519+200 - 526+600

CONTRACT A (MUKURU)

MAIN SUMMARY
ITEM

DESCRIPTION

AMOUNT (KShs.)

PRELIMINARIES

#REF!

BUILDER'S WORKS - RESIDENTIAL

#REF!

BUILDER'S WORKS - STALLS

26,582,450.00

BOUNDARY WALLS

#REF!

CIVIL WORKS

#REF!

FOOTBRIDGE

#REF!

ELECTRICAL INSTALLATIONS

#REF!

MECHANICAL SERVICES

#REF!

SUB-TOTAL

#REF!
Add 10% CONTINGENCIES

#REF!

SUB-TOTAL (V. A. T. Exclusive)

#REF!

Add 16% V. A. T.

#REF!

TOTAL CARRIED TO BID SUBMISSION FORM :

#REF!

AMOUNT IN WORDS ( V. A. T. Inclusive) ................................................................................


...............................................................................................................................................
........................................................................................................................................ Only

CONTRACTOR
NAME.................................................

EMPLOYER
NAME...........................................................................

SIGNATURE........................................

SIGNATURE....................................................................

ADDRESS............................................

ADDRESS..........................................................................

.............................................................
DATE...................................................

........................................................................
DATE...........................................................................

TRANSAFRIC TIMBER GODOWN

Item
No.

Units

Description

Qty

Rate

Amount
KShs.

BILL NO. 3
ELEMENT NO. 1
SUBSTRUCTURE (All Provisional)
Excavations and Earthworks, including upholding sides and
keeping bottoms free from mud and water by baling or pumping
as required
Bulk excavation to remove black cotton soil and removing from
3.01 site

C.M.

2880

200.00

576,000.00

Excavate foundation trench not exceeding 1500 mm deep


3.02 starting from reduced level reduced level

C.M.

360

200.00

72,000.00

3.03 Excavate for column bases, ditto

C.M.

50

225.00

11,250.00

3.04 Extra over excavation for excavating in soft rock, as described

C.M

1,020.00

Backfill selected excavated or imported material and compact in


3.05 150 mm layers to make up levels

C.M.

216

100.00

21,600.00

3.06 Load and cart away surplus excavated materials

C.M.

2880

520.00

1,497,600.00

300 mm Hardcore bed handpacked and compacted slab,


including levelling and blinding with 50 mm sand or murram to
3.07 receive concrete

S.M.

3600

400.00

1,440,000.00

3.08 50 mm Thick murram blinding over hardcore

S.M.

3600

65.00

234,000.00

3.09 1000 Gauge polythene sheeting, as described, laid over hardcore S.M.

3600

95.00

342,000.00

S.M.

3600

165.00

594,000.00

S.M.

192

500.00

96,000.00

3.12 Strip foundations and attached column bases

C.M.

14,500.00

72,500.00

3.14 Column stubs

C.M.

50

14,500.00

725,000.00

3.15 100 mm surface slab

S.M

3600

1,450.00

5,220,000.00

Disposal, as described

Filling, as described

Damp-proof membrane

Anti-termite treatment
3.10 Chemical anti-termite treatment to surface of hardcore, executed
complete by Rentokil or equal and approved specialist
under a ten-year guarantee
Concrete Work
Mass Concrete Class 15, as described, in:50 mm Blinding to strip foundations, ground beams and column
3.11 bases
Reinforced Concrete Class 20 as described in:-

10,901,950.00

Total Carried Forward

Item
No.

Units

Description

Qty

Rate

Amount
KShs.
10,901,950.00

Total Brought Forward


High Tensile Reinforcement to B.S. 4461, as described
3.16 8 mm to 12 mm Bars

K.G.

750

150.00

112,500.00

S.M.

3600

385.00

1,386,000.00

3.18 Sides of strip foundations

S.M.

280

400.00

112,000.00

3.19 Sides of bases

S.M.

120

400.00

48,000.00

3.20 Sides of column stubs

S.M.

50

400.00

20,000.00

Edge of surface slab over 150 mm but not exceeding 225 mm highL.M.

240

65.00

15,600.00

S.M.

1560

1,500.00

2,340,000.00

L.M.

240

100.00

24,000.00

3.26 12 mm Cement and sand render to plinth walls

S.M.

1200

350.00

420,000.00

Prepare and apply three coats three coats bituminous paint to


3.27 plinth walls

S.M.

