ANNEXURE-IV TECHNICAL SPECIFICATIONS FOR NATURAL DRAUGHT COOLING TOWER 1.00.00 Intent of the Specification A single Natural Draught Cooling Tower (NDCT) with dedicated Cooling ater !asin" #utlet Channel" sludge re$o%al su$& and %al%e &it" etc. shall 'e &ro%ided (or the )00 M *nit. This s&eci(ication co%ers the re+uire$ents o( design and construction o( natural draught rein(orced concrete h,&er'olic cooling tower. This section o( 'idding docu$ent deals with the technical s&eci(ications (or the design and &re&aration o( detailed wor-ing drawings and getting the$ a&&ro%ed ', the #wner and the ci%il construction wor-s. The &ro%isions o( this technical s&eci(ication are general in nature and co%er 'road as&ects. Technical s&eci(ication outlines the $ini$u$ re+uire$ents. .owe%er" it would 'e the a'solute res&onsi'ilit, o( the 'idder to collect" inter&ret" anal,/e all necessar, in(or$ation 0 data (or the success(ul design and construction o( the cooling tower. Structural sa(et, and success(ul o&eration o( the tower shall 'e the total res&onsi'ilit, o( the 'idder notwithstanding the a&&ro%al o( the #wner. 1.00.00 Scope of Wo ! The sco&e o( this wor- shall consist o(" 'ut not li$ited to" the design and construction o( rein(orced concrete dou'le cur%ature h,&er'olic shell" ra-er colu$ns" ring 'ea$s" (oundations including &iling wor(%ertical0ra-er &iles)" cold water 'asin with &artition walls" hot water ducts" drain su$&s" e2ternal drain cha$'er with associated &i&e wor-" cold water channels with sluice gates and re$o%a'le screens as s&eci(ied elsewhere" hoists 3 $onorails" &ri$ar, and secondar, hot water distri'ution troughs" (ill su&&ort s,ste$s including colu$ns 3 'ea$s" dri(t eli$inators (i( re+uired)" testing o( cold water 'asin (or water tightness" e2ternal stairs" cage ladders" handling (acilities at tower to& with wal-wa, &lat(or$ and C channel" &lat(or$s" wal-wa,s as s&eci(ied or re+uired (or o&eration and $aintenance" access doors" MS handrails" steel (ittings" (i2tures" inserts including (a'rication" gal%ani/ing and erection o( associated steel wor- and other che$icals on the co$&leted structures etc. all co$&lete as &er (unctional re+uire$ents and as &er directions o( #wner. The sco&e o( wor- under this s&eci(ication shall include &ro%iding engineering design and drawings" all la'our" su&er%ision" $aterials" shuttering and sca((olding" construction e+ui&$ents including tower
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

1 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

cranes" hoists" 'atching &lants etc. tools and &lant" su&&l, and trans&ortation o( all incidental ite$s not shown or s&eci(ied 'ut reasona'l, i$&lied (or success(ul co$&letion o( the wor-. The nature o( the wor- shall generall, in%ol%e (oundation0&iling" e2ca%ation" dewatering" shoring and strutting" 'ac-(illing around underground structures and &linth (illing" sand (illing" dis&osal o( sur&lus soil outside &lant 'oundar," concreting o( grade as s&eci(ied" (or$wor- including auto$atic cli$' (or$" laser 'ea$ instru$ents" (a'rication" gal%ani/ing and erection o( steel structures and inserts" (inishing anchor 'olts" 5CC su$&0duct" la,ing and testing o( hot water &i&e line" water &roo(ing" &ro%iding P6C water sto&s and 7oint (ilters" drainage and other ancillar, ite$s connected with cooling towers as a&&ro%ed. The sur(ace &rotection that would include all inner (ace o( h,&er'olic shell" ra-er colu$n (aces" inner (aces o( cold water 'asin" (ill su&&ort structures" hot water distri'ution ducts 3 channels" cold water channels etc. This list is indicati%e and the sco&e shall also include the &re&aration and su&&l, o( all wor-ing drawings re+uired (or this wor-. 8.00.00 De"i#n Pa a$ete " The design &ara$eters (or the NDCT shall 'e as (ollows9 :uantit, T,&e o( Tower ater (low rate Cooling 5ange Design et !ul' Te$&erature A&&roach 5elati%e .u$idit, A%aila'le &u$&ing head >.00.00 De"i#n Con"i%e ation" The cooling tower shall 'e designed (or continuous o&eration. The hot water distri'ution s,ste$ shall 'e designed to ensure e+ual distri'ution o( heat load and (low all o%er the (ill area. ood0ti$'er $aterial shall not 'e used in an, &art o( the cooling tower. ).00.00 &ate ia'" of Con"t (ction Cooling tower 'asin Cooling tower shell @nternal su&&orting structure" stair cases" etc. Lou%ers 0 !a((les
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

9 9 9 9 9 9 9 9

#ne Counter (low with P6C (il$ (ill ;8")00 $80hr 10<C 1;.=<C ).1<C >0? 18 M C (ro$ N L

9 9 9 9

5CC 5CC 5CC 5CC


PAG4

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

2 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

Ail$ Aill Aill su&&orts No//les Dri(t eli$inators (!lade t,&e) .ot water inlet &i&es .ot water distri'ution s,ste$ Distri'ution trough Sluice gates Side guides and $ountings Miscellaneous steel structures Screens ;.00.00 ;.01.00 Coo'in# To)e St (ct( e

9 9 9 9 9 9 9 9 9 9 9

P6C 5CC Pol,&ro&,lene P6C Mild Steel to @S 10;1 AC 5CC MS Gal%ani/ed SS 81; MS Gal%ani/ed SSB80>

The cooling tower shell shall 'e h,&er'olic &ara'oloid. The shell o( the cooling tower shall 'e su&&orted ', a set o( diagonal colu$ns" which shall 'e su&&orted ', &iles and a &eri&heral &ile ca& or (oundation as the case $a, 'e. .ot water inlet shall 'e through a &air o( MS &i&es suita'l, &rotected. The &i&es shall ha%e 'utter(l, %al%es and also re+uired nu$'ers o( ther$owel with 5TD" &ressure and (low $easuring instru$ents. !lowB down shall 'e ta&&ed (ro$ the . &i&ing. Se&arate &i&ing (or hot water inlet (ro$ AC circuit into the NDCT shall 'e &ro%ided ', the side o( hot water inlet &i&ing (or CC circuit. The AC &i&ing shall also ha%e 'utter(l, %al%es. Painting and &rotection o( hot water &i&ing shall 'e done as &er rele%ant @S codes. To control the h,draulic (orces at the change o( align$ent o( the hot water (. ) inlet &i&e" a 5CC thrust 'loc- shall 'e &ro%ided at ground le%el near the cooling tower along with suita'le other su&&orts. The hot water distri'ution shall 'e ', 5CC $ain and secondar, ducts which carr, the lateral distri'ution &i&es (itted with no//les (or uni(or$ distri'ution through the (ill. The concrete $ain distri'ution ducts shall 'e accessi'le and are to 'e &ro%ided with nonBcorroding" &ressureBsealed ins&ection o&enings. Cleaning and sludgeBre$o%al o&enings are to 'e included on each run at the end o( the duct in the $ain distri'utor. The . distri'ution arrange$ent shall 'e su&&orted inde&endent o( the shell ', internal colu$ns su&&orted on the (loor o( the cold water 'asin. The &ro(ile o( the dri(t eli$inators is to 'e selected to ensure a $a2i$u$ degree o( &reci&itation and a $ini$u$ o( air &ressure loss.
ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

;.01.00

;.08.00

;.0>.00

;.0).00

;.0;.00

;.0C.00 ;.0D.00

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

3 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

;.0=.00 ;.10.00

Access to the hot water distri'ution &lat(or$ and (urther access to the shell to& should 'e &ro%ided with two Gal%ani/ed Steel cage ladders. The $aterial used (or access (acilities including steel co$&onents (or ste&s" ladders" &lat(or$s" catwal-s" railings" doors" 'ase (ra$es" $ountings" etc $ust 'e gal%ani/ed and resistant to corrosion. All 'olted connections and attach$ents to concrete $ust 'e $ade out o( suita'le stainless steel $aterial. The 'asin shall 'e designed (or a water de&th" as &er the GA Drawing" with a (ree 'oard o( at least 0.8 $ a'o%e $a2i$u$ water le%el. The cooling tower 'asin shall 'e di%ided into two e+ual &arts ', watertight 5CC &artition (or the cleaning and $aintenance o( one hal( while the other hal( is in ser%ice. Arrange$ents (or water drainage shall also 'e &ro%ided. Suita'le o%er(low arrange$ent" to $aintain the $a2i$u$ water le%el at 800 $$ 'elow the sill in 'oth the co$&art$ents" shall 'e &ro%ided. The cold water (ro$ the 'asin shall 'e ta-en out through an o&ening connected to the $ain C closed Channel0duct" which in turn leads to a (oreB'a, o( the C su$&. The cold water (ro$ the 'asin shall (low ', gra%it, to o&en a&&roach channel leading to the (oreB'a,. The cold water channel shall 'e &ro%ided with a sluice gate. Suita'le handling arrange$ents with a $onorail and a chainBo&erated hoist with a tra%eling trolle, shall 'e &ro%ided (or handling o( the sluice gate. @n (ront o( the outlet structure" &ro%ision shall 'e $ade (or deBsludging (acilities so that sedi$ents can 'e withdrawn (ro$ the 'asin. @n order to clean the cooling tower 'asin" sludge su$&s are to 'e &ro%ided along its &eri$eter" (ro$ where the sludge can 'e &u$&ed out. Two sludge &u$&s shall 'e &ro%ided (or the re$o%al o( sludge (ro$ the NDCT to drain su$&s. All the drains shall 'e ter$inated in the 4TP.

;.11.00 C.00.00

D.00.00

=.00.00

Fi'' S(ppo tin# A an#e$ent The su&&orting o( the (ill is to 'e achie%ed ', a series o( 5CC colu$ns arranged in suita'le grid s&acing and 5CC 'ea$s in orthogonal directions. Loads (ro$ (ills" hot water ducts" &i&es including water load" wall 'loc-s" etc. shall 'e considered (or colu$nB'ea$ design. To ta-e care o( hori/ontal loads due to seis$ic and thrust (ro$ hot water header" a suita'le s,ste$ o( %ertical 'racings is to 'e designed and &ro%ided in either direction.

10.00.00

Concrete" which is i$&er$ea'le to water" is to 'e used (or all co$&onents" including rein(orced concrete co$&onents. The
ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

4 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

co$&osition o( the concrete and the ce$ent are to 'e chosen de&ending on the che$ical anal,sis o( the cooling tower water0cooling tower $a-eBu& water. 11.00.00 A*iation O+"t (ction Li#ht" @n accordance with @CA# regulations" a%iation warning lights are to 'e installed along the &eri$eter o( the NDCT o&ening. #&erating and reser%e a%iation warning lights are to 'e &ositioned ne2t to each other. The, are to 'e connected to co$&letel, se&arate &ower circuits and to 'e $onitored ', rela,s. Suita'le &hotoBelectric sensors" alar$ and annunciation s,ste$s" etc. shall also 'e &ro%ided along with the re+uired au2iliaries (or co$&leting the s,ste$ in all res&ects. 11.00.00 Ea thin# an% Li#htnin# P otection A suita'le s,ste$ o( earthing and lightning &rotection" including re+uired hoo-Bu& with the &lant grid0s,ste$" etc. shall 'e &ro%ided co$&letel,. All the electrical re+uire$ents" including ca'les shall 'e as &er &lant electrical s&eci(ications. 18.00.00 G(a antee% Pa tic('a " The contractor shall guarantee the (ollowing &ara$eters9 Co'% )ate te$pe at( e At the design &oint o( the cooling tower" the cold water te$&erature guaranteed ', the Contractor in accordance with the &er(or$ance cur%e (cooling tower characteristic cur%e) shall 'e achie%ed. The (unda$ental &ara$eter (or the design %alue o( the cold water te$&erature during acce&tance $easure$ent shall 'e that $easured at the cooling tower 'asin outlet. D ift 'o""e" At the design &oint" the total water $ass (low entrained in the air shall not e2ceed 0.01? o( the $ass o( water circulating. @n case the dri(t eli$inator &ac-ing is to 'e used (or achie%ing the s&eci(ied dri(t loss then" the sa$e shall 'e &ro%ided ', the 'idder. @( dri(t eli$inators are &ro%ided then" the dri(t shall 'e $easured at the to& o( the dri(t eli$inators. &ate ia' e"i"tance

1>.00.00

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

5 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

All $aterials (including 'uilding $aterials) are to 'e chosen and geared to each other such that no da$age will 'e occurred as a result o( o&erational e2&osure to cooling water. 1).00.00 Latest %ersions o( the (ollowing codes and standards shall 'e used (or conducting the &er(or$ance tests9 D@N 1=>C E 6D@ !S9 >>D) !S9 10>1 !S9 8>8) ASM4 E 1=.) A&&aratus 1;.00.00 9 9 9 9 9 Acce&tance test code (or water cooling towers S&eci(ication (or ater Cooling towers Methods (or the $easure$ent o( (luid (low in &i&es Measure$ent o( electrical &ower and energ, in acce&tance testing Su&&le$ents on @nstru$ents and

Contractor shall arrange (or all the test instru$entation re+uired (or conducting the &er(or$ance guarantee tests. All instru$ents used (or testing shall 'e cali'rated 'e(ore the tests as &er the rele%ant codes. Should the acce&tance tests not &roduce the guaranteed %alues" the Contractor shall 'e granted the right to $a-e i$&ro%e$ents. The re&eated acce&tance $easure$ents shall then 'e carried out at the ContractorFs e2&ense. &ate ia'" All $aterials including ce$ent" rein(orce$ent steel 3 structural steel re+uired under this 'id shall 'e &ro%ided ', the 'idder. No $aterials shall 'e issued ', the #wner.

