Você está na página 1de 11

VALORIZACIN DESAGREGADA ACUMULADA

MES OCTUBRE
VALORIZACIN N
ORDEN DE SERVICIO N

Nombre del Proyecto

Mes:

AREA U.E.A. SHILA-PAULA

OCTUBRE

Plazo de Ejecucin:

CONSTRUCCION DE TUNEL - SAN ANTONIO DE MIA

Fecha de Inicio:
Costo del Proyecto (S/.)

CONTRATISTA

Fecha de termino:

1,050,088.49
:

01

Partidas

Und.

Costo Unitario
(S/.)

Metrado

Costo
Parcial
(S/.)

AREQUIPA

Provincia:

CASTILLA

Metrado

Monto de
Valorizacin Total

CHOCO

Avance Actual

% de avance

Metrado

Monto de Valorizacin
Total

Avance Acumulado

% de avance

Metrado

Monto de
Valorizacin Total

Saldo a Ejecutar

% de avance

Metrado

Monto de
Valorizacin Total

% de avance

TRABAJOS PRELIMINARES

01.01

TRAZO Y REPLANTEO DE EJE

4.5

2139.4

9,607.62

99.80

01.02

LIMPIEZA DE TERRENO MANUAL

M2

1500.00

2.69

4,035.00

1,500.00

4,035.00

100.00

0.00

01.03

TRANSPORTE DE MATERIAL Y EQUIPO

KG

55000.00

0.25

13,750.00

55,000.00

13,750.00

100.00

30,000.00

01.04

CAMPAMENTO PROVISIONAL DE LA OBRA

M2

200.00

79.94

15,988.00

200.00

15,988.00

100.00

0.00

02

UNIDAD PAULA

Departamento:
Distrito:

ATAJA S.A.C.
Avance Anterior

Item

Ubicacin del Proyecto:

KM

9,627.30

4.49

0.00

7,500.00

9,607.62

99.80

1,500.00

4,035.00

100.00

54.55

85,000.00

4.49

21,250.00

154.55

0.01

200.00

15,988.00

100.00

169.56

(247.80)

(30,000.00)

19.68
(7,500.00)
-

0.20
(54.55)
-

MOVIMIENTO DE TIERRAS

02.01

EXCAVACION DE ZANJA EN MATERIAL SUELTO

M3

356.25

27.40

9,761.25

604.05

16,551.08

169.56

0.00

604.05

16,551.08

02.02

EXCAVACION DE CAJA DE CANAL EN ROCA SUELTA

M3

252.44

55.14

13,919.54

236.22

13,025.17

93.57

0.00

236.22

13,025.17

93.57

16.22

02.03

EXCAVACION DE ZANJA EN ROCA FIJA

M3

368.23

65.12

23,979.14

427.46

27,836.20

116.09

0.00

427.46

27,836.20

116.09

(59.23)

(3,857.06)

(16.09)

02.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

M3

976.92

33.11

32,345.82

1,286.86

42,607.82

131.73

188.85

6,252.82

19.33

1,475.71

48,860.64

151.06

(498.79)

(16,514.82)

(51.06)

3,925.00

580,900.00

95.73

03
03.01

SUMINISTRO E INSTALACION DE TUBERIA HDPE =315.00 mm SDR 26 PN 6 PE 100, Espesor : 12.10 mm .

4100.00

148.00

606,800.00

SUMINISTRO E INSTALACION DE VALVULA MARIPOSA =315 mm INCL. ACCESORIOS

UND

2.00

5720.00

11,440.00

03.01.03

SUMINISTRO E INSTALACION DE ACCESORIOS PARA TUBERIAS HDPE DE 315 mm

UND

4.00

2150.00

8,600.00

21.00

45,150.00

CAJA DE REGISTRO Y LIMPIEZA

190.00

28,120.00

4.63

4,115.00

609,020.00

100.37

(15.00)

(2,220.00)

(0.37)

4.00

22,880.00

200.00

4.00

22,880.00

200.00

(2.00)

(11,440.00)

(100.00)

5.00

10,750.00

125.00

26.00

55,900.00

650.00

(22.00)