1200

300.00

360,000.00

3.31 Allow for keeping all excavations free from general water

Item

5,000.00

5,000.00

3.32 Ditto upholding sides of excavation

Item

5,000.00

5,000.00

Fibre Mesh Reinforcement


3.17 Fibre mesh reinforcement, in surface slab concrete at the rate
of 900 grammes per m concrete
Formwork
Sawn Formwork, as described, to:-

3.21

3.22 200 mm Walling


Bituminous felt damp proof courses, as described, under:3.25 200 mm Walls
Plinths

15,750,050.00

Total Carried to Collection

Item
No.

Units

Description

Qty

Rate

Amount
KShs.

ELEMENT NO. 2
REINFORCED CONCRETE STRUCTURE
Reinforced Concrete Grade 25 as described in:-

3.34 Columns

C.M.

24

14,500.00

348,000.00

3.35

348,000.00

Total Carried to Collection

Item
No.

Units

Description

3.50 Prepare fair face block joints and rake in and point horizontal joints
in cement mortar
S.M.

Qty

1200

Rate

280.00

Amount
KShs.

336,000.00

336,000.00

Total Carried to Collection

Item
No.

Units

Description

Qty

Rate

Amount
KShs.

ELEMENT NO. 4
ROOFING & RAINWATER DISPOSAL
Roof Covering 24 Gauge Pre-painted LT5 sheets and
accessories of approved colours, fixed in accordance with the
manufacturers printed instructions in:Roof covering fixed to steel zed purlins at approximately 1500
3.51 mm centres with bolts, caps and washers

S.M.

4128

1,950.00

24 Gauge resincot sheet flashing 1000 mm girth shaped to fit


3.52 space

L.M.

525.00

L.M.

1680

900.00

8,049,600.00

Structural steelwork to B.S 4360 Grade 43C, galvanised in


accordance with B.S. 5493 as described with shop fabricated
connections and site welded, bolted or riveted intersections; all as
shown on Engineers Drawings
Zed purlin size 140 x 50 x 2 mm weighing 4.35 K.g per linear
3.53 metre

1,512,000.00

9,561,600.00

Total Carried to Collection

Item
No.

Units

Description

Qty

Rate

Amount
KShs.

ELEMENT NO. 8
ENGINEERING SERVICE INSTALLATIONS

Electrical Installation
Builders Work in connection with Electrical Installation
(Provisional)
Cut away for, make good and attend on all trades on the subcontractor installing the following points in a concealed conduit
system and leave to the satisfaction of the Architect
3.87 Lighting point

NO.

100

60.00

6,000.00

3.88 Single socket outlet

NO.

150

60.00

9,000.00

3.89 Double ditto

NO.

200

110.00

22,000.00

3.90 150 mm concrete block walling

NO.

100

150.00

15,000.00

3.91 200 mm Ditto

NO.

350

200.00

70,000.00

3.92 150 mm walling

NO.

150

300.00

45,000.00

3.93 200 mm Ditto

NO.

235

400.00

94,000.00

3.94 150 mm Reinforced concrete slab

NO.

125

300.00

37,500.00

3.95 15 mm Diameter pipe

L.M.

404

200.00

80,800.00

3.96 20 mm Ditto

L.M.

335

200.00

67,000.00

3.97 25 mm Ditto

L.M.

320

250.00

80,000.00

3.98 32 mm Ditto

L.M.

152

250.00

38,000.00

3.99 40 mm Ditto

L.M.

75

300.00

22,500.00

Plumbing, Drainage and Fire Fighting Installations


Builders Work in connection with Plumbing, Drainage
and Fire Fighting Installations (Provisional)
Holes through the following for small pipes and make good

Holes through the following for large pipes and make good

Cut chase in stone or block wall for the sub-contractor


installing the following and later make good in plaster

586,800.00

Total Carried to Collection

Item
No.

Units

Description

Qty

Rate

Amount
KShs.

COLLECTION

ELEMENT NO.

SUBSTRUCTURES

15,750,050.00

R.C. SUPERSTRUCTURE

348,000.00

WALLING

336,000.00

ROOFING AND RAINWATER DISPOSAL

FINISHINGS

DOORS AND WINDOWS

FITTINGS AND FIXTURES

BUILDERS WORKS FOR ENGINEERING SERVICE


INSTALLATIONS

9,561,600.00
-

586,800.00

TOTAL CARRIED TO MAIN SUMMARY

26,582,450.00