1C.00.00

1D.00.00

La,o(t an% Le*e'" The la,out (i2ing the location and le%els o( all structures shall 'e $ade ', the 'idder (at his own cost) w.r.t. &lantFs grids and 'ench $ar-s gi%en ', the #wner. The !idder shall e2tend all hel& in &ro%iding the instru$ents" $aterials and $en to the #wner (or chec-ing the correctness o( the la,out and le%els. .owe%er" the 'idder shall 'e solel, res&onsi'le (or correctness o( la,out and le%els and #wnerFs a&&ro%al in no wa, shall relie%e the 'idder o( his res&onsi'ilit, towards correctness o( la,out and le%els.

1=.00.00

App o*a' of De"i#n an% D a)in#" The 'idder shall su'$it detailed ther$al design 'asis and calculations in the (or$ o( a re&ort to $eet !S9 >>D) re+uire$ents. The #wner0Consultant shall chec- and a&&ro%e the ther$al design. #nce

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

6 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

the ther$al design is a&&ro%ed" the 'idder shall su'$it detailed anal,sis 3 design calculations (or the cooling tower structures including design assu$&tions along with arrange$ent drawings (or the a&&ro%al o( the #wner0Consultant. The theoretical 'ac-ground utili/ed (or de%elo&ing the co$&uter &rogra$$es shall 'e $ade a%aila'le to the #wner. This will 'e gi%en ', the 'idder 'e(ore a&&ro%al o( designs. #ne set o( anal,sis 3 design calculation0drawings dul, a&&ro%ed 0 $ar-ed with co$$ents ', the #wner shall 'e returned to the 'idder. A(ter recei&t o( a&&ro%al (ro$ the #wner the 'idder shall su'$it co&ies o( (inal detailed construction0(a'rication drawings as &er Distri'ution Schedule (or the a&&ro%al o( the #wners. #ne set o( drawings shall 'e returned dul, a&&ro%ed which will 'eco$e the 'asis (or ta-ing u& construction. The 'idder shall also (urnish to the #wner one good +ualit, &er$anent negati%e ((il$ t,&e) o( each o( the (inal a&&ro%ed drawings. Additionall," all drawings shall 'e &re&ared in A*T#CAD and CDs to 'e su'$itted to the #wner (or record. The a&&ro%al o( the #wner shall not relie%e the 'idder (ro$ the res&onsi'ilit, o( ade+uac, o( the design and correctness o( the drawing. 10.00.00 Gene a' Re-(i e$ent" All Aoundations shall 'e designed in accordance with &ro%isions o( rele%ant &arts o( the latest re%isions o( @ndian Standards and according to geotechnical in%estigation re&ort" a&&ro%ed ', #wner. 11.00.00 Gene a' De"i#n C ite ia Loading The (ollowing loads shall 'e considered (or the design o( cooling towers9 a) Dead loads ') ind loads c) 4arth+ua-e (orces d) Loads due to te$&erature and shrin-age e((ects. Te$&erature e((ects due to solar radiation shall also 'e considered. e) Construction load () Aoundation settle$ent etc. g) An, other load li-el, to co$e on cooling tower. Dea% Loa% Aor assessing the sel( weight o( the structure" the s&eci(ic weight o( the concrete shall 'e ta-en as 1)00 -g0$8. All other dead loads shall 'e assessed in accordance with rele%ant codal &ro%ision. Dead load shall include the sel( weight o( structure" weight o( (ill $aterial" weight due to
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

7 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

&lugging0choc-ing o( (ills" weight o( (alling water" weight o( hot water &i&e" weight o( water in hot water channel and distri'ution s,ste$ including the sel( weight o( channel and distri'ution s,ste$" weight o( dri(t eli$inators etc. Secondar, stresses" i( an," due to &er$anent (i2tures on the shell shall also 'e considered. @n addition" li%e load on the su&&orting structure due to $aintenance acti%ities related to (ills 0ducts0distri'ution s,ste$ shall 'e considered. Win% P e""( e The wind &ressure on the towers shall 'e assessed on theoretical 'asis as well as with the hel& o( Model tests in a wind tunnel o( tur'ulent 'oundar, la,er. All the theoretical $ethods outlined hereunder (or esti$ating wind load on cooling tower shell shall 'e %alid onl, i( the towers s&aced at clear distance o( greater than 0.) ti$es the 'ase dia$eter at the (inished graded ground le%el. The theoretical $ethod outlined herein (or$s the 'asis onl, (or assessing lowest li$it o( wind (orces and shell structure interaction. Aor conducting $odel tests" 'idders should sur%e, the whole terrain and $a-e their own assess$ent o( li-el, critical wind (orces 3 wind structure interaction. General to&ogra&h, o( the area is une%en. @t would 'e the res&onsi'ilit, o( the 'idder to collect necessar, $eteorological data dul, %etted (ro$ the recogni/ed go%t. agencies0institutions. A(ter collection o( necessar, $eteorological data" $ost critical wind s&eed" wind &ressure distri'ution and other necessar, &ara$eter shall 'e deter$ined ', the 'idder and get the sa$e %etted ', the a'o%e agenc,0a&&ro&riate agenc,(s). Then with the hel& o( &h,sical $odel tests in a wind tunnel" o((ering a&&ro&riate aerod,na$ic si$ilitude" the 'idder shall o'tain the $ost critical (orces" stresses etc. with cooling tower at %arious le%els and locations. Such $odel test shall also include all ad7acent to&ogra&hical (eatures" 'uildings" and other structures which are li-el, to in(luence the wind load &attern on the tower signi(icantl,. The $odel test shall 'e carried out in a well re&uted institute0testing la'orator, a(ter o'taining &rior a&&ro%al (ro$ the #wner. The testing agenc, selected ', the 'idder shall ha%e re+uisite e2&erience and should ha%e success(ull, carried out tests in the &ast (or at least one cooling tower o( si$ilar ca&acit,. The $odel tests shall 'e dul, witnessed and a&&ro%ed ', the #wner0consultant. The $odel test results shall 'e $ade a%aila'le 'e(ore (inal a&&ro%al o( the design. The co$&lete cooling tower shall 'e designed (or all &ossi'le wind directional and on the 'asis o( worst load conditions as o'tained (ro$
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

8 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

Model test and theoretical $ethods. *nder the theoretical $ethod" the circu$(erential net wind &ressure distri'ution and wind &ressure coe((icient (&1) (or the tower shell (without $eridional ri's) shall 'e o'tained (ro$ the GCriteria (or structural design o( 5ein(orced concrete Nature Dra(t Cooling Towers @S911)0>B1=D). The a'o%e circu$(erential wind &ressure coe((icient (&1) shall 'e increased ', $ulti&l,ing it ', 1.>8 to account (or tur'ulence in the incident wind and load intensi(ication due to tur'ulence induced ', the ad7acent cooling tower or the other structures o( signi(icant di$ensions. There(ore" the actual design circu$(erential net wind &ressure coe((icient (&) shall 'e co$&uted as &H1.>8(&1)" where (&1) is the wind &ressure coe((icient as &er @S9 11)0>B1=D). This design net &ressure coe((icient (&) and the distri'ution along the circu$(erence o( tower shall 'e used at all heights o( the tower. The a'o%e design net &ressure coe((icient (&) shall include the e((ect o( internal suction. @n order to co$&ute the +uasiBstatic design wind &ressure at a gi%en height along the circu$(erence o( the tower" the net design &ressure coe((icient (&) shall 'e $ulti&lied ', the wind &ressure acting at that height IP(/)J. Aor details" re(erence shall 'e $ade to GCriteria (or ind 5esistant Design o( Structures and 4+ui&$entsK &laced under Pro7ect Data and as gi%en 'elow. The wind &ressure at a gi%en height IP(/)J shall 'e co$&uted as &er the sti&ulations o( @S9 DC) (Part 8)B1=DC. Aor co$&uting the design wind &ressure at a gi%en height the 'asic wind s&eed (6') shall 'e ta-en as 6'H)0 $0sec at 10.0 $eters height a'o%e $ean ground le%el. Aor co$&uting design wind s&eed (6/) at a height /" the ris- coBe((icient L1H1.11 shall 'e considered. Aor coe((icient L1" Terrain categor, 1 and class MCF as &er ta'le 1 o( @S9 DC) (PartB8) E 1=DC shall 'e considered. Coe((icient L8 shall 'e deter$ined ', ta-ing into account o( the &resence o( hilloc- near', the &lant site and other (eatures o( the station 3 to&ogra&h,. The wind direction (or design &ur&oses shall 'e the one which would induce the worst load conditions. .owe%er" coe((icient L8 shall 'e less than one under an, circu$stances. The wind &ressure at a gi%en height shall 'e co$&uted theoreticall, in accordance to the @S Codal &osition gi%en as under9 1 P/ H 0.; 6/ N0$$1 The 'idder shall also co$&ute the wind &ressure (&/) along the wind direction ', Gust Aactor (GA) or Gust e((ecti%e (actor $ethod (G4A). Method (or esti$ating the wind load on the tower and other ele$ents" shall 'e 'ased on @S9 DC) (PartB8)B1=DC. hile calculating the gust (actor" the ter$ M'F shall 'e ta-en as the dia$eter o( the throat in Aig. 10 o( @S9 DC) (PartB8)B1=DC.
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

9 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

Design o( the tower shall satis(, +uasiBstatic $ethod 3 G4A $ethod. D,na$ic e((ects on the tower due to wind action shall also 'e in%estigated to ascertain the wind induced oscillation such as o%alling and e2citation along and across the wind direction. !idder shall carr, out detailed anal,sis (or the tower and consider the worst co$'ination o( static 3 d,na$ic e((ects. @n case the 'idder &ro&oses to ado&t aerod,na$ic rough sur(ace such as &ro%ision o( $eridional ri's in the cooling tower shell" the &ressure coe((icients as gi%en in the 6G!B!T5 L*.LT*M54 G45MAN SP4C@A@CAT@#NS (latest) (structural design o( cooling towers) shall 'e &er$itted. The &ro%isions o( !T5 $a, 'e ado&ted (or choosing the %alue o( circu$(erential wind &ressure coe((icient (&1) onl,. The wind &ressure coe((icient (&1)" as o'tained (ro$ !T5 a(ter accounting (or internal suction shall 'e $ulti&lied ', a (actor 1.>8 to arri%e at the net design &ressure coe((icient (&). The 'idder shall (urnish authori/ed 4nglish Translation o( 6G!B!T5 L*.LT*5M4 G45MAN SP4C@A@CAT@#NS (latest) (or the re%iew o( the #wner. All other sti&ulations as s&eci(ied in these s&eci(ications shall 'e $et with. 4ntire anal,sis and designs ado&ted shall 'e (ull, su&&orted with authenticated literatures0docu$ents along with rele%ant re(erences where the sa$e has 'een success(ull, i$&le$ented. Ea th-(a!e Fo ce" The seis$ic anal,sis shall 'e carried out in accordance with @S91D=8 ', $odal anal,sis (or the h,&er'olic cooling towers or an, other $ethod as a&&ro%ed ', the #wner. The earth+ua-e anal,sis o( the shell and its su&&ort colu$ns including the (oundations shall 'e carried out ', res&onse s&ectru$ $ethod. Aor the (ill su&&orting structures (5CC (ra$es) res&onse s&ectru$ $ethod is &er$itted. The $odulus o( elasticit, (or concrete shall 'e o'tained (ro$ @S9 >);B1000 Clause ;.1.8.1 with an Age Aactor o( 1.0. All the anal,sis shall 'e carried out as &er the theor, o( elasticit,. 4ntire anal,sis and designs ado&ted shall 'e (ull, su&&orted with authenticated literatures0docu$ents along with rele%ant re(erence where the sa$e has 'een success(ull, i$&le$ented. Loa%" %(e to te$pe at( e effect" Stresses due to te$&erature e((ects9 The cooling tower shell shall 'e designed (or stress due to a2iB s,$$etric te$&erature distri'ution corres&onding to e2ternal a$'ient
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

