COMPOSITE ELEVATED TANK SPECIFICATION

PART 1 GENERAL 1.1 DESCRIPTION 1. SCOPE OF WORK: The work to be performed under these specific tions inc!udes furnishin" !! ! bor# m teri !s# too!s nd e$uipment necess r% to desi"n# f bric te# construct# inspect nd test we!ded stee! e!e& ted w ter stor "e t nk supported on concrete support structure# inc!udin" the found tion nd ccessories s shown on the dr win"s nd specified herein. The work sh !! !so inc!ude !! ! bor# m teri !s nd e$uipment necess r% to c!e n# p int nd disinfect the w ter stor "e t nk s specified herein. '. RE()TE* WORK: The work sh !! !so inc!ude !! ! bor# m teri !s nd e$uipment necess r% to construct the site impro&ements nd site pipin" s shown on the dr win"s nd specified herein. +. *ESCR,PT,O-: The t nk nd support structure sh !! be the composite e!e& ted t nk st%!e s desi"ned nd constructed b% C./,. The t nk sh !! be of !! we!ded stee! desi"n nd h &e dome roof# str i"ht sides nd cone bottom. The support structure sh !! be of concrete desi"n. The concrete support structure sh !! be confi"ured so th t concrete t nk f!oor with stee! !iner p! te supports the w ter inside the support structure w !!. Suspended stee! t nk f!oor confi"ur tions wi!! not be !!owed. 1.2 PRE-QUALIFICATION OF CONTRACTOR .ids wi!! on!% be ccepted from e0perienced contr ctors who h &e successfu!!% comp!eted t !e st ten composite e!e& ted t nks of e$u ! or "re ter c p cit% in the ! st fi&e %e rs. E ch bidder sh !! pro&ide !ist of t !e st ten such pro1ects st tin" !oc tion# comp!etion d te# cont ct n mes nd te!ephone numbers. The composite e!e& ted t nk desi"n# concrete support structure construction nd we!ded stee! t nk f bric tion nd construction sh !! be performed b% the Contr ctor nd sh !! not be subcontr cted. 1.3 STANDARDS, CODES AND GUIDES The fo!!owin" st nd rds nd specific tions sh !! be used if the edition is not specified.
C., CET SPEC P "e 1 of '2

re referenced. The ! test edition

23'43'515

)WW) *155 St nd rd for We!ded Stee! T nks for W ter Stor "e )WW) *15' St nd rd for P intin" Stee! W ter Stor "e T nks )WW) C67' St nd rd for *isinfection of W ter Stor "e F ci!ities )SCE 8 )C, +51 )C, +57 )C, +56 )C, +14 -SF 61 OS:) SSPC;P)1 1.4 9inimum *esi"n (o ds for .ui!din"s nd Other Structures St nd rd Specific tions for Structur ! Concrete :ot We ther Concretin" Co!d We ther Concretin" .ui!din" Code Re$uirements for Structur ! Concrete *rinkin" W ter S%stem Components Occup tion ! S fet% nd :e !th St nd rds P int )pp!ic tion Specific tion

OWNER OR ENGINEER SUPPLIED INFORMATION The Owner or En"ineer sh !! pro&ide the fo!!owin" inform tion with the bid documents: 1. Soi!s in&esti" tion report th t is specific to the site nd prep red b% $u !ified <eotechnic ! En"ineer. The soi!s in&esti" tion report sh !! inc!ude determin tion of the Site C! ss. The determin tion of the Site C! ss sh !! be in ccord nce with )WW) *155;57. Summ r% of F)) re$uirements such s hei"ht restrictions# obstruction m rkin" or obstruction !i"htin". The e!e& ted w ter stor "e t nk m % ffect n &i" b!e irsp ce. The Owner or En"ineer sh !! fi!e Form 8265;1 with the F)) =http:33forms.f ."o&3> to determine re$uirements.

'.

1.5

SU MITTALS 1. E ch Contr ctor sh !! submit with their propos ! sketch of the composite e!e& ted t nk showin" m 1or dimensions nd p! te thicknesses. ) sketch of the found tion showin" pre!imin r% dimensions nd ppro0im te $u ntities of concrete nd reinforcin" stee! sh !! !so be pro&ided with the propos !. Prior to construction# the contr ctor sh !! furnish construction dr win"s of the t nk# concrete support structure nd found tion se !ed b% Profession ! En"ineer !icensed in the St te of ?????????????.

'.

C., CET SPEC

P "e ' of '2

23'43'515

+. 2.

We!der@s certific tions sh !! be submitted in ccord nce with )WW) *155 upon re$uest. ) summ r% of the desi"n for the found tion# support structure nd the t nk# sh !! be pro&ided prior to construction. ,nc!ude the desi"n b sis# !o din" nd resu!ts showin" conform nce with the specific tions nd the referenced codes nd st nd rds. The desi"n sh !! be se !ed b% Profession ! En"ineer !icensed in the St te of ?????????????. Pro&ide n oper tin" nd m inten nce m nu ! cont inin" oper tin" instructions# m inten nce instructions# s;bui!t construction dr win"s# c!e nin" nd p intin" instructions# " "e t b!e nd c t !o" cuts of e$uipment supp!ied.

7.

PART 2 PRODUCTS 2.1 GENERAL Furnish n e!e& ted w ter stor "e t nk s shown on the dr win"s nd s specified in this section. The t nk c p cit%# he d r n"e nd the hei"ht to TC( sh !! be s shown on the dr win"s. T nk net c p cit% sh !! be ????????? " !!ons. 2.2 MATERIALS 1. '. 9 teri !s nd m teri ! tests used for reinforced concrete sh !! conform to )C, +14 e0cept s modified herein. The s me br nd nd t%pe of cement# nd ""re" te from consistent source sh !! be used throu"hout the construction of the concrete support structure to m int in uniformit% of co!or. The minimum specified compressi&e stren"th of concrete sh !! be 2555 psi. The specified compressi&e stren"th of concrete used for the desi"n of concrete components sh !! not e0ceed 7555 psi. *eformed b r reinforcin" stee! sh !! conform to )ST9 )617 "r de 65 or )ST9 )856 "r de 65. P! in we!ded wire reinforcement sh !! conform to )ST9 )147. 9 teri !s nd m teri ! tests for the stee! t nk nd !! t nk components sh !! comp!% with the ! test edition of )WW) *155 e0cept s modified herein.

+.

2.

7.

2.3

DESIGN CRITERIA

2.3.1 GENERAL 1. *e d !o d sh !! be the estim ted wei"ht of !! perm nent construction nd fittin"s. The unit wei"ht of stee! sh !! be considered s 2A5 pounds per
P "e + of '2 23'43'515

C., CET SPEC

cubic foot nd the unit wei"ht of concrete sh !! be t ken s 122 pounds per cubic foot. '. +. 2. W ter !o d sh !! be the wei"ht of the w ter when the t nk is fi!!ed to the o&erf!ow. The unit wei"ht of w ter sh !! be 6'.2 pounds per cubic foot. Snow !o d sh !! be ???? pounds per s$u re foot# in )WW) *155. ccord nce with

Wind !o ds sh !! be b sed on b sic wind speed# B# of ????? mph nd e0posure c te"or% C in ccord nce with )SCE 8 for C te"or% ,B =essenti ! f ci!it%> structures. :oriCont ! nd &ertic ! seismic !o ds sh !! be b sed on m 0imum considered e rth$u ke spectr ! response cce!er tion t short periods# SS# of ???????# nd t period of 1.5 second# S 1# of ??????? in ccord nce with )SCE 8 for C te"or% ,B =essenti ! f ci!it%> structures. The site c! ssific tion sh !! be ???? s determined b% the soi!s in&esti" tion report. The structur ! effects of the pp!ied !o ds sh !! be considered with the !o ds defined ccordin" to )SCE 8. The fo!!owin" !o d combin tions re re$uired for stren"th desi"n: 1.2* D 1.6F D 1.6=(rD(> 1.'* D 1.'F D 1.6=(rD(> D 1.6W 1.'* D 1.'F D 1.5E 5.A* D 1.6W 5.A* D 1.5F D 1.5E The fo!!owin" !o d combin tions re re$uired for !!ow b!e stress desi"n: * D F D (r D ( * D F D (r D ( D W * D F D 5.8E *DW * D F D 5.8E

7.

