CONSTRUCTION OF RCC BRIDGE AT VILLAGE SAFI ABAD, DISTRICT MARDAN

ABSTRACT OF COST
Schedule No

DESCRIPTION

UNIT

Qty

RATE

AMOUNTS

APPROACHES

(A)
ROAD WORK
03-56

Clearing and grubbing

M2

2600.00

22.08

57408

03-58

Compection of natural ground

M2

2600.00

17.17

44642

03-61-c

Formation of embakment from borrow


excavation in common material including
compaction by power roller

11580.00

440.32

5098905.6

16-03-a

Grannular sub base using pitrun gravel

M3

383.25

944.55

361998.79

16-04-b

Water bound Macadam base course

M3

383.25

1916.73

734586.7725

Bituminous tack coat

M2

292.00

51.18

14944.56

16-12-b

Asphaltic wearing course (asphaltplant hot


mix)

14.60

17863.36

260805.056

16-08-c

Double surface treatment

M2

657.00

415.59

273042.63

16-08-b

Triple surface treatment

1898.00

504.1

956781.80

Scarifaying/ dismentling old road , including


removal of debries in one chain NHA
spacified.

949.00

20.01

18989.49

16-07

16-10

STRUCTURE WORK
03-60-a

Structural excavation in common material

M3

1140.00

236.2

269268

06-05-i

Plain concrete 1:4:8 including placing,


compacting , finishing & curing.

M3

144

4443.67

639888

Plain concrete 1:3:6 including placing,


compacting , finishing & curing.
Random rubble masnory in foundation &
plinth in cement sand mortor 1:6
Erection and Removing Form work to
concrete in any shape/ position (Vertical).
PCC (1:3:6) in mass concrete less formwork
using 40% boulders.

M3

110.40

5227.11

577072.94

M3

1830.00

4725.67

8647976.1

M2

480.00

406.72

195225.6

M3

960.00

3490.25

3350640

06-05-h
;08-03-d-03
06-38-b
06-36-b

21,502,175.82

TOTAL
BRIDGE WORK

(B)
16-25-a

16-25-b

Confirmatory Boring including SPTs, samples,


lab tests, bore hole logs & Reports complete
in Alluvial Soil.
Confirmatory Boring including SPTs, samples,
lab tests, bore hole logs & Reports complete
in Gravelly Soil.

10.00

6,947.77

69,477.70

20.00

9,329.66

186,593.20

16-26-d

Pile Load test Max Load 400 Tons

Job

1.00

485,722.41

485,722.41

16-27-b

Boring for cast in place RCC piles in Alluvial


Soils: Dia 760 - 1220 mm

72.00

4,366.80

314,409.60

16-28-b

Boring for cast in place RCC piles in Gravely


Soils: Dia 760 - 910 mm

153.00

7,145.67

1,093,287.51

06-40-c

Class A3 in piles, 4000 psi on 28 days


cylinder test.

M3

176.63

7,222.57

1,275,686.43

03-60-a

Structural Excavation in Common Matrial.

M3

27.00

236.20

6,377.40

03-60-c

Structural Back fill in common material.

M3

15.00

295.80

4,437.00

06-05-i

Plain Cement Concrete i/e placing,


compacting, finishing & curing Ratio 1:4:8.

M3

17.00

4,443.67

75,542.39

06-06-a-02

Concrete class A2 (245kgs/sq-cm) Mix ratio


(1:1.5:3)in pile caps i/c curing , complete in
all respects

M3

73.00

8,319.16

607,298.68

06-06-a-02

Concrete class A2 (245kgs/sq-cm) Mix ratio


(1:1.5:3)in pile caps i/c curing , complete in
all respects

M3

10.00

8,319.16

83,191.60

06-06-c-01

Concrete 1:1:2 (42 N/sq-mm) in precast deck


girder

M3

78.00

10,857.53

846,887.34

06-06-a-02

Concrete 1:1.5:3 (28 N/aq-mm) in cast in


place deck & diaphragms

M3

80.00

8,319.16

665,532.80

06-06-a-03

Concrete 1:2:4 (21 N/sq-mm) in barriers


using corduroy finish formwork.

