VIBRATION AND AXIAL

Us
DISPLACEMENT MONITORING CM&

1. INTRODUCTION 1) shutdowns can be timed;

TURBINES
STEAM TURBINES
It is normal for all machines, even in peak performance 2) replacement parts can be prepared in advance, saving
conditions, to vibrate and make noise. The level of vibration time;
is dependent on the operating condition of a mechanical 3) elimination of defects causing vibration significantly
system: when vibration increases, deviating from an reduces noise.
acceptable level, it is a sure indication that some component
is deteriorating. Development of reliable vibration measure- 3. RADIAL VIBRATION
ment instrumentation now gives us sufficient information for Two no-contact proximity probes are mounted, offset 90°,
a detailed analysis of the state of health of any mechanical on the front support and two on the rear support (or directly
component. on the exhaust casing cap); when the existing arrangement
Analysis of vibration signals, combined with experience and doesn’t allow such an installation, probes are mounted on
familiarity with the machine are the keys to relatively accurate the journal. The proximity probe signals are sent to a control
troubleshooting. room monitor, which:
• displays the peak-peak value of the signal from each
2. BENEFITS probe
Although machinery protection alone is sufficient reason for • performs alarm and trip functions on each probe
equipping critical machine parts with supervisory instru- • provides the power supply for field probes.
mentation systems, monitoring systems can be of advantage
for other reasons. They are essential for diagnostic and A third probe, a Keyphasor probe, is installed on the

STEAM
predictive maintenance, which is a growing industry trend toothed wheel cover plate.
and replacing preventive maintenance wherever possible as The Keyphasor, acts as a phase reference, ie, it generates a
preventive maintenance generally has a high economic pulse every time a notch made in the shaft passes under
penalty which is not always justified in technical terms. A the probe. By correlating the signals from the two proximity
predictive instead of a preventive approach means operating probes and the keyphasor, an elliptical wave shape is dis-
on a machine or component just when needed, and no ser- played (for instance on a 2-channel oscilloscope) repre-
vice as long as the system is running reliably. senting the shaft orbit. By simply observing deviations from
the ideal orbit pattern, it is possible to identify any defects
Early identification of machinery problems therefore offers or irregularities. Every defect generates a characteristic
a number of benefits, including: vibration mode and is represented in the form of a particular

GE Power Systems CM&Us TU/VA08-9/2002


Oil & Gas
Nuovo Pignone
VIBRATION AND AXIAL DISPLACEMENT
MONITORING
vibration frequency. Analysis of vibration frequencies identifies probes) can be done on site with modification drawings
many types of problems including, for example, unbalance supplied by Nuovo Pignone.
of rotating parts and reduction of the oil film which lubricates
journal bearings. Fig. 1 shows the string of instruments from 6. SCOPE OF SUPPLY
field to control room. • 2 axial displacement probes on the bracket cover plate or
on the front support;
4. AXIAL DISPLACEMENT • 4 radial vibration probes for both journal bearings;
No-contact probes are also used to measure rotor axial dis- • 1 keyphasor;
placement. The installation comprises two probes which • materials for probe installation;
guarantee redundancy; the probes are installed on the • extension cables and proximitors for all probes;
toothed wheel cover plate (inside a protection box) or on • local junction box for installing proximitors;
the front support. The average values of the signals from • cable sheathing up to the junction box;
the probes can be displayed on a dedicated monitor inte- • control room monitor to suit the number of probes;
grated in the previously described radial vibration monitoring • Zener barriers for each probe (if necessary);
system. • mechanical modification drawings for installing the probes
and wiring diagram.
5. INSTALLATION AND MACHINE MODIFICATIONS
All the modifications necessary for probes installation Interconnecting cables between the local junction box, barrier
(included shaft burnishing in the area exposed to the vibration and monitors can be supplied on request.

Figure 2

COMK/MARK 704/II- Studio Tre Fasi - 9-2002 ©2002 Nuovo Pignone S.p.A. all rights reserved

CONTROL ROOM FIELD

SYSTEM DUAL THRUST


MONITOR MONITOR

NO CONTACT
PROBES

POWER DUAL VIBRATION


SUPPLY MONITOR

ORBIT LOCAL
ZENER
BARRIER PROXIMITOR