6.

2.3.2 FOUNDATION 1. '. The desi"n of the found tion sh !! conform to )C, +14 e0cept s modified herein. The found tion desi"n sh !! be b% the Contr ctor nd sh !! conform to the recommend tions "i&en in the soi!s in&esti" tion report. The found tion depth sh !! be s re$uired for the e0treme frost penetr tion shown in )WW) *155.

C., CET SPEC

P "e 2 of '2

23'43'515

+.

E rth co&er sh !! be minimum of ????? feet o&er top of pipe in ccord nce with )WW) *155. )n% pipe p ssin" throu"h the found tion which does not meet this minimum co&er re$uirement# sh !! be proper!% insu! ted unti! such minimum co&er is chie&ed. En!ess modified b% the <eotechnic ! En"ineer# the found tion sh !! be siCed to pro&ide s fet% f ctor of +.5 " inst the u!tim te soi! be rin" c p cit% in ccord nce with )WW) *155. For dri&en pi!e the s fet% f ctor sh !! be t !e st '.5. S fet% f ctors m % be reduced to '.'7 nd 1.7 respecti&e!% when direct &ertic ! !o ds re combined with wind or seismic. The found tion sh !! be siCed such th t there is minimum s fet% f ctor of 1.7 " inst o&erturnin" for wind or seismic e&ents usin" ser&ice !o d combin tions.

2.

7.

2.3.3 CONCRETE SUPPORT STRUCTURE 1. '. +. The desi"n of the concrete support structure sh !! conform to )C, +14 e0cept s modified herein. The minimum w !! thickness sh !! not be !ess th n 4 inches e0c!usi&e of rustic tions or other rchitectur ! re!ief. The concrete support structure w !!s sh !! h &e minimum reinforcement r tio of 5.17F &ertic !!% nd 5.'5F horiCont !!%. Where -o. 6 or ! r"er b rs re used or where the seismic desi"n c te"or% determined in ccord nce with )SCE 8 is *# E or F# the minimum reinforcement r tio sh !! be 5.'7F in the &ertic ! nd horiCont ! directions. The concrete support structure w !!s sh !! h &e reinforcement p! ced in two ! %ers in e ch direction with 75F of the minimum re$uired stee! in e ch ! %er. The &ertic ! !o d c p cit% for w !!s sh !! be determined usin" stren"th desi"n methods. For w !!s without tr ns&erse tie reinforcement the &ertic ! !o d c p cit% of the concrete sh !! be determined b%# Puw G 5.+6.wf Hc)w For w !!s with tr ns&erse tie reinforcement s re$uired for the use of compression reinforcement in ccord nce with )C, +14# the &ertic ! !o d c p cit% sh !! be determined b%# Puw G 5.22.wIf Hc D 5.7'=f%;5.47f Hc>J)w Where: Puw G u!tim te c p cit% of the w !! .w G 45hw3*w# but not "re ter th n 1.5 hw G w !! thickness# e0c!usi&e of rustic tions or rchitectur ! re!ief
C., CET SPEC P "e 7 of '2 23'43'515

2.

7.

*w f @c f% )w 6.

G outside di meter of support structure G specified concrete stren"th G specified %ie!d stren"th of reinforcement G r tio of re of !on"itudin ! stee! to re of w !! G w !! re e0c!usi&e of rustic tions or rchitectur ! re!ief

:oriCont ! reinforcement sh !! be pro&ided to resist the o& !!in" of the w !! due to wind pressure. The stren"th desi"n wind o& !!in" moment per foot of hei"ht sh !! be determined b%# 9h G 1.6K5.57'pC*w' Where: pC G $C< in ccord nce with )SCE 8 *w G outside di meter of support structure

8.

The concrete support structure w !!s sh !! be desi"ned to resist in p! ne she r in ccord nce with )C, +14. The effect of openin"s sh !! be considered in the she r desi"n. Openin"s in the concrete support structure w !!s th t re !ess th n or e$u ! to '2 inches nd re iso! ted do not re$uire be m nd co!umn n !%sis. ,so! ted openin"s sh !! h &e c!e r dist nce between openin"s e$u ! to 5.87 times the cumu! ti&e width of d1 cent openin"s. )ddition ! reinforcement h &in" n re of not !ess th n 1.' times the re of interrupted reinforcement sh !! be distributed e$u !!% to either side of openin"s. Openin"s sh !! h &e minimum of one -o. 7 reinforcin" b r p! ced di "on !!% in e ch corner. )!! reinforcin" sh !! be fu!!% de&e!oped be%ond the openin". Openin"s ! r"er th n '2 inches or combin tions of openin"s th t re not iso! ted sh !! be desi"ned usin" n effecti&e be m nd co!umn n !%sis. E ch side of the openin" sh !! be desi"ned s tied reinforced concrete co!umn in ccord nce with )C, +14. A.1 The co!umn sh !! be desi"ned for the &ertic ! !o d pp!ied to h !f the openin" width p!us the co!umn width. The effecti&e width of the support structure w !! used for the co!umn sh !! not e0ceed# ='D .d324>3hw Where: .d G openin" width hw G w !! thickness# e0c!usi&e of n% rchitectur ! re!ief A.' The effecti&e unsupported co!umn !en"th =k!> for openin"s sh !! not be !ess th n 5.47:d# where :d is the openin" hei"ht. The co!umn sh !! be considered non;sw % co!umn. : d sh !! be !ess th n or e$u ! to 1' times the support w !! thickness to ensure th t the
P "e 6 of '2 23'43'515

4.

A.

C., CET SPEC

co!umn rem ins non;s!ender b% )C, +14. 9ono!ithic pi! sters m % be dded on the interior of the support w !! d1 cent to the openin" to &oid s!enderness effects nd for ddition ! co!umn stren"th. A.+ :oriCont ! reinforcement sh !! be pro&ided in the be ms bo&e nd be!ow openin"s. The reinforcement sh !! be pro&ided within hei"ht of + times hw. The reinforcement pro&ided sh !! not be !ess th n# )s G 5.12Puw.d3=Lf%> Where: Puw G f ctored 0i ! w !! !o d in !b per unit of circumference .d G openin" width L G reduction f ctor G 5.A for tension f% G specified %ie!d stren"th of reinforcement A.2 The corners of the openin"s sh !! be reinforced with di "on ! b rs. The re of b rs pro&ided sh !! be e$u ! to the minimum horiCont ! reinforcement r tio times the co!umn re . ) minimum of two -o. 7 reinforcin" b rs sh !! be p! ced di "on !!% in e ch corner. Reinforcement pro&ided round openin"s sh !! be fu!!% de&e!oped. Co!umn reinforcement sh !! e0tend the "re ter of h !f the openin" hei"ht or the de&e!opment !en"th bo&e nd be!ow the openin" or be de&e!oped into the found tion. :oriCont ! reinforcement sh !! e0tend the "re ter of the de&e!opment !en"th p st the midpoint of the co!umn or minimum of h !f de&e!opment !en"th be%ond the co!umn.

A.7

15.

(oc ! effects t openin"s sh !! be considered when the openin" is !oc ted !ess th n h !f the openin" width bo&e the found tion. The found tion sh !! be desi"ned to de$u te!% de&e!op the openin" reinforcement nd redistribute !o ds cross the unsupported width.

2.3.4 CONCRETE TO TANK INTERFACE 1. The concrete to t nk interf ce re"ion inc!udes those portions of the concrete support structure nd we!ded stee! t nk th t re ffected b% the tr nsfer of forces between the concrete t nk f!oor# rin"be m# t nk cone bottom nd support structure w !!. The desi"n of the interf ce re"ion sh !! be b sed on n n !%sis usin" finite e!ement or simi! r n !%sis which c n ccur te!% mode! the inter ction of the intersectin" e!ements. The n !%sis sh !! pro&ide resu!ts inc!udin" the she r# moment nd compression or tension c used b% the intersectin" e!ements in the interf ce re"ion. The n !%sis sh !! consider the tr nsfer of forces from the intersectin" e!ements under !! nticip ted !o d conditions. These conditions sh !!
P "e 8 of '2 23'43'515

'.