10 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

te$&erature %ariation (ro$ 11oC to )0oC. .owe%er" the detailed anal,sis o( actual ther$al gradient ', considering te$&eratures inside the tower and e2ternal a$'ient te$&eratures shall 'e carried out (urnishing detailed re(erences and 7usti(ication (or the sa$e. The shell shall also 'e chec-ed (or ther$al stresses arising due to &artial o&eration o( the tower in case the o&erational &hiloso&h, so de$ands. The anal,sis (or the stresses resulting (ro$ nonBa2iB s,$$etric te$&erature loading shall 'e carried out. @n such nonB s,$$etric te$&erature loading" the calculation shall 'e 'ased u&on the o&erating s&eci(ication. !esides" the shell shall also 'e designed (or one sided solar radiation e((ect. Ne%ertheless an e((ecti%e te$&erature di((erence o( at least 1)0 C across the shell thic-ness constant o%er the height and (ollow a sine (unctions along hal( the circu$(erence shall 'e considered. 4ntire anal,sis and designs ado&ted shall 'e (ull, su&&orted with authenticated literatures 0 docu$ents along with rele%ant re(erences where the sa$e has 'een success(ull, i$&le$ented. Con"t (ctiona' Loa%in#" The $ethod o( construction and the t,&e o( (or$wor- to 'e used shall 'e decided ', the 'idder in ad%ance and should 'e enclosed in the 'ids su'$itted. Construction loadings that $a, occur during e2ecution o( wor- shall 'e considered in the design o( the cooling tower structure. Aactors causing te$&orar, loading $a, include the (ollowing de&ending u&on the $ethod o( construction. a) !arrowing o( concrete ') Sca((olding and (or$worc) Loads &roduced ', anchoring de%ices o( cli$'ing sca((olds. d) .oist (i2ings e) Storage o( $aterials on sca((olding ') Te$&orar, access c) Tower crane (i2ings d) or-s te$&oraril, o$itted (or access &ur&oses. An, other load such as (oundation settle$ent" etc. All loads li-el, to act on cooling tower 'ut not s&eci(ied herein shall also 'e considered (or the design o( cooling tower structures. @n case di((erent degrees o( su'soil sti((ness e2ist" e((ect o( the sa$e shall 'e ta-en into account. @n such a case" (or co$&uting settle$ents" load distri'uting ca&acit, o( the shell $a, 'e considered. Di((erential

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

11 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

settle$ent 'etween ad7acent sections o( (oundation shall 'e considered under $ost un(a%oura'le load co$'ination. 11.00.00 Loa% Co$+ination" Aollowing $ini$u$ load co$'inations shall 'e considered (or the design o( cooling towers structures. a) DL N L N SL ') DL N Se L c) DL N TL d) DL N L N TL N SL e) DL N Se L N TL N SL () 1.0 DL N 1.) L here DL H Dead Load L H ind Load SL H Settle$ent Load Se L H Seis$ic Load TL H Ther$al Load @n addition to a'o%e" construction loads shall 'e dul, accounted (or. *nder TL %arious t,&es o( ther$al loads" as descri'ed a'o%e" shall 'e considered se&aratel,. !esides a'o%e load co$'ination" other load co$'inations as &er rele%ant @S codes shall also 'e (ollowed. 11.00.00 Pe $i""i+'e St e""e" Aor load co$'ination (a) to (e) the stresses in concrete and rein(orce$ent shall 'e restricted as &er li$it state $ethod o( @S9 >); with ser%icea'ilit, criteria o( crac- width li$ited to 0.8$$. Aor the load case (() the shell o( cooling towers shall 'e designed ', li$it state $ethod as &er @S9 >);. The stress in the rein(orce$ent steel shall not e2ceed DC? o( the s&eci(ic characteristic strength o( rein(orce$ent steel and the co$&ressi%e stress in the concrete shall not e2ceed >)? o( the s&eci(ied 1D da,s cu'e strength o( the concrete as &er @S9>);. @n the design o( the cooling tower shell" colu$n" &ile ca&s" &edestals" ring 'ea$s etc. no increase in the strength with the age o( the concrete shall 'e &er$itted. The age (actor e+ual to >.0 shall 'e considered. Per$issi'le stress (or steel structures shall 'e as &er @S9 D00 (latest) 'ased on wor-ing stresses. 18.00.00 To)e De"i#n Con"i%e ation
ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

12 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

i)

General The co$&lete cooling tower" including the shell" colu$ns" ring 'ea$ and (oundation" shall 'e structurall, anal,/ed using a &ro%en (inite ele$ent $odeling techni+ue or an a&&ro%ed alternati%e $ethod including %alidation o( so(tware used (or anal,sis. Aor elastic anal,sis" concrete $a, 'e assu$ed to 'e uncrac-ed" ho$ogenous and isotro&ic. The design geo$etric &ro(ile" thic-ness %ariation and su&&ort conditions o( shell shall 'e considered in the structural anal,sis. 5egardless o( anal,sis $ethod ado&ted" the e+uili'riu$ chec-s o( internal (orces and e2ternal loads shall 'e &er(or$ed. Anal,sis 'ased on a recogni/ed 'ending theor, o( the elastic shells shall 'e ado&ted (or the design o( the tower and su&&orting structures. Geo$etric i$&er(ections" i( e2ceed the &er$issi'le li$it" then the anal,sis o( shell shall ta-e into account o( such i$&er(ections and resu'$itted (or #wnerFs a&&ro%al. !oundar, conditions shall 'e realistic and 'ased on actual con(iguration. The $agnitude o( the calculated dis&lace$ents should 'e within li$its o( the a&&lied theor,. A detailed d,na$ic anal,sis shall 'e carried out (or co$&lete tower (or seis$ic (orces ', res&onse s&ectru$ $ethod. Cooling tower shall also 'e designed (or cross wind oscillations (wind induced %i'ration) i( the (unda$ental natural (re+uenc, o( the tower is less than or e+ual to 1 ./. Are+uenc, calculation (or (ree %i'ration anal,sis shall also 'e (urnished ', 'idder during detailed engineering.

@@)

Si/e and Sha&e The 'ase dia$eter" air inta-e o&ening height" tower height and throat dia$eter shall 'e deter$ined ', ther$al design consideration ', the 'idder and su'$itted to #wner (or a&&ro%al. As the range o( &ossi'le h,&er'olic shell sha&es is in(inite" the sa$e shall generall, con(or$ to the (ollowing $a7or &ro&ortions" which ha%e 'een e2tensi%el, ado&ted in cooling tower constructions. .0D H 1.1 to 1.)) here . is the total tower height a'o%e 'asin sill le%el

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

13 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

.'0. H 0.C) to 0.D) .' is the %ertical distance (ro$ the throat to 'asin sill le%el and MDF is the 'ase dia$eter at 'asin sill le%el. .owe%er" other &ro%en &ro(iles $a, 'e &er$itted su'7ect to a&&ro%al (ro$ the #wner. !idders shall su'$it along with the o((er co$&lete details o( the &ro(ile" in case the &ro(ile is not within the li$its stated a'o%e" and the na$es o( the sites where such shell &ro(iles ha%e 'een success(ull, constructed. Notwithstanding what is stated a'o%e" the #wner reser%es the right to acce&t 0 re7ect the shell &ro(ile. @@@) Tower Shell !oundar, Conditions A. Shell Anal,sis and Design The (ollowing 'oundar, conditions shall 'e assu$ed (or the design o( cooling tower shell9 a) At *&&er 4dge The to& edge o( the shell shall 'e graduall, thic-ened to (or$ a ring 'ea$ to guard against &ossi'le insta'ilit, o( the to& o( the shell due to high %elocit, wind gusts. To& edge shall 'e considered as a (ree edge in the anal,sis. ') At Lower 4dge The lower edge o( the shell shall 'e thic-ened to (or$ a lower ring 'ea$. The thic-ness transition (ro$ shell to lower ring 'ea$ shall 'e s$ooth and shall 'e considered as an integral &art o( the shell. The lower 'oundar, o( the shell shall 'e considered as elasticall, su&&orted ', discrete colu$ns. The in(luence o( 'oth su&&ort structure (le2i'ilit, and (oundation settle$ent shall 'e considered in the anal,sis and design o( cooling tower shell. The shell anal,sis should include (ollowing in(or$ation at 10o &lan angle and o( not $ore than 0.0) o( the shell height. i) ii) iii) !. Meridional and circu$(erential direct stress resultants and the tangential shear stress resultants. Meridional and circu$(erential 'ending $o$ents. Dis&lace$ents nor$al to the shell $idBsur(ace.

!uc-ling o( Tower Shells

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

14 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

Critical d,na$ic &ressure (wind &ressure) at 'uc-ling shall 'e alculated (ro$ !S9 >>D) PartB>91==;. The shell 'uc-ling shall 'e chec-ed using the design d,na$ic wind &ressure and other rele%ant loads acting on the tower. The (actor o( sa(et, against 'uc-ling shall 'e not less than ) (or the co$&leted tower as well as while under construction. !esides a'o%e" a 'uc-ling anal,sis with wind (orces should 'e $ade using the theoretical tower geo$etr, and 'oundar, conditions" including the in(luence o( dead weight" ', the $ethod o( 'uc-ling stress state (!SS) a&&roach in accordance with the &ro%isions o( 6G!. The 'uc-ling sa(et, (actor shall 'e at least ).0 (or load co$'inations o( dead load N wind load. hen i$&er(ections in the shell geo$etr, are larger than s&eci(ied tolerances" the anal,sis should 'e rechec-ed to account (or such i$&er(ections and ensure that the desired 'uc-ling ca&acit, re$ains. C. #&ening in Shells #&ening through the shells should 'e a%oided as (ar as &ossi'le. The, should 'e o( s$allest re+uired di$ensions and shall 'e sha&ed such that stress concentration is $ini$i/ed at the 'oundar, o( the o&ening. Should thic-ening o( the edges 'e necessar," it shall 'e s$oothl, te$&ered 'ac- to the shell thic-ness. #&enings shall 'e &ro%ided with additional edge rein(orce$ent o( a $ini$u$ cross sectional area at each edge e+ual to C)? o( the rein(orce$ent interce&ted ', the o&enings in the direction &arallel to the edges. @n addition diagonal rein(orce$ent shall 'e &ro%ided at each corner as close as &ossi'le. The total crossB sectional area in c$1 o( this rein(orce$ent shall 'e 0.)d" at each corner whereMdF is the shell thic-ness in c$. No hori/ontal thrust due to the inlet &i&ing shall 'e trans$itted to the shell. D. Mini$u$ Thic-ness o( Shell The $ini$u$ thic-ness o( the shell shall not 'e less than 100 $$.

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

15 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO
4.

Mini$u$ 5ein(orce$ent in Shell S&acing and Place$ent The rein(orce$ent used shall 'e cold wor-ed steel high strength de(or$ed 'ars o( grade Ae >1) con(or$ing to @S9 1CD; E latest. All rein(orce$ent steel shall 'e corrosion resistant steel o( Marine grade suita'le (or $arine a&&lication. 5ein(orce$ent steel higher than Ae>1) grade $a, 'e used i( &er$itted ', the #wner. The $ini$u$ rein(orce$ent to 'e &ro%ided shall 'e as (ollows9 To& one third &ortion o( shell9 0.>? o( concrete cross sectional area along circu$(erential direction and 0.8)? o( concrete cross sectional area along $eridional direction. 5e$aining twoBthird &ortion9 0.8)? o( concrete cross o( shell sectional are in 'oth $eridional and circu$(erential directions. Mini$u$ 'ar dia$eter shall 'e 10 $$ in trans%erse direction and 11 $$ in $eridional direction. S&acing o( rein(orcing 'ars should not e2ceed 100 $$ in circu$(erential direction and 1)0 $$ in $eridional direction. The two la,ers o( rein(orcing $eshes shall 'e ade+uatel, 7oined ', SBhoo- o%er the total shell sur(ace. At least two SBhoo-s in each s+uare $etre area o( shell sur(ace shall 'e &ro%ided. The hoo-s shall 'e o( $ini$u$ ; $$ dia$eter 'ars. The concrete co%er shall 'e )0 $$ $ini$u$. The rele%ant &ro%isions o( @S9 1110 E Criteria (or the design o( rein(orced concrete shell structures and (olded &lates and @S9 110> E Code o( Practice (or construction o( rein(orced concrete shell roo( shall also 'e dee$ed to 'e a&&lica'le. All other design criteria (or the cooling tower shell which are not s&eci(ied a'o%e shall 'e in accordance with !S9 >>D) Part > and !T5.

