Você está na página 1de 4

Early Bird Registration Deadline: 9 March 2013

Society of Petroleum Engineers


2224 April 2013 | The Address Dubai Marina Hotel | Dubai, United Arab Emirates

SPE Applied Technology Workshop Practical Sand Management


Who Should Attend
Professionals involved in the development, implementation, and monitoring of field sand management strategy, namely: Asset managers Production engineers/technologists Completion/Well engineers Geomechanics engineers Reservoir and facilities engineers
Committee Members
Chairperson Jorge Rezende Schlumberger Aaron J. Bonner Halliburton Basker Murugappan Taqa E&P Chris Kalli Chevron Colin Jones Chevron Colin McPhee Senergy World Eddie Bowen Superior Completion Services Erik Schrama Petroleum Development Oman George Varughese Emerson Hani Qutob Senergy World Jeffrey Bode Resman Mansour Shaheen Baker Hughes Sami Akel Baker Hughes Tracy Ballard Weatherford Ying Huo Schlumberger

Workshop Abstract
Sand management has been identified as one of the key issues in the development of oil and gas fields. Industry operators are facing a number of challenges as sand production is becoming a major economical issue. Sand management is not just about selection of sand control systemsit is about maximising and maintaining production while managing sand at acceptable rates. This workshop discusses: Data requirements and methods used to predict when and where sand production will occur When to manage sand and when to exclude it How best to work in an integrated team Sand control equipment specifications, selection, design, installation, and operation Why sand control fails and how to remediate

www.spe.org/events/13adu4

WORKSHOP
Practical Sand Management
Sponsorship Support Sponsorship support helps offset the cost of producing workshops and allows SPE to keep the attendance price within reach of operations-level individuals, those who benefit most from these technical workshops. Sponsors benefit both directly and indirectly by having their names associated with a specific workshop. While SPE prohibits any type of commercialism within the conference hall itself, the society recognises that sponsoring companies offer valuable information to attendees outside the technical sessions. Sponsorship Categories Sponsorships are offered on a first come basis. Please contact SPE to verify the availability of a particular sponsorship. Existing sponsors have the opportunity to renew the same level of sponsorship for annual workshops. Gold Sponsorship Silver Sponsorship Bronze Sponsorship Welcome Reception and Dinner LuncheonsPer Day Coffee BreaksPer Day Audio-Visual Equipment Sponsorship Benefits In addition to onsite recognition; SPE will recognise sponsors on the SPE website and in all printed material for the workshop. Based on the sponsorship selected, sponsoring companies also receive logo visibility on promotional workshop items. For More Information For a detailed list of available sponsorships, including benefits and pricing, contact Regina Alphonso at ralphonso@spe.org.

22 April Coffee Break Sponsor

Schedule Monday, 22 April 2013


08000830 hours 08300840 hours 08400900 hours 09001200 hours Registration and Welcome Coffee Seating/Safety Briefing by Hotel and Workshop Introduction by Chairman Opening Keynote Speech Session 1: Fundamentals of Sand ManagementKnow Your Enemy Session Chairs: Colin McPhee, Senergy World; Tracey Ballard, Weatherford Facilitators: Hani Qutob, Senergy World; Mansour Shaheen, Baker Hughes