C., CET SPEC

inc!ude the eccentricit% of !o ds# restr int effects c used b% shrink "e nd temper ture differenti !s# !on" term effects c used b% concrete creep# nd the effect of nchor "e of the we!ded stee! t nk to the concrete. +. The "eometr% of the interf ce re"ion sh !! pro&ide positi&e dr in "e t the top of the w !! nd rin"be m. Condens tion or precipit tion sh !! not be !!owed to ccumu! te in this re . The "eometr% of the t nk sh !! be est b!ished such th t the rin"be m pro&ided t the top of the w !! is compression member with "r &it% !o ds ctin" !one =* D F>. ,n this !o din" condition the compressi&e stress in the rin"be m sh !! be not !ess th n 75 psi to minimiCe cr ckin" in the interf ce re"ion. -o direct tension in the rin"be m under this !o din" condition wi!! be !!owed. The m 0imum compression in the rin"be m sh !! be no "re ter th n 5.14fH C psi. The rin"be m sh !! be reinforced s compression member with minimum !on"itudin ! reinforcement r tio of 5.75F. Tie reinforcement sh !! be pro&ided in ccord nce with )C, +14 for compression members s minimum. )ddition ! tie reinforcement sh !! be pro&ided if re$uired b% the n !%sis of the interf ce re"ion. When concrete dome supports the t nk contents# it sh !! not be !ess th n A inches thick# or !ess th n the me n spheric ! r dius of the dome di&ided b% 75. The minimum reinforcement r tio sh !! be 5.+6F in ortho"on ! directions. The reinforcement sh !! be p! ced in two ! %ers with 75F of the minimum re$uired stee! in e ch ! %er.

2.

7.

6.

2.3.5 WELDED STEEL TANK 1. The desi"n for !! sections of the stee! t nk sh !! be per the unit tension3compression stresses !!owed for m teri ! c! sses !isted in the ! test edition of )WW) *155. *esi"nin" per Section 12 of )WW) *155 sh !! not be permitted. The t nk sh !! h &e domed stee! roof to minimiCe w ter pondin" on the roof p! tes. The dome roof !so !!ows &isu ! confirm tion of roof ccessories for t nk securit% nd structur ! inte"rit% b% !!owin" obser& tion of the roof ppurten nces. The roof r dius sh !! be between 5.4 nd 1.' times the t nk di meter. Roof p! tes nd supportin" structure sh !! be desi"ned to support the fu!! snow !o d or 17 psf s minimum. For re s of the stee! t nk where the w ter is supported b% stee! cone# the cone p! te thickness m % be determined usin" non!ine r buck!in" n !%sis. ) non!ine r buck!in" n !%sis m % on!% be performed for !i$uid fi!!ed cones with thickness;to;r dius r tio "re ter th n 5.5515 nd !ess th n 5.55+5. The n"!e of the cone me sured from the 0is of re&o!ution to the p! te surf ce sh !! not e0ceed 65 de"rees. ,f non!ine r buck!in"
P "e 4 of '2 23'43'515

'.

+.

C., CET SPEC

n !%sis is not performed# the cone p! te thickness sh !! be determined in ccord nce with the she!! st bi!it% formu! s pro&ided in )WW) *155. +.1 +.' The non!ine r buck!in" n !%sis sh !! inc!ude the effects of m teri ! nd "eometric non;!ine rities# residu ! stresses nd imperfections. The imperfection considered in the n !%sis sh !! h &e m "nitude of not !ess th n 5.52=Rt>13'# where R is the r dius norm ! to the p! te me sured to the 0is of re&o!ution# nd t is the corroded p! te thickness. The !en"th of the imperfection sh !! be e$u ! to or !ess th n 2=Rt>13' nd be ppropri te for the t%pe of construction used for the cone. The !oc tion nd sh pe of the imperfection sh !! produce the !owest critic ! buck!in" stress. The minimum specified %ie!d stren"th of the cone p! te m teri ! sh !! be e$u ! to or "re ter th n +6 ksi. The %ie!d stren"th used for the n !%sis sh !! be no "re ter th n 25 ksi when the m teri ! of construction h s minimum specified %ie!d stren"th "re ter th n 25 ksi. P! te thickness used for the cone p! tes sh !! be no !ess th n 45F of th t re$uired b% the she!! st bi!it% formu! s pro&ided in )WW) *155 when the thickness to r dius r tio is "re ter th n or e$u ! to 5.5512+. Cone p! te thickness sh !! be no !ess th n 85F of th t re$uired b% )WW) *155 when the thickness to r dius r tio is !ess th n 5.5512+. The non!ine r buck!in" n !%sis sh !! demonstr te th t the pro&ided cone p! te thickness h s f ctor of s fet% of t !e st '.5 " inst buck!in" in the corroded condition.

+.+

+.2

+.7

2.

The concrete t nk f!oor sh !! be co&ered with we!ded stee! !iner to pro&ide w ter ti"ht bound r%. The minimum thickness of the !iner p! te sh !! be 132;inch. (iner p! tes m % be p! ced direct!% on the concrete when the !iner p! tes re formed to m tch the sh pe of the t nk f!oor. (iner p! tes th t re not formed to m tch the sh pe of the t nk f!oor sh !! h &e the sp ce between the !iner p! tes nd the t nk f!oor comp!ete!% fi!!ed with f!ow b!e "rout. En!ess otherwise noted# t 1unctions in p! tes where meridion ! forces re discontinuous such s cone to c%!inder 1unctions# tension or compression rin" m % be re$uired to resist the r di ! forces "ener ted. ,n these re"ions# the !!ow b!e stresses sh !! not e0ceed those referred to in )WW) *155. 7.1 7.' Tension rin" stresses sh !! not e0ceed the !esser of 17#555 psi or one h !f of the minimum specified %ie!d of the p! te m teri !. Compression rin" stresses sh !! not e0ceed 17#555 psi.
P "e A of '2 23'43'515

7.

C., CET SPEC

7.+

To determine the stresses in the rin" due to discontinuit% forces# the t nk p! tes immedi te!% d1 cent to the discontinuit% m % be ssumed to p rticip te for dist nce of 5.84=Rt> 13'. !! t nk p rts sh !! be in ccord nce with

6. 8. 2.4

9inimum p! te thickness of )WW) *155.

-o corrosion !!ow nce is re$uired.

APPURTENANCES

2.4.1 E!TERIOR DOORS 1. Pro&ide one +6;inch 0 42;inch commerci ! stee! door# 1MN thick# 2MN 16; " u"e 1 mb# industri ! dut% t%pe door c!oser nd utom tic door bottom. *oor to be )9WE(* series 1755 se m!ess door# with series 255 fr me# or ppro&ed e$u !. *oor sh !! be minimum 16;" u"e nd insu! ted with pre;formed po!%st%rene insu! tion. *oor sh !! be thorou"h!% c!e ned# phosph ted nd finished with one co t of b ked;on rust inhibitin" primer in ccord nce with )ST9 .118 nd )ST9 *18+7. Pro&ide three =+> fu!! mortise# 7 knuck!e hin"es# 2ON 0 2ON minimum. :in"es sh !! be stee!# phosph ted nd primed co ted for finish p intin". Pro&ide comp!ete nd function ! door !ockset nd tumb!er;t%pe !ock# ke%ed to the owner@s e0istin" s%stem. *oor p intin" sh !! conform to the t nk e0terior p int s%stem. Pro&ide one m nu !!% oper ted ????@ wide 0 ????@ hi"h o&erhe d stee! ro!!in" door !oc ted in the b se of the support structure. *oor s! ts sh !! be formed of '';" u"e stee! with end !ocks nd desi"ned for minimum '5; psf wind !o d. Stee! curt in construction with hi"h;"r de Cinc co tin" per )ST9 )17+ hot process# nd phosph te co tin" for p int dhesion. Pro&ide ir b ff!e for entire upper b rre!# curt in bottom b r with brush se !in"# we ther end !ock on !tern te s! ts nd se !in" strips for we ther ti"htness. The door sh !! be e$uipped with s!ide bo!t !ocks on both sides of interior bottom. *oor p intin" sh !! conform to the t nk e0terior p int s%stem. O&erhe d door !oc tion sh !! be s shown on the dr win"s. Pro&ide two ='> 4;inch di meter stee! s fet% posts outside of the o&erhe d door openin" to protect the door from &ehic!e imp ct. S fet% posts sh !! be fi!!ed with concrete.

