23.25 23.26 23.27

HVAC General Mechanical submittals / adjustments / preparation RTU DX / Gas HVAC Unit / Set-up (50 T) RTU DX / Gas HVAC Unit / Set-up (30 T) RTU DX / Gas HVAC Unit / Set-up (12.5 T) RTU DX CCR VAC Units / Set-up (10 T) RTU DCV / Power Blower / Economizer RTU Humidity Control RTU DDC EMCS Card / Interface CCR VAC Humidity Control Split DX / Electric HVAC Unit / Set-up Ductwork / Insulation (50T) Ductwork / Insulation (30T) Ductwork / Insulation (12.5T) Ductwork / Insulation (2-10T) Fan Powered Mixing Boxes / DDC Control Interface Exhaust Fans - Roof Mounted Exhaust Fans - Ceiling Mounted Relief Vents Relief Vents / Hoods / Vapor Proof Unit Heaters Ventilation system for hood Diffusers / Registers - Ceiling Diffusers / Registers - Exposed Duct Dampers - Large Dampers - Standard Seismic Bracing / suspension Test and Balance / adjustment / Comm. Support IAQ start-up
Page 4 of 7

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supply Management Facilities Portfolio


Facilities Construction Category Management Center
Western Facilities Construction CMT

Attachment 11 - Schedule of Values


23.28 23.29 23.30 23.31 23.32 23.33 23.34 EMCS Workstation / Headend EMCS System Interface / Programming EMCS LAN / Cabling EMCS Distributed Panels / Connections EMCS Sensors / Probes EEMS JACE Panel / Interface EEMS / Programming / Integration

Solicitation 072382-13-A-0023

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 25 25.0

Integrated Automation NA

Division 26 26.0 26.1 26.2 26.3 26.4 26.5 26.6 26.7 26.8 26.9 26.10 26.11 26.12 26.13 26.14 26.15 26.16 26.17 26.18 26.19 26.20 26.21 26.22 26.23 26.24 26.25 26.26 26.27 26.28 26.29 26.30 26.31 26.32 26.33

Electrical General electrical / submittals / preparation Commissioning support Main switchboard / feeders Main distribution panelboard / feeders Distribution Panels - 480/277V Distribution Panels - 208/120V Transformers - Shielded / 45kva+ Transformers - Shielded / 30kvaDisconnects - NF General Lighting Support (Fluorescent) / Wiring General Lighting Workroom (Fluorescent) / Wiring Task Lighting (Fluorescent) / Wiring Exit / Emergency Lighting / Wiring Zone Lighting Control Interface Zone Lighting Control Panels Zone Lighting Controls Contactors / enclosure / distribution Electrical Power Feeds/cond. (HVAC - RTUS) Electrical Power Feeds/cond. (HVAC - FBMB/VAV) Electrical Power Feeds/cond. (EF) Electrical Power Feeds/cond. (MPE) Electrical Power Feeds/cond. (MPE sub feeds) Electrical Power Feeds/cond. (Lighting distribution) Electrical Power Feeds/cond. (Dock / Support Equipment) Electrical Power Feeds/cond. (Lighting distribution) Electrical Power Feeds/cond. (General power / receptacles) Electrical General Distribution Feeds/cond. - misc. CCR UPS / Batteries / Panel Exterior canopy lighting / Wiring Exterior egress lighting / Wiring Flagpole lighting / Wiring Monument sign lighting / Wiring Seismic Bracing / suspension EEMS Electrical Conduit / Wiring EEMS Meter Monitoring Support 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 27

Communications System
Page 5 of 7

Supply Management Facilities Portfolio


Facilities Construction Category Management Center
Western Facilities Construction CMT

Attachment 11 - Schedule of Values


27.0 27.1 27.2 27.3 27.4 27.5 27.6 27.7 27.8 27.9 27.10 27.11 27.12 Structured Wiring System - Racks / Equip - CCR Structured Wiring System - Fiber / cable backbone Structured Wiring System - Distrib / IDFs Structured Wiring System - Distrib / IDFs mounting / cascade Structured Wiring System - TO cable Structured Wiring System - TO triplex Structured Wiring System - CP / cable Fiber Service for APPS / Connections 12" Cable tray / transitions / bracing 18" Cable tray / transitions / bracing Paging System master controller / telecom interface Paging System speakers / cabling Seismic Bracing / suspension

Solicitation 072382-13-A-0023

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 28 28.0 28.1 28.2 28.3 28.4 28.5 28.6 28.7 28.8 28.9 28.10 28.11 28.12 28.13 28.14 28.15 28.16 28.17 28.18 28.19 28.20 28.21 28.22 28.23 28.24 28.25 28.26 28.27 28.29 28.30 28.31

Electronic Safety and Security Fire Alarm Programming / FACP Mods. / cards Fire Alarm Devices (FAAP) / cabling Fire Alarm Devices (Pulls / horn strobes / aud. vis.) / cabling Fire Alarm Devices (Smoke detectors, sensors) / cabling Fire Alarm Interface for APPS / cabling Fire Alarm Interface for Pre-action system in CCR / cabling Physical Access Control System (Vanderbilt PACS) - headend Physical Access Control System (Database migration) Physical Access Control System (Programming) Physical Access Control System (Badging / camera / printer) Physical Access Control System (Card readers / panels) PACS Burn-in / activation / support PACS USPS Prox. Cards PACS site fence gates (high speed alum.) PACS site fence gate operators / sensor loops / safety edges PACS site barrier gates PACS site barrier gates sensor loops PACS tandem turnstiles PACS opening contacts / sensors Security door / gate hardware Security hardware accessories ISIP PACS Site / Ext. Security CCTV System (cameras env.) ISIP PACS Site / Ext. Security CCTV System (fiber / interface) PACS Intercom System - master station / cabling PACS Intercom System - remote stations / cabling PACS stanchions / shrouds Intrusion Detention System (IDS) - master panel / cabling Intrusion Detention System (IDS) - remote breakout / cabling Intrusion Detention System (IDS) - motion sensors / contacts Integrated Secur. & Investig. Platform (ISIP) CCTV-related GFE / Head-end Equip 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 31

Earthwork
Page 6 of 7

Supply Management Facilities Portfolio


Facilities Construction Category Management Center
Western Facilities Construction CMT

Attachment 11 - Schedule of Values


31.0 31.1 31.2 Site Adjustments - Signage / gates Earthwork / Prep Erosion control / barricading

Solicitation 072382-13-A-0023

0.00 0.00 0.00

Division 32 32.0 32.1 32.2 32.3 32.4 32.5 32.6 32.8

Exterior Improvements Paving Prep / Doweling Concrete Sidewalk Concrete curb and gutter adjustments Asphalt paving adjustments Chain link fencing Chain link fencing gates (manual) Landscaping / xeriscaping adjustments Site sealants 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Division 33 33.0

Utilities Storm Drain. tie-in add. canopies 0.00

SOV Totals

0.00

0.00

0.00

Alternates Alternate 1 Alternate 2 Alternate 3 Reduce 5 month construction performance time to 4 months. Extend 5 month construction performance time to 6 months Provide 8' high FRP panels on all exposed Workroom walls and partitions.

ADD or (DEDUCT) $$ $ $ $ -

Page 7 of 7

Você também pode gostar