A.

Pro%ision o( $eridional ri's in Cooling Tower Shell Meridional ri's in the cooling tower shell $a, 'e &ro%ided su'7ect to the (ollowing conditions9 a) ') Mini$u$ thic-ness o( shell e2cluding ri's shall not 'e less than 100 $$. CoBe((icients (or &ressure distri'ution around the cooling tower circu$(erence including suction $a, 'e ta-en as &er 6G!B!T5 L*C.LT*5M4N SP4C@A@CAT@#NS
ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

16 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

(latest). All other (actors including load intensi(ication (actors shall 'e as s&eci(ied else where in these s&eci(ications. c) d) e) Shell 'uc-ling and strength shall 'e chec-ed as &er clauseB' a'o%e without considering the e((ect o( ri's. All other sti&ulations as s&eci(ied in these s&eci(ications shall 'e $et with. !idder shall (urnish an authori/ed 4nglish translation o( the 6G!B!T5 L*.LT*5M4 G45MAN SP4C@A@CAT@#NS (Latest) during detailed engineering stage.

@6)

5a-er Colu$ns @nclination o( the colu$n shall closel, $atch the $eridional slo&e at the shell so that the load trans(er to (oundation ta-es &lace through &redo$inantl, a2ial (orce in colu$ns. 5a-er colu$ns shall 'e designed (or the $ost critical (orces trans(erred to an indi%idual ra-e colu$n (ro$ su&erstructure considering %arious load co$'inations as s&eci(ied in this docu$ent. Aor selecting e((ecti%e length o( the ra-er colu$ns" (ollowing restraints shall 'e considered9 a) @n case colu$ns restrained at 'oth the ends" the e((ecti%e length shall 'e 0.D and 0.; ti$es the length o( the colu$n radiall, and tangentiall, res&ecti%el,. @n case colu$ns are restrained at one end onl," the e((ecti%e length o( colu$ns shall 'e 0.= and 0.C ti$e the length o( colu$ns radiall, and tangentiall, res&ecti%el,. The colu$ns shall 'e designed 'ased on wor-ing stress $ethod e2ce&t (or the (orces (ro$ DL N 1.) L which shall 'e designed as &er li$it state o( strength $ethod o( @S9>);. idth Control

')

c)

6)

Crac-

*nder wor-ing stress $ethod the $a2i$u$ crac- width o( tower shell" lintels" ra-er colu$ns" cold water 'asin and (ill su&&ort structure shall 'e controlled u& to 0.8 $$ on 'asis o( (or$ulas as &er @S9>); and rele%ant !ritish codes.

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

17 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

Aill su&&ort structures and Dri(t 4li$inators shall 'e designed as &er the load co$'inations s&eci(ied in this docu$ent. A&&ro&riate Li%e Loads and i$&osed loads shall also 'e considered in addition. The design shall con(ir$ to li$it state $ethod as &er @S9 >);. Aor (ill su&&ort structure" the design shall 'e done considering the weight o( (ills" (alling water" &lugging0scaling load and the li%e load due to the $aintenance acti%ities. 6@) Prestressed Concrete Me$'ers Design construction and wor-$anshi& o( &restressed concrete" $e$'ers shall 'e in accordance with @S9 18>8 (Latest re%ision). Steel wire (or &restressing shall con(or$ to @S9 1CD) (Part 1) (latest edition) or @S9 ;008 (latest edition). Crac- width control shall 'e li$ited to 0.1 $$. Particular attention shall 'e &aid to achie%e an e((ecti%e 'ond o( the wires in &retensioned concrete units. Aor this &ur&ose" indented wire shall 'e used. ires shall 'e corrosion resistant ($arine grade) or should ha%e coating s,ste$ (it (or seawater dut, condition. 6@@) Li+uid 5etaining Structures a) The cold water 'asin including sludge &its" cold water channels" shall 'e designed as &er @S9>); (latest) with crac- width control o( 0.1 $$ (or outer (ace o( the wall and inside (ace o( the wall shall 'e designed as &er @S 88C0.

The structures shall 'e designed (or the (ollowing conditions9 i. ii. ater (illed inside u& to $a2i$u$ le%el and no earth outside. 4arth &ressure with surcharge load o( 1.) t0$1" as a&&lica'le" and with0without ground water ta'le at (inal graded ground le%el outside and no water inside.

')

c) d) e)

The 'asin and associated structures shall 'e chec-ed against u&li(t (or 'asin e$&t, condition. Sta'ilit, shall 'e chec-ed during construction stage as well as $aintenance stage. The (actor o( sa(et, shall 'e as &er @S9 88C0. Loads during construction" erection and $aintenance stage shall also 'e considered. Te$&erature (luctuations (ro$ o&eration shall 'e o'tained (ro$ the design data. .ot water te$&erature inside and cold air te$&erature outside shall 'e considered. !asin (loor sla' shall 'e designed to rest on &iles or ra(t0$at (oundation including (illB&ac- su&&ort structures. The sti((ness o( the su'soil shall 'e ta-en into account. The (ounding le%el o( the ra(t0$at shall 'e either on %irgin ground le%el or shall 'e &laced at higher le%el onl, a(ter
ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

18 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

()

g) 6@@@)

scoo&ing out (illed u& soil u& to %irgin ground and then (illing 'ac- with well co$&acted sand (D0? o( relati%e densit,) u& to the (ounding le%el o( the ra(t0$at. The 'idder shall ascertain the sa(e 'earing ca&acit, o( the stratu$ at the (ounding le%el and $a, ado&t the sa$e su'7ect to #wnerFs a&&ro%al. Mini$u$ thic-ness o( 'asin sla' shall 'e 800 $$ with $ini$u$ rein(orce$ent 0.8)? o( gross sectional area in 'oth the directions. 5ein(orce$ent shall 'e &laced in two la,ers" to& and 'otto$ sur(ace. The e((ect o( &ro%ision o( (la& %al%es0&ressure release %al%es shall not 'e considered in the design o( C 'asin. @n the s&ace underneath the 'asin (loor sla' a la,er o( at least 100 $$ thic- PCC o( $i2 1989; shall 'e &ro%ided. All rein(orce$ents used shall 'e corrosion resistant steel o( $arine grade. ater Distri'ution S,ste$ The structural design o( the water distri'ution s,ste$ shall consider the worst co$'ination o( (ollowing loads9 i) Sel( weight" other i$&osed loads and li%e load. ii) .,draulic &ressures during nor$al o&erations including &ressure surges. iii) .,draulic &ressure due to $alBo&eration o( the tower or su&&l, &u$&s. The water distri'ution s,ste$ shall 'e &ro%ided with ade+uate &ressure surge relie( (acilities to &re%ent &ressure loading in e2cess o( %alues used in the design. @( such (acilities are not &ro%ided" a (urther increase in loading shall 'e considered in the design. Aor the structural design the &ressure le%el to 'e considered shall not 'e less than 1.) ti$es the design &ressure. The design o( water distri'ution s,ste$ and its su&&orts shall 'e ca&a'le o( acco$$odating all ther$al stresses and $o%e$ents due to changes in inlet water te$&erature and a$'ient te$&erature. The &ossi'ilit, o( %i'rations 'eing i$&osed on the distri'ution s,ste$ shall 'e in%estigated in the design. Seis$ic loading on the water distri'ution s,ste$ shall also 'e ta-en into account. The design shall 'e carried out 'ased on uncrac-ed section as &er @S9 88C0 under nor$al o&erating conditions. Strength chec- (or worst loading including $al(unctioning shall 'e carried out with stress li$itations as &er @S9 88C0. The construction shall 'e co$&letel, water tight without the use o( (illets" sealing co$&ounds etc. The $ethod o(

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

19 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

construction shall 'e such so as to a%oid e2cessi%e rise in te$&erature o( concrete due to release o( heat o( h,dration. @O) Plat(or$s" al-wa,s" Stairwa,s" Staircases" @nternal Grillage etc.

These shall 'e designed as &er wor-ing stress $ethod @S9 >);B1=CD and @S9 D00 (Latest). The crac- width in all 5CC structures shall 'e li$ited to 0.1 $$. A $ini$u$ li%e load o( >00 -+0s+$ shall 'e considered (or the design o( all &lat(or$s" wal-wa,s" staircases etc. in addition to their own weight. O) Steel Structures These structures shall 'e designed" (a'ricated and erected as &er @S9 D00 (latest re%ision) and other rele%ant @ndian Standard codes (or structural steel wor-. All steel structures shall 'e coated with antiB corrosi%e s,ste$. O@) Slide Gates and Screens Slide Gates and Screens" as &er @S9 );10 con(or$ing to @S9 10;1 Gr. A" shall 'e designed (or worst co$'ination o( o&erating and $aintenance condition. All steel co$&onents shall 'e coated with antiBcorrosi%e &aint s,ste$. .owe%er" all guides o( slide gates and screens shall 'e o( stainless steel o( Grade A@S@ 80>L. O@@) Aoundations The design o( the tower (oundation structures shall 'e 'ased on @S9 >); as er wor-ing stress $ethod (or worst load co$'ination as &er clause 1).C.D. @n case o( load co$'ination DL N 1.) L" the li$it state $ethod as &er @S9 >); shall 'e ado&ted. Aoundation shall 'e chec-ed (or sa(et, against o%erturning" sliding and u&li(t. hile chec-ing sta'ilit, o( the structures" neglect (a%oura'l, acting loads (ro$ water (ill" soil co%er 'e,ond the edge o( the (oundation. .igh ground water le%el u& to (inal graded ground le%el shall 'e considered to ta-e into account 'uo,anc, e((ect. The (oundation shall 'e o( $ini$u$ MB1) grade concrete resting o%er 100 $$ thic- PCC 1989; la,ers. Clear co%er o( concrete shall not 'e less than )0 $$. Pile (oundation i( ado&ted shall 'e designed in accordance with @S9 1=11(PartB@ 0 SecB@" @@ and @@@).

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

20 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

Generall, net tension should 'e a%oided in the (oundations0&iles (or the shell su&&ort (oundation unless s&eci(icall, &er$itted ', the #wner. hile accounting (or o%er 'urden o( the soil (or chec-ing the (oundation against u&Bli(t" dead weight o( the soil directl, a'o%e the &ile ca& or ring ra(t" as the case $a, 'e" shall onl, 'e considered" neglecting the weight o( soil in the cone o( u&Bli(t a'o%e the (oundation. The (oundation structures will 'e su'7ected to (ollowing loading and e2tre$e load co$'ination case shall 'e considered (or design. 1. 1. 8. >. ). ;. Most critical (orces trans(erred (ro$ su&erstructure (or the %arious load co$'inations. *&li(t (orces Loading due to (oundation settle$ent Concentrated local loading (ro$ colu$n nodes Ther$all, induced local loading where su&&l, cul%erts &ass through the (oundation structures without structural isolation. Surcharge o( 1.) t0s+.$.