'.

+.

2.4.2 PIPING " PRESSURE RELIEF 1. ) ??????;inch di meter in!et3out!et pipe sh !! be pro&ided from ne r the !ow point of the t nk f!oor to f! n"ed connection t the b se of the support structure. The in!et3out!et pipe sh !! be )ST9 )'25;+52( m teri !. Pipin" sh !! conform to )ST9 )884 nd we!ded fittin"s sh !! conform to )ST9 )882. )!! pipe;to;pipe 1oints sh !! be we!ded. The pipe sh !! h &e minimum thickness of schedu!e 15S but not !ess th n +316;
P "e 15 of '2 23'43'515

C., CET SPEC

inch. Pro&ide st in!ess stee! e0p nsion 1oint ne r "r de to ccommod te differenti ! mo&ements between the in!et3out!et pipe nd concrete support structure. The in!et3out!et pipe sh !! be tt ched to the support structure with " !& niCed stee! br ckets sp ced no more th n '5 feet p rt. '. ) ??????;inch di meter o&erf!ow pipe e$uipped with n nti;&orte0 entr nce sh !! be pro&ided. The o&erf!ow pipe within the support structure sh !! be )ST9 )'25;+52( m teri !. St in!ess stee! pipin" sh !! conform to )ST9 )884 nd we!ded fittin"s sh !! conform to )ST9 )882. The pipe sh !! h &e minimum thickness of schedu!e 7S but not !ess th n 134;inch. ,nside the t nk# the o&erf!ow pipe sh !! conform to )ST9 )7+ <r de . nd h &e minimum thickness of 132;inch. )!! pipe;to;pipe 1oints sh !! be we!ded. The o&erf!ow sh !! be tt ched to the ccess tube nd support structure# nd disch r"e t point ppro0im te!% two feet bo&e "r de !e&e! onto sp! sh b!ock. The tt chment to the support structure sh !! be with " !& niCed stee! br ckets sp ced no more th n '5 feet p rt. The end of the o&erf!ow sh !! be co&ered with -o. 2 mesh screen. ) +;inch di meter dr in pipe sh !! penetr te the t nk t the !ow point of the t nk f!oor. The dr in pipe sh !! be fitted with thre ded p!u" nd h nd!e inside the t nk nd h &e w !! thickness e$u ! to or "re ter th n st nd rd wei"ht pipe. The dr in pipe sh !! conform to )ST9 )7+ <r de . nd !! pipe;to;pipe 1oints sh !! be we!ded. ) -SF ppro&ed f!e0ib!e pipe sh !! be used to connect the dr in pipe to the o&erf!ow pipe. ) minimum of one !uminum pressure;& cuum &ent ne r the center of the roof sh !! be pro&ided. The &ent=s> sh !! be siCed to h nd!e pressure differenti ! c used b% w ter enterin" or !e &in" the t nk t m 0imum r te. The m 0imum in!et r te is ?????? "pm# the m 0imum withdr w ! r te is ????? "pm. The open re of the o&erf!ow sh !! not be considered s &entin" re . The &ent=s> sh !! h &e insect screens nd sh !! be desi"ned to re!ie&e n% pressure or & cuum in the e&ent the screen frosts o&er or is otherwise c!o""ed nd sh !! be e si!% dism nt!ed for c!e nin". The &ent=s> sh !! be se!f;correctin". The pressure;& cuum &ent m % be mounted on the e0h ust h tch.

+.

2.

2.4.3 ACCESS, LADDERS " PLATFORMS 1. Pro&ide " !& niCed stee! ! dder s%stem tt ched to the support structure which e0tends from "r de to the w !kw % nd p inters ccess m nho!e. This ! dder s%stem sh !! consist of continuous str i"ht run ! dder with " !& niCed stee! side step rest p! tforms pro&ided t no more th n +5 feet inter& !s. This ! dder sh !! be e$uipped with ! dder s fet% c b!e. Pro&ide p inted stee! ! dder on the interior of the ccess tube from the w !kw % to the t nk roof. This ! dder sh !! be e$uipped with ! dder s fet% c b!e.
P "e 11 of '2 23'43'515

'.

C., CET SPEC

+. 2.

Pro&ide " !& niCed stee! ! dder from the w !kw % to the t nk bottom m nho!e. This ! dder sh !! be e$uipped with ! dder s fet% c b!e. The ! dder s fet% c b!e sh !! be n OS:) ppro&ed# " !& niCed s%stem s m nuf ctured b% *., ,ndustries# or e$u !. Pro&ide remo& b!e e0tension for e ch ! dder th t does not e0tend 24 inches be%ond the w !kw % !e&e!. The owner sh !! be supp!ied with ' h rnesses# ' ! n% rds nd ' s!ee&es. Pro&ide " !& niCed stee! w !kw % immedi te!% be!ow the t nk e0tendin" from the support structure to the ccess tube. The w !kw % sh !! be minimum of 24 inches wide with 2';inch hi"h h ndr i!s. Pro&ide n ccess tube !oc ted on the &ertic ! center!ine of the t nk. The ccess tube sh !! h &e minimum di meter of 24 inches. The ccess tube sh !! e0tend be!ow the t nk f!oor to the w !kw % !e&e! to pro&ide continuous ! dder ccess from the w !kw % to the t nk roof.

7.

6.

2.4.4 MAN#OLES, #ATC#ES " VENTS 1. One '2;inch 0 +6;inch p inters ccess m nho!e3&enti! tion !ou&er openin" sh !! be pro&ided "i&in" ccess to the e0terior p inters r i! !oc ted t the top of the concrete support structure. This openin" sh !! h &e remo& b!e !uminum r inproof !ou&er with bird screen to pro&ide &enti! tion for the concrete support structure. The !ou&er sh !! be ccessib!e from the w !kw %. One +5;inch di meter t nk bottom m nho!e sh !! be pro&ided in the t nk f!oor with ccess b% ! dder from the w !kw %. Two +5;inch di meter stee! h tches sh !! be supp!ied. One sh !! be t the top of the ccess tube with ch in# inside h nd!e nd 6;inch !uminum &ent. The other sh !! be d1 cent to the ccess tube for entr% into the t nk nd sh !! h &e h nd!e nd h sp. The h tch openin"s sh !! h &e curb 2 inches hi"h nd the co&er sh !! h &e downw rd o&er! p of ' inches. One '2;inch di meter f! n"ed e0h ust h tch sh !! be supp!ied# !oc ted d1 cent to the ccess tube nd so constructed th t n e0h ust f n m % be connected for &enti! tion durin" p intin". One '2;inch di meter p inters ccess m nho!e sh !! be pro&ided d1 cent to e ch interior p inters r i! "i&in" ccess from the roof. The '2;inch di meter e0h ust h tch m % be positioned to ser&e s one of these ccess m nho!es.

'. +.

2.

7.

2.4.5 PAINTERS RAILS Pro&ide p inters r i!s nd n interior inspection r i! s shown on the dr win"s nd specified herein:
C., CET SPEC P "e 1' of '2 23'43'515

1.

,nterior P inters R i!s. The r i!s sh !! be tt ched to the underside of the roof. Pro&ide one r i! ne r the center of the t nk nd one r i! ppro0im te!% 14 inches from the t nk she!!. ,f the s!ope dist nce between these two r i!s e0ceeds +' feet# pro&ide third r i! ne r midsp n. E0terior P inters R i!. The r i! sh !! be !oc ted ne r the top of the support structure nd be ccessib!e from the w !kw % &i the p inters ccess m nho!e3&enti! tion !ou&er. ,nterior ,nspection R i!. The r i! sh !! be !oc ted ne r the top of the support structure nd be ccessib!e from the w !kw %. The r i! nd support br ckets sh !! be " !& niCed.

