Você está na página 1de 14

No No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2 3 4 5 6 7 8 9 10 11 12 13 13 1 2 1 2 1 1

Problem Problem 2G LAC Profiling 2G SD Cause Template 2G HO Parameter Recommendation Part 1 2G HO Parameter Recommendation Part 2 Low TBF Est DL SR di Hotel AmaliaMD2, MD3 dan Simpur CenterID1 Degradation of Cells Bakauheni IVMG2 2G Initial Feature Low CSSR PS at Cluster NPI UL Power Congestion DL IuB Congestion 3G Initial Feature 3G KPI remarks for NPI KOM High RRC rejection due to RL Fail in Kota Agung 3 MW LDR Algorithm Concept Ping Loss Concept HSUPA Congestion Sub Counter Cause RAB Fail Distribution Revision PCHR Analysis Support EXPLAINATION TRIAL 3G PARAMETER HUAWEI Recommendation Improvement KPI IuB Congestion in Site Pasar Concat Yogya no IFHO attempt Backlog Sites Backlog Sites CIO Concept 3G CSSR CDR Strategic Optimization 3G Swap Redirection Exclusion method for swap / modernization closing Strategic Optim - 3G PCH FACH Cong for backlog - swn Strategic Optim - 3G 1A - 1B Event for backlog -swn - modernization High RRC Rejection due to RL Fail in BanaranMW RRC Rejection due to other congestion in RNC Solo 2G CSSR CDR Strategic Optimization Training RNO Telkomsel Project for Huawei Evaluation Low CSSR CS at Demati Dalam 2G HO Fail due to other congestion Rab Other Congestion User Congestion RTWP getting worse than before after swap M2000 Performance Export file Directory

Type Type Support Support Support Support Ask Support Ask ASK ASK ASK Ask Ask Ask Ask Ask Ask Support Ask Ask Support ASK ASK Support Support Sharing and training Support Ask Support Support Support Ask Support Support Support ASK Ask ASK ASK Ask Support

2 3

2G DT Analysis Session Sharing 3G DT Analysis Session Sharing

Sharing and training Sharing and training

Area Area South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra South Sumatra Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java South Sumatra South Sumatra Central Java Central Java West Java Central Java

Project Project 2G NPI Telkomsel Lampung 2G NPI Telkomsel Lampung 2G NPI Telkomsel Lampung 2G NPI Telkomsel Lampung 2G NPI Telkomsel Lampung 2G NPI Telkomsel Lampung 2G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 3G NPI Telkomsel Lampung 2G NPI Telkomsel Lampung 3G RO Tsel CJ 3G RO Tsel CJ 3G RO Tsel CJ 2G RO Tsel CJ 3G RO Tsel CJ 3G RO Tsel CJ 3G RO Tsel CJ 3G RO Tsel CJ 3G RO Tsel CJ 3G RO Tsel CJ 3G RO Tsel CJ 3G RO Tsel CJ 2G RO Tsel CJ 3G RO Tsel CJ 3G RO TSEL SS 2G RO Tsel SS 3G Modernisation Tsel CJ 3G Modernisation Tsel CJ 3G Swap Telkomsel WJ Internal NDS - OSS Center

Vendor Vendor Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei

PIC Request PIC Request TL NPI SS OSS SS - OSS Center TL NPI SS TL NPI SS Andry Jatmiko Andry Jatmiko TL NPI SS Arief Nugroho Arief Nugroho Arief Nugroho TL NPI SS TL NPI SS Arief Nugroho Arief Nugroho Arief Nugroho Arief Nugroho OSS SS - OSS Center Arief Nugroho Arief Nugroho TL NPI SS Irwan Wahyudi Adi Purnomo TL RO Telkomsel CJ TL RO Telkomsel CJ TL RO Telkomsel CJ TL RO Telkomsel CJ M.Arifin OSS CJ TL RO Telkomsel CJ TL RO Telkomsel CJ Irwan Wahyudi M.Arifin TL RO Telkomsel CJ TL RO Telkomsel CJ Arief Firman M Badruz M.Arifin M.Arifin Arie Safaraz OSS Center

Problem Date Received Problem Date Received 6-Nov-13 14-Nov-13 4-Dec-13 4-Dec-13 17-Dec-13 16-Dec-13 30-Oct-13 12-Nov-13 26-Nov-13 26-Nov-13 30-Oct-13 30-Oct-13 9-Nov-13 15-Nov-13 19-Nov-13 25-Nov-13 25-Nov-13 5-Dec-13 14-Dec-13

6-Jan-14
25-Nov-13 27-Nov-13 27-Nov-13 27-Nov-13 27-Nov-13 11-Nov-13 27-Nov-13 2-Dec-13 4-Dec-13 4-Dec-13 3-Dec-13 4-Dec-13 11-Nov-13 6-Jan-14 21-Nov-13 11-Nov-13 26-Nov-13 26-Nov-13 13-Dec-13 6-Dec-13

