Você está na página 1de 61

Customer's logo

Alcatel-Lucent 9500 MPR-A


MSS-1/MSS-4/MSS-8 Microwave packet radio links 9500 MPR-A R4.1.0
Also acceptable for use with R2.2.y, R3.x.y, and R4.0.y.

Test Data Sheet

This document is used during the equipment commissioning and acceptance phases. This document must be used according to the instructions given in the corresponding chapters of the 9500 MPR-A Turn-Up Manual. Reference documents Contract reference 9500MPR-A Turn-Up Manual

0. Title (Turn-Up DLP-100)


Site: Address:

Latitude: Longitude: To/From:


Software Version:

MSS Shelf #: Main Radio Ch. Slot #:

of #: Port #: Port #:

Standby Radio Ch. Slot #: Date: Tester: Equipment ID: Rack Number: IP Address: Hardware Order #: Customer Site Ref #: Customer P.O. Ref #: TDS Submitter:

Status X Creation Extension Date: 11/01/12 ED: 01 Company TDS for 9500MPR-A Name(s) 3EM239550005TQZZA Date and signature(s) 3EM239550000TQZZA Ed 01

Company Originator Approved By Alcatel-Lucent < Customer >

Name(s) < Alcatel-Lucent representative > < Customer representative >

Date and signature(s) < Date and signature(s) ALU approves TDS > < Date and signature(s) Customer approves TDS >

TDS for 9500MPR-A

3EM239550000TQZZA Ed 01

Customer's logo

Tab

1. 2. 3. 4. 5. 6. 7. 8. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Change History Process (How to use this document) Process Continued Turn-Up Checklist Inspection Checklist Link Information ODU300 Link Information MPT-HC/MPT-XP Link Information MPT-HL Synchronization Tributary Functionality Test RSL ODU RX Sensitivity MPT-HL RX Sensitivity Protection Switching Protection Scheme Hop Stability Software License Configuration File Remote Inventory Current Alarm File Housekeeping Alarm RFC2544 Blank Tab

2 3 3A 4 5 6.1 6.2 6.3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

Change History
R4.1.0 1. Update release specific information

2. 4-Turn-Up Checklist: Add new Installation Chart 11 and increment the remainder of the Chart numbers.

3. 8-Tributary Functionality Test: Add MSS-1 DS1 tributary test, new rows 30 and 31.

TDS for 9500MPR-A Release 3.2

TDS for 9500MPR-A Release 3.2

TDS for 9500MPR-A Release 3.2

TDS for 9500MPR-A Release 3.2

Customer's logo

Test Data Sheet


Introduction The Test Data Sheet (TDS) is a contractual document between ALU and the Customer and, as such, must be modified to reflect the agreement between parties, the deployment particularities and/or any deployment constraints.

Macros

WARNING: Always enable macros in your version of Excel before entering data into the TDS. Failure to enable macros will result in loss of ALL data entered upon Save or Save As operation.

TDS Structure

The TDS is divided into several tabs. Each tab contains data entry fields to be individually filled in during the acceptance testing of the radio path. One TDS is required per path end, per Radio Channel If multiple RF channels are being provisioned, use separate TDS's for each end of each Radio Channel.
Note : See Table of Content tab "1-TOC" for specific TDS tab description.

TDS Modification

The TDS will be modified to reflect the agreement between ALU and the customer. The DPM will perform the following: Task 1 2 3 4 Description Apply Customer Logo to all pages of the TDS. Add Customer Approval Name on Title page. Color all Non-Applicable tabs "red" Add tabs as needed after "20-RFC2544" tab. A blank tab is provided at the end of the TDS to function as a template for adding tabs.
Note: No entry fields may be added on existing tabs. No tabs can be

inserted before "20-RFC2544" tab. Upon completion of the TDS modifications, the DPM will: Task 1 2 3 4 Description Secure customer approval of modified TDS. Archive approved TDS in FST. Archive Customer TDS Approval in FST. Distribute approved TDS to appropriate team members.

TDS Modification Guidelines

The following are guidelines for modifications to the TDS: The final TDS must be a trade off between too much and too little information The smaller the TDS, the more efficiently it will be completed by field personnel It is strongly advised to translate the TDS into the customer's and field personnel's language TDS for 9500MPR-A Release 3.2

Field Entry

The Field Technician is responsible for completing the following field entries: data entries screenshots photos

NEVER USE CUT & PASTE to fill in cells! Many cells include a formula and/or conditional formatting. Cut and paste into one of these cells will override the formula and/or conditional formatting.
Warning : Each field must be filled in separately!