'.

+.

2.4.$ ELECTRICAL ,nterior w terproof !i"ht sockets with ri"id conduit# wirin" nd switch sh !! be pro&ided inside the support structure nd ccess tube. There sh !! be one !i"ht !oc ted t the top of the ccess tube# one !i"ht t the !ower end of the ccess tube bo&e the w !kw % openin"# one !i"ht t e ch of the support structure ! dder rest p! tforms# nd one !i"ht t the b se of the support structure. Tot ! number nd !oc tion of !i"hts sh !! be s shown on the dr win"s. )!! wirin" sh !! be in conduit. The conduit nd wirin" sh !! termin te with 1unction bo0 in the b se of the tower. *up!e0 out!ets sh !! be inst !!ed s shown on the dr win"s. E!ectric ser&ice sh !! be pro&ided nd connected b% others. 2.4.% LIG#TNING PROTECTION Pro&ide !i"htnin" protection s%stem for the e!e& ted t nk structure nd n% roof mounted e$uipment th t m % be d m "ed b% !i"htnin". 9inimum re$uirements inc!ude two '4 str nd b% 12 " u"e copper conductors bonded to the stee! t nk 145 de"rees p rt. The conductors sh !! be f stened to the interior support w !! t + foot minimum sp cin"# nd sh !! termin te with buried 734 inch di meter b% 4 foot !on" copper c! d "round rods. (i"htnin" protection for obstruction !i"hts sh !! consist of n ir termin ! mounted on the support nd formed to fit round the fi0ture. The 13' inch di meter copper ir termin ! sh !! e0tend minimum of 15 inches bo&e the !i"ht fi0ture nd sh !! connect to copper conductor th t termin tes in bondin" p! te secured to the t nk roof. PART 3 E!ECUTION 3.1 GENERAL 1. )!! concrete formwork# p! cement nd conso!id tion sh !! comp!% with )C, +14 nd )C, +51 e0cept s modified herein. Concrete to!er nces sh !! comp!% with )C, 118 e0cept s modified herein.
P "e 1+ of '2 23'43'515

C., CET SPEC

'.

Concrete p! ced in co!d we ther conditions sh !! be protected to pre&ent d m "e in ccord nce with )C, +56. The co!d we ther protection sh !! continue unti! the concrete h s tt ined +7F of the specified compression stren"th nd the !!ow b!e temper ture differenti ! c n be m int ined. Concrete p! ced in hot we ther conditions sh !! be protected to pre&ent d m "e in ccord nce with )C, +57. Concrete sh !! be cured in conform nce with )C, +14. Curin" methods sh !! be continued for three d %s or unti! the concrete h s re ched 85F of the specified compressi&e stren"th. Concrete stren"th tests sh !! be t ken in ccord nce with )C, +14 e0cept s modified herein. Stren"th test s mp!es sh !! be t ken s the concrete is de!i&ered from the truck. )t !e st one stren"th test s mp!e sh !! be t ken for e&er% d % th t concrete is p! ced. )ddition ! stren"th test s mp!es sh !! be t ken for e&er% 75 %d + of concrete p! ced when the tot ! d i!% pour is !ess th n or e$u ! to 175 %d + nd for e&er% 175 %d + of concrete p! ced when the tot ! d i!% pour is "re ter th n 175 %d +. E ch stren"th test s mp!e sh !! pro&ide t !e st four mo!ded c%!inders. Two c%!inders wi!! be used to est b!ish the '4 d % stren"th in ccord nce with )C, +14. One c%!inder shou!d be tested t 8 d %s to supp!ement the '4 d % test. The fourth c%!inder sh !! be sp re for the other c%!inders. ,nspection nd testin" of the we!ded stee! t nk sh !! comp!% with )WW) *155 e0cept s modified herein.

+. 2.

7.

6.

8. 3.2

CONCRETE FOUNDATION 1. ,f# durin" e0c & tion# conditions re encountered which differ from those "i&en in the soi! report# ppropri te d1ustments to construction schedu!e nd price wi!! be ne"oti ted. )n in!et3out!et pipe e0tendin" 17 feet outside the found tion w !! sh !! be inc!uded s p rt of the found tion. )!! e0posed formed surf ces sh !! recei&e smooth s;c st form finish nd !! une0posed formed surf ces sh !! recei&e rou"h form finish. )!! e0posed unformed surf ces sh !! recei&e trowe! finish nd !! une0posed unformed surf ces sh !! recei&e f!o t finish. Pro&ide 6;inch concrete s! b t "r de in the b se of the support structure. The s! b sh !! be p! ced o&er comp cted structur ! b ckfi!! nd sh !! be reinforced with P2 reinforcin" stee! t 1';inch centers e ch w %. Pro&ide 13';inch e0p nsion m teri ! t the s! b to found tion intersection nd t f!oor penetr tions. Pro&ide s w;cut contro! 1oints t 14 foot m 0imum sp cin". The s! b sh !! be s!oped tow rds the f!oor dr in. The s! b sh !! be constructed in ccord nce with the ! test edition of )C, +51.
P "e 12 of '2 23'43'515

'. +.

2.

C., CET SPEC

3.3

CONCRETE SUPPORT STRUCTURE 1. The concrete support structure w !! sh !! be constructed usin" 1ump form process. The form s%stem sh !! use cur&ed# pref bric ted form se"ments of the ! r"est pr ctic ! siCe to minimiCe p ne! 1oints. Concrete pour hei"ht sh !! be minimum of 6 feet nd m 0imum of 1' feet. Form p ne!s sh !! e0tend the fu!! hei"ht of the concrete pour usin" on!% &ertic ! p ne! 1oints. Formwork sh !! be secured usin" bo!ts throu"h the w !! prior to concrete p! cement. Workin" p! tforms th t !!ow s fe ccess for inspection nd concrete p! cement sh !! be pro&ided. Form f cin" m teri ! sh !! be met !# or p!%wood f ced with p! stic or fiber"! ss. The form s%stem sh !! incorpor te uniform p ttern of &ertic ! nd horiCont ! rustic tions to pro&ide rchitectur ! re!ief to the e0terior w !! surf ce. Construction 1oints nd formwork p ne! 1oints sh !! be !oc ted in rustic tions. Formwork p ne! 1oints sh !! be se !ed usin" c!osures which combine with the form p ttern to pre&ent "rout !e k "e nd p ne! 1oint !ines. The top of e ch concrete p! cement sh !! be finished with "r de strip. The &ertic ! nd horiCont ! rustic tions sh !! be proportioned nd combined to imp rt s%mmetric ! rchitectur ! p ttern to the comp!eted structure. Support w !! formin" s%stem sh !! incorpor te se"mented concrete p! cement. Tempor r% &ertic ! bu!khe ds sh !! di&ide the w !! pour into se"ments th t re !ess th n sin"!e b tch of concrete. The bu!khe ds sh !! be !oc ted t rustic tions# br ced ri"id nd ti"ht to m int in &ertic ! !i"nment under concrete !o d. E ch se"ment sh !! be continuous!% p! ced with concrete to the fu!! form hei"ht. Tempor r% bu!khe ds sh !! not be remo&ed unti! d1 cent concrete is p! ced. Formwork sh !! rem in in p! ce unti! the concrete h s tt ined sufficient stren"th to support the form remo& ! nd subse$uent !o ds without d m "e to the structure. The Contr ctor sh !! b se formwork remo& ! procedures nd times on e r!%; "e test resu!ts. :owe&er# form mo&ements nd concrete p! cement sh !! be !imited to m 0imum of once per d %. *imension ! to!er nces for the concrete support structure sh !! be checked b% the contr ctor prior to e ch pour nd m int ined s the structure is bui!t. The to!er nces for construction of the concrete support structure re: 7.1 Support w !! & ri tion: Thickness QQQQQQQQ.. ;+F#D7F *i meter QQQQQQQQQ 5.2F R + inch Bertic ! !i"nment: in n% 15 feet of hei"ht Q..1 inch in n% 75 feet of hei"ht Q..' inch o&er tot ! hei"ht QQQQ..+ inch
P "e 17 of '2 23'43'515

'.