C 'asin surcharge load shall also 'e considered in addition to the other rele%ant loads (or the design. O@@@) Aill Su&&ort Structures and #ther Structures The sel( weight o( the &ac- su&&ort structures shall 'e 'ased on the weight o( the &ac-ing including weight o( standing" running and dri&&ing water" other o&eration and &lugging0choc-ing (de'ris0scaling) loads" etc. in accordance with $anu(acturerFs data. @n addition" a li%e load o( 100 -g0$1 shall also 'e considered (or the design o( su&&orting structures. Aor other structures li-e wal-wa,s" &lat(or$s" etc. a li%e load o( >00 -g0s+.$ shall 'e considered. .and railings shall 'e designed (or hori/ontal load o( ;0 -g0$1. ind de(lector walls and an, other structural ele$ents shall 'e designed (or a hori/ontal wind load o( D0 -+0s+$ or as &er $anu(acturerFs reco$$endations" whiche%er is higher. Ther$al loading shall 'e as &er $anu(acturerFs reco$$endations. 4arth+ua-e loading shall 'e considered 'ased on criteria gi%en (or cooling tower. 5es&onse s&ectru$ anal,sis shall 'e considered. Design o( 5CC $e$'ers shall 'e 'ased on @S9 >);91000 with li$iting crac- width o( 0.1 $$. The cold water 'asin sla'0ra(t shall (or$ the co$$on (oundation (or the &ac- su&&ort structures. The (oundation shall 'e designed (or the $ost
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

21 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

critical (orces trans(erred (ro$ C 'asin 3 (ill su&&orting structures including loads introduced ', constructional e+ui&$ents and crane de&lo,ed (or (ill su&&orting structure or shell erection. O@6) 5e+uire$ents (or Concrete and 5ein(orce$ent Structural concrete shall 'e o( design $i2 co$&l,ing with the rele%ant &ro%isions o( @S codes or an, @nternational Code o( Practice as a&&ro%ed ', the #wner. Dura'ilit, o( the concrete shall con(or$ to se%ere e2&osure categor, as &er Ta'le 1= o( @S9 >); e2ce&t noted s&eci(icall, otherwise. Mini$u$ ce$ent content o( all 5CC structures shall 'e 8;0 -g0cu$ e2ce&t in case o( concrete 'lended with GG!S s&eci(ied a'o%e 3 &iling. 5ein(orce$ent shall con(er to grade Ae >1) as &er @S9 1CD; e2ce&t noted otherwise. All rein(orce$ents used in 5CC structure shall 'e corrosion resistant o( $arine grade. Colu$n rein(orcing 'ars shall 'e care(ull, anchored in the shell and (oundation. The anchoring length shall not 'e less than D0 ti$e the dia$eter o( the 'ars. All (oundations structures shall 'e &ro%ided on all sides with a $ini$u$ rein(orce$ent o( 0.11? o( gross crossBsectional area distri'uted o%er to& and 'otto$ (aces. The $ini$u$ grade o( concrete o( structural co$&onents o( cooling towers shall 'e as (ollows in accordance with @S9 >);. a) ') c) d) e) () g) Shell and 5a-er Colu$ns PreBcast &reBstressed ele$ents All other 5CC concrete PCC encase$ent concrete e2ce&t &iles Piles (with #PC0PPC0PAC) Tower (oundation Mud $at PCC 9 MB>0 grade 9 MB8) grade 9 MB80 grade 9 MB1) grade 9 MB1) grade 9 MB1) grade 9 MB10 grade

Coarse and (ine aggregates shall 'e s&eciall, selected to ensure that the, are not susce&ti'le to al-ali0chloride attach or &rone to disintegration at high te$&eratures. @n &articular li$estone aggregates shall ne%er 'e used. The $a2i$u$ si/e o( coarse shall not 'e larger than 10Dth narrowest di$ension 'etween rein(orce$ent 'ars not $ore than 10 $$. ashing and screening o( coarse and (ine aggregates to re$o%e (ines" dirt or other deleterious $aterials shall 'e carried out ', a&&ro%ed $eans as directed ', the 4ngineerBinBcharge.

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

22 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

The water ce$ent ratio ', weight shall 'e 0.>) $a2i$u$ including (ree $oisture in the aggregates" and slu$& should 'e suita'l, decided to &ro%ide good +ualit, concrete wor-. O6) Ad$i2tures Ad$i2tures $a, 'e &er$itted to 'e used in accordance with rele%ant @S codes to $odi(, the rate o( hardening or setting" to i$&ro%e wor-a'ilit, or as an aid to control concrete +ualit,. The #wner reser%es the right to direct the contractor to conduct la'orator, tests or use test data" or other satis(actor, re(erence 'e(ore granting a&&ro%al. The cost o( all tests conducted shall 'e 'orne ', the contractor. The ad$i2ture shall 'e used in strict accordance with the $anu(acturerFs directions and0or as directed ', the #wner. No e2tra &a,$ent will 'e $ade to the contractor on account o( using ad$i2tures. Particular attention $ust 'e gi%en to concrete &lace$ent 'ecause o( the thin wall section and the &resence o( rein(orcing steel. Consolidation o( concrete shall 'e ', %i'ration. 5e$o%al o( air and water at the (or$ sur(ace shall 'e ', %i'ration and rodding. Particular attention shall 'e &aid to accuratel, sha&e the corners at all o&enings. Point o( discharge o( the concrete in to the (or$s 'e 1)00 $$ $a2. a'o%e the concrete sur(ace. Concrete shall 'e de&osited in a&&ro2i$atel, le%el la,ers not greater than >00 $$ dee& unless &er$itted otherwise. Concrete in the cooling tower shell in each li(t shall 'e so laid that the no. o( %ertical or inclined construction 7oints are $ini$i/ed to the e2tent &ossi'le. .ori/ontal construction 7oints shall 'e $aintained at uni(or$ s&acing throughout the height o( the cooling tower as &er the directions o( the #wner. S&ecial attention shall 'e &aid to &ro&er curing o( %ertical (aces o( the cooling tower shell so that these do not re$ain dr,. All thin walled structural $e$'ers shall 'e &rotected ', $eans o( curing agents. @t is reco$$ended to use a curing agent (or the cooling tower shell &ro%iding additional &rotection li-e a single trans&arent cooling with a $aterial 'ased on %in,l $i2ed &ol,$er. @nside (ace o( the shell should 'e &rotected ', a second &ig$ented coating o( the na$e 'ase $aterial. An, other $ethod o( curing" i( &er$itted ', the #wner $a, 'e used. Sa$&ling and testing o( concrete shall 'e carried out as stated in Technical S&eci(ication elsewhere and as &er rele%ant @ndian Standard Codes. .owe%er" (ollowing $ini$u$ tests shall 'e carried out" irres&ecti%e o( whate%er stated otherwise9

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

23 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

Test o( co$&ressi%e strength Colu$ns E 1 Set o( 8 cu'es &er colu$n ShellB1 sets o( 8 cu'es &er cli$'ing section O6@) Co%er to 5ein(orce$ent *nless indicated otherwise the clear concrete co%er (or rein(orce$ent shall 'e as &er @S Codes. The correct co%er shall 'e $aintained ', ce$ent $ortar s&acers0cu'es or other a&&ro%ed $eans" rein(orce$ent (or (ooting0&ile ca&s" grade 'ea$" and sla's on su'Bgrade shall 'e su&&orted on &reBcast concrete co%er 'loc- as a&&ro%ed ', 4ngineerBinBcharge. The use o( &e''les or stones as co%er 'loc-s shall not 'e &er$itted. The 1D da,s crushing strength o( ce$ent $ortar cu'es0&reBcast concrete co%er 'loc-s shall 'e at least e+ual to the s&eci(ied strength o( concrete in which the cu'es 0 'loc-s are e$'edded. The $ini$u$ clear distance 'etween rein(orcing 'ars shall 'e in accordance with @S9>); (latest edition) or as s&eci(ied elsewhere in this s&eci(ication. All la&&ing o( rein(orce$ent 'ars in the cooling tower shell shall 'e ', la&&ing as &er rele%ant codal &ro%isions. Prior a&&ro%al o( the #wner shall 'e ta-en (or deciding the $ethod o( la&&ing the rein(orce$ent 'ars in the shell. Tolerances (or the cooling tower construction shall 'e in accordance with the (ollowing9 i) ii) iii) i%) %) O6@@) Shell wall centerline in hori/ontal &lane $easured radiall, at $id &oint on a 8$ wide chord is N 1) $$. Shell wall centerline in $eridional &lane $easured o%er a height o( 1$ is N 10 $$. Shell thic-ness is N 10 $$ or B)$$. .ori/ontal radius o( shell at an, section other than shell 'ase is P )0 $$. .ori/ontal radius at shell 'ase is P >0 $$.

Chec-ing o( shell geo$etr, Chec- (or a'solute &ositions $a, 'e carried out (ro$ ground stations arranged at not $ore than 10 degree &lan angle a&art. 5eadings o( hori/ontal radius shall 'e ta-en at e%er, ;$ height or wee-l, during construction &eriod whiche%er is $ore (re+uent.

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

24 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

@( the &er$issi'le di$ensional tolerance are e2ceeded the #wner will instruct the contractor" in writing" to sto& construction o( the shell. The Contractor shall then e2a$ine the situation and su'$it a re&ort to the #wner who $a, re+uire the contractor to de$onstrate ', calculations that the structural integrit, o( the shell will not 'e i$&aired as a result o( the i$&er(ections. The calculations shall 'e su'$itted to the #wner" (or a&&ro%al" 'e(ore construction will 'e &er$itted to &roceed. @( in the o&inion o( the #wner the calculations show that the integrit, o( the shell could 'e threatened" the Contractor will 'e re+uired to su'$it to the #wner detailed arrange$ent and su&&orting calculations to set right the shell geo$etr, (or a&&ro%al" 'e(ore construction will 'e &er$itted to &roceed. The cost o( carr,ing out the calculation" an, re$edial wor- re+uired and idle ti$e or an, dela,s to the construction &rogra$$e as a result o( di$ensional tolerances 'eing e2ceeded will 'e 'orne ', the contractor. Ad7ust$ent to the tower shell line on the 'asis o( the sur%e, results shall 'e $ade graduall,Q li$iting the $a2i$u$ change o( direction (ro$ the e2isting %ertical shell &ro(ile to 'e not $ore than an angular change o( 10 $$ $easured o%er 1$ o( height. An, such ad7ust$ent shall 'e $ade with (ull -nowledge and consent o( the #wner. The contractor shall carr, out an asB'uiltBsur%e, o( each li(t o( the shell. The results o( these chec-s will 'e recorded on a suita'l, de%elo&ed drawing o( the shell (ro$ which it will 'e &ossi'le to locate the sur%e, chec- &oint. A co&, o( these results will 'e &resented to the #wner &rior to co$$encing the ne2t shell &our. The contractorFs shell construction &rocedures shall include (or &ro%iding the #wner with the (acilities and a reasona'le ti$e &eriod as $a, 'e re+uired to carr, out an inde&endent chec- o( the co$&leted wor-s. Suita'le co$$unication s,ste$ such as tele&hone" wireless e+ui&$ents" etc. shall 'e &ro%ided ', the contractor so that the co$$unications are C&ossi'le at di((erent ele%ations o( the tower (ro$ the ground during construction. All &iling wor- shall 'e carried out ', s&ecialist su'contractor a&&ro%ed ', the #wner. @nitial &ile load test shall 'e carried out (or at least 8 sets o( &iles (or direct co$&ression and lateral load. Since the e((ecti%e action o( the &iles will de&end on the ado&ted $ethod o( construction" the contractor shall guarantee that the &iles" as
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

25 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

constructed ', the su'Bcontractor" shall e((ecti%el, trans$it the $a2i$u$ loads which can 'e i$&osed on the (oundation soil and corres&onding $a2i$u$ de(lections. O6@@@) General 5e+uire$ents i) The 'asin sla' shall 'e di%ided into two e+ual &arts ', a &artition wall designed to withstand (ull h,drostatic &ressure" with one side e$&t,. The 'asin construction 7oints shall 'e $ade watertight ', in7ection o( che$ical grout through ni&&les. The 'asin construction shall 'e tested (or water tightness" in accordance with @S9 88C0 (Part @) (Latest edition). The cost o( the test and an, recti(ication and reBtest i( re+uired is dee$ed to 'e included in the contractorFs +uoted &rice. An, cost o( (illing and e$&t,ing o( the 'asin and to recti(, de(ects shall also 'e 'orne ', the contractor. P6C ri''ed water sto&s with central 'ul' shall 'e used where e2&ansion 7oints are en%isaged. The $ini$u$ thic-ness o( P6C ri''ed water sto&s with central 'ul' will 'e 10 $$ and $ini$u$ width 1)0 $$. The 'asin (loor o( each co$&art$ent shall 'e &ro%ided with a slo&e o( not less than 1 in )00 towards su$& (or dewatering. Aro$ su$&" the water will 'e drained ', C.@. drain &i&e" e$'edded 'elow the 'asin (loor" into a drain cha$'er outside the tower 'asin or as &er the arrange$ents descri'ed elsewhere in the tender docu$ent. Suita'le sluice gates (rising s&indle t,&e) con(or$ing to @S9 80>1 or sluice %al%es shall 'e &ro%ided in the drain cha$'er or an, other arrange$ent s&eci(ied elsewhere in the tender docu$ent. Suita'le o&erating &lat(or$ with access ladders (or o&erating the gates or %al%es and &i&es" shall 'e &ro%ided in the drain 'o2. A 1)0 $$ high sill shall se&arate the &ond (loor (ro$ the tower outlet. *ni(or$ sur(ace on the to& o( 'asin (loor shall 'e &ro%ided. @n case undulated sur(ace is o'ser%ed" a to& o( la,er o( $ini$u$ 1) $$ thic- 1.8 $i2 $ortar to 'e &ro%ided to achie%e uni(or$ sur(ace. Aill will 'e o( (il$ t,&e su&&orted on 5CC 'ea$. Ail$ (ill should 'e characteri/ed ', reduced air &ressure losses" and shall not susce&ti'le to clogging. Design and (acing o( the (il$ (ill shall 'e such as to e2&ose high air0water sur(ace with $ini$u$ air &ressure dro&.
ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

ii)

iii)

i%) %)