M3

54.00

7,480.35

403,938.90

06-06-a-03

Concrete 1:2:4 (21 N/sq-mm) in approch


slab.

M3

19.00

7,480.35

142,126.65

06-07-c

Supply & fabricate M.S. reinforcement for


cement concrete (Hot rolled deformed bars
Grade 60

Tonn

60.19

118,397.4

7,126,147.84

16-71-a

Supply of high tensile pre-stressed concrete


steel wire strands grade 270k 0.5" dia
packed in standard reeless/weldless coils of
two 2000kgs, approximatly binded and
wraped in hesscian cloth.

Tonn

6.891

147,530.0

1,016,629.44

M3

172200.00

1.4

242,802.00

630.00

268.4

169,117.20

Each

40.00

7,976.6

319,064.00

120.00

1,172.2

140,661.60

Nos

40.00

1,274.6

50,984.00

630.00

89.8

56,586.60

Each

40.00

190.2

7,608.80

Kg

400.00

115.8

46,332.00

88.00

1,227.0

107,973.36

Kg

264.00

152.2

40,180.80

16-30-a
16-73-d

16-72-c

Supply & fix neoprene bearing pads as


shown in the drawings.
S & F un-galvanized sheath for 10 to 12 wires
0.5" strands cables for concrete girders as
shown in the drawings.
Jack anchorage for 10 to 12 wires 0.5"
strands (comprising - trumpet stressing
blockand wages complete.

16-36

Launch girders in position.

16-37

Stressing cables of high tensile steel wire.

16-38
16-39
16-40
16-55

16-29

Inject cement grout in sheath pipe after


stressing.
Cutt off projecting strands from anchorage
pockets.
Supply and fixing M.S expension joints
assemblies as specified.
Providing & laying PVC services pipes (229
mm diameter) for utilities as per drawings as
directed by the Engineer.
Supply fabricate 7 install welded M.S
scupper of thickness as per drawings as
directed by the Engineer.
TOTAL

'(C)

15,584,597.24

ANCILLARY WORKS

16-16-a

16-18-b
16-66- a

Road signs (not exceeding 1 sq-m) without


reflection sheets & lettering supply & fixing
at site with PCC 1:3:6 upto 3 m depth
Supply & fixing reflective sheets on MS /
alluminium road signs etc including lettering
High intensity grade.
Pavement markings in non- reflecting
thermoplastic paint for 15 cm width

10.00

7,765.79

77,657.90

M2

10.00

5,356.59

53,565.90

103.00

61.50

6,334.50

16-19-b-01

Supply and fix alluminium alloy studs as per


specs medium strip 114x18 mm , 74 beads:
uni- direction
TOTAL
GRAND TOTAL (A+B+C)

Each

20.00

450.93

9,018.60
146,577
37,233,350

ROAD WORK

SR NO

DESCRIPTION

LENGTH

WIDTH

DEPTH

Quantity

(M)

(M)

(M)

MKS

NO

Clearing and Grubbing

1x 1

140.00

10.00

1400.00

Towards Safi Abad Village

1x 1

120.00

10.00

1200.00

M2

2600.00

Total

Natural Ground Compaction

2
Towards Malakand Road

1x 1

140.00

10.00

1400.00

M2

Towards Safi Abad Village

1x 1

120.00

10.00

1200.00

2600.00

M2

Total

Towards Malakand Road

Formation of Embankement from Borrow excavation in common material


3

Towards Malakand Road

1x 1

140.00

10.00

3.00

4200.00

Towards Safi Abad Village

1x 1

120.00

10.00

3.00

3600.00

M3

Approach Roads

2x 2

45.00

6.00

3.50

3780.00

M3

11580.00

M3

Total

Granular Sub Base course using pit run

4
Towards Malakand Road

1x 1

140.00

7.30

0.15

153.30

M3

Towards Safi Abad Village

1x 1

120.00

7.30

0.15

131.40

M3

Approach Roads

2x 2

45.00

3.65

0.15

98.55

M3

383.25

M3

Total

P/L Water Bound Macadam as specified

5
Towards Malakand Road

1x 1

140.00

7.30

0.15

153.30

M3

Towards Safi Abad Village

1x 1

120.00

7.30

0.15

131.40

M3

Approach Roads

2x 2

45.00

3.65

0.15

98.55

M3

383.25

M3

292.00

292.00

14.60

14.60

M3

657.00

M2

657.00

M3

Total

P/L Bituminous Tack Coat

6
Bridge Portion

1 x 1

40.0

7.30

Total

Asphaltic wearing course (asphaltplant hot mix)