+.

2.

7.

C., CET SPEC

7.'

7.+ 7.2

T nk f!oor & ri tion: S! b f!oor thickness QQQQ. ;+F# D7F *ome f!oor thickness QQQ...;6F# D15F *ome f!oor r dius QQQQQ.1F (oc ! de&i tion from true QQ +32 inch =Esin" 7 foot sweep bo rd> (e&e! !i"nment & ri tion: From specified e!e& tion QQ. 1 inch From horiCont ! p! ne QQ.. 13' inch Offset between formwork: E0terior e0posed surf ces Q.. 134 inch ,nterior e0posed surf ces Q... 132 inch

6.

)!! e0terior e0posed surf ces sh !! recei&e smooth s;c st form finish. )!! e0posed surf ces sh !! be c!e ned to remo&e surf ce cont min tion. )!! tie ho!es nd concrete &oids ! r"er th n +32;inch sh !! be fi!!ed with co!or m tchin" "rout. The surf ce sh !! recei&e !i"ht brush b! st to enh nce the ppe r nce. )!! interior e0posed surf ces sh !! recei&e rou"h s;c st form finish. )!! tie ho!es nd concrete &oids ! r"er th n +32;inch sh !! be fi!!ed with co!or m tchin" "rout. -o ddition ! finishin" of the interior e0posed surf ces is re$uired. The top of the concrete t nk f!oor sh !! recei&e f!o t finish.

8.

4. 3.4

WELDED STEEL TANK 1. '. +. )!! we!din" sh !! comp!% with )WW) *155. )!! we!din" procedures# we!ders nd we!din" oper tors sh !! be $u !ified in ccord nce with )S9E Section ,S for the processes nd positions uti!iCed. To minimiCe corrosion nd rust st inin" on the underside of the roof# the roof p! te ! ps nd r fter;to;roof p! te se ms sh !! be se ! we!ded. The minimum thickness for se ! we!ded roof p! tes sh !! be 132 inch. The ed"es or surf ces of the pieces to be 1oined b% we!din" sh !! be prep red b% f! me cuttin"# p! sm rc cuttin"# rc "ou"in"# m chinin"# she rin"# "rindin" or chippin" nd sh !! be c!e ned of detriment ! oi!# "re se# sc !e nd rust. The ed"es of the pieces m % h &e protecti&e co tin" pp!ied to them which need not be remo&ed before the% re we!ded un!ess specific !!% prohibited b% the we!din" procedures. Fie!d nd shop we!din" m % be done b% the shie!ded met ! rc we!din" process# the " s met ! rc we!din" process# the f!u0 core rc we!din" process nd the submer"ed rc we!din" process.

2.

7.

C., CET SPEC

P "e 16 of '2

23'43'515

6.

P! tes nd component members of the t nk sh !! be ssemb!ed nd we!ded fo!!owin" erection methods which resu!t in minimum of distortion from we!d shrink "e. Surf ces to be we!ded sh !! be free from !oose sc !e# s! "# he &% rust# "re se# p int nd other forei"n m teri !. The contr ctor sh !! remo&e we!d of s! "# sp tter# burrs nd other sh rp or rou"h pro1ections. The surf ce of the we!d sh !! be suit b!e for subse$uent c!e nin" nd p intin" oper tions. Fu!! penetr tion butt;we!ded 1oints sh !! be inspected usin" the r dio"r phic e0 min tion method. The number nd !oc tion of the r dio"r phs nd the ccept nce criteri sh !! be s re$uired b% )WW) *155. ,nspection b% section ! se"ments is not !!owed. )!! !iner p! te we!ds sh !! be tested usin" the & cuum bo0 testin" method before the t nk is p inted. When the cone p! te thickness h s been determined usin" non!ine r buck!in" n !%sis# the contr ctor sh !! me sure the ctu ! imperfections of the cone p! tes fter we!din". The me surements sh !! be t ken in the meridion ! direction. 9e surements sh !! be t ken t e ch meridion ! we!d se m nd midw % between e ch meridion ! we!d se m. Where the ctu ! imperfections e0ceed the to!er nces ssumed in the n !%sis# further e& !u tion wi!! be re$uired nd correcti&e ction such s reworkin" the she!! or ddin" stiffeners m % be re$uired. ,n order to ssist in the m 0imiC tion of the p int@s !ifec%c!e# !! we!ds on the t nk e0terior sh !! be "round smooth nd b!ended to -)CE;* profi!e. )!! we!ds on the t nk interior sh !! be "round smooth nd b!ended to -)CE;* profi!e. We!ds on the interior dr% support co!umn c n rem in in n s;we!ded condition but must h &e profi!e de$u te for the specified p int s%stem. En"ineer3Owner reser&es the ri"ht to pro&ide third;p rt% inspection to ensure comp!i nce to this re$uirement.

8.

4.

A. 15.

11.

PART 4 COATINGS " FINIS#ES 4.1 GENERAL 1. )!! t nk p intin" nd p int testin" sh !! be in ccord nce with )WW) *15'# the Stee! Structures P intin" Counci! Specific tion SSPC;P)1# ppro&ed p int m nuf cturer specific tions nd s specified herein. E ch s%stem sh !! be from sin"!e m nuf cturer. The p int products specified re m nuf ctured b% Tnemec nd the products of other m nuf cturers m % be used sub1ect to re&iew nd ppro& ! b% the en"ineer. Pre;construction primers m % be uti!iCed in the f bric tion process to preser&e the b! st profi!e nd c!e n!iness. ,n the fie!d# we!d se ms nd
P "e 18 of '2 23'43'515

'.

+.

C., CET SPEC

br ded re s wi!! be c!e ned on spot b sis. The rem inin" sound primer wi!! be c!e ned to remo&e dirt nd other cont min nts. )fter c!e nin" the specified co tin" s%stem wi!! be pp!ied in its entiret% in the fie!d t the mi!! "es specified. 2. -o p int sh !! be pp!ied when the temper ture of the surf ce to be p inted is be!ow the minimum temper ture specified b% the p int m nuf cturer# or !ess th n 7 de"rees bo&e the dew point temper ture. P int sh !! not be pp!ied to wet or d mp surf ces or when the re! ti&e humidit% e0ceeds 47F un!ess !!owed b% m nuf cturer@s d t sheets. Fo!!ow the p int m nuf cturer@s recommend tions for the specific p int s%stem used. )fter erection nd before p intin"# remo&e s! "# we!d met ! sp! tter nd sh rp ed"es b% chippin" or "rindin". )!! surf ces th t h &e been we!ded# br ded or otherwise d m "ed# sh !! be c!e ned nd primed in the fie!d in ccord nce with the p int s%stem re$uirements. )!! re s b! sted in the fie!d sh !! be co ted the s me d % before n% rustin" occurs.

7.

6. 4.2

E!TERIOR COATING S&STEM 1. Shop Surf ce Prep r tion: Spot c!e n s re$uired to remo&e !! oi! nd "re se from the surf ce prior to b! st c!e nin". )!! surf ces sh !! be br si&e b! st c!e ned to commerci ! finish in ccord nce with the recommended methods out!ined in the Stee! Structures P intin" Counci! Specific tion SSPC SP;63-)CE -o. +. Shop Primer: ,mmedi te!% fter br si&e b! stin" nd before n% rustin" occurs =within 1' hour m 0imum> pp!% one co t of rom tic ureth ne T-E9EC Series A2;:'5 =<reenish;<r %> :%dro;Tinc or e$u !# to dr% fi!m thickness =*FT> r n"e of '.7 to +.7 mi!s. Fie!d Surf ce Prep r tion: )fter erection nd prior to fie!d touch;up primin"# !! surf ces sh !! be c!e ned to remo&e !! surf ce cont min tion inc!udin" oi!# "re se# dust# dirt nd forei"n m tter. We!d s! "# we!d sp tter nd other sh rp or rou"h pro1ections sh !! be remo&ed. )!! rusted# br ded nd unp inted re s sh !! be b! st c!e ned to commerci ! finish in ccord nce with SSPC SP;63-)CE -o. +. Fie!d Touch;Ep: Spot prime with rom tic ureth ne T-E9EC A2;: '5 =<reenish;<r %> :%dro;Tinc# or A1;:'5 =<reenish;<r %> :%dro;Tinc# or e$u !# to *FT r n"e of '.7 to +.7 mi!s. Fie!d ,ntermedi te Co t: )pp!% one co t of po!% mido mine epo0% T-E9EC Series -6A :i;.ui!d Epo0o!ine ,, or -6AF :i;.ui!d Epo0o!ine ,,
P "e 14 of '2 23'43'515

'.

