BILL OF QUANTITIES FOR HVAC SYSTEM

BILL OF QUANTITIES FOR AIR-CONDITIONING PLANT ROOM


Item
No.

Description

Qty

Unit

Net capacity not less than 200 TR as per schedule

Nos.

Net capacity not less than 100 TR as per schedule

Nos.

Nos.

Lot

3
3
4

Nos.
Nos.
Nos.

Lot

Lot

Lot

Job

Lot

Supply, delivery & installation of following equipment /


system and material as per schedule, specifications and
drawings with all accessories, fitting and complete in all
respects and ready for use. This work also includes
cutting, chipping and making holes in walls floors and
slabs with the prior permission of engineer incharge and
making good all the damages .

Sub-Head "A" Mechanical


1
a
b
2
a

Electric Screw Chiller

Cooling Tower
Induced Draft Cross Flow Multi Cell Cooling Tower
including balancing / globe valve, piping and valves for
make up, drain and over flow lines as per schedule
Spares for 04 Nos. Cooling Tower as per list of spares in
tender document

Pumps

a
b
c
d

Chilled water Primary pumping sets as per schedule


Chilled water Secondary pumping sets as per schedule
Condenser water pumping sets as per schedule
Spares for Chilled water Primary pumps as per list of
spares in tender documents
Spares for Chilled water Secondary pumps as per list of
spares in tender documents

e
f

Spares for Condenser water pumps as per list of spares


in tender documents

4
a

Water Treatment & Chemical feeding System


Chilled & condenser water system Chemical feeding
system (e.g. conductivity controller, corrosion inhibitor)
complete with accessories as per drawings and
specifications
Chemical and spares for Water treatment system as
recommended by the manufacture for 2 years
consumption.
Chilled Water Piping MS Schedule-40 Seamless with
fittings, flanges unions, gaskets, specialties, etc

b
5
6
7
8
a

Condenser Water Piping MS Schedule-40 Seamless


with fittings, flanges unions, gaskets, specialties, etc
Closed cell foam EPDM based elestromaric
insulation for chilled water piping.
Instruments, Valves & Fittings
Gate Valve
Page 1

Rates

Amount

BILL OF QUANTITIES FOR HVAC SYSTEM

Item
No.
b
c
d
e
f
g
h
9
12

13

16
17
18
19
20
21
22
23
24
25
26

Description

Qty

Double Regulating Valve


Strainer
Check Valve
Flexible Connection
Pressure Gauge
Thermometer
Flow Switch
uPVC Schedule 40 piping for Cooling tower makeup and
drain lines including valves etc.
Rockwool insulation & 26 gauge aluminum cladding on
04 Nos. DFA chillers

12

26 gauge Aluminum sheet metal cladding on all Chilled


water supply and return pipes in plant room after proper
Insulation
Pressurized Unit (Pressurized expansion tank) having
capacity of 150 gallons complete with all valve &
specialties.
Hanger & Supports for all Equipment, piping & ducting as
required.
BMS for Air-Conditioning System
Testing and commissioning of all Air-Conditioning
Systems
Air & water balancing of all complete system by
specialized contractor and contractor will submit 3 sets of
balancing report.
Painting , Color Coding, Stenciling and Providing and
Fixing of brass tags for complete AC System.
Repair/maintenance tools in a proper tool box as per list
given in tender document
Preparing & supplying of shop drawings for complete job.
Preparing & supplying of as built drawings for Complete
job, 3 Sets on butter paper and two set on CD
Providing of operation, maintenance, trouble shooting,
servicing, over hauling manual and daily operation
schedule.
Operation & maintenance of complete AC system for
one-year period.

Unit

42
8
4

Nos.
Nos.
Nos.

Job

Job

Nos.

Nos.
1

Job

Job

Job

Job

Job

Job

Job

Job

sets

Job

Total Of Sub Head "A"


Sub Head "B" Electrical Work
1
2

MCC for AC Plant Room as per drawing


All Power Cables and cable tray as shown in drawings

Nos.

Job

Total Of Sub Head "B"


Sub Head "C" Civil Work
1

Foundations for all equipment as required

Job

Total Of Sub Head "C"


Page 2

Rates

Amount

BILL OF QUANTITIES FOR HVAC SYSTEM

Item
No.

Description

Qty

Unit

Job

Rates

Amount

Sub Head "D" Miscellaneous


1

Any Other item or quantity not mentioned above but


required for the completion of job and satisfactory
operation of system.

Total Of Sub Head "D"


Total Of Sub Head "A"
Total Of Sub Head "B"
Total Of Sub Head "C"
Total Of Sub Head "D"

Rs.
Rs.
Rs.
Rs.

Grand Total Of A+B+C+D Rs. ..


Total Rupees In Words .