OF UNIT RATE OF SHUTTERING/FORMWORK FOR CONCRETE ITEMS ( First

Reprint OCTOBER 1996 )

Indian Standard PROFORMA FOR ANALYSIS

IS : 10421 - 1983 ( Reafiinned 1995)

UDC 69.057.5 : 69.003.12

0 BUREAU OF

Copyright INDIAN

1983 STANDARDS SHAH ZAFAR MARG

MANAEC BHAVAN, 9 BAHALNR

NEW DELHI 110002

Gr2

April 1983

IS :10421 - 1983 ( Reaflirmrd 1995 )

Indian Standard
PRO FORMA
UNIT FOR ANALYSIS OF RATE OF SHUTTERING/FORMWORK FOR CONCRETE ITEMS

Cost Analysis

and Cost Estimates

Sectional

Committee,

HDC 63

Chairman
SKRI S. N. AGNIHOTRI

7 10, Sector Members CHIEF ENCIN~EI~ ( DRAINAGE )


SRRI J. .P. AWASTHY

1 I-B,

Chandigarh Representing

DIRECTOR CENTRAL DESIGNS ( Alternate ) CHIEF ENQINEER ( MEDIUM Irrigation & Power Department, Government of IRRIGATION & DESIGNS ) Andhra Pradesh, Byderabad-, .. SUPERINTENI~NG ENQINEER ( Alternate ) Government of Maharashtra, CHIEF ENGINEER ( SPECIFIEU Irrigation Department, PROJECT ) -P une _ CHIEF ENQINEER ( WORKS J Beas Sutlai Link Proicct, Sundernaear _ SU~ERINTEND;NG EN(:I&YTL ( Alternate ) DIRF,CT?R ( CMC ) Central Water Commission, New Delhi DEPUTY DIRECTOR ( CMC ) ( Alternate ) DIRIXTOR ( R & C ) Central \Vater Commission, New Delhi DV:PTWYDIRIWTOR ( R & C ) ( Alternate ) SHRT J. DUXAIRAJ In personal capacity ( D-Z/141, Satya Marg, New Zklhi 110021 ) EXIZCUTIVE EI-?GINEER ( CIVIL ) Kerala State Electricity Board, Trivandrum GENERAL M A~CAGER S. B. Joshi 81 Co Ltd, Bombay Roads Wing ( Ministry of Shipping & Transport ), SHRI R. M. GUPTA New Delhi SHRI M. L. M.~NDAL ( Alternate) M. N. Dastur & Co ( P ) Ltd, Calcutta SHRI S. S. IYENCaR SHRI N. G. TOSHI Karnataka Power Coruoration Ltd. Bangalore SHRI A. S. ~ISHNASWAMY Directorate General Bbrder Roads,Newbelhi SRRI H. B. U~ASI ( Alternate ) SHRI T. S. MURTHY National Project Construction Corporation Ltd, New Delhi SHRI P. D. DUBHASHI ( Alternate ) ( Continued on page 2 )

Continental Construction ( P ) Ltd, New Delhi Irrigation Works, Government of Punjab, Chandigarh

@ Copyrighf 1983
BUREAU OF INDIAN STANDARDS This publication is protected under the Indian Copyri@ Act ( XIV of 1957 ) and reproduction in whole or in part by any means except with written permission of the publisher shall be deemed to be an infringement of copyright under the said Act.

IS : 10421- 1983

Sunr

Repesentin.~ hlembers Hindustan Construction Corporation .I. N,AC..\IIJII:SIIAN.+ KAU SJXRI D. M. S.\vux ( Allernnle ) Pate1 Engineering Co Ltd, Uombay SJJRI Y. G. PATI% Hinduztan Steel Works Construction SJrl<I i. A. 1<.,0 Institution of Engineers, Pathankot SIIIlJ :\. s. SPXNclN Construction Consultation Services, SI~I~I G. D. l.\s~.\it
SHRI SHRI G. D. A. I<oTJ~.\RI ( Mernnle ) SJsIlI hf.'I'l3YAGAlMJAiV

Ltd,

Bombay

Ltd, Bombay

Cakutta

R \MAN, Director ( Civ Engg

Indian Institute Director General, ) Secretary


SICRI HEMANT

ofPublic &ministration,
IS1 ( Ex-oficio Member )

New Delhi

Assistant

Director

KGMAR ( Civ Engg ), IS1

IS : 10421- 1983

Indian Standard
PRO FORMA FOR ANALYSIS OF UNIT RATE OF SHUTTERINGlFORMWORK FOR CONCRETE ITEMS

0.

