SKOP REKA BENTUK


KEPERLUAN RUANG

REKA BENTUK LUARAN

SISTEM TELEFON

REKA BENTUK DALAMAN

JENIS SISTEM

KEPERLUAN RUANG DALAMAN TELEFON


BILIK SDF BILIK MDF BILIK PABX/KEYPHONE BILIK OPERATOR BILIK RISER

Subscriber Distribution Frame (SDF) ROOM


The SDF is the final termination point of the TM network and the beginning of the subscriber network consist of:
1. Vertical frames or vertical c/w brackets/hooks 2. Termination blocks 3. Earth bar 4. Lightning arrestors

ROOM REQUIREMENT
Entry ducts from outside the building shall be designed to run parallel with the length of the longer side of the SDF room. Any turning or bending shall be avoided. SDF room must be flood free either on ground or 1st floor with a 150mm kerb across doorway (basement not allowed). Must be dust free - avoiding louvered doors and windows. : Normally equipped with Exhaust Fan, A/C if located in the basement / lower ground floor Must be fitted with suitable lighting At least 2 no. of 13A power points. Sprinkler system not allowed. Must be provided with one lockable cabinet, table and chair for TM staff use

SDF ROOM

RISER ROOM
The cable risers stretch from the SDF room to the full height of the building and have access to distribution conduits on each floor of the building. For buildings with large floor areas (longer than 90m) in each storey, more than one cable riser at strategic points may be planned on every floor. This riser hole shall be sealed up with fire resistant barriers.It is important that no other services be allowed in this enclosure. Enclosures shall have fire resistant locked doors of min 2.1m height with the words TELECOM RISER displayed on it One set of keys of the door shall be kept by owner for safe custody and the other by TM.

RISER CLOSET

RISER ROOM

CROSS SECTION OF RISER CLOSET

KOMPONEN REKA BENTUK LUARAN


JC9(M)/ JC9/C(M)

R2A

LURANG TELEFON

PIT

JB30/ JRC7

LALUAN KABEL MASUK KE DALAM BANGUNAN

REKA BENTUK DALAMAN


CATEGORY OF BUILDING

INTERNAL DESIGN DESIGN CABLING DIAGRAM TMS REQUIREMENT

Clasification of building
Based on Number of telephone station required Size of incoming underground cables to the building Total floor area

Categorized of building
Category 1 Category 2 Category 3

Category 1
Category 1 >5 storeys and any building with total floor space exceeds 650 m2 Size of underground cable exceeds 50 pairs Jointing chamber usually required outside the building to facilitate linkage of entry duct to the building Ie; jc9 for cabless <400 pr R2A for larger size of cable

Category 2
5 storeys and below any building with total floor space less than 650 m2 Size of underground cable less than 50 pairs

Category 3 building
Terrace or link house for residential purpose only Bungalow house for residential purpose only

INTERNAL DESIGN

How to start telephone design


Planning 1. Site visit for verification clients property 2. Any existing telecommunication infrastructure 3. The nearest telecommunication manhole 4. Application to service provider i.e.; TM c/w survey plan and target date of completion. 5. Obtain clients requirement.

Design 1. Liaise for telecommunitaion space/room i.e., mdf room,sdf room, telefony room riser etc. 2. Plan for external infrastructure. 3. Design internal infrastructure i.e. under floor trunking system, internal cabling

PABX
Determine telephony equipment (key phone/PABX) and size Design schematic diagram Send 3 sets to TM site plan, location plan, key plan internal infrastructure (layout plan of under floor ducting, telephone rooms) schematic diagram external infrastructure layout

Typical schematic diagram


10 Prs DEL3 DP (Line 21 30) 10 Prs EXT3 DP (Line 21 30) 10 Prs DEL2 DP (Line 11 20) 10 Prs EXT2 DP (Line 11 20)

10 Prs DEL1 DP (Line 1 10)

10 Prs EXT1 DP (Line 1 10)

10pr grey cable Incoming cable Outgoing cable 30 Prs DEL DP


30 Prs EXT DP
EXT NUMBER

From TM

SDF room

PABX 100/0.63mm PEUTFF

TERIMA KASIH