The following table describes shaded field definitions: When the entry field is shaded ... gray gray Then the field ... is not applicable and no entry is required. contains an entry which is either out of range or is in conflict with data entry in another field on the tab. requires entry. contains an entry which is either out of range or is in conflict with data entry in another field on the tab. is complete. auto populates from entry on another cell in the TDS.

green red

white yellow

Issue Reporting

To report an issue with this TDS, contact the DPM responsible for the project. Provide the DPM with the following information: TDS document number TDS Edition number Tab number Cell number Detailed description of the issue and/or concern

TDS Approval

The TDS will be submitted and approved following the process outlined on tab "3A-Process Cont".

TDS for 9500MPR-A Release 3.2

TDS for 9500MPR-A Release 3.2

TDS for 9500MPR-A Release 3.2

Customer's logo

Instructions for archiving TDS form in FST


Introduction Every TDS will be archived in FST and approved by ALU using the process described below. One TDS is required for each path end, per radio channel. Warning: The TDS file must be saved as an .xls m file if using MS Office 2007 or newer.

File naming convention

File submitted to FST shall use the following file naming convention, replacing the words "site location" with the actual site names. File naming convention: Site location A-Site location B-path#.revison# Title of Document

Milestone #

The table below defines the milestone numbers used to submit TDS's to FST. Milestone # 905.0 905.5 Description Vendor's TDS submission to FST Auditor's/DPM approved TDS submission to FST

Example FST file names

The following are examples of FST files names: Example 1: Pequop-Wells TDS (This is the vendors original FST submission.) Example 2: Pequop-Wells.1 TDS (This is a vendor's second FST submission.) Note: If there are multiple radios on the same path a "-1" or "-2", etc. should be added to the end of the path name. Example 3: Wells-Pequop-2 TDS (This is the 2nd radio on this path.) Example 4: Pequop-Wells-2.1 TDS (This is the second radio on this path, first revison.)

Vendor submit completed TDS to FST for approval process

The following table describes the process for the vendor to submit the completed TDS to FST for approval. Step 1 2 Description Vendor names TDS file per 'File naming convention'. Vendor uploads TDS file to FST. Vendor will upload the file to the FST server under the Documents section of the appropriate site in task 905.0 for the 1/2 path the TDS applies to. Note: TDS's must be uploaded to FST within (3) business days radio testing completion. TDS for 9500MPR-A R3.3.0

Auditor review submitted TDS to FST process

The following table describes the process for the auditor to review a submitted TDS for approval. Step 1 Description Auditor reviews TDS adherence to ALU & project standards. Auditor to download TDS file, review all data, and note any defects in an email. The subject line should indicate: Site location A-Site location B TDS defects For example: Pequop-Wells TDS defects If defects are assessed, the auditor should describe each defect and the suggested corrective action in the email. 2 *If the TDS has NO defects assessed, then the auditor will move the document from 905.0 to 905.5

Vendor submit corrected TDS to FST for approval process

The following table describes the process for the vendor to submit a corrected TDS to FST for approval. Step 1 Description Vendor Reviews Defect Email from Auditor / DPM If vendor has any objections to the assessed defects, they should address these in email or by phone to the auditor. Note: Objections noted by the vendor or lack of response by the auditor does not extend the due date of the corrective actions by the vendor. It is solely the vendor's responsibility to make contact with the auditor. All corrective actions must be completed within the allotted (10) business days. 2 Vendor Downloads TDS with Defect(s) and make Correction(s). Vendor will download the TDS file, make the applicable correction(s) to the defect(s) and re-take screen shots, re-run tests, correct radio configurations, etc. Note: All corrective actions to be submitted at one time. 3 Step 3. Vendor Renames TDS File per 'File naming convention'. The vendor shall change the file name to make path name end in ".1" to represent the 1st revision. 4 Vendor Uploads TDS File to FST. Vendor uploads corrected TDS file to 905.0 Note: Vendor should complete corrective actions and re-upload TDS to FST within (10) business days of initial auditor findings. Audit process repeats until all defects are corrected and auditor / DPM moves TDS to 905.5 TDS for 9500MPR-A R3.3.0

TDS for 9500MPR-A R3.3.0

Customer's logo

4. Turn-Up Checklist
Site To/From Tester Equipment ID 0 0 0

Site Condition-- Note and take pictures of any standing alarms, safety issues, trash or other major concerns as itemized below. Forward any urgent condition (equipment major or critical, safety issues, etc) to ALU DPM. Attach photos of concern to the bottom of this tab. Please include the photo number in your comments.