+.

2.

7.

C., CET SPEC

=f st cure># or e$u !# to *FT r n"e of '.5 to +.5 mi!s. The co!or sh !! be tinted to contr st the prime co t. 6. Fie!d Finish Co t: )pp!% one co t of !iph tic cr%!ic po!%ureth ne T-E9EC Series 1587E Endur ;Shie!d ,, or e$u !# to *FT r n"e of '.5 to +.5 mi!s. Finish co!or sh !! be se!ected b% the Owner. The tot ! *FT r n"e of the three co t E0terior P int S%stem sh !! be 6.7 to A.7 mi!s.

8. 4.3

INTERIOR WET COATING S&STEM 1. Shop Surf ce Prep r tion: Spot c!e n s necess r% to remo&e !! oi! nd "re se from the surf ce prior to b! st c!e nin". )!! surf ces sh !! be br si&e b! st c!e ned to ne r;white finish in ccord nce with SSPC SP; 153-)CE -o. '. Shop Primer: ,mmedi te!% fter br si&e b! stin" nd before n% rustin" occurs =within 1' hour m 0imum># pp!% one co t of po!% mido mine epo0% T-E9EC Series B125;1'77 =.ei"e> Pot ;Po0 P!us or Series B125F;1'77 =.ei"e> Pot ;Po0 P!us =f st cure> or e$u !# to *FT r n"e of 2.5 to 6.5 mi!s. Fie!d Surf ce Prep r tion: )fter erection nd prior to fie!d touch;up primin"# !! surf ces sh !! be spot c!e ned s re$uired to remo&e !! surf ce cont min tion inc!udin" oi!# "re se# dust# dirt nd forei"n m tter. We!d s! "# we!d sp tter nd other sh rp or rou"h pro1ections sh !! be remo&ed. )!! rusted# br ded nd unp inted re s sh !! be b! st c!e ned to ne r white finish in ccord nce with SSPC SP;153-)CE -o. '. Fie!d Touch;Ep: spot prime with po!% mido mine epo0% T-E9EC Series125;1'77 =.ei"e> Pot ;Po0 P!us or Series 125F;1'77 =.ei"e> Pot ; Po0 P!us =f st cure># or e$u !# to *FT r n"e of 2.5 to 6.5 mi!s. ,rre"u! r surf ces# inc!udin" we!d se ms# bo!t he ds nd nuts# corners nd ed"es# sh !! be stripe co ted b% brush or ro!!er fter the fie!d spot prime co t h s been pp!ied nd prior to pp!ic tion of the first fu!! fie!d co t. Fie!d Finish Co t: )pp!% one co t of po!% mido mine epo0% T-E9EC Series 125;17.( =T nk White> Pot ;Po0 P!us or Series 125F;17.( =T nk White> Pot ;Po0 P!us =f st cure># or e$u !# to *FT r n"e of 2.5 to 6.5 mi!s. The tot ! *FT r n"e of the two co t ,nterior P int S%stem sh !! be 4.5 to 1'.5 mi!s.

'.

+.

2.

7.

6.

8. 4.4

INTERIOR DR& COATING S&STEM


P "e 1A of '2 23'43'515

C., CET SPEC

1.

Shop Surf ce Prep r tion: Spot c!e n s necess r% to remo&e !! oi! nd "re se from the surf ce prior to b! st c!e nin". )!! surf ces sh !! be br si&e b! st c!e ned to commerci ! finish in ccord nce with SSPC SP;63-)CE -o. +. Shop Primer: ,mmedi te!% fter br si&e b! stin" nd before n% rustin" occurs =within 1' hour m 0imum># pp!% one co t of po!% mide epo0% T-E9EC Series B125;1'77 =.ei"e> Pot ;Po0 P!us or Series B125F;1'77 =.ei"e> Pot ;Po0 P!us =f st cure> or e$u !# to *FT r n"e of +.5 to 7.5 mi!s. Fie!d Surf ce Prep r tion: )fter erection nd prior to fie!d touch;up primin"# !! surf ces sh !! be spot c!e ned s re$uired to remo&e !! surf ce cont min tion inc!udin" oi!# "re se# dust# dirt nd forei"n m tter. We!d s! "# we!d sp tter nd other sh rp or rou"h pro1ections sh !! be remo&ed. )!! rusted# br ded nd unp inted re s sh !! be b! st c!e ned to commerci ! finish in ccord nce with SSPC SP;63-)CE -o. +. Fie!d Touch;Ep: spot prime with po!% mido mine epo0% T-E9EC Series -125;1'77 =.ei"e> Pot ;Po0 P!us or Series -125F;1'77 =.ei"e> Pot ; Po0 P!us =f st cure># or e$u !# to *FT r n"e of +.5 to 7.5 mi!s. Fie!d Finish Co t: )pp!% one co t of po!% mido mine epo0% T-E9EC Series -125;17.( =T nk White> Pot ;Po0 P!us or Series -125F;17.( =T nk White> Pot ;Po0 P!us =f st cure> or e$u !# to *FT r n"e of +.5 to 7.5 mi!s. The tot ! *FT r n"e of the two co t ,nterior P int S%stem sh !! be 6.5 to 15.5 mi!s.

'.

+.

2.

7.

6. 4.5

LETTERING AND LOGO (etterin" nd (o"o desi"n# siCe nd !oc tion sh !! be s indic ted on the dr win"s. (etterin"3(o"o sh !! be pp!ied usin" one co t of !iph tic cr%!ic po!%ureth ne T-E9EC series 1587E Endur ;Shie!d. (etterin"3 (o"o co!or sh !! be se!ected b% the Owner.

PART 5 TESTING AND STERILI'ATION 1. Sufficient cure# per the m nuf cturerHs recommend tions# of the fin ! co t on the interior wet surf ce sh !! be !!owed before the e!e& ted t nk is steri!iCed nd fi!!ed with w ter. The t nk sh !! be steri!iCed per the re$uirements of )WW) C67' Ch!orin tion 9ethod -o. ' or +. The Owner# free of ch r"e to the Contr ctor# sh !! furnish nd dispose of sufficient w ter for testin" nd steri!iC tion. The w ter sh !! be t proper
P "e '5 of '2 23'43'515

'. +.

C., CET SPEC

pressure to fi!! the t nk to the m 0imum workin" !e&e!. )n% !e ks in the t nk th t re disc!osed b% this test sh !! be rep ired b% "ou"in" out defecti&e re s nd re;we!din". -o rep ir work sh !! be done on n% 1oint un!ess the w ter in the t nk is t !e st ' feet be!ow the 1oint bein" rep ired. )n% p int d m "ed b% rep irs sh !! be proper!% restored. 2. Epon comp!etion of the steri!iC tion procedure# the Owner or his represent ti&e sh !! rr n"e nd be r the cost of n% b cterio!o"ic ! testin" of w ter s mp!es from the t nk th t m % be re$uired. The t nk sh !! not be p! ced in ser&ice unti! s fe test resu!ts re obt ined.

PART $ GUARANTEE The Contr ctor sh !! "u r ntee its work for period of one %e r from the d te of subst nti ! comp!etion. Subst nti ! comp!etion is defined s the d te when the t nk is p! ced# or & i! b!e to be p! ced# into ser&ice. The Contr ctor wi!! rep ir n% defects of which the% re notified durin" th t period which m % ppe r bec use of f u!t% desi"n# workm nship or m teri !s furnished under the specific tions. *efects c used b% d m "in" ser&ice conditions such s e!ectro!%tic# chemic !# br si&e or other d m "in" ser&ice conditions re not co&ered b% this "u r ntee. )!! "u r ntees obt ined b% the Contr ctor from the m nuf cturer or inst !!er of p int# e$uipment or ccessories not m nuf ctured b% the Contr ctor sh !! be obt ined for the benefit of the Owner.