7
Bridge Portion

1 x 1

40.0

7.30

Total

0.05

Double surface treatment

8
Approach Roads

2x 2

45.00

3.65

Total
Triple surface treatment

9
Towards Malakand Road

1x 1

140.00

7.30

1022.00

M2

Towards Safi Abad Village

1x 1

120.00

7.30

876.00

M2

1898.00

M2

Total
10

Scarifaying/ dismentling old road , including removal of debries in one chain NHA spacified.
Towards Malakand Road

1x 1

140.00

3.65

511.00

M2

Towards Safi Abad Village

1x 1

120.00

3.65

438.00

M2

949.00

M2

Total

STRUCTURE WORK

SR NO

DESCRIPTION

LENGTH

WIDTH

DEPTH

Quantity

(M)

(M)

(M)

MKS

NO

Structural Excavation in Common Material

1
Towards Malakand Road

1x 1

100.00

3.00

1.00

300.00

Towards Safi Abad Village

2x 1

80.00

3.00

1.00

480.00

Along Approach Roads

2x 1

30.00

3.00

2.00

360.00

1140.00

Total
Structural Backfill using Common Material

2
Towards Malakand Road

1x 1

100.00

1.00

2.00

200.00

M3

Towards Safi Abad Village

2x 1

80.00

1.00

2.00

320.00

M3

Along Approach Roads

2x 1

30.00

1.00

2.00

120.00

M3

640.00

M3

Total
3

Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8).
Towards Malakand Road

1x 1

100.00

3.00

0.15

45.00

M3

Towards Safi Abad Village

2x 1

80.00

3.00

0.15

72.00

M3

Along Approach Roads

2x 1

30.00

3.00

0.15

27.00

M3

144.00

M3

Total
4

Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:3:6).
PCC Bands
Towards Malakand Road

1x 1

100.00

2.00

0.15

30.00

M3

Towards Safi Abad Village

2x 1

80.00

2.00

0.15

48.00

Along Approach Roads

2x 1

30.00

2.00

0.15

18.00

M3

Towards Malakand Road

1x 1

100.00

0.60

0.075

4.50

Towards Safi Abad Village

2x 1

80.00

0.60

0.075

7.20

M3

Along Approach Roads

2x 1

30.00

0.60

0.075

2.70

M3

110.40

Coping

Total

Random Rubble Masonry in foundation & Plinth in cement, sand mortor:Ratio 1:6
Towards Malakand Road

1x 1

100.00

1.50

4.000

600.00

M3

Towards Safi Abad Village

2x 1

80.00

1.50

4.000

960.00

M3

Along Approach Roads

2x 1

30.00

1.50

3.000

270.00

M3

1830.00

M3

Total

Erection and Removing Form work to concrete in any shape/ position (Vertical).
Towards Malakand Road

1x 1

100.00

1.500

150.00

M2

Towards Safi Abad Village

2x 1

80.00

1.500

240.00

Along Approach Roads

2x 1

30.00

1.500

90.00

480.00

M2

Total

PCC (1:3:6) in mass concrete less formwork using 40% boulders.


Towards Malakand Road

1x 1

100.00

2.00

1.500

300.00

M3

Towards Safi Abad Village

2x 1

80.00

2.00

1.500

480.00

M3

Along Approach Roads

2x 1

30.00

2.00

1.500

180.00

M3

960.00

M3

Total

DETAIL ESTIMATE

SR NO

DESCRIPTION

LENGTH

WIDTH

DEPTH

QUANTITY

(M)

(M)

(M)