(47,300.00)

(550.00)

20.00

26,568.00

100.00

65.00

20.00

3,628.80

100.00

19.80

9,332.73

100.00

BUZONES HDPE 30"x1.00 mt. C/01 INGRESO, 01 SALIDA =315 mm

UND

20.00

1328.40

26,568.00

20.00

26,568.00

100.00

0.00

03.03.02

INSTALACION DE BUZONES HDPE DE 30"x30"x1.00 M

UND

20.00

181.44

3,628.80

7.00

1,270.08

35.00

13.00

471.35

9,332.73

19.80

9,332.73

100.00

2,358.72

OBRAS DE CONCRETO ARMADO


ALCANTARILLAS

04.01.01

CONCRETO f'c=210 kg/cm2, P/ALCANTARILLAS

M3

19.8

04.01.02

ACERO REFORZADO GRADO 60, P/ALCANTARILLAS

KG

198.23

4.44

880.14

04.01.03

ENCOFRADO Y DESENCOFRADO P/ALCANTARILLAS

M2

218.50

41.61

9,091.79

471.35

04.02

6.43

525.00

03.02.01

04.01

(69.56)

TUBERAS

03.01.02

04

894.37

TUBERIAS Y VLVULAS

03.01.01

03.02

(6,789.83)

0.00

198.23

880.14

100.00

81.15

3,376.65

37.14

80.00

3,328.80

36.61

161.15

6,705.45

73.75

57.35

2,386.33

26.25

0.00

CANOAS

04.02.01

CONCRETO f'c=210 kg/cm2, P/CANOAS

M3

13.50

6,363.23

2.66

1,253.79

19.70

3.99

1,880.69

29.56

6.65

3,134.48

49.26

6.85

3,228.75

50.74

04.02.02

ACERO REFORZADO GRADO 60, P/CANOAS

KG

168.00

4.57

767.76

32.00

146.24

19.05

32.00

146.24

19.05

64.00

292.48

38.10

104.00

475.28

61.90

04.02.03

ENCOFRADO Y DESENCOFRADO P/CANOAS

M2

210.00

44.11

9,263.10

9.86

434.92

4.70

9.89

436.25

4.71

19.75

871.17

9.40

190.25

8,391.93

90.60

471.35

04.03

CAJAS ROMPE PRESION

04.03.01

CONCRETO f'c=210 kg/cm2, P/CAJA ROMPE PRESIN

M3

26.58

12,528.48

2.80

1,319.78

10.53

5,891.88

47.03

15.30

57.56

11.28

5,316.83

42.44

04.03.02

ACERO REFORZADO GRADO 60, P/CAJA ROMPE PRESIN

KG

312.00

4.70

1,466.40

191.20

898.64

61.28

62.88

295.54

20.15

254.08

1,194.18

81.44

57.92

272.22

18.56

04.03.03

ENCOFRADO Y DESENCOFRADO P/CAJA ROMPE PRESIN

M2

324.00

41.61

13,481.64

44.96

1,870.79

13.88

279.04

11,610.85

86.12

324.00

13,481.64

100.00

M2

140.00

28.27

3,957.80

47.50

1,342.83

33.93

47.50

1,342.83

33.93

92.50

471.35

29.50

13,904.83

100.00

1,071.94

4,759.41

428.78

(821.94)

(3,649.41)

(328.78)

152.31

6,337.62

50.77

147.69

6,145.38

49.23

04.04

12.50

7,211.66

CAPTACIN DE OJO DE AGUA

04.04.01

CANAL RECTANGULAR MANPOSTERIA DE PIEDRA 0.20x0.20 m

04.04.02

CONCRETO f'c=210 kg/cm2, P/CAPTACIN

M3

29.50

13,904.83

29.50

13,904.83

100.00

0.00

04.04.03

ACERO REFORZADO GRADO 60, P/CAPTACIN

KG

250

4.44

1,110.00

1,071.94

4,759.41

428.78

0.00

04.04.04

ENCOFRADO Y DESENCOFRADO P/CAPTACIN

M2

300

41.61

12,483.00

147.51

6,137.89

49.17

4.80

199.73

COSTO DIRECTO DE OBRA


GASTOS GENERALES 10 %
UTILIDADES 10 %
COSTO TOTAL SIN I.G.V.