Sand production and sand management are critical challenges in reservoir management and production operations. It is estimated that 70% of the worlds conventional oil and gas reserves are contained in sandstone reservoirs where sand production is likely to become a problem at some point during the life of the field. Sand production results in high removal/ disposal costs, equipment erosion, and significant maintenance expenditure. Sand production issues arise at the reservoir appraisal stage, where the risk of sand production must be quantified to formulate and cost the reservoir management strategy or to satisfy regulatory authorities, and in fields where sand production has been encountered and must be economically managed. Sand production strikes with varying degrees of severity, not all of which require action with time at constant production conditions and is frequently associated with clean up after stimulation. In other cases, sand production may lead to a well becoming seriously damaged, production being killed, or surface equipment becoming seriously damaged leading to catastrophic accidents (blow out). The goal of sand management is to limit sand production to a level acceptable to wells and facilities while maintaining economic production over the asset life. It is essential to consider all viable options to find the best sand management strategy for the asset. Key questions are: Will my well produce sand? If so, where, when, and how much? Can I live with sand or do I have to exclude it? If I dont want to exclude sand are there other options? If I have to exclude sand, what is the optimum sand control technique for my wells? Factors controlling the onset of sand production include inherent rock strength, naturally existing earth stresses, and additional stress caused by drilling, drawdown, and depletion. The first part of the session recognises that accurate characterisation of the reservoir sand, in terms of strength and particle size variability, is the starting point for designing effective sand management strategies. This is easier said than done. Rock strength measurements are destructive and constrained by available core condition and geometry. Non-destructive strength index testing can aid in sample selection and rock strength modelling. Particle sizing is not necessarily straightforwardhow do you select the samples to measure for lab testing? There are currently various methods for sand retention testinghow valid are these and how do you interpret the results? The second part of the session is a breakout session to discuss and define the key issues and challenges in sand management. 12001300 hours 13001430 hours Luncheon and Prayers Session 2: Sand Prediction Session Chairs: Colin Jones, Chevron; Eddie Bowen, Superior Completion Services

One of the most important factors in any practical sand management strategy is the full understanding of whether a rock will fail during the production life cycle of a well and if the failed sand will be produced. There are many tools, philosophies, techniques, and methods for understanding the failure mechanisms like 1) Empiricaltesting the well 2) Analogicaluse of offset well data from nearby or similar reservoir data 3) Analyticalby performing strength test on cores or deriving strength from log based correlations, and 4) Finite Element Analysiswhich can predict the onset of sand production and, for some models, the volume of sand produced. In this session, we will present some of these proven methods and techniques as well as explore newer methods of predicting sand failure mechanisms. How does the way in which we drill, complete, and produce these wells affect these failure modes? 14301500 hours 15001730 hours Coffee Break Session 3: Sand Management Strategies Session Chairs: Jeffrey Bode, Resman; Ying Huo, Schlumberger

SAVE USD 450 BY REGISTERING BEFORE 9 MARCH 2013

This session offers a perspective of how the sand control method is chosen based on economic reservoir development. The strategy ranges from managed production of well rates to control sand production, oriented perforation, and downhole methods of controlling sand such as gravel packs and fracpacks. However, the strategies that worked in the past may not be the right solution today. Optimisation should be part of the strategy in order to find the fit-for-purpose solution. Topside equipment (sand detector, separator, and sand disposal options) will also be incorporated in this session. Hence, we will focus not only on sand management downhole but on the surface as well. 1800 hours Workshop Dinner

Tuesday, 23 April 2013


08300900 hours 09001200 hours Welcome Coffee Session 4: Sand Control Design and Selection Process Session Chairs: Eddie Bowen, Superior Completion Services; Tracey Ballard, Weatherford Facilitators: Colin Jones, Chevron; Sami Akel, Baker Hughes

Registration Deadline: 22 March 2013

www.spe.org/events/13adu4
Workshop Venue
The Address Dubai Marina Hotel P.O. Box 32923, Dubai, UAE Tel: +971.4.436.7777 Fax: +971.4.436.7788 Web: www.theaddress.com

Now that we have a better understanding of the failure mechanisms, strategies for managing sand control, and explored the fundamentals of sand management, it is time to unravel the sand control selection and design process. As with any completion, this process has several economic and operational concerns. Some of the economic concerns include cost of sand control, potential productivity reduction/increase caused by sand control, cost and risk incurred when ignoring/using inadequate sand control including lost production. Operational concerns include, but are not limited to expected well life, complexity of the completion, and environmental and safety concerns. It is the proper evaluation of each of these concerns which will direct us to the right sand control solution for each application. Despite advances in technology there is a tendency to stick to conventional, tried and tested techniques rather than try anything new. We will take a look at the various technological solutions available and how each of these solutions is selected based on the concerns at hand. Proper sand control completions, installation, and design techniques should lead to reduced production costs and should consider the following points: Provide efficient sand retention Minimise cost and time Design for well life to minimise workovers and interventions Have a large bore to maximise the capability for future selective completions 12001300 hours 13001430 hours Luncheon and Prayers Session 5: Practical Implementation Session Chairs: Aaron J. Bonner, Halliburton; Jorge Rezende, Schlumberger

Workshop Guidelines
Format
Three (3) days of informal discussions prompted by selected keynote presentations and discussions. Workshops maximise the exchange of ideas among attendees and presenters through brief technical presentations followed by extended Q&A periods. Focused topics attract an informed audience eager to discuss issues critical to advancing both technology and best practices. The majority of the presentations are in the form of case studies, highlighting engineering achievements, and lessons learnt. In order to stimulate frank discussion, no proceedings are published and the press is not invited to attend.