MKS

NO

Confirmatory boring, SPT samples & lab tests, bore logs and report alluvial soil

2x

5.00

Total

10.00

10.00

Confirmatory boring, SPT samples & lab tests, bore logs and report Gravelly soil

2 x

10.00

Total

20.00

20.00

1.00

Job

1.00

Job

Pile Load testing: Max Load 360-600 Tonne

Load Test

1x

Total

Boring for cast in place RCC piles in Alluvial Soil for 1000 mm diameter pile

Test Pile

1 x

8.00

8.00

Abuttement Pile

2 x

8.00

64.00

72.00

Total

Boring for cast in place RCC piles in Gravely soil for 1000 mm diameter pile

Test Pile

1 x

17.00

17.00

Abuttement Pile

2 x

17.00

136.00

Total

153.00

P/L PCC Type B with 28 days min cylinderical strength of 280kg/ sq.cm complete in all respect or as
directed by the Engr: Incharge.
Test Pile

1 x 0.785

25.0

1.00

1.00

19.63

M3

Abutment Piles

8 x 0.785

25.0

1.00

1.00

157.00

M3

176.63

M3

16.50

16.50

M3

165.00

165.00

M3

Total

Structural Excavation in Common Matrial.

7
Abuttment Transom

2 x 1.000

11.0

1.50

0.50

Total

Behind Transoms

2 x 1.000

11.0

2.50

3.00

Total

Plain Cement Concrete i/e placing, compacting, finishing & curing Ratio 1:4:8.
Abuttment Transom

2 x 1.000

11.0

1.50

0.15

Total

10

Structural Back fill in common material.

4.95

M3

4.95

M3

Plain Cement Concrete i/e placing, compacting, finishing & curing Ratio 1:4:8.
Abuttment Transom
Total

2 x 1.000

11.0

1.50

0.15

4.95

4.95

Safi Abad Bridge


Detail of abutment Reinforcement, Grade 60.
Bar dia
S.No

Description of Item Work

Length

mark

Nos
(mm)

(M)

TRANSOM

TRANSOM DISTRIBUTION BARS

101

16

x 67

6.6

MAIN BAR LOWER PORTION

102

12

x 22

9.75

TRANSOM MAIN BAR TOP & BOTT

103

25

x 20

11.3

TRANSOM MAIN BAR (Side Bars)

104

16

9.8

DOUBLE BINDERS

105

12

x 134

2.75

RETAINING BLOCK MAIN BARS

106

12

x 24

3.55

RETAINING BLOCK DIST BARS

107

16

x 28

3.2

10

RETAINING BLOCK (BACK WALL PORTION)

107 a

16

x 28

3.2

11

BEARING PLINTH MAIN BAR FOR G1

UM

12

x 20

2.15

12

BEARING PLINTH RINGS FOR G1

UM

12

2.35

13

BEARING PLINTH MAIN BAR FOR G2

UM

12

X 20

2.25

14

BEARING PLINTH RINGS FOR G2

UM

12

2.35

BACK WALL

B
12

MAIN BAR EARTH FACE

108

12

X 20

5.15

13

MAIN BAR FAR FACE

109

12

X 20

3.75

14

MAIN BAR EARTH FACE VARIABLE

110

12

X 48

4.8

15

MAIN BAR FAR FACE VARIABLE

111

12

X 48

3.5

16

SIDE DIST BARS EARTH FACE

112

20

X 32

4.65

17

CENTRE DIST BARS EARTH FACE

113

12

X 16

4.5

18

DIST BARS FAR FACE

114

12

X 16

8.3

19

TOP BARS

115

12

9.9

20

CORNER BARS

116

20

3.75

WING WALL

C
21

BOTTOM BARS

117

25

9.15

22

DIST U-BARS

118

12

X 18

6.85

23

DIST U- BARS (VARIABLE)

119

12

X 50

4.5

24

BOTTOM PORTION MAIN BARS (E.F)

120

20

X 16

3.25

25

BOTTOM PORTION MAIN BARS (F.F)

121

12

X 16

3.25

26

MIDDLE PORTION MAIN BARS (E.F)

122

20

X 22

5.15

27

MIDDLE PORTION MAIN BARS (F.F)

123

12

X 22

4.7

28

TOP PORTION MAIN BARS (E.F)

124

20

4.95

29

TOP PORTION MAIN BARS (F.F)

125

12

4.95

30

FOOT PATH MAIN BARS (TOP & BOTT)

126

12

X 24

4.95

31

FILLET BARS

127

12

X 16

1.35

32

FOOT PATH RINGS

128

12

X 70

3.85

33

BARRIER BOTT DIS BAR

129

12

X 70

2.67

34

BARRIER TOP DIS BAR

130

12

X 70

1.7

35

BARRIER MAIN BARS

131

12

X 16

4.96

APPROACH SLAB

D
36

MAIN BAR BOTTOM

132

12

X 50

4.96

37

MAIN BAR TOP

133

12

X 50

5.95

38

MAIN BAR CORNER

134

12

X 50

2.2

39

DIST BAR

Total

135

12

X 43

7.26

ge

ement, Grade 60.