%i)

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

26 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

The sluice gate s shall 'e structural steel with antiBcorrosi%e coating s&eci(ied elsewhere. Nu$'er o( sluice gates and re$o%a'le screen shall 'e two (1) &er tower. Pro&er ru''er seal shall 'e &ro%ided so as to a%oid an, lea-age o( water. The ru''er seal &ro%ided (or the sluice gate s 'e tested in accordance with the rele%ant @ndian Standard Code. Sluice gate s shall 'e chec-ed (or water tightness and s$ooth o&eration in dr, and wet conditions. Suita'le (acilities" as a&&ro%ed ', the #wner" shall 'e &ro%ided (or handling o( sluice gates and screens. A screed or concrete la,er not less than 100 $$ thic- and o( grade not wea-er than 1989; $i2 con(or$ing to @S9 >);B1000 shall 'e &ro%ided 'elow the cold water 'asin and other li+uid retaining structures. Lean concrete 'elow other (oundations and underground structures" unless noted otherwise shall 'e 1989; no$inal $i2 (with aggregate o( no$inal si/e >0 $$ $a2i$u$) and shall 'e at least 100 $$ thic-. All e2&osed sur(aces o( concrete including sur(ace o( cooling tower shell shall 'e gi%en two or $ore coat o( water&roo( ce$ent &aint o( a&&ro%ed $a-e and colour. *nless noted otherwise all concrete sur(ace which are in contact with the earth shall 'e a&&lied with anticorrosi%e coat s,ste$. ater &roo(ing and &lastici/er ad$i2tures con(or$ing to rele%ant @S codes $a, 'e added as &er $anu(acturerFs instruction to the concrete su'7ect to a&&ro%al o( the #wner. The tower shall 'e &ro%ided with two nu$'ers e2ternal 5C staircase" leading to a hea%, dut, door gi%ing access to the distri'ution s,ste$. Staircase shall 'e $ini$u$ 1000 $$ wide (clear)" with landings o( $ini$u$ width o( 1000 $$ at not $ore than 1)00 $$ height inter%als unless a&&ro%ed otherwise. The ste&s shall ha%e a rise o( a'out 11) $$ and tread o( a'out 1)0 $$. AntiBs-id nosing at each ste& shall 'e &ro%ided. Mini$u$ si/e o( all doors shall 'e 1100 $$ high (clear) and 1100 $$ wide (clear). The door shall 'e o( steel with antiBcorrosi%e coating o( &ol,urethane as s&eci(ied elsewhere. .owe%er" A5P $aterial or e+ui%alent $a, also 'e used su'7ect to a&&ro%al o( the #wner. The door shall 'e air tight when closed.

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

27 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

The hand railing on 'oth sides o( the staircase shall 'e gal%ani/ed with three rails o( 81 $$ N! &i&es con(or$ing to $ediu$ class as &er @S9118=" and &osts con(or$ing to $ediu$ class as &er @S9118= o( 81 $$ dia gal%ani/ed &i&es s&aced not $ore than 1.1 $ centers. The to& hand rail shall 'e at 1000 $$ a'o%e the ste&s. Co$&lete hand rails shall 'e a&&lied with antiBcorrosi%e coating s,ste$ as s&eci(ied elsewhere. All gal%ani/ation wor- shall ha%e ;10 g$0s+.$ o( de&osit. A&&ro%ed wal-wa,s and &lat(or$s shall 'e &ro%ided inside the tower at distri'ution &i&e le%el. These wal-wa,s and &lat(or$s shall &ro%ide sa(e and clear access to all s&ra,ers and all distri'ution &i&es. A rein(orced concrete &lat(or$ o( 1)00 $$ clear width shall 'e &ro%ided around the tower %al%es. #ther wal-wa,s shall 'e at least ;00 $$ wide with )0 $$ ($ini$u$) sa(et, -er's along each edge. Access wa,s shall 'e clear o( all o'structions such as distri'ution &i&e su&&ort 'ea$s" dri(t eli$inator su&&ort 'ea$s etc. The wal-wa,s shall 'e &ro%ided with trans%erse slots or other o&ening which will &er$it the (ree &assage o( air and water. .ot dou'le di& gal%ani/ed handrails as descri'ed a'o%e shall 'e &ro%ided on all sides where there is a ris- o( (alling through the (ill. 5ein(orced concrete &lat(or$s 1.1 $ clear width all around the tower circu$(erence shall 'e &ro%ided on the tower (or (i2ing o( a%iation warning light at le%els s&eci(ied elsewhere. Two (1) dia$etricall, o&&osite gal%ani/ed MS caged ladders" ;00 $$ wide" $ade out o( ; $$" 2 10 $$ (lats (or (ull height o( the tower shall 'e &ro%ided as &er @S9 8;=;. The ladder shall ha%e 10 $$ dia rungs at 800 $$ centers" with sta,s at e%er, 11)0 $$" connected to the concrete shell and gal%ani/ed MS caging consisting o( )0 $$ 2 C0 $$ %ertical cage (lats on the e2terior sur(ace o( each cooling tower u& to throat. A'o%e throat le%el" these ladders shall 'e continued along the inside sur(ace o( the tower u& to the to& o( the tower. A 5CC landing o( $ini$u$ si/e 1$21$ with gal%ani/ed handrails and gal%ani/ed steel door at the throat (or interchange to 'e &ro%ided. @n addition to the to& &lat(or$" inter$ediate landings o( 1.0$ 2 1.0$ with handrails 'e &ro%ided at e%er, D to 10 $ height o( the MS ladders throughout. So$e o( these landing le%els shall 'e suita'l, ad7usted to gi%e access to a%iation warning 'eacons (or $aintenance. .andrails as descri'ed a'o%e shall 'e &ro%ided on all &lat(or$s. The ladder leading to the to& &lat(or$ shall ha%e a&&roach (ro$ ground %ia the 5CC staircase.

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

28 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

@n order to &ro%ide a&&roach (or $aintenance o( shell (inside 3 outside (orces)" all &lat(or$s shall ha%e 10 $$ wide radial o&enings shall 'e &ro%ided in the &lat(or$ (loor at locations a&&ro%ed ', #wner. Ade+uate nu$'ers o( C) $$ internal dia$eter &uddle (langed C.@. &i&es shall 'e e$'edded in this &lat(or$ (or &assing ro&es during $aintenance o( tower shell. Steel gratings" where re+uired" shall 'e (a'ricated out o( steel (lats with $ini$u$ thic-ness o( ; $$ thic-ness o( (a'ricated grating shall 'e 81 $$ with (lats so arranged as to ha%e a $a2i$u$ o&ening or 1) $$ or less. Treads (or staircases" where needed" shall 'e o( si$ilar grating construction 'ut &ro%ided with toe (lats o( ; $$ thic-" and nonBs-id nosing in an a&&ro%ed $anner e2tending u& to 100 $$ a'o%e the wal-wa, sur(ace. All steel gratings shall 'e gal%ani/ed and a&&lied with anticorrosi%e coating s&eci(ied elsewhere. The $ild steel &arts o( structures used in cooling towers shall 'e hot dou'le di& gal%ani/ed unless it is coated with a se&arate antiBcorrosi%e coating s,ste$. The $ini$u$ coating shall 'e ;10 g$0s+.$ and shall co$&l, with rele%ant @S codes. Gal%ani/ing shall 'e chec-ed and tested in accordance with @S9 1;1=. The gal%ani/ed shall 'e (ollowed ', the a&&lication o( an etching &ri$er and antiBcorrosi%e .iB'uild e&o2, coating s,ste$ o( DAT 1;0 $icrons. All welding shall 'e done 'e(ore gal%ani/ing. An, site 7oints re+uired to 'e carried out a(ter gal%ani/ing shall 'e either (langed or screwed 7oints. Nails" nuts" 'olts and all co$&onents co$ing in direct contact with water shall 'e o( stainless steel o( A@S@ 80> or e+ui%alent. The (urnished ground le%el shall 'e &a%ed (or 1.0$ width all round the outer edge o( the cold water 'asin. The &a%ing shall consist o( 1)0 thic5CC sla' o( MB10 grade. The $ini$u$ rein(orce$ent shall 'e 10 $$ dia s&aced 1)0 $$ center to center 'oth wa,s to& and 'otto$. The 5CC sla' shall 'e o%erlaid 100 $$ thic- MB10 PCC $at and 800 $$ well co$&acted sand la,er. All around &eri&heral 5CC drain leading to drain cha$'er shall 'e suita'l, &ro%ided. Ite$" to +e p o*i%e% .Gene a'/ a. Mini$u$ two nos. Cage ladder con(or$ing to @S9 8;=;" ;00 $$ wide and $ade o( hot dou'le di& gal%ani/ed ;0 $$ 2 ; $$ thic- (lats with 10 $$ dia$eter rungs at 800 $$ centres with sta,s at e%er, 1.C) $ connected to the wall. The ladder shall 'e &ro%ided with hot dou'le di& gal%ani/ed MS cage consisting o( C) $$ 2 D $$ stra&s at D00 $$ centres with (i%e nos. o( )0 $$ 2 ; $$ %ertical cage (lats throughout the co$&lete length o( the ladders. The cage ladders shall 'e co$&lete with all the necessar, accessories" e$'edded &arts" hardware" etc. hot
ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

29 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

dou'le di& gal%ani/ed as &er @S9 >C)= with ;10 g$0s+.$ o( Rinc coating as &er s&eci(ications and drawings or as directed ', 4ngineerBinBcharge" co$&lete in all res&ects. '. G@ .andrails o( 1.1 $ high with &osts $ade o( 81 N! hea%, dut, class &i&es con(or$ing to @S9 118= &laced at 1.1$ c0c $a2. and three hori/ontal rails ('etween an, two &osts) o( 81 N! hea%, class con(or$ing to @S9 11;1. The handrails shall 'e co$&leted with all the necessar, accessories" e$'edded &arts" hardware" etc. hot dou'le di& gal%ani/ed as &er @S9 >C)= with ;10 g$0s+.$ o( /inc coating as &er s&eci(ications and drawings or as directed ', 4ngineerBinBcharge" co$&lete in all res&ects. Two nos. Slide gates o( suita'le o&ening si/e con(or$ing to @S9 );10 co$&lete with e$'edded &arts o( SS 80>L" guide (ra$es o( SS 80>L" gate con(or$ing to @S9 10;1 Gr. A" side seal o( 4PDM Musical Note" 'otto$ seal o( 4PDM" all other accessories and hardware necessar, to install and o&erate the s,ste$ as &er s&eci(ications and drawings or as directed ', 4ngineerBinB charge" co$&lete in all res&ects. The slide gates shall generall, $eet the (ollowing re+uire$ents9 Standard De&th o( water colu$n (or design Guide (ra$e (4$'edded in Concrete) Gate (including su&&orting (ra$e) Slide &lates o( gate Slide Seal !otto$ Seal Painting Aasteners 0 0 0 0 0 0 0 0 0 @S9 );10 8$ MS.DG with SS 81; L sealing sur(ace @S 10;1 Gr. A SSB80> L 4PDM Musical note con(ir$s to @S9 11D)) 4PDM con(ir$s to @S9 11D)) S&eci(ied elsewhere SS 80>

c.

1. 1. 8. >. ). ;. C. D. =. d.

Two nos. Coarse Screens with guide (ra$e to 'e suita'l, installed in the cold water channel and $ade o( ; S G wire $esh o( SS 80>L ha%ing 1; $$ 2 1; $$ o&enings with trash tra, and e$'edded &arts o( SS 80>L" screen (ra$e o( CS (gal%ani/ed to ;10 g$0s+.$)" guide (ra$e o( SS 80>L and all other accessories and hardware necessar, to install and o&erate the s,ste$ as directed ', 4ngineerBinBcharge" co$&lete in all res&ects.

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

30 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO
1. 1. 8. >. ). ;. e.