FOREWORD

0.1 This Indian Standard was adopted by the Indian Standards Institution on 27 January 1983, after the draft finalized by the Cost Analysis and Cost Estimates Sectional Committee had been approved by the Civil Engineering Division Council.
0.2 Shuttering/formwork for concrete boardly of following types: a) Panel c) Mobile d) Special forms, forms, forms, and forms. works for river valley projects are

b) Built-in-place

0.2.1 The material for shuttering in all the above cases may either be of steel or timber. Shuttering provided for concrete works may be plain formwork or shuttering of special shapes such as circular, horse-shoe, conic and other shapes required for the structure. 0.3 Struts, braces and ties are required for single or multi-stage depending upon the requirements. The following information will be helpful for a full appreciation of the type and nature of the shuttering work involved: a) Name b) Name c) Layout d) Location e) Purpose of project, of work, plan of project, of work, of work, and cross-section, agency, or contract 3

f) Longitudinal g) Construction

1) Departmental

IS : 10421- 1983
2) Name h) VoIume k) Average m) Type.of n) Normal p) Detailed of department/contractor of concrete work, area for shuttering,

j) Approximate

lead and lift for the formwork, shuttering, size of shuttering dimension units used, and of special shapes. sketches

NOTP: - Detailed plan, elevation and sections of the work and full dimension sketches of the formworks for the whole work as well .as for individual units should be provided.

0.4 For the purpose of deciding whether a particular requirement of this standard is complied with, the final value, observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with IS : 2-1960. The number of significant places retained in the rounded off value should be the same as that of the specified value in this standard.

1. SCOPE

1.1 This standard shutteting/formwork


2. PRO. FORMA

lays down the pro forma for analysis of unit for concrete items in river valley projects.

rate

of

2.1 The pro forma recommended for analysis of unit formwork for concrete items is as given in Table 1.

rate

of shuttering/

TABLE

CR0

FORMA

FOR ANALYSIS :SHUTTERING/F~RMWORK

OF UNlT

RATE

OF

Details of Shuttering: i) Name of work fqr which shuttering is required ii) Q.uantity of concrete iii) Type and shape of shuttering ( Continued )

*Rules for rounding- off numerical

values ( revised ),

IS :10421-1983
TABLE 1 PRO FORM/i FOR ANALYSIS SHUTTERING/FORMWORK Unit (2) Quantity (3) OF UNIT - Contd Rate (4) RATE Amount (5) OF

Item (1) (A) STEEL SHKTERING

Remarks (6)

a) Materials i) Steel plates ii) Steel sections iii) Pipes iv) Miscellaneous materials including that required for welding, rivetting, etc b) Labour charges for fabrication i) Foremen/supervisors ii) Welders iii) Fitters labour iv) Helpers v) Skilled/ordinary vi) Others
C)

Charges for machinery and equipment including chargesfor power/gas/diesel i) Cutting iii) Rolling v) Others machine machine machine

ii) Welding/rivetting iv) Air compressors d) Maintenance charges of items under (c)

e) Ancillaries and incidentals Proportional cost of the following job facilities: i) Labour and staff quarters ii) Service roads and transportation arrangements for staff and labourers iii) Electric iv) Water supply supply ( Continued )

X5:10421-

1983

TABLE

PRO FORMA FOR ANALYSIS SHUTTERING/FORMWORK Unit (2) facilities facilities facilities amenities Quantity (3)

OF UNITRATE - Conk Rate (4) Amount (5)

OF

Item (1) . v) Sanitary vi) Drainage vii) viii) Medical Other

Remarks (6)

f ) Maintenance cost of items under clause (c) g) Proportional cost of su@G3rwork establishmezt h) Coaliagcacies j) Ooerhead ( exctuding projt ) Total Area cost of shuttering of shuttering of reuse

Numher

Cost of shuttering/unit/use L) Erection cost i) Transportation ii) Labour iii) charges charges with details oiling,

Materials including sealing, etc charges, cost

iv) Scaffoldings v) Machinery m) Dismanding/stri&& i) Transportation ii) Lahour iii) Machinery charges if any

charges with details if aiy charges,

n) -Total charges ( a to m ) of formwork/sq.m chargeable to work *This sh+l include establishment, office stationery, general tools and plantc .cars, their runnmg and maintenance, insurance, workmans compensation phone and telecommunication facilities, consultation services, entertainme&, staff tele_ etc

( Continued 1

IS:10421-1983
TABLE I PRO FORMA FOR ANALYSIS SHUTTERING/FORMWORK Unit (2) Quantity (3) OF UNIT - Contd Rate (4) RATE Amount (5) OF Remarks (6)