Total length

Unit Weight

Total Weight

(M)

(Kg/Mtr)

Tonnes

884.4

1.579

1.396

429

0.888

0.381

452

3.854

1.742

156.8

1.579

0.248

737

0.888

0.654

170.4

0.888

0.151

179.2

1.579

0.283

179.2

1.579

0.283

86

0.888

0.076

28.2

0.888

0.025

90

0.888

0.080

28.2

0.888

0.025

206

0.888

0.183

150

0.888

0.133

460.8

0.888

0.409

336

0.888

0.298

297.6

2.467

0.734

OM

ALL

144

0.888

0.128

265.6

0.888

0.236

39.6

0.888

0.035

60

2.467

0.148

109.8

3.854

0.423

246.6

0.888

0.219

450

0.888

0.400

104

2.467

0.257

104

0.888

0.092

226.6

2.467

0.559

206.8

0.888

0.184

59.4

2.467

0.147

59.4

0.888

0.053

237.6

0.888

0.211

43.2

0.888

0.038

539

0.888

0.479

373.8

0.888

0.332

238

0.888

0.211

158.72

0.888

0.141

496

0.888

0.440

595

0.888

0.528

220

0.888

0.195

ALL

SLAB

624.36

0.888

0.554

13.113

Safi Abad Bridge


Detail of deck slab Reinforcement, Grade 60.
Bar dia
S.No

Description of Item Work

Length

mark

Nos
(mm)

(M)

MAIN BAR (BOTT)

12

x 202

10.11

MAIN BAR (TOP)

12

x 140

10.11

TOP (LEFT & RIGHT) MAIN BAR

16

x 556

2.08

TOP CENTERAL MAIN BARS

12

x 280

1.5

DIST BARS (BOTT)

12

x 88

15.32

TOP (BOTH ENDS) DIST BARS

12

x 104

11.9

TOP CENTRAL DIST BARS

12

x 52

7.5

SAFETY BARRIERS
8

10

X 200

3.545

12

X 200

1.95

10

10

12

X 200

1.62

11

11

10

x 15

30

Total

ge

ment, Grade 60.


Total length

Unit Weight

Total Weight

(M)

(Kg/Mtr)

Tonnes

2042.22

0.888

1.813

1415.4

0.888

1.257

1156.48

1.579

1.826

420

0.888

0.373

1348.16

0.888

1.197

1237.6

0.888

1.099

390

0.888

0.346

2836

0.617

1.75

1560

0.888

1.39

1296

0.888

1.15

1800

0.617

1.11

RIERS

13.307

Safi Abad Bridge


Detail of Diaphragms Reinforcement, Grade 60.
Bar dia
S.No

Description of Item Work

Length

mark

Nos
(mm)

(M)

EXTERNAL DIAPHRAGMS
1

25

9.85

25

2.735

25

3.85

25

3.85

12

x 16

1.21

12

x 16

1.95

12

x 16

1.7

12

1.95

10

x 36

4.305

INTERNAL DIAPHRAGMS
10

10

25

9.85

11

11

25

2.735

12

12

25

3.85

13

13

25

3.85

14

14

12

X 16

1.21

15

15

12

X 16

1.95

16

16

12

X 16

1.7

17

17

12

1.95

18

18

Total

10

X 36

3.755

ge

cement, Grade 60.


