FICHTNER India

Project

Subject

95MW CCPP

STATION BATTERY SIZING CALCULATION

SL. NO.
1

DESCRIPTION

LOAD
(WATTS)

AMPS

TOTAL
NO.

Doc. No.

IST MINUTE LOAD


QTY.

AMPS

2 - 119TH MINUTE
LOAD
QTY.

AMPS

Rev.

Sheet No.

00

119 - 120TH MINUTE


LOAD
QTY

REMARKS

AMPS

11 kV Generator Breakers

2 nos of 11 kV breakers

a.

Tripping coil

550

2.50

10.00

0.00

0.00

b.

Tripping relay

150

0.68

1.36

0.00

0.00

c.

Indicating lamps

0.03

0.25

0.25

0.25

d.

Auxiliary relay

20

0.09

0.73

0.73

0.73

4 auxiliary relays / feeder


Only one breaker will be closed
at a time

e.

Spring charging motor

400

1.82

0.00

0.00

1.82

f.

Closing coil

500

2.27

0.00

0.00

2.27

g.

Trip circuit supervision relay

25

0.11

0.45

0.45

0.45

h.

Annunciator

30

0.14

0.14

0.14

0.14

2 coils/breaker

4 lamps / feeder

2 relays/feeder

7 nos of 6.6 kV breakers


considered

6.6 kV Breakers
a.

Tripping coil

400

1.82

12.73

0.00

0.00

b.

Tripping relay

150

0.68

4.77

0.00

0.00

c.

Indicating lamps

0.03

60

60

1.91

60

1.91

60

1.91

4 lamps / feeder

d.

Auxiliary relay

25

0.11

30

30

3.41

30

3.41

30

3.41

4 auxiliary relays / feeder

e.

Spring charging motor

350

1.59

0.00

0.00

11.14

f.

Closing coil

350

1.59

0.00

0.00

11.14

g.

Trip circuit supervision relay

25

0.11

30

30

3.41

30

3.41

30

3.41

h.

Annunciator

50

0.23

0.23

0.23

0.23

2 relays/feeder

All PCC incomers&MCC


incomer breakers are
considerd.(10 nos operating at
a time)

415 V Breakers

a.

Tripping coil

250

1.14

10

10

11.36

0.00

0.00

b.

Tripping relay

40

0.18

10

10

1.82

0.00

0.00

c.

Indicating lamps

0.03

80

80

2.55

80

2.55

80

2.55

F:\Elec\3679\bat-cal latest\212772751.xls.xls

1 coil/breaker

JJS / EL

1 coil/breaker

4 lamps / feeder

02/22/2014

FICHTNER India
Project

Subject

95MW CCPP

STATION BATTERY SIZING CALCULATION

SL. NO.

DESCRIPTION

AMPS

TOTAL
NO.

IST MINUTE LOAD

2 - 119TH MINUTE
LOAD

Rev.

Sheet No.

00

119 - 120TH MINUTE


LOAD

QTY.

AMPS

QTY.

AMPS

QTY

AMPS

d.

Auxiliary relay

25

0.11

80

80

9.09

80

9.09

80

9.09

e.

Spring charging motor

350

1.59

10

0.00

0.00

10

15.91

f.

Closing coil

350

1.59

10

0.00

0.00

10

15.91

g.

Trip circuit supervision relay

25

0.11

40

40

4.55

40

4.55

40

4.55

h.

Annunciator

50

0.23

0.23

0.23

0.23

1000

4.55

4.55

4.55

4.55

ST Generator loads
1

LOAD
(WATTS)

Doc. No.

STG control and relay panel

REMARKS

4 auxiliary relays / feeder

2 relays/feeder

From Load List

GT Generator loads

From Load List

GTG control and relay panel

1000

4.55

4.55

4.55

4.55

GTG enclosure emergency lighting

200

0.91

0.91

0.91

0.91

STG loads
1

Emergency Lube oil pump

11000

50.00

100.00

50.00

50.00

Jacking oil pump

18500

84.09

168.18

84.09

84.09

Starting current= 2 X Full load


current(for 1 min)