COSTO TOTAL DE OBRA


% AVANCE FSICO EJECUTADO

1.60

S/. 875,073.74

S/. 840,724.63

S/. 102,994.34

S/. 943,718.97

S/. 87,507.37

S/. 84,072.46

S/. 10,299.43

S/. 94,371.89

S/. 87,507.37

S/. 84,072.46

S/. 10,299.43

S/. 94,371.89

S/. 1,050,088.49

S/.

1,050,088.49

-S/. 6,864.52

S/. 123,593.20

11.77%

S/. 1,132,462.76

107.84%

1,008,869.56

96.07%

S/. 123,593.20

11.77%

1,132,462.76

107.84%

107.84%

-S/. 3,432.26

96.07%

11.77%

66.07

-S/. 68,645.23

S/. 1,008,869.56

96.07%

2,614.98

-S/. 82,374.27

(82,374.27)
-7.84%

-7.84%

-7.84%

ADICIONALES
REPARACIN DE BOCATOMA
unidad
cantidad
Tareas
8
bls
15
balde
2
balde
1
TOTAL

P.U.
S/. 115.60
S/. 25.00
S/. 211.86
S/. 207.63

UNIONES ELECTROFUSIN
Descripcin
unidad
cantidad
Mano de Obra
Tareas
4
Equipo de Electrofusin
Da
1
Uniones Lightft Coupler 315 Plasson
und
10
TOTAL

P.U.
S/. 115.60
S/. 420.00
S/. 560.00

TAPAS DE CONCRETO
unidad
cantidad
Tareas
6
bls
8
m3
0.75
TOTAL

P.U.
S/. 115.60
S/. 25.00
S/. 70.00

Descripcin
Mano de Obra
Cemento Portland Tipo I
Sello Elastomerico para Juntas
Pegamento Epxico

Descripcin
Mano de Obra
Concreto
Agregado

PORTICOS DE CONCRETO EN BOCATUNEL


Descripcin
unidad
cantidad
Mano de Obra
Tareas
8
Cemento Portland Tipo I
bls
10
Puerta Metlica c/n Bisagras
und
2
Soldadura
GLB
1
TOTAL

P.U.
S/. 115.60
S/. 25.00
S/. 200.00
S/. 150.00

EXCAVACIN EN ROCA FIJA (Cachorreos adiconales)


Descripcin
unidad
cantidad
P.U.
Mano de Obra
Tareas
7
S/. 115.60
Grupo Electrgeno
hm
12
S/. 25.00
Taladro Elctrico
hm
12
S/. 5.00
Gasolina
gln
6
S/. 14.00
TOTAL
INSTRUMENTACIN DE RESERVORIOS
Descripcin
unidad
cantidad
Mano de Obra
Tareas
6
Valvula de Bronce = 4"
und
4
Valvula de Bronce = 2"
und
6
Tubera HDPE = 4"
m
80
Uniones Rpidas = 4"
und
8
SIKAFLEX
manga
3
Escalera de Gato
und
2
Rejilla Cmara Rompe Presin
und
3
TOTAL