Sand production presents a major economical challenge to the industry and has a variety of different approaches and systematic solutions. Operators are constantly seeking the most economical solution which has to balance operational costs and well productivity. Normally the common approach for those problems is kept within the scope of a project due to its complexity and costs. Solutions are available throughout the industry and sometimes more than one approach can be used for a specific sand production issue. The implementation of any solution is very complex and needs to address several interfaces and different levels of reservoir and production information. For the successful management of those projects, seeking the optimum solution requires a great effort from several groups in the industry. The objective of this session is to describe tools and processes which can lead to the implementation of different sand management methods.

Documentation

Proceedings will not be published; therefore, formal papers, and handouts are not expected from speakers. Work in progress, new ideas, and interesting projects are sought. Professionally-prepared visual aids are not required; however, PowerPoint presentations are most commonly used. Note-taking by participants is encouraged.

14301500 hours 15001700 hours

Coffee Break Session 6: Life Cycle Management. Session Chairs: Chris Kalli, Chevron; Erik Schrama, Petroleum Development Oman

Breakout Sessions

Attendees will be assigned to discussion groups on a random basis for the breakout sessions to maximise the opportunity to interact with other participants.

Sand management doesnt stop after the wells have been completed and the surface facilities have been commissioned. For the entire lifetime of the field, sand needs to be managed proactively. This session addresses operating practices that have proven to be successful in extending run life of and minimising production upsets related to sand production.

Poster Session

The Steering Committee encourages registrations from professionals who are able to prepare and present a poster on a relevant project. For further details kindly contact Regina Alphonso at ralphonso@spe.org.

Wednesday, 24 April 2013


08300900 hours Welcome Coffee Session 7: Topside Sand Management Session Chairs: Basker Murugappan, Taqa E&P; George Varughese, Emerson

Attendance

09001200 hours

Topside sand management or surface sand management has the same key objectives which are: Transporting sand without deposition in the surface system Erosional constraints of sand transport and monitoring Removal and disposal of sand with surface equipment The goal here is to reduce the downhole sand control system and to allow the wells to produce and remove sand to surface. This will remove the downhole complexity of sand control installations and more importantly remove a major portion of the downhole pressure drops which in turn would increase well productivity. A majority of these problems is directly related to our basic mindset of surface sand management. In general topside facilities have a base case of no sand production at surface. 90% of topsides are initially designed with none or very little sand production from the wells. It is difficult to break down or change this mindset. In recent years, new technologies have been used to address a number of these issues. However, there has been no concerted effort to develop a full topside management system using the newer monitoring, evaluations, and sand removal technologies. Topside sand management has almost the same productivity value (or more value) as downhole sand management and yet it has had very little or no focus from the sand control industry. This session will attempt to connect the dots between equipment and monitoring software to show how to set up a surface sand management system. 12001300 hours 13001500 hours Luncheon and Prayers Session 8: Well Intervention and Sand Remediation Session Chairs: Aaron J. Bonner, Halliburton; Erik Schrama, Petroleum Development Oman; Sami Akel, Baker Hughes

Registrations will be accepted on a first-come, first-serve basis. The Steering Committee encourages attendance from those who can contribute to the workshop most effectively either in discussions or with posters. A mix of attendees in terms of geographic origin, companies, and disciplines will be encouraged.

Workshop Deliverables

The Steering Committee will appoint a scribe to record the discussions and to produce the full workshop report for SPE. This report will be circulated to all attendees as the workshop deliverable within 46 weeks following the workshop. The copyright of the report is with SPE. PowerPoint presentation materials will be posted on a specific SPE URL address after the workshop. Provision of the materials by the speakers will signify their permission for SPE to do so.

