ALIGNMENT PROTOCOL

Project : 1 x 10 MW CAPTIVE POWER PLANT

Customer : M/S SHYAM STEEL INDUSTRIES LTD

Consultant : CETHAR CONSULTING ENGINEEERS (P) LTD.

Rev.

04.11.2011 Date

For Alignment Purpose Description

HP/BMK Prepared

SB Checked

MP Approved

We reserve the rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden. SIEMENS Ltd.

Format No.: IP-Q-F-3009/C

Rev.Date : 31.03.2010

Revision :

Language :

Page :

eng. ELEVATION WITH HEIGHT DIFFERENCE

1CYJ441164A112

NOMINAL ACTUAL View

0.280 0.02

NOMINAL ACTUAL

0.080 0.02

C1 C2

PLAN WITH RADIAL DIFFERENCE NOMINAL ACTUAL 0.025 0.02 NOMINAL ACTUAL 0.300 0.02

View

DBSE (mm): HS COUPLING (C1) LS COUPLING (C2)

1000 350

NOTES : 1- WITH THIS ALIGNMENT VALUES ALL THE ROTOR CENTER LINES SHOULD BE ALIGNED AT THE WORKING TEMPERATURE(WARM CONTROL) 2- DOWELL THE GEARBOX AS PER GA DRAWING AFTER FINAL ALIGNMENT

Format No.: IP-Q-F-3009/C Rev.Date : 31.03.2010

Revision :

Language :

Page :

eng. Turbine - Gear Box

1CYJ441164A112

LEFT

a1 b3 r1

0.000 0.000 0.000

RIGHT

a2 b4 r2

0.000 0.000 0.255

a4 b2 r4

0.000 0.000 0.305

a3 b1 r3

0.000 0.000 0.560

Notes: 1 When measuring turn both the shafts to measure at the same point. 2 Two nos. of dial gauges to be used for Axial measurement. 3 Dial gauge readings to be filled in coloured boxes. Axial Alignment Axial Measurement Top - Bottom m1 = [(a1+b3) - (b1+a3)] / 2 Right - Left m2 = [(a2+b4) - (b2+a4)] / 2 [ mm ] 0.000 0.000 Radial Alignment Radial Measurement Top - Bottom e1 = ( r1 - r3 ) / 2 Right - Left e2 = ( r2 - r4 ) / 2 [ mm ] -0.280 -0.025 Required -0.280 0.02 -0.025 0.02 Required <= 0.02 <= 0.02

m1 [ mm ] m2 [ mm ]

e1 [ mm ] e2 [ mm ]

Sr. No. 1 2 3 4

Clutch Misalignment Turbine shaft is below Gear Box shaft Turbine shaft is above Gear Box shaft Turbine shaft is right from Gear Box shaft Turbine shaft is left from Gear Box shaft

[ mm ] 0.280 0.025

Measuring Instruement Radial Axial Other


Format No.: IP-Q-F-3009/C Rev.Date : 31.03.2010

Performed By Siemens Other Name Sign Date

Siemens

Checked By Cust.

Conusl.

Revision :

Language :

Page :

eng. Gear Box - Alternator

1CYJ441164A112

LEFT

a1 b3 r1

RIGHT

a4 b2 r4

a2 b4 r2

a3 b1 r3

Notes: 1 When measuring turn both the shafts to measure at the same point. 2 Two nos. of dial gauges to be used for Axial measurement. 3 Dial gauge readings to be filled in coloured boxes. Axial Alignment Axial Measurement Top - Bottom m1 = [(a1+b3) - (b1+a3)] / 2 Right - Left m2 = [(a2+b4) - (b2+a4)] / 2 [ mm ] 0.000 0.000 Radial Alingment Redial Measurement Top - Bottom e1 = ( r1 - r3 ) / 2 Right - Left e2 = ( r2 - r4 ) / 2 [ mm ] 0.000 0.000 Required -0.080 0.02 -0.300 0.02 Required <= 0.02 <= 0.02

m1 [ mm ] m2 [ mm ]

e1 [ mm ] e2 [ mm ]

Sr. No. 1 2 3 4

Clutch Misalingment Gearbox shaft is below Alternator shaft Gearbox shaft is above Alternator shaft Gearbox shaft is left to Alternator shaft Gearbox shaft is right to Alternator shaft

[ mm ]

Mesuring Instruement Radial Axial Other


Format No.: IP-Q-F-3009/C Rev.Date : 31.03.2010

Performed By Siemens Other Name Sign Date

Siemens

Checked By Cust.

Conusl.

Revision :

Language :

Page :

Eng.

5 of 5

1CYJ441164A112

A. CHECK FOR AXIAL MOVEMENT DUE TO BACK LASH 1. Place dial gauges in axial direction on both High speed & Low speed shaft ends. 2. Now, pull the High speed shaft towards the turbine such that the dial gauge on low speed shaft starts to move. 3. Set both the Dial Gauges to "ZERO". 4. Now, Push the high speed shaft in other direction i.e. towards the generator such that the dial gauge on low speed shaft just starts to move. 5. Take reading of dial gauge on the high speed shaft, which is the axial movement due to back lash. B. POSITIONING OF LOW SPEED SHAFT FOR ALIGNMENT 1. Move the low speed shaft towards the turbine till butts against the journal bearing. To do so, rotate the low speed shaft slowly in the direction of rotation by hand wheel provided, causing the shafts to slide in the journal bearings so that the contacting tooth flanks are the same as required. 2. Now, move the low speed shaft in other direction i.e. Towards the generator so as to maintain dimension - E. The procedure to be followed has to be same as mentioned in Step-1 After dim.E is maintained, check & ensure dim.B is maintained by default. 3. Place dial gauges in axial direction on both High speed & Low speed shaft ends. 4. Set both the Dial Gauges to "ZERO". 5. Repeat the step-1. The reading on the high speed dial gauge is axial float in turbine direction (dim.C). 6. Move the low speed shaft towards the alternator till butts against the journal bearing. To do so, rotate the low speed shaft slowly in the opposite to direction of rotation by hand wheel provided, causing the shafts to slide in the journal bearings so that the contacting tooth flanks are the same as required. The reading on the low speed dial gauge is axial float in alternator direction (dim.F). 7. Repeat step - 1 and 2. 8. For alignment & mounting of couplings, it is very ESSENTIAL to adhere to the Low speed shaft position as defined in step-7