) JLR Version 1 IMPORTANT This Jaguar Land Rover process is derived from the original Ford process used by Jaguar Land Rover prior to June 2008 but is unique to Jaguar Land Rover. Certain aspects of this process will appear similar to the process currently used by Ford and which was historically used by Jaguar Land Rover, however the two processes are now distinct from each other and contain important differences. It is important to ensure that the Jaguar Land Rover version is always used for Jaguar Land Rover business; the Jaguar Land Rover and Ford versions are NOT interchageable. For any queries regarding the Jaguar Land Rover process described in this document, please contact your Jaguar Land Rover STA Engineer.
Programme mandate This JLR Version 1 SHALL be used on L538 and on all other JLR programmes. This version supercedes all previous Ford versions, up to and including Revision #33 (dated 24 June 2008)
JLR PSF-010
I. Key Information
A) Product
Supplier Site Location Vendor Code Date of Study Part # / Name
B) Customer Production
X Customer Demand / Week Y # of days customer works per week Z Daily Production Volume (DPV) -
JLR Version 1
Process 2 Process 3 Process 4 Process 5 Process 6 Process 7
Projected Downtime Tool / Variant Changeover (minutes) F G Changeovers / shift H Inspections of facilities / shift (minutes) Breakdowns / shift (unscheduled downtime) (minutes) I J Total projected downtime/week (hours) [(FxG+H+I)/60xAxD] K Equipment Availability [(E-J)/E]
Projected percent of parts scrapped and/or reworked For linked processes, see notes.
Net Planned Ideal Cycle Time (sec/part) For multiple cavities in one tool, see notes. Planned production capacity / week [(E-J)*3600/M*L] Planned production capacity / day [(E-J)*3600/M*L/D]
(Select One)
customer DPV
DEDICATED SHARED
% above/below DPV:
0.0% 0
Process 1
Process 2
0 0.0%
0.0% 0
Process 3
0.0% 0
Process 4
0.0% 0
Process 5
0.0% 0
Process 6
0.0% 0
Process 7
Approved
Rejected
Signature
Date
Signature
Date
Sub Tier Components: In addition to the data contained in this report, the Supplier Authorised Representative approval confirms that all sub-tier components used in the assembly of these components are also approved to the relevant Production Run i.e. Run at Rate (Phase 0) or Capacity Verification (Phase 3)
File Champion: P Couch JLR PSF-010 Version # 1 Issue Date : 31 March 2010
Page 2 of 7
B) Customer Production
Cust Demand / Week (excl service parts) # of days customer works per week Daily Production Volume (DPV) 5000 5 1000
DEDICATED A. Product The first Step in completing the Capacity Analysis Report is to enter details of the part being analysed. These Cells hold the basic information on the supplier and the part analysed within the worksheet. B. Customer Production Before the Capacity verification can take place, the Program Volume must be verified. This information will be available through the buyer and may also be available through the Request for Quote and the Purchase Order or other official information from the Launch teams. Service part volumes should be accounted for in the Capacity Analysis (see note below regarding Customer Demand per Week). Input Cell: Customer Demand per Week. Contact the buyer for the Average Production Weekly volume number. Confirm that service volumes are accounted for in the Average Production Weekly numbers. Input Cell: Number of days customer works per week , this is per default 5. Please note that the supplier should plan their operations to work at 5 days (or fewer) to be within the same Tact as the Powertrain / Vehicle Assembly plant. C. Capacity Revision Record. Any revisions to the capacity of the process must be tracked using this section.
CAPACITY PLANNING
The Capacity Planning element will assess if suppliers have a "true production environment" in place and have a adequately prepared their organization and their suppliers for the start of production and ramp-up.
