Near Temple,Kanjoli,Mahuva.
Contact No.
S. N. A 1 2 3 4 5 6 7 8 9 B 1 2 3 4 5 a) b) c) d) 6 a) b) 7 8 C 1 2 3 4
5 Type of Shelter (Indoor/Outdoor) Is the access ladder / Door Steps provided? Check all the equipments are installed as per Layout. Is Trx-Rack installed properly with DCDB ? Height of MW Antenna mounts on tower Type of Site (RTT /GBT/Pole /IBS) Category of Site - Outdoor / Indoor / Tower Top Height of Building (a) Height of Tower (b) Height of GSM Antenna mounts on tower
Status
Remarks
RTP ok ok ok ok ok ok ok ok
18 9
Mount 1 Mount 2 Mount 3 Mount 4
Mount for MW Antenna 1 Mount for MW Antenna 2 Vertical access ladder available from bottom of Tower Support Ring provided with climbing ladder
30 18
ok ok
SHELTER OUTDOOR ok ok ok ok ok ok ok ok ok ok ok ok ok
Are AC properly working and AC's body is properly Earthed? Are the Bulkhead Lights/ Internal lights Installed & Functioning ? Check EGB/IGB is installed properly and connected with Earth pit ? Check Cable entry (Hatch Plate ) provided and sealed properly ? Is the fire extinguisher available inside of Shelter? Check all power cabling / Control wiring are properly dressed up. Is SMPS/ Battery Bank placed on Proper Base and leveled Check for Proper Routing of AC cable from PIU to SMPS Check for Proper Terminations of Power cable at SMPS Check for Proper Connections from SMPS to Battery Bank
6 7 8 9 10 11 12 13
14
D 1 2 3 4 5 6 7 8 a) b) c) d) e) f) g) h) E 1 2 3 4 5 6 7 8 9 10 11 12 F 1 2 3 4 5 6 7 8 9 10 11 12
Is SMPS Body Earthed? Is +Ve Busbar Grounded? Provide Nos of Rectifiers Installed Are all Rectifiers working in normal mode Check and Record Input AC Voltage
Check and Record Voltage Between Neutral & Earth. Is it in specified Limit ? Check & Record DC Output DC voltage. Is it within specified limit? Check for SMPS Display Voltage Calibration w.r.t Actual Battery Terminal Voltage
BATTERY BANK
Check Battery Bank for Proper Installation & Leveling Is Battery bank stand earthed Properly? Is there any leakage from battery cells? Are Battery Interconnection hardwares tightened Are that Battery cells marked with numbers Is petroleum jelly applied on battery cell terminals Check Vent plugs for tightness Check Battery Cable Connections for Tightness Are lugs of copper and properly creamed.
ok ok ok ok ok ok ok ok ok
Check Individual Cell Voltage for More than 2.1 Volts else do not accept. Is Battery Bank given Fresh/Boost charge for minimum 18-24 Hrs
ok ok
ELECTRICAL
Check Healthiness of EB Supply (Availability of all 3 Phases and Neutral with Proper Voltages) Is DG functioning properly Check for Proper Installation of EB/ DG Meter Box Check & Note Input/Output voltage for Correctness Check DG Automation (Changeover from Mains to DG and Vice Versa) Total No. of Earthing pits Are Earth chambers are properly constructed ? Are the funnels in place & clean ? Check & Provide for Earthing Resistance value for Pit No.1 and Pit no.2 Is the lightening arrestor installed and earthed with main earth grid Is LED type Aviation Lamp Provided. Is it Functioning Properly? Check all Cables Connections for Tightnes
ok ok ok ok ok ok ok ok ok ok ok ok
OTHERS 1 2
Is Security Guard available at site Is there any issue related to owner/local public etc No No