Materials Mesh Si/e Su&&orting Ara$e Guide Ara$e (4$'edded in Concrete) Trash Tra, Aasteners

0 0 0 0 0 0

SS 80> L 1; $$ 2 1; $$ s+uare o&enings with ; S G wire MS.DG with SS 80>L slide &arts MS.DG with SS 81; L sealing sur(ace MS.DG SS 80>

Two nos. Aine Screens with guide (ra$e to 'e suita'l, installed in the cold water channel and $ade o( D S G wire $esh o( SS 80>L ha%ing 11 $$ 2 11 $$ o&enings with trash tra, and e$'edded &arts o( SS 80>L" screen (ra$e o( CS (gal%ani/ed to ;10 g$0s+.$)" guide (ra$e o( SS 80>L and all other accessories and hardware necessar, to install and o&erate the s,ste$ as &er s&eci(ications and drawings or as directed ', 4ngineerBinBcharge" co$&lete in all res&ects. 1. 1. 8. >. ). ;. Materials Mesh Si/e Su&&orting Ara$e Guide Ara$e (4$'edded in Concrete) Trash Tra, Aasteners 0 0 0 0 0 0 SS 80> L 11 $$ 2 11 $$ s+uare o&enings with D S G wire MS.DG with SS 80>L slide &arts MS.DG with SS 81; L sealing sur(ace MS.DG SS 80>

(.

g. .andling (acilities o( a&&ro%ed $a-e in Cold ater Channel including (a'rication" erection co$&lete with all the necessar, accessories" e$'edded &arts" hardware" etc. hot dou'le di& gal%ani/ed as &er @S9 >C)= with ;10 g$0s+.$ o( /inc coating as &er s&eci(ications or as directed ', 4ngineerBinBcharge" co$&lete in all res&ects. h. Monorails (or Slide gates and Screens shall 'e @SM! 800. Monorail trolle,s ($anual t,&e) $o%ing o%er @B'ea$s. Chain &ulle, 'loc- (8.0Ton ca&acit, with ) $ chain) con(or$ing to @S98D81 with )$ load chain con(or$ing to @S9 810= co$&lete with necessar, accessories such as hoo-s" slings etc with hardware as &er s&eci(ications or as directed ', 4ngineerBinBcharge" co$&lete in all res&ects. i. .andling Aacilities on to& o( cooling tower including (a'rication" erection co$&lete with all the necessar, accessories" e$'edded &arts" hardware" etc. hot dou'le di& gal%ani/ed as &er @S9 >C)= with ;10 g$0s+.$ o( /inc coating as &er s&eci(ications or as directed ', 4ngineerBinBcharge"
ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

31 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

co$&lete in all res&ects (or !rac-ets" hot dou'le di& gal%ani/ed as &er @S9 >C)= with ;10 g$0s+.$ coating. Swi%eling t,&e li(ting ar$ co$&lete with swi%eling 'rac-ets" &ins" etc. along with 1)0 $$ dia$eter CS &ulle,s" and all the necessar, e$'edded &arts" inserts" hardware" etc. hot dou'le di& gal%ani/ed as &er @S9 >C)= with ;10 g$0s+.$ coating. 7. 1) $$ dia$eter MS rungs" hot dou'le di& gal%ani/ed as &er @S9 >C)= with ;10 g$0s+.$ coating and co$&lete with all accessories as &er s&eci(ications or as directed ', 4ngineerBinBcharge.

-. MS structural su&&orts in trusses (or . &i&e with all 'racings" 'rac-ets" cleats" gusset &lates" etc. as &er detailed drawings or as directed including cutting" (a'ricating" hoisting" erecting" (i2ing in &osition" welded connections and &ainting with 5ed #2ide Rinc Chro$ate &ri$er etc. co$&lete as &er s&eci(ications or as directed ', 4ngineerBinBcharge. l. MS.DG Access Door with (ra$e in hollow $etal construction o( 1.1$ clear height 2 1.1$ clear width 2 >)$$ th- with gal%ani/ing to ;10 g$0s+.$ coating and o( 1D Guage sheet with suita'le sti((eners o( sa$e $aterial including accessories 3 (i2tures li-e (ra$e" hinges" latches" hardware etc co$&lete as &er s&eci(ications or as directed ', 4ngineerBinBcharge.

$. Mini$u$ two nos. o( 800N! (langed C@ &i&es o( Class SAS t,&e con(ir$ing @S9 1)8; as directed ', 4ngineerBinBcharge shall 'e &ro%ided in the drain su$&s (or sludge re$o%al n. At least two nos. o( 800 $$ dia. Sluice gates con(or$ing to @S9 80>1 ClassB@ as directed ', 4ngineerBinBcharge shall 'e &ro%ided (or sluice o&erations. o. All the MS &i&ing con(or$ing to @S9 8)D= and MS &lates as &er @S9 10;1 including 'ends" Ts" el'ows" reducers etc. co$&lete with all the necessar, .DGS hardware" gas-ets etc. including (a'rication" cutting" aligning" welding" lowering" la,ing" h,droBtesting etc. shall 'e &ro%ided as &er s&eci(ications or as directed ', 4ngineerBinBcharge (or all dia$eter &i&es. &. Two nos. Dou'le Alanged !utter(l, %al%es o( suita'le dia$eter and o( a&&ro%ed $a-e con(or$ing to A A CB)0> 0 !S9 )1)) with $ating (langes and co$&lete accessories and hardware as &er s&eci(ications including aligning" erecting" testing etc. co$&lete in all res&ects shall 'e &ro%ided se&aratel, in the CC and AC . &i&ing res&ecti%el,. +. Suita'le MS.DG drain ni&&le with suita'le drain &lug (or (lushing o( Pri$ar, . ducts and co$&lete with accessories and hardware as &er s&eci(ications including aligning" erecting" testing etc. all as directed ', 4ngineerBinBcharge.

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

32 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO
r.

5e+uired nos. o( D0N! 2 100$$ long MS hea%, dut, Stu' connections as &er @S9 11D= with isolating 'all %al%es as &er @S9=D=0 o( threaded t,&e (or (low $easure$ent in . &i&es and co$&lete with accessories 3 hardware as &er s&eci(ications including aligning" erecting etc. and as directed ', 4ngineerBinBcharge.

s. At least (our nos. o( Dial t,&e &ressure gauges o( ;T dial si/e as &er @S98;1> including stu' connection with isolation 'all %al%e as &er @S9=D=0 and co$&lete accessories" hardware as &er s&eci(ications including erecting" testing etc necessar, (or installing 3 o&erating the s,ste$ shall 'e &ro%ide. t. All the underBground &i&ing shall 'e suita'l, sur(ace &re&ared and Gcoated and wra&&edK with e&o2, and (i'erglass S5PS tissue as &er rele%ant s&eci(ications and as directed ', the 4ngineerBinBcharge.

u. All the a'o%eBground &i&ing shall also 'e sur(ace &re&ared and &ainted on outside sur(ace as &er rele%ant s&eci(ications and as directed with a&&ro%ed $a-e and t,&e o( &aints" all as directed ', 4ngineerBinBcharge. %. The P6C (il$ (ills $ade (ro$ %irgin P6C shall 'e *6 sta'ili/ed and o( a&&ro%ed $a-e in 'lac- colour ha%ing 1C01= $$ cross (lutes with 0.1) $$ uni(or$ thic-ness and dou'le edge (olding to $eet the re+uire$ents o( CT@ code STDB18;. @t shall ha%e a heat trans(er area not less than 1>D $ 10$8. *6 test shall 'e conducted as &er @S# >D=1 and i$&act test as &er ASTMBDB1);. The re+uired a$ount o( gluing co$&ound to $a-e $odules o( (ills shall also 'e &ro%ided ', the 'idder. The $ini$u$ total height o( (ill shall not 'e less than 1.) M and shall 'e su&&lied in (i%e ()) la,ers. w. AC &i&es o( suita'le dia$eters and o( class 1) grade as &er @S91)=1 with s&igot end including drilling o( holes (or (i2ing no//les" hoisting" grouting in 5CC ducts" erecting" 7ointing with re+uired accessories" testing etc. including end ca&s co$&lete as &er s&eci(ication and as directed (or the (ull (unctionalit, o( the s,ste$ shall 'e &ro%ided. 2. 5e+uired nu$'er o( Pol,&ro&,lene No//les o( suita'le o&ening si/es to cater to %aried water (low rate as &er s&eci(ication or as directed ', 4ngineerBinB charge" co$&lete with all the necessar, hardware re+uired (or (astening the no//les to the AC &i&es including accessories" hardware etc. shall 'e &ro%ided. ,. Ther$al &er(or$ance Test in%ol%ing $easure$ent o( water (low as &er !S910>1 using &itot tu'e con(ir$ing to @S#98=;;" air te$&eratures ( !T 3 D!T) using $echanicall, as&irated Ps,chro$eter" water te$&eratures (. T 3 C T) using $ercur, in glass ther$o$eters" air (low using ane$o$eter as &er s&eci(ications and as directed ', the 4ngineerBinB Charge shall 'e done ', the 'idder. All the instru$ents shall 'e cali'rated (at @@T 0 @@SC) within ; $onths &rior to test.
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

33 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

/. Mini$u$ eight nos. o( .igh intensit, L4D t,&e red0white (lashing t,&e a%iation o'struction light as &er @CA# and Director General o( ci%il a%iation re+uire$ents and with corrosion resistant alu$inu$ casting (inished in sto%e ena$eled control gear suita'le (or 10001>06" )0./ su&&l," co$&lete as &er s&eci(ication shall 'e &ro%ided. The li(e o( A#Ls shall 'e $ore than 10 ,ears and with all the necessar, (i2ing accessories as directed ', 4ngineerBinBcharge. The A#L s,ste$ shall 'e &ro%ided with Photoelectric light detectors to $onitor north s-, (or controlling the a%iation warning lights. The lights should 'e switched on when the a$'ient light goes 'elow 8) candelas and switched o(( when the intensit, is $ore than )D candelas. The lights should not 'e switched o(( due to $o$entar, increases in light intensities due to lightning (lashes or an, other short 'ursts o( light. The detectors should 'e co$&lete with all the accessories" hardware etc. necessar, (or installation. The (acilit, (or Auto0Manual o&eration shall 'e &ro%ided. aa. All ca'les shall 'e hea%, dut, P6C insulated" G@ wire 0 (lat ar$ored" P6C sheathed" ;)0011006 grade A5LS co&&er ca'le as &er @S9 1))> PartB@ with ownerSs a&&ro%al. The ca'le shall 'e cla$&ed at e%er, C)0 $$ along its run and will include all the hard ware re+uired (or its (i2ing and ter$inations etc. The Uunction0Ter$inal 'o2es should 'e &ro%ided where%er re+uired. The ca'le schedule shall 'e as under9 >C 2 10 s+.$$ Co&&er Ca'le (or a%iation warning lights >C 2 ; s+.$$ Co&&er ca'le (or &ower rece&tacles" stair case lighting and tail end a%iation warning lights etc. 1C 2 1.) S+.$$ co&&er ca'le (or local connection (ro$ local Uunction 'o2 to a%iation warning lights. ''. The 'idder shall also &ro%ide 1>06 2 1)A single &hase 8B&in outdoor" weather &roo(" industrial t,&e switchB Bsoc-et outlets with interBloc- switches and (itted with $etal ca&. 5e+uired nos. o( weather 3 dust &roo( (@PB))) 100 $$ 2 1)0$$ 2 100$$ dee& 7unction 'o2 (1080> wa,) $ade out o( 1$$ thG.S. with 4LM4O t,&e ter$inals" glands etc. co$&lete shall also 'e &ro%ided. cc. A Lighting Distri'ution !oard and Control Panel (or A%iation arning Lights (a'ricated (ro$ 1$$ th- sheet steel" dust and %er$in &roo( and re$o%a'le gland &lates at to& and 'otto$ with 4LM4O t,&e connectors and with suita'le earthing including 1 nos. 81A TPN inco$ers" .5C (uses and 1 nos. 81A outgoing connections with .5C (uses and Co$$on Alasher shall 'e &ro%ided. Two in&uts will 'e &ro%ided ', the #wner E one the $ain su&&l, and the other as stand ',. Auto$atic change o%er with

