Indian Standard
PRO FORMA
UNIT FOR ANALYSIS OF RATE OF SHUTTERING/FORMWORK FOR CONCRETE ITEMS
Cost Analysis
Sectional
Committee,
HDC 63
Chairman
SKRI S. N. AGNIHOTRI
1 I-B,
Chandigarh Representing
DIRECTOR CENTRAL DESIGNS ( Alternate ) CHIEF ENQINEER ( MEDIUM Irrigation & Power Department, Government of IRRIGATION & DESIGNS ) Andhra Pradesh, Byderabad-, .. SUPERINTENI~NG ENQINEER ( Alternate ) Government of Maharashtra, CHIEF ENGINEER ( SPECIFIEU Irrigation Department, PROJECT ) -P une _ CHIEF ENQINEER ( WORKS J Beas Sutlai Link Proicct, Sundernaear _ SU~ERINTEND;NG EN(:I&YTL ( Alternate ) DIRF,CT?R ( CMC ) Central Water Commission, New Delhi DEPUTY DIRECTOR ( CMC ) ( Alternate ) DIRIXTOR ( R & C ) Central \Vater Commission, New Delhi DV:PTWYDIRIWTOR ( R & C ) ( Alternate ) SHRT J. DUXAIRAJ In personal capacity ( D-Z/141, Satya Marg, New Zklhi 110021 ) EXIZCUTIVE EI-?GINEER ( CIVIL ) Kerala State Electricity Board, Trivandrum GENERAL M A~CAGER S. B. Joshi 81 Co Ltd, Bombay Roads Wing ( Ministry of Shipping & Transport ), SHRI R. M. GUPTA New Delhi SHRI M. L. M.~NDAL ( Alternate) M. N. Dastur & Co ( P ) Ltd, Calcutta SHRI S. S. IYENCaR SHRI N. G. TOSHI Karnataka Power Coruoration Ltd. Bangalore SHRI A. S. ~ISHNASWAMY Directorate General Bbrder Roads,Newbelhi SRRI H. B. U~ASI ( Alternate ) SHRI T. S. MURTHY National Project Construction Corporation Ltd, New Delhi SHRI P. D. DUBHASHI ( Alternate ) ( Continued on page 2 )
Continental Construction ( P ) Ltd, New Delhi Irrigation Works, Government of Punjab, Chandigarh
@ Copyrighf 1983
BUREAU OF INDIAN STANDARDS This publication is protected under the Indian Copyri@ Act ( XIV of 1957 ) and reproduction in whole or in part by any means except with written permission of the publisher shall be deemed to be an infringement of copyright under the said Act.
IS : 10421- 1983
Sunr
Repesentin.~ hlembers Hindustan Construction Corporation .I. N,AC..\IIJII:SIIAN.+ KAU SJXRI D. M. S.\vux ( Allernnle ) Pate1 Engineering Co Ltd, Uombay SJJRI Y. G. PATI% Hinduztan Steel Works Construction SJrl<I i. A. 1<.,0 Institution of Engineers, Pathankot SIIIlJ :\. s. SPXNclN Construction Consultation Services, SI~I~I G. D. l.\s~.\it
SHRI SHRI G. D. A. I<oTJ~.\RI ( Mernnle ) SJsIlI hf.'I'l3YAGAlMJAiV
Ltd,
Bombay
Ltd, Bombay
Cakutta
ofPublic &ministration,
IS1 ( Ex-oficio Member )
New Delhi
Assistant
Director
IS : 10421- 1983
Indian Standard
PRO FORMA FOR ANALYSIS OF UNIT RATE OF SHUTTERINGlFORMWORK FOR CONCRETE ITEMS
0.
FOREWORD
0.1 This Indian Standard was adopted by the Indian Standards Institution on 27 January 1983, after the draft finalized by the Cost Analysis and Cost Estimates Sectional Committee had been approved by the Civil Engineering Division Council.
0.2 Shuttering/formwork for concrete boardly of following types: a) Panel c) Mobile d) Special forms, forms, forms, and forms. works for river valley projects are
b) Built-in-place
0.2.1 The material for shuttering in all the above cases may either be of steel or timber. Shuttering provided for concrete works may be plain formwork or shuttering of special shapes such as circular, horse-shoe, conic and other shapes required for the structure. 0.3 Struts, braces and ties are required for single or multi-stage depending upon the requirements. The following information will be helpful for a full appreciation of the type and nature of the shuttering work involved: a) Name b) Name c) Layout d) Location e) Purpose of project, of work, plan of project, of work, of work, and cross-section, agency, or contract 3
f) Longitudinal g) Construction
1) Departmental
IS : 10421- 1983
2) Name h) VoIume k) Average m) Type.of n) Normal p) Detailed of department/contractor of concrete work, area for shuttering,
j) Approximate
lead and lift for the formwork, shuttering, size of shuttering dimension units used, and of special shapes. sketches
NOTP: - Detailed plan, elevation and sections of the work and full dimension sketches of the formworks for the whole work as well .as for individual units should be provided.
0.4 For the purpose of deciding whether a particular requirement of this standard is complied with, the final value, observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with IS : 2-1960. The number of significant places retained in the rounded off value should be the same as that of the specified value in this standard.