Item 1 2 3

Description Site Compound Inside Shelter Front Panel Equipment Red, Green, or Yellow Alarms Present Immediate Safety Concern - Tower, Shelter, Power, Ground, etc.

Check

Comments

EQUIPMENT INSTALLATION (9500 MPR-A Installation Practices Manual, PN: 3EM23953AL 01) Chart # Check/NA Comments Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Unpack and Inspect Equipment Prepare Floor Rack Installation PDU Installation Route and Terminate Station Ground and Office Battery Power Cables MSS-4/MSS-8, MPT-HL Shelf, and Power Injector Installation Route and Terminate 9500 MPR-A Shelf Power Cables Type N Adapter Bracket Installation Demarcation Patch Panel (DSx (1/3)) Installation MPT-HC V2/XP Installation (Integrated and nonIntegrated) Route and terminate MPT ODU to MSS cables Integrated Antenna and ODU300 Installation Non-Integrated Antenna and ODU300 Installation IF Cable System Installation Lightning Surge Suppressor Installation

IF Cable System Grounding Installation Weatherproofing Coaxial Cable Connections 17 3DB 18528BDAA Test Result Sheet for Site Acceptance Test Procedure of 9500MPR and Cable Grounds

17 18 19 20 21 22 23 24 25 26 27 28

Weatherproofing Coaxial Cable Connections and Cable Grounds Route and Terminate DS1 Signal Cables-Verify Continuity Route and Terminate DS3 Signal Cables-Verify Continuity Route and Terminate Ethernet Signal CablesVerify Continuity Route and Terminate OC3 Signal Cables-Verify Continuity Route and Terminate Sync Signal Cables-Verify Continuity Route and Terminate Aux Signal Cables-Verify Continuity Route and Terminate FAN Office Alarm Signal Cables-Verify Continuity Route and Terminate MPT Power Unit Housekeeping Alarm Signal Cables-Verify Continuity Install Standoffs and Secure Cables with Cable Ties Assemble CSM-E to PC Cable Antenna Alignment

EQUIPMENT COMMISSIONING (9500 MPR-A Turn-Up Manual, PN: 3EM23954AL 01) DLP # Check/NA Description DLP-102 DLP-103 DLP-104 DLP-105 DLP-106 DLP-107 DLP-108 DLP-109 DLP-110 DLP-111 DLP-112 DLP-113 DLP-114 DLP-115 DLP-116 DLP-117 DLP-118 DLP-119 DLP-120 DLP-121 DLP-122 Antenna Installation Verification ODU300 Installation Verification Antenna Polarization Verification Flex Section Installation Verification LMR400 Transmission Line Installation Verification Radio and Radio Rack Visual Inspection DC Power installation Verification Tributary Cable Installation Verification Install Plug-In Cards Load System and Craft Terminal Software on PC Provision MSS-4/MSS-8 Shelf Tributary Functionality Test Tx Output Power and RSL Tests Hop Stability Test Radio Interference and Fade margin Test ODU300 Radio Interference and Fade Margin Test - MPTHL Disconnect Test Equipment and Test Cables Provision Cross-Connections Provision Verification Perform Database Backup

Comments

Verify Alarm-Free System Complete system Turn-Up activities and obtain DLP-123 customer acceptance certification 3DB 18528BDAA Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

DLP-123

Complete system Turn-Up activities and obtain customer acceptance certification

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

5. Installation Checklist (Turn-Up DLP-100,102 through DLP-110)


Site To/From Tester Equipment ID 0 Comment
OK NOK NA

0 0

Indoor installation visual inspection check Rack placement in accordance with approved and communicated floor plan Rack and Subrack ground connections MSS and cables labeling PDU and other power supply distributor position and connection Power supply protection circuit breakers values IDU Power supply wiring MSS-4/8 cards installed per site documentation Unused slots have blank plates installed User Ethernet cabling and labeling of Ethernet Demarcation Point Tributary DS1 cabling and labeling of DS1 Demarcation Point Tributary DS3 cabling and labeling of DS1 Demarcation Point Tributary OC3 fiber cabling and labeling of OC-3 Demarcation Point Fan for MSS-1c Power injector box or plug-in MPT Power Unit MPT Extended Power Unit Direct Connection to Office Power presence Low Pass Filter and Lighting Arrestor presence Site left clean & tidy Outdoor installation visual inspection check Antenna(s) mounted per manufacturer / ALU specifications Antenna(s) diameter according to plant doc. Antenna sway bars/Stiff Arms should be installed to proper specs. (if used) Flex section installation according to plant documentation Antenna(s) grounding Flange connection (not integrated antenna only) 3DB 18528BDAA
OK NOK NA