SHARED
Process 2 drill 1 3.00 8.00 30.00 30.00 5.00 105.00 Process 3 bore 7 3.00 8.00 30.00 30.00 4.00 84.00 Process 4 washing 7 1.00 3.00 0.00 30.00 5.00 12.50 Process 5 assembly 1 3.00 8.00 30.00 30.00 5.00 105.00 Process 6 assembly II 1 3.00 8.00 30.00 30.00 5.00 105.00 Process 7 assembly III 1 3.00 8.00 25.00 0.00 5.00 113.75
A. B. C1 C2 D E
A cut of the Operating pattern is shown above with an example of data input for a process with seven operations. The Operating pattern gives the opportunity to give each operation a different operating pattern. The operating pattern input should mirror the true dedicated manufacturing time for each operation, e.g. by shared machines. Input Cells: Process Description : Enter a brief Description of a process (e.g. final assembly, or inspection) Input Cells: Dedicated or Shared Process : Identify from a drop-down box, the process type dedicated / shared. Dedicated Processes A dedicated process is one, which is solely used for the part being analysed in this worksheet. For example, a test station may be a dedicated process. A process which is used by this part, and one or two others, with a short changeover time can also be categorized as a "dedicated" process. An example is a manually operated projection nut welder. A shared process is one which has many different parts manufactured on the process, and a more significant tool changeover time. It would be usual for such a process to manufacture parts in a batch production mode. Examples of a shared process are: stamping press injection moulding machine heat treatment facility
Page 3 of 7
The operating pattern should only show the real production time to the part in question. In addition to identifying the process as "shared" in the Capacity Analysis Report, a Shared Capacity Analysis of the "shared" facility should be calculated, identifying all Jaguar Land Rover parts, Non-Jaguar Land Rover parts volume and other production hours produced on the manufacturing line, determining if the capacity or time available is oversold. (See Excel sheet for Shared Production Line) Input Cells: Shifts per day : - indicate the number of shifts in which each process operates per day. Input Cells: Total hours per shift total number of hours for each shift. Input Cells: Personal Breaks If the machine stops during personal breaks enter the length of time over one shift that the machine will not be operating. If the machine operates during personal breaks and is guaranteed to never run out of parts, then enter "0". Input Cells: Planned Maintenance this is the length of time that is planned for the machine to be down during a shift for a maintenance. Input Cells: Days per Week indicate the number of days in which each process operates per week. Example: Supplier works 4 days 3 shifts each and on Friday only 1 shift should just enter: 4 working days plus 1/3 working day = 4.333 days / week Projected Downtime
F G H I J K Tool / Variant Changeover (minutes) Changeovers / Shift Inspections of facilities / shift (minutes) Breakdowns / shift (unscheduled downtime) (minutes) Total projected downtime/week (hours)
[(FxG+H+I)/60xAxD]
Input Cells: Tool / Variant Changeover Enter the changeover time for tool changes or module changes for the part in question. Changeover time is defined as the total time from last off previous part to checked first off new part. Input Cells: Changeovers / shift Enter the frequency of tool / module change per shift. Input Cells: Inspections of facilities / shift - Enter the downtime required for equipment inspections or adjustments during a shift Input Cells: Breakdowns / shift Enter all other projected downtime during a shift. Calculation Cell: The Equipment Availability is calculated automatically by using previous data. Equipment Availability = (Total Planned Production Time Breakdowns) / Total Planned Production Time Projected Quality Rate (%)
Projected percent of parts scrapped and/or reworked L Projected Quality Rate (%) 0.00% 100.00% 1.00% 99.00% 1.00% 99.00% 0.00% 100.00% 2.00% 98.00% 0.00% 100.00% 1.00% 99.00%
Input Cells: Projected percent of parts scrapped and/or reworked Enter the combined percentage of parts that are scrapped and/or reworked on-line. If zero losses are expected, enter a zero. Note: This sheet does not address the scrap rate loss of linked processes. To evaluate output of linked processes, the scrap rate must be multiplied with the scrap rate of the previous process. Planned Cycle time / Capacity
Required Cycle time needed to cover exact customer demand (sec/part) [E*3600 * K / X *L] M Net Planned Ideal Cycle Time (sec/part) Planned production capacity / week Planned production capacity / day
[(E-J)*3600/M*L] [(E-J)*3600/M*L/D]
Input Cell: Net Planned Ideal Cycle Time Please provide the best estimate of the cycle time of the part on each process. The worksheet will use this data to calculate the Planned Production Capacity. This could be also a time taken with a stopwatch at the bottleneck operation. The measurement taken should always include the time for loading / unloading and inspection (Part-to-Part). Part-to-Part cycle time measurement requires that the operation being measured is not blocked or starved for at least two consecutive part cycles. Pick a point in the operation's cycle to begin timing and when the next part reaches that same point in the cycle, stop timing and record the elapsed time as the operation's cycle time. It is best to repeat this measurement at least 10 times (making sure that the blocked and starved condition is absent in each measurement) and take the average. Note: For multiple cavities in one tool the actual cycle time of the tool must be divided by the number of cavities in the tool (to provide a net cycle time per part). Calculation Cell: Required Cycle time needed to cover exact customer demand - "For Information Only" - the worksheet displays the Cycle time needed to cover exact customer demand, calculated from planned operating pattern, projected downtime and quality rate. This is to be compared to the Planned cycle time Calculation Cells: Planned production capacity per week and Planned production capacity per day . This is to be compared with the Customer Demand per Week or Day .
