Escolar Documentos
Profissional Documentos
Cultura Documentos
The faster reeling installation method is very attractive to lay Steel Catenary Risers (SCR) because it minimizes the time spent by the lay vessel in the vicinity of the topsides. Technip was first to install a fully reeled SCR on the deepwater field B !ile in "##$ ($%$##m&'%(## ft water depth). Than)s to a superior welding *uality% achieved at their on+shore spoolbases% Technip successfully assembled and installed many SCRs in both sweet and sour service design conditions% in the ,ulf of -e.ico. The trac) record includes the first ever pipe+in+pipe SCR (Shell !a /i)a in "##0 ($%1'1m&(%'(#ft) and latterly the deepest SCR (Shell erdido in "##1 in "%0(1m&2%$##ft). 3n alternative to SCR is the 4ybrid Catenary Riser (4CR)% which combines a rigid pipe length and two fle.ible pipes tails% located in the most dynamic sections of the riser. 3part from the e.cellent dynamic behavior of 4CR% the configuration also offers the advantage of a closer touchdown point to the topsides.