OK OK OK

NOK NOK NOK

NA NA NA

OK OK OK OK OK

NOK NOK NOK NOK NOK

NA NA NA NA NA

OK

NOK

NA

OK

NOK

NA

OK

NOK

NA

OK OK OK OK OK OK OK

NOK NOK NOK NOK NOK NOK NOK

NA NA NA NA NA NA NA

OK OK

NOK NOK

NA NA

OK OK OK

NOK NOK NOK

NA NA NA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Waveguide type ODU/MPT and pole mounting according to plant doc. ODU/MPT grounding ODU/MPT tightening ODU/MPT cable protection weatherproofing ODU/MPT connectors tightened to proper torque spec. IDU/ODU cable(s) grounding IDU/ODU cable(s) length (m) Antenna Diameter Antenna Azimuth Polarization Antenna 1 / Antenna 2 Antenna 1 / Antenna 2

Elliptic OK OK OK OK OK

Flex. NOK NOK NOK NOK NOK

NA NA NA NA NA NA

OK

NOK

NA

Vertical

Horizontal

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

6.1. Link Information ODU 300 (Turn-Up DLP-120)


Site To/From Tester Equipment ID Link Settings Frequency band
L6 GHz 11 GHz 38 GHz U6 GHz 15 GHz 7 GHz 18 GHz 8 GHz 23 GHz

0 0 0

Configuration Mode Reference Channel Spacing Modulation

1+0 Presetting 10 Mhz QPSK 64 QAM

1+1 HSB Adaptive 30 Mhz 8PSK 128 QAM 4,16, 64 QAM 16/64 QAM

1+1 HSB/SD

1+1 FD

40 Mhz 16 QAM 256 QAM

50 Mhz 32 QAM

Modulation Range Remote Thresholds Option User Label Local End Link Identifier Values Enable Tx Channel 1 Tx Frequency (Mhz) Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Low Rx Threshold Tx power min(dBm) Channel 0 Tx Frequency (Mhz) Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Rx Threshold Tx power min (dBm) Enable Min 0 Enable Min Disable Rx

4,16 QAM 4/16 QAM

Far End / To/From Site Link Identifier Values 0 Enable 0 Tx Disable 0 Rx

Channel 1 Tx Frequency (Mhz) Shifter (Mhz) Disable Max dBm ATPC ATPC Range (dBm) ATPC Rx Threshold Tx power min (dBm) Enable Min 0 Disable Max dBm

Channel 0 Tx Frequency (Mhz) Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Rx Threshold Tx power min (dBm) Enable Min Max dBm 0 Disable Max dBm Disable

Radio automatic restoration criteria (1+1 only) EPS 3DB 18528BDAA Revertive Not Revertive 0

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

RPS HSB Tx protection Radio Main View Settings Tab Screenshot:

Revertive Revertive

Not Revertive Not Revertive

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

6.2. Link Information MPT-HC/XP/9558HC (Turn-Up DLP-120)


Site To/From Tester Equipment ID Link settings Frequency band
Unlicensed 8 GHz 23 GHz L6 GHz 11 GHz 38 GHz 1+1 HSB 1+1 XPIC Adaptive 10 Mhz 30 Mhz 40 Mhz 1+1 HSB/SD 1+1 FD U6 GHz 15 GHz 7 GHz 18 GHz

0 0 0

Configuration Mode Reference Channel Spacing Modulation (For Adaptive, select all supported modulation techniques.) Option User Label Local End Power Source Ch1 Power Source Ch0 Link Identifier Values Card Card Enable Tx Channel 1 Tx Frequency (Mhz) Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Low Rx Threshold Tx power (dBm) Enable Min QMA QMA Disable Rx

1+0 1+0 XPIC Presetting 5 Mhz 50 Mhz QPSK 64 QAM

8PSK 128 QAM

16 QAM 256 QAM

32 QAM

Far End / To/From Site PFoE PFoE Power Source Ch1 Power Source Ch0 Link Identifier Values Card Card 0 Enable 0 Tx QMA QMA Disable 0 Rx PFoE PFoE

Channel 1 Tx Frequency (Mhz) Shifter (Mhz) Disable Max dBm ATPC ATPC Range (dBm) ATPC Rx Threshold Tx power (dBm) Enable Min 0 Disable Max dBm

Channel 0 Tx Frequency (Mhz) Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Rx Threshold Tx power (dBm) 3DB 18528BDAA Enable Min 0 Disable Max dBm