PRODUCTION RUN
Prior to performing Run-at-Rate (Phase 0) or Capacity Verification (Phase 3), the supplier and customer should be in agreement on the following key parameters: quantity of parts to produce, selection of characteristics to measure, process set-ups, review of personnel involved, data analysis and reporting. - The intent of the Phase 0 Run-at-Rate is to determine if the supplier can meet the demand with the Process Actual Cycle Time (tact). Run-at-Rate (Phase 0) formula = [(E-J)*3600/U] E - Net Available Time, J - Projected Downtime, U - Process Actual Cycle Time (tact) - The intent of the Phase 3 Capacity Verification is to determine if the supplier can meet the demand with the Process Actual Cycle Time (tact) and considering Equipment Availability. Capacity Verification (Phase 3) formula = [E*3600/U * (N-O1-O2-P)/N] E - Net Available Time, U - Process Actual Cycle Time (tact) N - Total Duration of Production Run, O1 - Planned Downtime, O2 - Planned Changeovers, P - Total Unplanned Downtime
(Select One)
28.99
74.59
73.33
9.88
75.22
77.65
66.00
Page 4 of 7
Input Cells: Total duration of production run Please enter the amount of time that is used for the production run. If the production run covers one shift of 8 hours, the total minutes run would therefore be 480 minutes (8*60min). Input Cells: Planned downtime (lunch, breaks, maint.) Please list all real downtimes during production run which have previously been planned according to the capacity planning - operating pattern, i.e. lunch, breaks, maintenance. Input Cells: Planned downtime (changeovers, inspections) - Please list all real downtimes during production run which have previously been planned according to the capacity planning - projected downtime, i.e. changeovers, inspections and adjustments. Input Cells: Total unplanned downtime - List all unplanned downtime, i.e. breakdowns or other unscheduled adjustments or setups. These downtimes will be subtracted from the Duration of production run in the Process Total Actual Cycle Time calculation. Input Cells: Total parts run , the Total scrapped parts and Total parts reworked from production run need to be listed. Calculation Cell: Total good parts - Only the total good parts will be used for the Process Total Actual Cycle Time calculation. Please list in detail the Reasons for breakdown and Reasons for scrapped or reworked parts . Calculation Cell: Process Total Actual Cycle Time The Worksheet will automatically calculate the cycle time based on minutes of production run and total parts produced. This will give the Production Run actual cycle time. For validation, compare the Process actual cycle time with the Required cycle time from the Capacity Planning section. This cycle time used for the Capacity Analysis includes only the good parts produced during available production time.
CAPACITY CALCULATION
This part of the Production Run is the analysis of the results. The Cycle time of each process from the Capacity Verification Run is compared with the Customer Demand for the part. If a process does not cover the customer demand on the daily production volume, the process is highlighted RED. The worst-performing process will be marked as the bottleneck process. If the Supplier Operating Pattern to produce the Jaguar Land Rover part(s) takes more days than the Customer weekly production days, the process is highlighted in RED.
Weekly Parts Available for Shipment Daily Parts Available for Shipment
DPV Percent above/below DPV [(W/Z)-1]
[V/Y]
SHARED
DPV comparison
1200 1000 800 600 1024 400 200 0 Process 1 -200 980 795 850 910 974
customer DPV
2.43%
1.40%
1014
-2.00%
Process 2
-20.48%
Process 3
-15.00%
Process 4
-9.00%
Process 5
-2.64%
Process 6 Process 7
Page 5 of 7
Capacity Analysis Sheet - Shared Process Shared Production Line Information Sheet
Supplier / Process Information Mon. Supplier Name Site Location Vendor Code Process Description Shifts / Day Gross Hours / Shift Breaks / Shift (min) Production Hours Tue. Wed. Thur. Weekly Operating Pattern Fri. Sat. Sun. Total Weekly Prod Hrs Date
Part Information
Changeover/Downtime
Scrap/Rework
Part Description
Part Number
Tool / Module Planned Change- Change- Maint. over overs / / Shift (min) Shift (min) D E F
Days / Week
Required Prod. Hours / Week (based upon Net Ideal Cycle Required Machine Usage by Time) Part
R (N*C/3600)+P T R/(Total Weekly Production Hours)
Total "Other" Customers Production Hours: Totals NOTE: This form can be used to analyse machine usage for all products made (Jaguar Land Rover products as well as other company's products). Machine Usage for Jaguar Land Rover products and others:
Page 6 of 7
Data Collection
Scrap/ Off-Line Rework Parts (Parts/Hr) Plan Actual
Plan
Actual
Plan
Actual
Page 7 of 7