Escolar Documentos
Profissional Documentos
Cultura Documentos
Division: Eluru
Section : Mulagalampalli
Beat : Antharvedigudem
Sl.
No
Source
Lead in
Kms
Deduct
Contr.profit
14%
7
Blasting
Seignorage
Materials
ADD
Total Cost
Total Cost VAT (5%)
10
11
12
Local
7.50
385.00
116.00
14.25
0.00
40.00
526.75
26.34
553.09
RR Stone (12-G)
Local
3.50
245.00
68.00
8.35
0.00
50.00
354.65
17.73
372.38
Local
3.50
188.00
68.00
8.35
0.00
50.00
297.65
14.88
312.53
Local
3.50
904.76
68.00
8.35
0.00
50.00
1014.41
50.72
1065.13
Buttaigudem
---
5300.00
0.00
0.00
0.00
0.00
5300.00
265.00
5565.00
3
4
Cement
Local
7.50
285.00
116.00
101.75
0.00
40.00
339.25
16.96
356.21
40 mm metal (30 - f)
Local
3.50
588.00
68.00
59.65
70.00
50.00
716.35
35.82
752.17
DATA SHEET
(AP REVAISED STANDARD DATA)
Name of the Work : Construction of Check dam during 2012-13
Range : Jangareddigudem
Section : Mulagalampalli
Sl.
No
Contents
Description of Item
Rate
Per
Amount
day
1019.20
per 10cum
3.64 days
BLD-CSTN 2.5
Mazdoor (Unskilled)
280.00
162
kgs
Cement
0.90
0.45
1.2
1
0.10
1.39
cum
cum
Kl
hour
days
days
40 mm HGB metal
Sand of mortar
Water (using for curing)
Concret Mixing Charges(38 -a)
Mason 1st class
Mazdoor (Unskilled)
Sundries
752.17
553.09
100
417.4
350.00
280.00
1000
kg
cum
cum
1000
1hour
day
day
5565.00
312.53
372.38
1065.13
553.09
350.00
280.00
1000
cum
cum
cum
cum
nos
nos
440.75
137.51
186.19
170.42
182.52
420.00
560.00
0.11
2097.50
per cum
5565.00 1000
312.53 cum
372.38
1065.13
553.09
350.00
280.00
440.75
137.51
186.19
170.42
182.52
420.00
560.00
-3.00
5565.00
901.53
676.95
248.89
120
417.4
35.00
389.20
0.03
2789.00
per cum
BLD-CSTN4-8
79.2
0.44
0.5
0.16
0.33
1.2
2
kgs
cum
cum
cum
cum
days
days
BLD-CSTN4-8
79.20
0.44
0.50
0.16
0.33
1.20
2.00
kgs
cum
cum
cum
cum
days
days
0.11
2094.50
per cum
553.09 cum
5565.00 MT
280.00 each
580.75
2003.40
56.00
2640.15
per 10sqm
2640.15 cum
320.00 day
280.00 day
554.43
300.80
448.00
0.02
1303.25
per 10sqm
Range : JR Gudem
Section : Mulagalampalli
Beat :Antharvedigudem
Measurments
Sl.No
Description of Item
No
Contents
Rate
L
B
D
1
2
3
4
5
6
7
8
Earthwork excavation for structures as per the drawing and technical
specification clause 305.1 including setting out, construction of shoring and
1
13.00
2.10
1.50
40.95
2.50
0.60
0.75
2.25
2.00
0.60
0.75
1.80
13.00
0.60
0.45
3.51
v) Apron D/S
4.00
2.50
0.45
4.50
4.00
0.60
0.60
1.44
54.45
1019.20
C.C.(1:4:8) using 40 mm HBG metai concrete mixture for all works including
cost and conveyance of all material and all labour charges etc.complete but
excluding seignorage charges.
i) Main wall
13.00
2.10
0.30
8.19
2.50
0.60
0.15
0.45
2.00
0.60
0.15
0.36
13.00
0.60
0.15
1.17
v) Apron D/S
4.00
2.50
0.15
1.50
4.00
0.60
0.15
0.36
12.03
Cum
3
2789.00
per cum
Below GL
Above GL
13.00
2.10
13.00 2.10+0.90
1.20
32.76
1.80
35.10
2
ii) Suopport wallsD/s BelowGL
Above GL
2.50
0.60
0.60
1.50
2.50
0.60 0.00+1.80
2.70
2
iii) Side walls D/s Below GL
Above GL
v) Cutoff wall
2.00
0.60
0.60
1.44
2.00
0.60
0.50
1.20
4.00
2.50
0.45
0.934
75.634
Cum
3 (a)
2097.50
per cum
13.00
0.60
0.30
2.34
4.00
2.40
0.30
2.88
5.22
2094.50
per cum
Sides U/s
Sides D/s
Top
13.00
---
1.80
23.40
13.00
---
2.16
28.08
13.00
---
0.90
11.70
D/s Sides
2X2
2.50
---
0.00+1.80
9.00
2
Top
iii) Side walls
U/s Sides
2.50
---
0.60
3.00
2X2
2.00
---
0.50
4.00
2.00
---
0.60
2.40
Top
62.14
1303.25
Contingencies
---
---
---
---
--TOTAL:
5550
33552
158643
10933
8098
2224
219000
Account
VAT
S_No
Item
Qty
Rate
Sand
1
2
3
4
5
6
7
8
9
10
11
Earth work
CC(1:4:8)
CC(1:4:8)
RR(1:6)
RR(1:6)
RR(1:6)
RR(1:6)
RR(1:6)
RR(1:6)
RR(1:6)
RR(1:6)
12 Contingencies
Total
VAT
Seignorage
Tobe deducted
52.17
8.58
2.31
11.44
11.44
11.44
11.44
11.44
11.44
8.03
0.7
5%
1019.2
2789
2789
2097.5
2097.5
2097.5
2097.5
2097.5
2097.5
2097.5
2094.5
Seignorage
Amount
RR
5317
0
0
23930 101.70
0.00
6443 27.38
0.00
23995 99.44 101.42
23995 99.44 101.42
23995 99.44 101.42
23995 99.44 101.42
23995 99.44 101.42
23995 99.44 101.42
16843 69.80 71.19
1466
4.35
4.43
197969
31
198000
5014.00
5952.00
10966.00
CR
BS
0
0.00
0.00
74.90
74.90
74.90
74.90
74.90
74.90
52.57
3.27
0
0.00
0.00
92.84
92.84
92.84
92.84
92.84
92.84
65.17
4.06
Cement
0
368.34
99.17
240.10
240.10
240.10
240.10
240.10
240.10
168.53
14.69
40 mm
0
203.40
103.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Sand
0.00
673.44
230.50
608.69
608.69
608.69
608.69
608.69
608.69
427.26
30.80
5014.00
VAT
5014.00
0.00
154.44
41.58
151.01
151.01
151.01
151.01
151.01
151.01
106.00
9.24
RR
0.00
0.00
0.00
286.00
286.00
286.00
286.00
286.00
286.00
200.75
12.50
CR
0.00
0.00
0.00
251.68
251.68
251.68
251.68
251.68
251.68
176.66
11.00
BS
0.00
0.00
0.00
91.52
91.52
91.52
91.52
91.52
91.52
64.24
4.00
Cement 40 mm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
386.10
103.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
0.00
540.54
145.53
780.21
780.21
780.21
780.21
780.21
780.21
547.65
36.74
5952.00
5952.00