Item (1) (B) WOODEN SHUTTERINGY

a) Materials i) Type of timber ii) Wooden joists iii) Jigs and joists iv) Miscellaneous b) Labour charges i) Foremen/supervisors ii) Carpenters iii) Labour for creating position iv) Helpers v) Other labour, if any. in material

c) Charees for machinerv and e&&nent includi& chargesfor power/gas/diesel i) Band/circular/trolley ii) Planer iii) Shaper iv) Others. Ancillaries and incidentals Proportional cost of the following job facilities:
i) Labour ii)

saw

and staff quarters

Service road and transportation arrangements for staff and labourers supply facilities facilities facilities ( Continued

iii) Electric v). Sanitary vi) Drainage vii) Medical viii)

iv) Water supply

Other amenities

TABLE

FRO FORMA FOR ANALYSIS SHUTTERING/FORMWORK Unit (4 Quantity (3)

OF UNI? - Co&d Rate (4)

RATE

OF

Item
(I) e) A4aintenance of items znder (d)

Amount (5)

Replark (6)

f ) FYoportional cost of
g) Conlingencies

superuisorp work establishment

lh) Overhends ( ex&iing Total Area of shuttering Number of reuse

pro& ) *

cost of shuttering

Cost of shuttering/unit/use j) Erestion cwt i) Transportation iii) charges oiling ii) Labour charges with deta;;ls Materials including sealing, etc charges,

iv) Scaffoldings v) Machinery if any

k) Disnlanllinglstrip~i~g cost
i) ii)

Transportation
Labour

charges

charges with deta2.s charges, if any

iii) Machinery

m) Totar chqes of ( a to k ) formwwklsq, nt chargeable to work *Overhead shal1 include establishment, office stationery, general tools and plants, staff cars, their running and maintenance, insurance, workmans compensation, telephone and telecommunication facili,ties, consultation service, entertainments, etc.

BUREAU

OF INDIAN STANDARDS

Headquarters: Manak Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002 Telephones: 323 0131, 323 8375,323 9402 Fax : 91 11 3234062,91 11 3239399 Telegrams : Manaksanstha (Common to all Offices) Telephone Industrial Area, Sahibabad 201010 0-77 00 32

Central Laboratory

Plot No. 20/9, Site IV, Sahibabad Regional Central *Eastern Offices:

: Manak : l/14

Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002 CIT Scheme VII M, V.I.P. Road, Maniktola, CALCUTTA Sector 34-A, CHANDIGARH 160022 600113 Exchange, Andheri (East), 700054

323 76 17 337 86 62 60 30 43 235 23 15 832 92 95

Northern : SC0 335-336, Southern

: C.I.T.

Campus, IV Cross Road, MADRAS

tWestern : Manakafaya. MUMBAI 400093 Branch Offices::

E9, Behind Marol Telephone

Pushpak, Nurmohamed

Shaikh Marg, Khanpur, AHMEDABAD Road,

380001

550 13 40 839 49 55 554021 40 36 27 21 0141 8-28 88 01 8-71 1996

SPeenya Industrial Area, 1st Stage, Bangalore-Tumkur BANGALORE 560058 Gangotri Complex, 5th Floor, Bhadbhada Plot No. 62-63,

Road, T.T. Nagar, BHOPAL 462003 751001 641037

Unit VI, Ganga Nagar, BHUBANESHWAR

Kalaikathir Buildings, 670 Avinashi Road, COIMBATORE Plot No. 43, Sector 16 A, Mathura Road, FARIDABAD Savitri Complex, 116 G.T. Road, GHAZIABAD 201001

121001

53/5 Ward No.29, R.G. Barua Road, 5th By-lane, GUWAHATI 5-8-56C,

781003 500001

54 11 37 20 10 83 37 29 25 21 68 76

L.N. Gupta Marg, Nampally Station Road, HYDERABAD Marg, C-Scheme, JAIPUR 302001 208005 Leela Cinema, Naval

E-52, Chitaranjan

1171418 B, Sarvodaya Seth Bhawan, 2nd LUCKNOW 226001

Nagar, KANPUR Floor, Behind

Kishore

Road,

23 09 23 26 23 05

Patliputra Industrial Estate, PATNA 800013 T.C. No. 14/1421, inspection Pushpanjali, NAGPUR Offices University P. 0. Palayam, THIRUVANANTHAPURAM (With Sale Point) West 695034

621

17

:
High Court Road, Shankar Nagar Square, 52 51 71

1st Floor, 205-A, 440010

Institution of Engineers (India) Building 1332 Shivaji Nagar, PUNE 411005

32 36 35

*Sales Office is at 5 Chowringhee CALCUTTA 700072 tSales

Approach, P.O. Princep Street,

271085

Office is at Novelty Chambers,

Grant Road, MUMBAI 400007 Square,

309 65 28 222 39 71

*Sales Office is at F Block, Unity Building, Narashimaraja BANGALORE 560002

Printed at Printograph,

New Delhi (INDIA).

Você também pode gostar