Total length

Unit Weight

Total Weight

(M)

(Kg/Mtr)

Tonnes

39.4

3.854

0.152

43.76

3.854

0.169

30.8

3.854

0.119

30.8

3.854

0.119

38.72

0.888

0.034

62.4

0.888

0.055

54.4

0.888

0.048

31.2

0.888

0.028

309.96

0.617

0.191

19.7

3.854

0.076

21.88

3.854

0.084

15.4

3.854

0.059

15.4

3.854

0.059

19.36

0.888

0.017

31.2

0.888

0.028

27.2

0.888

0.024

15.6

0.888

0.014

HRAGMS

HRAGMS

135.18

0.617

0.083

1.360

Safi Abad Bridge


Detail of GIRDER Reinforcement, Grade 60.
Bar dia
S.No

Description of Item Work

Length

mark

Nos
(mm)

(M)

MAIN BARS BOTT (BOTH ENDS)

16

8.26

MAIN BARS BOTT (MID PORTION)

16

15

MAIN BARS TOP & BOTT (BOTH ENDS)

12

x 16

MAIN BARS TOP & BOTT (MID PORTION)

12

SKIN REINFORCMENT (BOTH ENDS)

12

x 16

2.923

SKIN REINFORCMENT (BOTH ENDS)

12

x 16

8.06

SKIN REINFORCMENT (MID PORTION)

12

BOTTOM RINGS

10

x 100

1.862

TOP RINGS (MID PORTION)

10

x 90

1.45

10

BINDERS

10

12

x 139

4.34

11

BOTT BINDERS (BOTH ENDS)

11

16

x 10

2.952

12

TOP BINDERS (BOTH ENDS)

12

12

x 10

2.542

13

BOTT BINDERS (BOTH ENDS)

13

16

X 22

4.454

14

14

12

1.6

15

15

12

1.365

16

16

12

X 129

0.255

17

17

12

X 32

1.67

18

18

16

5.94

19

19

10

X 2.1

8.06
15

15

3.09

Total

ge

ment, Grade 60.


Total length

Unit Weight

Total Weight

(M)

(Kg/Mtr)

Tonnes

264.32

1.579

0.417

240

1.579

0.379

515.84

0.888

0.458

480

0.888

0.426

187.072

0.888

0.166

515.84

0.888

0.458

480

0.888

0.426

744.8

0.617

0.459

522

0.617

0.322

2413.04

0.888

2.143

118.08

1.579

0.186

101.68

0.888

0.090

391.952

1.579

0.619

51.2

0.888

0.045

43.68

0.888

0.039

131.58

0.888

0.117

213.76

0.888

0.190

190.08

1.579

0.300

25.956

0.617

0.016

7.257

CONSTRUCTION OF RCC BRIDGE AT VILLAGE SAFI ABAD,


DISTRICT MARDAN.

Ref No. =JCC/SA /B.B.S/001

S.No Description of Item Work mark

Bar dia

Nos

Spacing Length

(mm)

Total
Length

Test Pile

A
1

Bottom protion

25

12

N.A

12.3

147.6

Top Portion

25

12

N.A

12.3

147.6

Spiral on laps

12

27

75

2.82

76.14

Spiral on bottom portion

12

x 134

150

2.82

377.88

Total

AGE SAFI ABAD,

Date of Submission: 22/01/2013


Activity: TEST PILE

Unit

Total Weight

Weight

Pile
3.854

0.569

3.854

0.569

0.888

0.068

0.888

0.336

1.541

Shape

CONSTRUCTION OF RCC BRIDGE AT VILLAGE SAFI ABAD,


DISTRICT MARDAN.

Ref No. =JCC/SA /B.B.S/002

S.No Description of Item Work mark

Bar dia

Nos

Spacing Length

(mm)

Total
Length

Working Pile

A
1

Bottom protion

25

16

N.A

12.3

1574.4

Mid Portion

25

16

N.A

12.3

1574.4

Top Portion

25

16

N.A

768

Additional Bars

25

N.A

576

Spiral on laps

12

27

75

2.82

609.12

Spiral on bottom portion

12

97

150

2.82

2188.32

Spiral on top portion

16

x 107

75

2.82

2413.92

Total

AGE SAFI ABAD,

Date of Submission: 09/05/2013


Activity: WORKING PILES

Unit

Total Weight

Weight

g Pile
3.854

6.068

3.854

6.068

3.854

2.960

3.854

2.220

0.888

0.541

0.888

1.943

1.579

3.811

23.611

Shape