C., CET SPEC

P "e '1 of '2

23'43'515

PART % - PURC#ASER OPTIONS ( ALTERNATIVES

The following items are to be added or deleted within the specification by the Engineer / Owner prior to issuing said specification for bidding:
%.1 E!TERIOR DOORS 1. '. )ddition ! ccess doors m % be dded for !oc tions where mu!tip!e entr% points re re$uired. )!tern te m teri !s of construction nd oper tion c n be specified for ccess doors nd o&erhe d doors. O&erhe d doors m % be insu! ted nd3or specified with motor contro!!ed oper tion =inc!udin" remote contro!>.

%.2

PIPING " PRESSURE RELIEF Pro&ide ???;inch mo!ded ri"id fo m po!%ureth ne insu! tion comp!ete with & por b rrier on in!et3out!et pipe. Secure!% f sten the insu! tion to the pipe usin" !uminum b ndin".

%.3

ACCESS, LADDERS " PLATFORMS 1. ) p inted stee! ! dder for ccess to the t nk interior from the roof# sh !! be pro&ided nd tt ched to the ccess tube. =-ote: this is not recommended in co!d c!im tes where freeCin" m % occur>. This ! dder sh !! be e$uipped with ! dder s fet% c b!e. Pro&ide 2';inch hi"h roof h ndr i! to enc!ose !! centr !!% !oc ted roof ccessories. The h ndr i! sh !! be furnished with top r i!# intermedi te r i!# nd toe bo rd. The h ndr i! must be constructed to meet !! OS:) re$uirements.

'.

%.4

MAN#OLES, #ATC#ES " VENTS For inst !! tions where mech nic ! e$uipment such s pumps nd motors or ch!orin tion e$uipment wi!! be !oc ted in the b se of the support structure# reinforced openin"s for &ents nd !ou&ers sh !! be specified.

%.5

ELECTRICAL 1. E0terior !i"htin" bo&e the ccess door=s> nd3or o&erhe d door=s> for dded securit%# nd e0terior !i"htin" round the b se of the support structure t "round !e&e! to i!!umin te the t nk nd3or support structure for esthetic effect. ) doub!e obstruction !i"ht sh !! be pro&ided on the roof of the t nk ne r the pe0. The !i"hts sh !! be enc!osed in &i tion red obstruction !i"ht "!obes s ppro&ed b% the F))# comp!ete with n utom tic photo;e!ectric
P "e '' of '2 23'43'515

'.

C., CET SPEC

ce!! t%pe switch. The contr ctor sh !! inst !! !! conduit nd wirin" from the !i"ht to the e!ectric ! ser&ice p ne!. %.$ GRAVEL FLOOR The interior of the support structure b se sh !! be finished with 6;inch crushed stone or "r &e! f!oor. )!! e0c & ted re s under the crushed stone or "r &e! f!oor sh !! be b ckfi!!ed with suit b!e m teri ! nd comp cted to A5 percent m 0imum dr% densit%. %.% FLOORS 1. Pro&ide structur ! f!oor !oc ted s shown on the dr win"s. The f!oor sh !! be desi"ned for minimum uniform !i&e !o d of 1'7 psf nd sh !! consist of concrete s! b supported b% formed " !& niCed stee! deckin" nd " !& niCed stee! "irders. The f!oor sh !! be c!e r sp n desi"n supported entire!% b% the support structure w !!. (o ds tr nsferred from structur ! f!oors to support structure sh !! be considered in the desi"n of the found tion. Construct st irs nd p! tforms usin" stee! p! te for the st ir strin"ers nd "r tin" st%!e st ir tre ds. The st ir tre ds sh !! be " !& niCed nd bo!ted to the strin"ers. )!! st ir nd p! tform components sh !! be " !& niCed. Pro&ide w !! mounted 1ib cr ne with 1;ton !o d c p cit% nd 1';foot sp n. The 1ib cr ne sh !! be e$uipped with 1;ton m nu ! ch in hoist nd tro!!e%. (oc te the 1ib cr ne s shown on the dr win"s. Pro&ide 24;inch 0 24;inch s$u re !uminum h tch embedded in the structur ! f!oor !oc ted s shown on the dr win"s. The Contr ctor sh !! m ke pro&isions in the desi"n of the support structure nd found tion for inst !!in" ddition ! f!oors t future d te with minimum uniform !i&e !o d of 1'7 psf. This responsibi!it% is !imited to meetin" on!% the structur ! re$uirements for the ddition ! !o ds on the support structure nd found tion. Pro&isions for future penetr tions of the support structure re not re$uired. )n% rchitectur ! re$uirements such s p!umbin"# e!ectric !# fire e0its# etc. needed to meet the code for fire r tin" re$uirements for usin" the structure for n%thin" other th n s n e!e& ted w ter t nk re e0c!uded. %.) CORROSION ALLOWANCE ) corrosion !!ow nce of 1316U sh !! be pp!ied to the w ter be rin" t nk surf ces. The corrosion !!ow nce sh !! be dded to the re$uired thickness determined b% desi"n. %.* COATINGS " FINIS#ES
P "e '+ of '2 23'43'515

'.

+.

2. 7.

C., CET SPEC

1. '. %.10

The - me Si"n nd3or (o"o sh !! be finish co ted with one co t of T-E9EC Series 86 for dr% fi!m thickness of 1.7 mi!s. )s n !tern te to pp!%in" c!e r co t to the - me Si"n nd3or (o"o# T-E9EC 22;655 EB .!ocker dditi&e m % be specified s bein" re$uired.

ANTENNA RAIL AND CA LE DETAILS We su""est the fo!!owin" be pro&ided for in the p! ns / specific tions# to !!ow for future inst !! tion of te!ecommunic tions ntenn =s>: Pro&ide !! ! bor# m teri !s# e$uipment nd inst !! tion to m ke !! necess r% pro&isions for future ntenn c b!e=s> routin". This work inc!udes but is not !imited to the fo!!owin": 1. Three =+> 2;inch di meter pipe penetr tions =with c ps> in the support structure# !oc ted ppro0im te!% two feet ='@> bo&e the top of found tion. '. Three =+> 2;inch di meter pipe penetr tions =with c ps> in the ccess tube co&er. +. Suit b!e br ckets we!ded to the inside of the support structure nd ccess tube to s fe!% secure future ntenn c b!es. .r cket sp cin" sh !! not e0ceed 4 feet. 2. For s fet% consider tions durin" ntenn inst !! tion# nd for m inten nce# 2'N hi"h h ndr i! sh !! be furnished with top r i!# intermedi te r i!# nd toebo rd. : ndr i! sh !! be V '5@ di meter nd centered round the t nk ccess tube roof h tch. The h ndr i! sh !! !so pro&ide n tt chment point for the ntenn =s>.

%.11 TANK DRAFT TU E MI!ING S&STEM Furnish nd erect Fresh9i0 w ter stor "e dr ft tube st%!e t nk mi0in" s%stem# s m nuf ctured b% C./,. )s n !tern ti&e# Tidef!e0 s%stem m % be !!owed# pro&idin" th t the Contr ctor supp!% comp!ete sp re set of the f!e0ib!e duck;bi!! noCC!es for owner@s future rep! cement use. The stor "e t nk mi0in" s%stem sh !! ccomp!ish thorou"h mi0in" of the t nk contents. The mi0in" s%stem sh !! function without the use of mech nic ! pumps or b!owers or other e$uipment with motor dri&es or other continuous!% mo&in" p rts. The ener"% needed to mi0 the stor "e t nk sh !! be pro&ided so!e!% b% the f!ow of w ter throu"h the t nk in!et pipe. The mi0in" s%stem sh !! distribute the fresh# new!%;disinfected incomin" w ter# throu"hout the t nk# reducin" microbi ! "rowth nd re! ted t stes nd odors.

C., CET SPEC

P "e '2 of '2