1. SCOPE
lays down the pro forma for analysis of unit for concrete items in river valley projects.
rate
of
2.1 The pro forma recommended for analysis of unit formwork for concrete items is as given in Table 1.
rate
of shuttering/
TABLE
CR0
FORMA
OF UNlT
RATE
OF
Details of Shuttering: i) Name of work fqr which shuttering is required ii) Q.uantity of concrete iii) Type and shape of shuttering ( Continued )
values ( revised ),
IS :10421-1983
TABLE 1 PRO FORM/i FOR ANALYSIS SHUTTERING/FORMWORK Unit (2) Quantity (3) OF UNIT - Contd Rate (4) RATE Amount (5) OF
Remarks (6)
a) Materials i) Steel plates ii) Steel sections iii) Pipes iv) Miscellaneous materials including that required for welding, rivetting, etc b) Labour charges for fabrication i) Foremen/supervisors ii) Welders iii) Fitters labour iv) Helpers v) Skilled/ordinary vi) Others
C)
Charges for machinery and equipment including chargesfor power/gas/diesel i) Cutting iii) Rolling v) Others machine machine machine
ii) Welding/rivetting iv) Air compressors d) Maintenance charges of items under (c)
e) Ancillaries and incidentals Proportional cost of the following job facilities: i) Labour and staff quarters ii) Service roads and transportation arrangements for staff and labourers iii) Electric iv) Water supply supply ( Continued )
X5:10421-
1983
TABLE
PRO FORMA FOR ANALYSIS SHUTTERING/FORMWORK Unit (2) facilities facilities facilities amenities Quantity (3)
OF
Remarks (6)
f ) Maintenance cost of items under clause (c) g) Proportional cost of su@G3rwork establishmezt h) Coaliagcacies j) Ooerhead ( exctuding projt ) Total Area cost of shuttering of shuttering of reuse
Numher
Cost of shuttering/unit/use L) Erection cost i) Transportation ii) Labour iii) charges charges with details oiling,
iv) Scaffoldings v) Machinery m) Dismanding/stri&& i) Transportation ii) Lahour iii) Machinery charges if any
n) -Total charges ( a to m ) of formwork/sq.m chargeable to work *This sh+l include establishment, office stationery, general tools and plantc .cars, their runnmg and maintenance, insurance, workmans compensation phone and telecommunication facilities, consultation services, entertainme&, staff tele_ etc
( Continued 1
IS:10421-1983
TABLE I PRO FORMA FOR ANALYSIS SHUTTERING/FORMWORK Unit (2) Quantity (3) OF UNIT - Contd Rate (4) RATE Amount (5) OF Remarks (6)
a) Materials i) Type of timber ii) Wooden joists iii) Jigs and joists iv) Miscellaneous b) Labour charges i) Foremen/supervisors ii) Carpenters iii) Labour for creating position iv) Helpers v) Other labour, if any. in material
c) Charees for machinerv and e&&nent includi& chargesfor power/gas/diesel i) Band/circular/trolley ii) Planer iii) Shaper iv) Others. Ancillaries and incidentals Proportional cost of the following job facilities:
i) Labour ii)
saw
Service road and transportation arrangements for staff and labourers supply facilities facilities facilities ( Continued
Other amenities
TABLE
RATE
OF
Item
(I) e) A4aintenance of items znder (d)
Amount (5)
Replark (6)
f ) FYoportional cost of
g) Conlingencies
pro& ) *
cost of shuttering
Cost of shuttering/unit/use j) Erestion cwt i) Transportation iii) charges oiling ii) Labour charges with deta;;ls Materials including sealing, etc charges,
k) Disnlanllinglstrip~i~g cost
i) ii)
Transportation
Labour
charges
iii) Machinery
m) Totar chqes of ( a to k ) formwwklsq, nt chargeable to work *Overhead shal1 include establishment, office stationery, general tools and plants, staff cars, their running and maintenance, insurance, workmans compensation, telephone and telecommunication facili,ties, consultation service, entertainments, etc.
BUREAU
OF INDIAN STANDARDS
Headquarters: Manak Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002 Telephones: 323 0131, 323 8375,323 9402 Fax : 91 11 3234062,91 11 3239399 Telegrams : Manaksanstha (Common to all Offices) Telephone Industrial Area, Sahibabad 201010 0-77 00 32
Central Laboratory
Plot No. 20/9, Site IV, Sahibabad Regional Central *Eastern Offices:
: Manak : l/14
Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002 CIT Scheme VII M, V.I.P. Road, Maniktola, CALCUTTA Sector 34-A, CHANDIGARH 160022 600113 Exchange, Andheri (East), 700054
: C.I.T.
Pushpak, Nurmohamed
380001
SPeenya Industrial Area, 1st Stage, Bangalore-Tumkur BANGALORE 560058 Gangotri Complex, 5th Floor, Bhadbhada Plot No. 62-63,
Kalaikathir Buildings, 670 Avinashi Road, COIMBATORE Plot No. 43, Sector 16 A, Mathura Road, FARIDABAD Savitri Complex, 116 G.T. Road, GHAZIABAD 201001
121001
53/5 Ward No.29, R.G. Barua Road, 5th By-lane, GUWAHATI 5-8-56C,
781003 500001
54 11 37 20 10 83 37 29 25 21 68 76
L.N. Gupta Marg, Nampally Station Road, HYDERABAD Marg, C-Scheme, JAIPUR 302001 208005 Leela Cinema, Naval
E-52, Chitaranjan
Kishore
Road,
23 09 23 26 23 05
Patliputra Industrial Estate, PATNA 800013 T.C. No. 14/1421, inspection Pushpanjali, NAGPUR Offices University P. 0. Palayam, THIRUVANANTHAPURAM (With Sale Point) West 695034
621
17
:
High Court Road, Shankar Nagar Square, 52 51 71
32 36 35
271085
309 65 28 222 39 71
Printed at Printograph,