Commercialism

In keeping with ATW objectives and the SPE mission, commercialism in posters or presentations will not be permitted. Company logos must be limited to the title slide and used only to indicate the affiliation of the presenter and others involved in the work.

Attendance Certificate

In this interactive session, the workshop attendees are asked to participate in a discussion and share experiences on well interventions related to sand management. Possible discussion topics are: retrofitting downhole sand control, sand clean outs in low pressure wells, workovers to remove and install another form of sand control, etc. 15001520 hours 15201600 hours Closing Keynote Speech Workshop Closing Remarks by Chairman

All attendees will receive an attendance certificate attesting to their participation in the workshop. This certificate will be provided in exchange for a completed Workshop Questionnaire.

Continuing Education Units

Attendees at this workshop qualify for SPE Continuing Education Units (CEU) at the rate of 0.1 CEU per hour of the workshop.

REGISTRATION FORM
2224 April 2013 | The Address Dubai Marina Hotel | Dubai, United Arab Emirates

Practical Sand Management

Important: Attendance is limited and is not guaranteed. Early registration is recommended. Please print or type in black ink. Registration Fee MUST be paid in advance for attending the Applied Technology Workshop.

First Name/Forename__________________________________________________ Middle Name___________________________________________________ Last/Family Name________________________________________________________________________________________ SPE Member?

Yes No

Member No.__________________________________________ Job Title_____________________________________________________________________ Company/Organisation_______________________________________________________________________________________________________________ Street or P.O. Box Number_____________________________________________________________________ City___________________________________ State/Province___________________________________ Zip/Postal Code___________________________ Country___________________________________ Telephone____________________________________________Facsimile Email (required)____________________________________________________________________________________________________________________ Workshop Fee:

Workshop Fee includes: Technical sessions, materials, daily coffee breaks and luncheons, certificate of Continuing Education Units (CEU) and welcome reception and dinner (if applicable). Accommodation is NOT included in the workshop registration fee. Do you wish to present a poster? (subject to selection) Do you wish to be considered a Discussion Leader? (subject to selection) If yes, please indicate which subject you would like to present on: Credit Card (Check One):

WORKSHOP
Before 9 March 2013 After 9 March 2013

USD 1,150 for SPE Members USD 1,600 for SPE Members

USD 1,350 for Nonmembers USD 1,800 for Nonmembers

Yes Yes

No No

American Express MasterCard Visa

NO REFUNDS will be granted on cancellations on or after 15 April 2013.

Card Number (will be billed through Society of Petroleum Engineers)

Expiration Date (mm/yy)

Security Code

Name of Credit Card Holder (printed) _________________________________________________________________________________________________ Signature (required)___________________________________________________________________________ Date_______________________________ Please inform us of mobility or special dietary needs_____________________________________________________________________________________
Payment by Bank Transfer: IMPORTANTFor reference: Please quote 13ADU4 and name of delegate Make Payment to: HSBC Bank Middle East Ltd, Jebel Ali Branch, P.O. Box 66, Dubai, UAE Account Name: SPE Middle East DMCC Account Number: 036-217131-100 Swift Code: BBMEAEAD

Not an SPE Member?


Join SPE when you register and save money by paying the lower member registration fee.
A portion of your dues is allocated to a JPT subscription and is not deductible or refundable.

Cancellation and Refund Policy:


A processing fee of USD 100 will be charged for cancellations received before the registration deadline 22 March 2013. For cancellations received after the registration deadline, 22 March 2013, 25% refund will be made to the registrant. No refund on cancellations received within seven (7) days prior to the workshop date, i.e. on or after 15 April 2013. No refund will be issued if a registrant fails to attend the workshop.

Visa:
SPE Middle East, North Africa, and India will assist in providing a visa invitation letter, upon request in writing, to confirmed registrants after receiving full payment of registration fees. Visa invitation letters take five days to issue from the date of request and it is the delegates responsibility to obtain their own visa. SPE cannot issue the visa nor can we guarantee it will be obtained. For questions or additional information contact: Regina Alphonso at ralphonso@spe.org.

To submit your registration online, please visit the event website at: www.spe.org/events/13adu4 Alternatively, you can email this form to: formsdubai@spe.org, or fax it to: +971.4.457.3164.
13ADU4

Você também pode gostar