Emergency DC lighting

10000

45.45

45.45

45.45

45.45

From Load List

AC control panel

1000

4.55

4.55

4.55

4.55

Assumed

Plant air compressor control panel

1000

4.55

4.55

4.55

4.55

Assumed

10

Station auxiliary control panel

10.00

10.00

10.00

10.00

11

DAVR

10.00

10.00

10.00

10.00

12

DVR -1

15/40

40.00

15.00

15.00

13

DVR -2

50

50.00

0.00

0.00

14

HRSG Aviation lamp

100

0.45

0.45

0.45

0.45

TOTAL LOAD

F:\Elec\3679\bat-cal latest\212772751.xls.xls

512.16

JJS / EL

261.03

319.21

02/22/2014

FICHTNER India

F:\elec\3679\data\212772751.xls.xls

512.16

512.16

261.03

261.03

261.03

261.03

261.03

261.03

261.03

261.03

261.03

10

261.03

11

261.03

12

261.03

13

261.03

14

261.03

15

261.03

16

261.03

17

261.03

18

261.03

19

261.03

20

261.03

21

261.03

22

261.03

23

261.03

24

261.03

25

261.03

26

261.03

JJS / EL

22/12/1999

FICHTNER India

F:\elec\3679\data\212772751.xls.xls

27

261.03

28

261.03

29

261.03

30

261.03

31

261.03

32

261.03

33

261.03

34

261.03

35

261.03

36

261.03

37

261.03

38

261.03

39

261.03

40

261.03

41

261.03

42

261.03

43

261.03

44

261.03

45

261.03

46

261.03

47

261.03

48

261.03

49

261.03

50

261.03

51

261.03

52

261.03

53

261.03

54

261.03

55

261.03

JJS / EL

22/12/1999

FICHTNER India

F:\elec\3679\data\212772751.xls.xls

56

261.03

57

261.03

58

261.03

59

261.03

60

261.03

61

261.03

62

261.03

63

261.03

64

261.03

65

261.03

66

261.03

67

261.03

68

261.03

69

261.03

70

261.03

71

261.03

72

261.03

73

261.03

74

261.03

75

261.03

76

261.03

77

261.03

78

261.03

79

261.03

80

261.03

81

261.03

82

261.03

83

261.03

84

261.03

JJS / EL

22/12/1999

FICHTNER India

F:\elec\3679\data\212772751.xls.xls

85

261.03

86

261.03

87

261.03

88

261.03

89

261.03

90

261.03

91

261.03

92

261.03

93

261.03

94

261.03

95

261.03

96

261.03

97

261.03

98

261.03

99

261.03

100

261.03

101

261.03

102

261.03

103

261.03

104

261.03

105

261.03

106

261.03

107

261.03

108

261.03

109

261.03

110

261.03

111

261.03

112

261.03

113

261.03

JJS / EL

22/12/1999

FICHTNER India

F:\elec\3679\data\212772751.xls.xls

114

261.03

115

261.03

116

261.03

117

261.03

118

261.03

119

261.03

119

319.21

120

319.21

120

JJS / EL

22/12/1999

FICHTNER India
Project

Subject

Doc. No.

Rev.

Sheet No.

STATION BATTERY SIZING CALCULATION

Voltage variation

Hence no.of cells

220 + 10%
Max.voltage of system
(Max.cell voltage during float
charging)

220 x 1.1/2.25

107.6

Selected no.of cells

108

End cell voltage

Min.sys.voltage
No.of cells

198/108

1.83

1.85 volt/cell

System Voltage

220 Volts

End cell voltage

1.85 volt / cell

Max.voltage during float charging


Minimum ambient temperature considered

2.25 V(From Amara Raja Battery catalogue)

18 0

Capacity Factor (col. 6)

Hence selected end cell voltage


Design parameters

Deg.
AH

Discharge current in Amps for the


chosen cell corresponds to a
particular period
Required size (col.7)

Change in load x capacity factor

Temperature Correction factor

1.07(From temperature correction


factor curve)

F:\Elec\3679\bat-sum\212772751.xls.xls

JJS / EL

02/22/2014

FICHTNER India

Project

Subject

Doc. No.

Rev.

Sheet No.

95 MW CCPP

STATION BATTERY SIZING CALCULATION

PEEC-1741

00

TNEB- VALUTHUR(PERUNGULAM)
Based on above design parameters the required battery size is calculated below as per IEEE-485 standard

PERIOD

LOAD(Amps)

CHANGE IN LOAD(Amps)

DURATION OF
PERIOD(min)

TIME TO END OF
SECTION(min)

CAPACITY FACTOR

REQUIRED
SIZE(AH)

512.16

512.16

1.03

527.53

NET VALUE

527.53

PERIOD - II
1

512.16

512.16

119

3.26

1669.65

261.03

-251.14

118

118

3.26

-818.70

NET VALUE

850.95

PERIOD - III
1

512.16

512.16

120

3.26

1669.65

261.03

-251.14

118

119

3.26

-818.70

319.21

58.18

1.03

59.93

NET VALUE

Uncorrected size

910.88

Corrected size

Uncorrected size x ageing factor x design margin x Temperature correction factor

910.88x 1.1 x 1.1 x 1.07

1179.31

1200 AH

Hence, selected Ampere hour capacity

F:\Elec\3679\bat-sum\212772751.xls.xls

910.88

AH

AH

JJS / EL

02/22/2014

FICHTNER India

F:\Elec\3679\bat-sum\212772751.xls.xls

JJS / EL

02/22/2014

DUTY CYCLE
600.00

512.16 A for 1 min

500.00

319.21A for 1 min.

CURRENT (AMPS)

400.00

261.03 A for 118 min.


300.00

200.00

100.00

0.00
0

20

40

60
TIME (MIN.)

80

100

120

140