Escolar Documentos
Profissional Documentos
Cultura Documentos
AREA OF EXPERIENCE
1. 2. 3.
Oil Gas ,Petrochemical Power and industrial Water and wastewater treatment .
2. LIST OF Employers : Kharafi National L.L.C -UAE Metito Overseas Limited -UAE ARESCO(ASEC GROUP)-EGYPT ARAB CONTRACTOR(Osman Ahmed Osman &Co.)-EGYPT ASK MORE (Environmental consultant office)-EGYPT
Key skills
Creative , innovative and Active listener Willing to
learn and listen Strong drive to success: Goal-oriented and Results driven Organized Outstanding organizational skills, Planning and organizing. Leadership, Adaptability, tolerance and Conflict resolution and Tolerant to stressed situations. Excellent project-management skills, Communication and networking skills.
initiate/manage cross-functional teams and multidisciplinary projects. Critical thinking, decision making and problem solving skills. Excellence Personal Communication skills, Influencing, leading, negotiating and delegating abilities. Effective budgeting and cost management ,Excellent commercial, Admin , procurement and contract management of projects
Education& Qualifications :-
University , (Alexandria /Egypt) from 1993-1998 Started my career in May 1995. PMI Certified Project Manager. Possessed technical knowledge in [oil gas, petrochemical, water &sewage treatment and power] industries. Vast knowledge on Internet, budgeting, finance, [product technology] and BI applications. English, Arabic and familiar with German Experience with data management tools BAN, ERP systems and Microsoft platform applications (MS Word, Excel, Power-point, AutoCAD 2011, MS Project, Primavera, cost control, project engineer 13).
Construction of the followings : Diesel and DM tanks (12 tanks) Boilers and stacks Hydrogen plants and natural gas pipe lines EPC Water and wastewater projects Transformers,11 kv cable ,MCC,PLC,SCADA,..etc. Ear thing ,lightening ,lighting,syetems Civil work Tanks, Building, Finish work,..etc..) Generators ,piping work(GRE,GRP , S.S, Alloy Steel,..Etc.) All Types of steel structure and accessories Cement and steel factories capital repairs ETC
Accomplishments Brief
processing (Main Contractor Technip Group (K.T.I), Suez/Egypt. Construction of the main natural gas pipe line (feeder) to the power plant (Elkurimat power station)Egypt Diesel storage tanks in El Kurimat Power station ,phase II ,EGYPT DM tanks in DEWA power station,Jebel Ali /UAE Elkurimat power generation plant ,combined cycle ,750 MV Phase #II construction (in Egypt-PEGASCO (Bechtel) (Boilers, stacks, intake, DM &Diesel tanks, steel structure.etc.)
Hydrogen Generation Plant ,19,000 Nm3/h Main Contractor :-K.T.I (Technip Group) Employment :- Arab contractor Position :-Electromechanical site Engineer
Borg Arab stadium steel shade construction Capacity of stadium:-80,000 shade total weight :-4,000 ton
Borg Arab stadium steel shade construction Capacity of stadium:-80,000 shade total weight :-4,000 ton
Suez Canal University Sports Hall &swimming pool space frame shade construction
Suez Canal University Sports Hall &swimming pool space frame shade construction
MBR technology , EPC project, budget :- $130 M , Abu Dhabi-UAE (Sewage Treatment)-present 2. YAS ISLAND Sewage treatment plant ,57,000 m3/day , MBR technology , EPC project, budget :- budget :- ($80 M) / Abu Dhabi/UAE)/ Sewage Treatment 3. AUGMENTATION OF DM WATER PRODUCTION ,4000 m3//day, Mixed bed technology, budget :- ($40 M) (Dubai / Jebel Ali) Water treatment 4. Riffa views STP,3600 m3/day, Extended aeration process, / budget :- ($35 M) Bahrain - Sewage Treatment
5. Jabeish surface water treatment, (3600m3/h) budget :($30 M)- Iraq, Water treatment 6. Al Tawessa STP ,400 m3/day , budget :- $7 M, Al Ain/UAE-, Sewage Treatment 7. El Tabeen WTP phase II construction ,3000 m3/h budget :- $15 M , Cairo-Egypt (surface water treatment ) 8. Construction of five sewage pumping stations and STP ,25,000 m3/day , budget :- $15 M ,Cairo-Egypt (sewage treatment ) 9. Compliance action plans, environmental and wastewater treatment projects for up to 150 factories in Egypt ,with Environmental consultant office
Project #1:- Yas Island Sewage Treatment/38,000 m3/day /ABU DHABI Plant Metito overseas limited Position:- Construction Manager
Project :-#2 :-Sadiyaat Island Sewage Treatment Plant II Capacity :-45,000 m3/day future professional :28,000 m3/day Location :- Sadiyaat Island /Abu Dhabi/UAE Client :- TDIC Consultant:-PARSON/DORCH/MWH/KEO/EMIT Employment:-Kharafi National L.L.C Position :-Construction Manager
Project #2:- Sadiyaat Island Sewage Treatment Plant II/Abu Dhabi Kharafi National L.L.C Position:- Construction Manager
Project #3:-Jebiesh Water Treatment Plant construction/Iraq 3000 m3/h Metito overseas limited Position:- Project Manager
Project #4:-Riffa Views STP plant/Bahrain 3600 m3/day Metito overseas limited Position:-Project Manager
project #5:-Al Tweesa Sewage Water Treatment Plant construction,200 m3/h Metito overseas limited Position:-project manager