24 th FLOOR SNAG LIST (Finishing works only)

Attendee : PMC ANC Sr

Dhiren Barot , Anil Vaniya Arafat,Siji,Chandran Description of balance work Lift lobby 1 Floor Wall GRC All : Background normal touch up required spot found from mirror at p6 GRC and mirror junction to be properly treated and cleaned ss top and bottom architrave not in one level Ceiling Clean ceiling fixtures Neaten finish around ceiling fixtures Lift lobby 2 Floor Wall GRC All : Background normal touch up required mirror damage at top location at p,11 GRC and mirror junction to be properly treated and cleaned trap door balance ceiling band at above p, 12 lift Ceiling crack found at ceiling couple of location Clean ceiling fixtures Neaten finish around ceiling fixtures 1.8 Corridor Tile chip to be properly treated and replayed where ever red colour found on skirtind 20mm gap found at floor tile bottom to door juntion nos 1,2,3,4and finishing balance arround door finishing above skirting Clean ceiling fixtures Neaten finish around ceiling fixtures un even offset above skirting grout balance at metal door frame crack observe at ceiling /and pop lumps found 2.4 Corridor Tile chip to be properly treated and replayed where ever Photograph/Remark

crack at ceiling and paint touchup fin ishing arround S.LL door floor tile colour variation Clean ceiling fixtures Neaten finish around ceiling fixtures Wall paint touch to be done Wall undulation Service lift lobby neatan clean arround plaster band beam skirting short at disable toilet door varnish touchup tile damage at floor trap nailhole fillat woodan architrave Ceiling to channel junction gap visible Dustproof strike not installed Excess gap between timber architrave to wall tile Granite damage near Disabled toilet 3 nos tile damage visible Disabled Toilet door varnish touchup ceiling paint touchup Remove paint from ceiling fixtures Remove paint at wall and floor Excess gap between timber architrave to wall tile 1 tile damage at wall Excess tile cutting above door Electrical room Remove paint from services Internal shaft - door not installed Entrance card sensor installation balance Paint touch up balance Toilet no 1 Vestibule offset at floor tile finishing arround door and door varnish touchup Touch up balance Neaten finish around ceiling fixtures ceiling and wall paint touchup Excess gap between timber architrave to wall Neaten plaster/paint finish around AHU, Shaft door frame Janitor door varnish touchup Incomplete installation of ceiling fixtures Undulation at Ceiling finish ceiling Touch up balance door timber architrave installation balance Excess gap between timber architrave to wall tile

Male Finishing balance above door door frame and door shutter varnishing touchup pvc short at 4 location offset at wall tile /and colour variation finishing in comp arround trap door grout balance at bottom of door frame Finishing work incomplete at top of mirror Undulation around trap door Ceiling to wall joint junction groove paint balance Ceiling Cove- finishing work incomplete Toilet paper holder , Hand drier , Soap dispenser , Paper dispenser , Waste paper bin etc. are not installed Female Floor trap around proper treated and finish wall tile colour variation door varnish touchup chip to be properly treated and cleaned health faucet flexible hose rusted improper finish above mirror Ceiling to wall joint junction groove paint balance Finishing work incomplete at top of mirror Ceiling Cove- finishing work incomplete Ceiling undulation Trap door around proper finish balance Excess gap between timber architrave to wall tile Toilet paper holder , Hand drier , Soap dispenser , Paper dispenser , Waste paper bin etc. are not installed Store room 2 nos shaft 12 m2x 12 m2) = 24m2 plaster balance.

Plaster balance at back wall of shaft (partly balance) Floor balance Wall paint touch up balance Remove paint from ceiling services Grouting of metal frame is balance Door around properly finish balance. Extra room Floor balance Paint balance Excess gap between timber architrave to wall tile Toilet no 2 Vestibule door varnish touchup Clean ceiling fixtures Touch up balance Neaten finish around ceiling fixtures

Excess gap between timber architrave to wall Neaten plaster/paint finish around AHU, Shaft door frame Janitor door varnish touchup Incomplete installation of ceiling fixtures Undulation at Ceiling finish ceiling Touch up balance Floor tiles extension below door is balance door timber architrave installation balance Excess gap between timber architrave to wall tile Male Finishing work incomplete at top of mirror Undulation around trap door Ceiling to wall joint junction groove paint balance Ceiling Cove- finishing work incomplete Clean ceiling fixtures wall tile colour variation door varnish touchup Excess gap between timber architrave to wall tile Toilet paper holder , Hand drier , Soap dispenser , Paper dispenser , Waste paper bin etc. are not installed Female chip to be properly treated and cleaned cleaning below W/B counter improper finish above mirror Ceiling to wall joint junction groove paint balance Finishing work incomplete at top of mirror Ceiling Cove- finishing work incomplete Ceiling undulation door varnish touchup Clean ceiling fixtures Excess gap between timber architrave to wall tile Toilet paper holder , Hand drier , Soap dispenser , Paper dispenser , Waste paper bin etc. are not installed Store room 2 nos shaft 12 m2x 12 m2) = 24m2 plaster balance.

Plaster balance at back wall of shaft (partly balance) Floor balance Wall paint touch up balance Remove paint from ceiling services Grouting of metal frame is balance Extra room Floor balance Paint balance Excess gap between timber architrave to wall tile

Toilet cubicle partition - Door does not close properly & legs are not perpendicular. Tenant area Remove plastic from slab soffit Sanding/Grinding required at offset at slab soffit Stair case 1 & 2 shade variation observed.

All toiles