Descripcin
Mano de Obra
Cemento Portlad Tipo I

BUZONES CON MAMPOSTERA


unidad
cantidad
Tareas
20
bls
40

P.U.
S/. 115.60
S/. 490.00
S/. 85.00
S/. 15.00
S/. 98.00
S/. 23.73
S/. 150.00
S/. 200.00

P.U.
S/. 115.60
S/. 25.00

TOTAL

Descripcin
Mano de Obra
Gaviones

GAVIONES
unidad
Tareas
und
TOTAL

cantidad
4
4

P.U.
S/. 115.60
S/. 0.00

MONTO TOTAL DE ADICIONALES


EQUVALENTE CONCRETO fc=210 kg/cm2 CMARA ROMPE-PRESIN

Parcial/Total
S/. 924.80
S/. 375.00
S/. 423.73
S/. 207.63
S/. 1,931.16

Parcial/Total
S/. 462.40
S/. 420.00
S/. 5,600.00
S/. 6,482.40

Parcial/Total
S/. 693.60
S/. 200.00
S/. 52.50
S/. 946.10

UNEL
Parcial/Total
S/. 924.80
S/. 250.00
S/. 400.00
S/. 150.00
S/. 1,724.80

adiconales)
Parcial/Total
S/. 809.20
S/. 300.00
S/. 60.00
S/. 84.00
S/. 1,253.20

IOS
Parcial/Total
S/. 693.60
S/. 1,960.00
S/. 510.00
S/. 1,200.00
S/. 784.00
S/. 71.19
S/. 300.00
S/. 600.00
S/. 6,118.79

Parcial/Total
S/. 2,312.00
S/. 1,000.00

S/. 3,312.00

Parcial/Total
S/. 462.40
S/. 0.00
S/. 462.40

S/. 38,711.22
4.00

PERFORACIN Y CONSTRUCCIONES JUMBO E.I.R.L.


COSTO DIA DE TRABAJADORES DE APOYO
Descripcin
unidad cantidad
P.U.
Parcial/Total
Capataz
Tareas
1
S/. 125.40
S/. 125.40
Pen
Tareas
10
S/. 115.60
S/. 1,156.00
Cocinero
Tareas
0.5
S/. 75.00
S/. 37.50
Miniban
dias
1
S/. 125.00
S/. 125.00
Herramientas Manuales 5% MO
% MO
5%
S/. 1,318.90
S/. 65.95
COSTO DIRECTO / DA S/. 1,509.85
Gastos Generales 5%
S/. 75.49
Utilidad 10% S/. 150.98
COSTO TOTAL SIN I.G.V. / Da S/. 1,736.32

REPARACIN DE COMPRESORA NEUMTICA ATLAS


Descripcin
unidad cantidad
P.U.
Parcial/Total
Servicion de Reparacin de Compresora
glb
1
S/. 3,000.00 S/. 3,000.00
TOTAL
S/. 3,000.00

DIA
5/21/2013
5/22/2013
5/23/2013
5/24/2013
5/25/2013
5/26/2013
5/27/2013
5/28/2013
5/29/2013
5/30/2013
5/31/2013
6/1/2013
6/2/2013

COMPRESORA INGERSSOL RAND 750 CFM CIA


H. INICIAL
H. FINAL H. HOROMETRO H. EFECTIVA
12565.00
12571.10
6.10
HM
5.60
HM
12571.10
12579.00
7.90
HM
7.40
HM
12579.00
12587.30
8.30
HM
7.80
HM
12587.30
12595.00
7.70
HM
7.20
HM
12595.00
12598.70
3.70
HM
3.20
HM
12598.70
12600.00
1.30
HM
0.80
HM
12600.00
12610.20
10.20
HM
9.70
HM
12610.20
12619.70
9.50
HM
9.00
HM
12619.70
12625.30
5.60
HM
5.10
HM
12625.30
12631.50
6.20
HM
5.70
HM
12631.50
12638.30
6.80
HM
6.30
HM
12638.30
12643.50
5.20
HM
4.70
HM
12643.5
12648.3
4.80
HM
4.30
HM
TOTAL
83.30
HM
76.80
HM

RAND 750 CFM CIA


OBSERVACIN
Reparaciones
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin
Perforacin - Ventilacin

ALQUILER DE RETROEXCADORA
Descripcin
unidad
cantidad
P.U.
Parcial/Total
Retroexcavadora D420
hm
67.5
S/. 109.20
S/. 7,371.00
Flete Terrestre Arequipa - Mia
vje
2
S/. 3,500.00 S/. 7,000.00
Combustible
gln
168.75
S/. 12.50
S/. 2,109.38
TOTAL
S/. 16,480.38
GASTOS GENERALES (10%)
S/. 1,648.04
PRESUPUESTO TOTAL SIN I.G.V.
S/. 18,128.41