y Well-organized
representation of work
packs.
By providing such a broad spectrum of design assessment,
rapid system development, testing and quality assurance y Ability to import & export
data from external
services, STOP system has one aim in general – setting a
sources plus integration
unique, comprehensive and massive tool for project &
with scheduling tools.
turnaround planning activities with Graphical User
Interface (GUI) approach.
y Dynamic reporting
queries with multiple
With the growing complexities The main feature of STOP system is FILES REPOSITORY SYSTEM y Ability to track down
of today’s projects, a new class the ability to generate work packs. Maintaining crucial data and planning progress with
of planning tools is needed – This is the best platform for information in a safe and reliable predefined work status.
comprehensive planning turnaround planners to develop work condition is an important
management. STOP system is packs electronically, therefore will precondition for profitability. y Maximum systems
designed to improve productivity reduce the time for preparing a large That is why STOP system security and access
by minimizing the planning time mass of work packs manually. prepares users with a platform control for preserving
and maximizing the information not only for data migration & data integrity.
resources in order for planning processing purposes, but also
managers and decision makers to acts as a tool to collaborate y STOP Source Manager
decide, which is best for their unlimited format files, for data & system’s
organization. documents, reports and maintenance.
THE WORK PACK APPROACH templates associated with a
Work pack or job pack is a specific work process and
systematic approach of project. These documents are
Some processed documents assets of the company
representing detail information on a
included in a work pack are Job representing final package based
particular work with required level
Method Statement, Material List, on countless man hours of labor
of detail to allow correct site
Scaffolding Instruction, Insulation and therefore it should not be left
implementation.
Requirements, Equipment outside from the system.
Isolation Sheet etc.; with or
without image plus attachment
STOPTM Version 2006
files associated with a specific job.