Você está na página 1de 1

270

0
45
225
315
180
90
295
330
245
135
115
56
2280 PCD
OF LUGS
75
165
255
345
90
800
1600
2400
3200
4000
4800
5600
6400
7200
8000
8800
9600
10400
11200
12000
12800
13600
14400
15200
0
MH
DETAIL A
10mmTHK
GUSSET
DETAIL B
DETAIL C
DETAIL A
DETAIL C
DETAIL B
DETAIL D
DETAIL D
NAME PLATE
D
R
G
. N
o
.
SCALE
1:15
REV NO
CHKD DESCRIPTION REV DATE BY
ENGR
PROJ -
APPD.
ENGINEER'S SIGN.
3 - NOT ACCEPTABLE
1 - FINAL
VENDOR DOCUMENT REVIEW
DATE -
4 - FOR INFORMATION
WITH COMMENTS
2 - ACCEPTED
ESSAR ENGINEERING SERVICES LTD.,MUMBAI
VOLTAS LIMITED
EESL DOCUMENT NUMBER
3850 MTPD UREA FERTILISER PROJ ECT
MATIX FERTILISERS &CHEMICALS LTD
0 0
TITLE:
WATER MANAGEMENT BUSINESS DIVISION
SO770003512/WBS-WM/049/STP/CGA-AT/01
TAG NO. DESCRIPTION SIZE QTY
ACIDSTORAGE TANK 2130Mx4300 HOS 1 NO. ETP-TK-242
0 08.11.11 ISSUEDFOR APPROVAL SAC YRT ASM YRT
Specify the following in the GA drawing:
1) Foundation load data i.e. wind shear, wind
moment, Seismic shear and seismic moment for
operating, empty & Hydro test conditional.
2) Operating and Hydro test weight.
3) Spare requirements.
4) FRP layer details with thickness.
5) Tensile strength, Barcol Hardness, Glass
content of MOC as applicable.
6) Specify the platform and ladder requirements.
7) Nozzle, Flanges, gasket MOC.
Show details with the no. of
anchor bolts and sizes, etc.
show the joint detail of shell &
bottom
show name plate Details for this
tank
Loads coming on shell due to this
to be considered in calculation.
show this distance
& angle of roof
show detail of
all the nozzles
Show thickness of roof considered for
fabrication.
Provide adequate stiffeners
Show Details
Show Details
Specify the Details of
nozzle flanges and its MOC
Submit lifting calculation.
Corrosion allowance -?
Joint Efficiency - ?
Specify design code here
Thickness excluding Surface MAT
10.8 thk as per
calculation
without surface
MAT
11 thk as per
calculation
By Gaurav Gupta at 2:14 pm, Nov 21, 2011
1. N10 is not shown here.
2. If it is float & tape or float & board type indicator
it requires three nozzles & Nozzle shall be 2" in
size.. Vendor to check it.
3. Access to the top where the level gauge is
mounted shall have proper arrangement for the
maintenance team to stand and work.
Level Gauge