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

34 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

suita'le dela, ti$ers with Auto0Manual o&eration shall 'e &ro%ided ', the 'idder. dd. To care o( @CA# and DGCA re+uire$ents" the 'idder shall &ro%ide Te$&orar, A%iation arning Lights during construction a'o%e the )0$ le%el (ro$ general ground le%el. ee. The earthing and lightning &rotection s,ste$ shall 'e as &er @S9 80>8 in general. Air ter$inators $ade out o( 1$ long >0 dia MS.DG round 'ar with &ointed to& and cla$&ed at $ini$u$ 8 &oints with hea%, dut, G.@. cla$&s shall 'e &ro%ided. @t shall 'e ensured that 1.1 $ o( the air ter$inator shall 'e &ro7ecting a'o%e the to& o( the cooling tower. ((. A )0 2 ; th- G@ (lat Coronal 'and connecting all air ter$inator on one side and to the down conductor on the lower side co$&lete with all the necessar, (i2tures" hardware etc. re+uired (or installation shall 'e &ro%ided. The cla$&s used shall 'e G@ and hea%, dut, and shall 'e (i2ed a&&ro2 1$ 'elow the to& o( the cooling tower and cla$&ed at the s&acing not $ore than 1$ C0C. Also" a )0 2 ; th- G@ (lat down conductor co$&lete with all the necessar, (i2tures" hardware etc. re+uired (or installation shall 'e included. The down conductors on the to& shall 'e connected to the coronal 'and and on the lower side the, shall 'e connected to the test lin-s. The cla$&ing shall 'e at 1$ C0C with hea%, dut, G@ cla$&s. The down conductors shall 'e in one &iece as (ar as &ossi'le. The necessar, 7oints shall 'e o( (ull, welded t,&e and not 'olted t,&e e2ce&t at the test lin-. These conductors shall 'e e$'edded in the concrete o( the shell with a $ini$u$ co%er o( )0$$ and shall co$e out o( the concrete at the to& and 'otto$ o( ring 'ea$. gg. The 4arth conductor to 'e &ro%ided ', the 'idder shall 'e $ade out o( >0 $$ Dia. MS round 'ar co$&lete with all the necessar, (i2tures" hardware etc. re+uired (or installation and shall 'e su&&lied and installed 'etween test linon one side and to the earth $at on the other side. 4arthing electrode o( dia. >0 $$ MS rod 2 8$ long and $a-ing o( earth &it as &er @S980>8 co$&lete with all the necessar, (i2tures" hardware etc. re+uired (or installation and connection to the earth $at shall also 'e in the sco&e o( the 'idder. hh. Te$&orar, lightning &rotection s,ste$ during construction to $eet @CA# and DGCA re+uire$ents shall 'e &ro%ided ', the 'idder" co$&lete with all the necessar, (i2tures" hardware etc. re+uired (or installation. ii. The 'idder shall conduct tests on circuit as &er s&eci(ication or as directed ', 4ngineerBinBcharge. 77. 5e+uired nos. o( ther$owel co$&lete with all the necessar, (i2tures" hardware etc. re+uired (or installation shall 'e &ro%ided ', the 'idder and he shall
Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package ol!"e # $$ # %&0 Section&$, 'nnex!re&$
PAG4

35 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

also &ro%ide re+uired nos. o( Te$&erature and Pressure Gauges" 5TDs" Alow Measuring De%ices" etc. co$&lete with all the necessar, (i2tures" hardware etc. re+uired (or installation. --. The 'utter(l, %al%es shall 'e &ro%ided with 1N#N1NC &otential (ree li$it switches (or !A %al%es co$&lete with all the necessar, (i2tures" hardware etc. re+uired (or installation. ll. The %al%es shall generall, $eet the (ollowing re+uire$ents9 !utter(l, 6al%es9 T,&e Standard P#D (Proo( o( Design) Test #&erating Aluid Design Pressure Ma2. di((erential &ressure .ead loss coe((. !od, Sha(t !earing t,&e Disc seat !od, Seat @nternal .ardware 42ternal .ardware Aasteners Gland Pac-ing Gas-ets" 5ings" etc. Accessories 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Manuall, o&erated Dou'le (langed !utter(l, 6al%e A A C E )0>0 !S9 )1)) A A C E )0> ater at >0 deg. C to >) deg. C ).0 Lg.0S+.c$. ).0 Lg.0S+.c$. Ma2. 0.8 Cast @ron con(ir$s to @S9 110 Grade AG 1;0 or Aa'ricated steel con(ir$s to @S910;10@S91001 Stainless Steel A@S@ >10 Sel( lu'ricated t,&e Nitrile 5u''er SS E 81; Stainless Steel .igh Tensile Steel SS E 80> 0 SS E 81; Te(lon Nitrile 5u''er 1 Nos. o( 1N# N 1NC li$it switches M#P4NF 3 MCL#S4F.

All the 'utter(l, %al%es shall 'e co$&lete with graduated &osition indicator" arrow indicating the (low direction. The %al%es shall 'e suita'le (or erection in an, &osition (.ori/ontal 0 6ertical" etc.). The o&erating $echanis$ shall 'e $ounted directl, on or su&&orted (ro$ %al%e 'od,. All the 'utter(l, %al%es shall 'e &ro%ided with hand wheel. !utter(l, %al%es o( si/e 8)0 N! and a'o%e shall 'e &ro%ided with reduction gear units. 6al%es shall close in cloc-wise direction. The hand controls shall 'e di$ensioned to guarantee an eas, $aneu%er under $ost se%ere conditions. The hand controls shall 'e &ro%ided with loc-ing s,ste$s to a%oid the dis- assu$ing a not desired &osition during o&eration. The &ulling (orce re+uired on the hand wheelBri$ shall not e2ceed 80 Lg. when o&erating the %al%e under (ull (low and o&erating &ressure. The

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

36 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

reduction units shall 'e watertight" co$&lete with lu'rication and &osition indicator. !all 6al%es9 Standard T,&e Pattern and Construction No$inal si/e Design &ressure Material o( construction $$. Alanges Aor %al%es designed as &er A A CB)0>" %al%e (langes shall con(or$ to ANS@ !1;.1 Class 11) (or C@ %al%es and A A CB10C Class D (or (a'ricated steel %al%es. The counter (langes shall con(or$ to A A CB10C Class D. Aor %al%es designed as &er !S9 )1)) the (langes shall 'e as &er !S9 >)0>. All the (langes shall 'e o( sli&Bon and (latB(ace t,&e. Alanges shall 'e (a'ricated (ro$ steel &lates con(or$ing to @S9 10;1. 1>.00.00 Pe fo $ance G(a antee Per(or$ance0Acce&tance test shall 'e carried out (or deter$ination o( the ther$al ca&a'ilit, and %eri(ication o( the guarantee o( the cooling tower constructed at the &ro7ect. (i) Test shall 'e conducted ', accredited re&resentati%es o( the contractor and owner. The contractor shall 'e gi%en &er$ission to ins&ect the tower in ad%ance. ContractorFs re&resentati%es shall witness all &hases o( the test and record the data 7ointl, with #wnerFs re&resentati%e. The res&onsi'ilit, (or conducting the test will 'e with the contractor. All test instru$ents re+uired (or the Per(or$ance test will 'e &ro%ided ', the contractor. The cali'ration o( the test instru$ents will 'e o( the res&onsi'ilit, o( the contractor. Cali'ration o( the test instru$ents will 'e carried out ', an a&&ro%ed inde&endent agenc,. The cali'ration o( the e+ui&$ent should not 'e older than si2 $onths 'e(ore the test and should 'e %alid at the ti$e o( testing. 0 0 0 0 0 0 @S9 =D=0 Threaded Aull 'ore in single &iece As s&eci(ied elsewhere ) Lg".0s+.c$. Car'on Steel 6al%es con(ir$s to @S9 =D=0

(ii) (iii)

(i%)

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

37 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO
(%)

The &er(or$ance o( cooling tower shall 'e co$&ared with the &er(or$ance re+uired on the 'asis o( the Per(or$ance cur%es (or D0?" =0?" 100? and 110? o( design water (low. The &er(or$ance test will 'e generall, as &er CT@ Code ATCB10) 0 !S9 >>D) PartB@@ 4%er, e((ort shall 'e $ade to conduct the test when the conditions are %er, close to the design condition. The station &ower load will 'e $aintained at its near $a2i$u$. ACC4PTANC4 C5@T45@A9 @( the test cold water te$&erature is less than or e+ual to the &redicted cold water te$&erature" the tower is dee$ed to ha%e $et the guarantee.

(%i) (%ii)

(%iii)

1).00.00

Pena'tie" Penalt, (or (ailure in res&ect o( ther$al guarantee in ter$s o( recooled water te$&erature shall 'e 5s. #ne (1) Crore (or e%er, 0.1 0 C increase in guaranteed recooled water te$&erature. Prior to a&&lication o( the &enalties as a'o%e the contractor will 'e gi%en a chance to correct the cooling tower as constructed ', the contractor ', su'stitution o( $aterials 0 $odi(ications o( construction solel, at his cost and the &er(or$ance test shall 'e conducted once again a(ter such $odi(ications. #n test indicating success(ul &er(or$ance the contractors will 'e dee$ed to ha%e deli%ered the goods in the &ro&er $anner and in that case the contractor will 'e allowed to re$o%e (ro$ the site such o( the $anu(actured $aterials as ha%e 'een rendered to 'e in e2cess due to su'stitution thereo( ', (resh asse$'lies. The &er(or$ance test shall 'e ta-en two ti$es %i/. at the end o( Ma, when the at$os&heric te$&erature is $a2i$u$. .owe%er" no credit will 'e gi%en (or an, uncalled i$&ro%e$ents in the guarantee &er(or$ance and to this e2tent contractor will not 'e eligi'le to recei%e an, &a,$ent (or inter&retation o( the &er(or$ance clause in o&&osite direction. @n case the contractor re(uses to carr, out an, $odi(ications ins&ite o( the initial &er(or$ance test ha%ing shown de(initel, incorrect results" it shall 'e right(ul (or owner to ta-e o%er the entire cooling tower along with all &lants and tools $ade a%aila'le ', hi$ at site o( wor- and $odi(, the cooling tower in accordance with that o( #wnerFs own notions a'out ad7ust$ents0redesign as re+uired and in that case contractor will ha%e no clai$ on the #wner. @t shall also 'e right(ul (or the #wner to a&&oint at contractorSs ris- and cost an, se&arate consulting and0or contracting agenc, in res&ect o( such ad7ust$ents0$odi(ications. Contractor will 'e considered not to ha%e acted in &ositi%e $anner in res&ect o( the (ailure to gi%e the goods

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

38 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

during the initial &er(or$ance test in the e%ent o( contractors not ha%ing ta-en de(inite action within a &eriod o( one $onth o( such initial &er(or$ance test. 1;.00.00 &ini$($ The $a' Si1in# of NDCT !idder to note that the $ini$u$ si/e o( NDCT shall 'e as that indicated in the tender drawing attached with this docu$ent and as such an, si/e s$aller than this shall not 'e acce&ted. .owe%er the 'idder is (ree to o((er NDCT o( an, higher si/e with necessar, 7usti(ication in the (or$ o( design 'asis" calculations" cur%es" re(erences etc. 1C.00.00 Ven%o Li"t .S(##e"ti*e/ DESCRIPTION A@LL VENDORS !54NT ##D 0 M*NT45S 4*5#A#5M 0 PA.A5P*5 0 .AM#N 0 MMA:*A 0 C##LD4CL AS P45 A@LL MAN*AACT*545FS 54C#MM4NDAT@#N S5@5AM LA!S" N4 D4L.@ 0 0 C@P4T" C.4NNA@ A*DC# 0 A#*54SS 0 L4VST#N4 0 @L 0 @NT45 6AL64 0 L@5L#SLA5 GM 0 MACMAT0 MA.@ND5A ASS#C@AT4S SA@L0 TATA0 U@NDAL0 6@RAG ST44L A@N#L4O 0 S*P54M4 C.4MPLAST 0 P5@NC4 M@ 0 @ND4A MAPC#M@NF #A AS@AN PA@NTS 0 !@S#N *N@645SAL #A !5@T@S. PA@NTS 0 F8100F #A UANS#N 3 N@C.#LS#N 0 SVNT.4T@C R@NC C.5#MAT4 #A S.AL@MA5 PA@NTS

A@LL GL*4 T4ST@NG AG4NCV A#5 P6C A@LL !*TT45ALV 6AL64S SL@D4 GAT4S ST44L P6C P@P4S P*S. T5#LL4V" C.A@NP*LL4V !L#CL" .##L 3 C.A@N 54D #O@D4 R@NC C.5#MAT4 P5@M45

4P#OV P5@M45 4P#OV PA@NT A6@AT@#N L@G.TS A5N@NG

.@ND*STAN C@!A G4@GV0 Dr.!4CL 3 Co0 C.4M.4.L44L0 4:*@6AL4NT .@ND*STAN C@!A G4@GV0 Dr.!4CL 3 Co0 4:*@6AL4NT !@N#V #PT# 4L4CT5#N@CS

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

39 o( 40

Maharashtra State Power Generation Co. Ltd, Maharashtra State Power Generation
Co. Ltd.

MAHA GENCO

The a'o%e is onl, a Msuggesti%eF %endor list. !idder shall o'tain a&&ro%al o( %endors during wor- e2ecution (or all ite$s irres&ecti%e o( whether or not the sa$e are s&eci(ied in the a'o%e list.

Khaperkheda TPS Expansion Project 1 x 500 MW, Balance of Plant Package

ol!"e # $$ # %&0 Section&$, 'nnex!re&$

PAG4

40 o( 40

Você também pode gostar