NDS NDS

Internal NDS - RF Center Internal NDS - RF Center

Huawei Huawei

Internal Internal

14-Nov-13 20-Nov-13

NPI TSEL SS P
Solution Sent Solution Sent 7-Nov-13 14-Nov-13 7-Dec-13 13-Dec-13 17-Dec-13 16-Dec-13 30-Oct-13 12-Nov-13 27-Nov-13 2-Dec-13 30-Oct-13 30-Oct-13 11-Nov-13 15-Nov-13 19-Nov-13 25-Nov-13 25-Nov-13 Status Status Close Close Close Close Close Close Close Close Close Close Close Close close Close Close Close Close 6-Jan-14 Close 13-Dec-13 Close Open 26-Nov-13 Close 28-Nov-13 Close Open Open 27-Nov-13 Close 11-Nov-13 Close Open Open Open Open 4-Dec-13 Close 5-Dec-13 Close 11-Nov-13 Close Open 21-Nov-13 Close 14-Nov-13 Close 9-Dec-13 Close 9-Dec-13 Close 12/13/2013 & 19 Dec 2013 Close Open

14-Nov-13 20-Nov-13

Close Close

NPI TSEL SS PROJECT TRACK


Problem Finding Problem Finding

2G LAC Profiling Done Already sent via email by Pak Cahyono. Already sent via email by Pak Cahyono. Already sent via email by Pak Cahyono. Already sent via email by Pak Cahyono. 2G / 3G Feature Explanation The problem was caused by HSUPA activation n some NodeB and the power congestion Problem was founded due to increase number of Uplink power congestion. Data OSS not complete, mas Arief using IuB Congestion problem to answer question from Telkomsel 2G / 3G Feature Explanation 3G KPI Remarks High RRC Rejection Fail due to RL Fail and high RLM Fail due to IUB CFGUNSP, problem was in BBU which consist of WMPT / UMPT Module Already sent via email by Pak Adransyah. IP Ping Loss Concept and QOS Mapping Already sent via email by Pak Adransyah. HSDPA and HSUPA User Congestion must be added into RAB Fail Analysis, since TSEL SS already use RAN 14 Waiting Software License and processing Already sent via email by Pak Adriansyah. Power Control & Board Audit The problem was caused by IuB capacity limitation Can't do IFHO attempt and even to do IF Prep HO attempt, problem was caused by high XPU Load Still in progress to support Backlog team Still in progress to support Backlog team Done Implement several parameter CSSR not achieve, meanwhile in same time was found RRC Redirection Waiting OSS Report Waiting Result, parameter has been executed Waiting Result, parameter has been executed Problem occurred after "additional board", then high RRC Rejection was occurred , not alarm found but found high unavailability due to sy High RRC Rejection due other congestion found after NPI team change RNC Control Plane Parameter, which lead increase XPU Load in seve Implement several parameter In Progress The problem was caused by IuB capacity limitation in transport network i.e RTN / MW capacity, so IUB capacity offered can't be achieved Finding HO Fail due to other congestion This problem was caused there is problem in RNC Interface toward to SGSN and might be datacomm (router) and transport can be major c This problem was caused by "limitation in RNC License", several RNC can be retune due to new RNC integrated Already sent via email by Pak Adriansyah. Waiting file folder location

Done Done

T TRACKING
Temporary Solution Temporary Solution

Problem Solved by retune ENU and UL threshold

Reset BBU / WMPT Module and escalate to BSS / RAN Team which also occurred BBU Halt Alarm

In Progress
Adjust FTI profile Balancing XPU Load

gh unavailability due to system increase XPU Load in several SPU subsytem, lead also for RRC Rejection due to other congestion

In Progress Adjust FTI profile Retune Half Rate Management in source and target, and retune frequency management in source and target d transport can be major cause for this issue

Remarks Remarks

Already sent via email by Pak Cahyono. Already sent via email by Pak Cahyono. Already sent via email by Pak Cahyono. Already sent via email by Pak Cahyono. Adjust Parameter HSUPA max User number in UCELLCAC and retune E-HICH/RGCH and E-AGCH in UCELLHSUPA

LDR Algortihm Explanation

Already sent via email by Pak Adriansyah.

In Progress
Also found high ping loss in IP transmission forward to IP segmen 40.40.40.X

In Progress Add Capacity of IuB

Already sent via email by Pak Adriansyah.

url

po number

Area

Project

Operator

Vendor

Periode

Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Lampung Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java Central Java
South Sumatra South Sumatra Central Java Central Java West Java

NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung NPI Telkomsel Lampung RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ RO Telkomsel CJ
RO Telkomsel SS RO Telkomsel SS Modernization Telkomsel CJ Modernization Telkomsel CJ Swap Telkomsel WJ Internal NDS Project

Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel
Telkomsel Telkomsel Telkomsel Telkomsel Telkomsel

Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei Huawei
Huawei Huawei Huawei Huawei Telkomsel 2013

2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013 2013

Internal NDS Project Internal NDS Project

2013 2013

Você também pode gostar