Channel 0 Tx Frequency (Mhz) Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Rx Threshold Tx power (dBm) Enable Min 0 Disable Max dBm

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Radio automatic restoration criteria (1+1 only) MSS-4/MSS-8 EPS RPS HSB Tx protection Revertive Revertive Revertive Not Revertive Not Revertive Not Revertive

Radio Main View Settings Tab Screenshot:

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

6.3. Link Information MPT-HL (Turn-Up DLP-120)


Site To/From Tester Equipment ID Link settings Frequency band Configuration Mode Ref. Channel Spacing Modulation (For Adaptive, select all supported modulation techniques.) Driving MSE Option User Label Local End Link Identifier Values Enable Tx Channel 1 Tx Frequency (Mhz) Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Low Rx Threshold Tx power (dBm) Channel 0 Tx Frequency (Mhz) Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Rx Threshold Tx power (dBm) Enable Min 0 Disable Max dBm Enable Min Disable Max dBm Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Rx Threshold Tx power (dBm) Enable Min Disable Rx Far End / To/From Site Link Identifier Values 0 Enable 0 Tx Disable 0 Rx
Unlicensed 8 GHz 1+0 Presetting 5 Mhz 4 QAM 128 QAM L6 GHz 10.5 GHz 1+1 HSB Adaptive 10 Mhz 16 QAM 256 QAM 30 Mhz 32 QAM 40 Mhz 64 QAM U6 GHz 11 GHz 1+1 FD 7 GHz

0 0 0

Channel 1 Tx Frequency (Mhz) 0 Disable Max dBm

Channel 0 Tx Frequency (Mhz) Shifter (Mhz) ATPC ATPC Range (dBm) ATPC Rx Threshold Tx power (dBm) Enable Min 0 Disable Max dBm

Radio automatic restoration criteria (1+1 only) EPS RPS HSB Tx protection 3DB 18528BDAA Revertive Revertive Revertive Not Revertive Not Revertive Not Revertive 0

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Radio Main View Settings Tab Screenshot:

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

7. Synchronization Information (Turn-Up DLP-120)


Site To/From Tester Equipment ID 0 0 0

Synchronization Settings Tab


Role Synchronization Role Restoration Criteria Primary Source Primary Source DS1 Slot and Port # OC3 Slot and Port # Synch-In Port Radio/MPT Port Ethernet Port L1 LAG Port Secondary Source Secondary Source DS1 Slot and Port # OC3 Slot and Port # Synch-In Port Radio/MPT Port Ethernet Port L1 LAG Port Synch-Out Port Synch-Out Port Synchonisation Ethernet Port Ethernet Operation mode port #1 Ethernet Operation mode port #2 Ethernet Operation mode port #3 Ethernet Operation mode port #4 Ethernet Operation mode port #5 Ethernet Operation mode port #6 Synchronous Synchronous Synchronous Synchronous Synchronous Synchronous Not Synchronous Not Synchronous Not Synchronous Not Synchronous Not Synchronous Not Synchronous Master Master Master Master Slave Slave Slave Slave
SSM SSM SSM SSM SSM SSM

Master Revertive LO DS1 Slot Slot

Slave Not Revertive OC3 Port Port


Synch-In Port L1 LAG Port

Radio/MPT Port

Ethernet Port

None
Radio/MPT Port

LO Slot Slot

DS1
Ethernet Port

OC3

Synch-In Port

L1 LAG Port

Port Port

Enable

Disable

Frequency (Mhz)

Synchronization View Settings Tab Screenshot: Paste Synchronization View Settings Tab below:
Screenshot Add Macro

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

ation (Turn-Up DLP-120)

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

8. Tributary Functionality Test (Turn-Up DLP-113)


Site To/From Tester Equipment ID DS1 Tributary Ports Slot # (Port #) P32E1DS1 Slot 3 (1-32) P32E1DS1 Slot 4 (1-32) P32E1DS1 Slot 5 (1-32) P32E1DS1 Slot 6 (1-32) P32E1DS1 Slot 7 (1-32) P32E1DS1 Slot 8 (1-32) MSS-1 MSS/DS1 (1-16) DS3 Tributary Ports Slot # (Port #) P2E3DS3 Slot 3 (1-2) P2E3DS3 Slot 4 (1-2) 0 Tributary Tests Pass Pass Pass Pass Pass Pass Pass NA NA NA NA NA NA NA Protection Switching Main to Protection Protection to Main Pass Pass NA NA Pass Pass NA NA Protection Switching Main to Protection Protection to Main Pass Pass Pass Pass Pass Pass NA NA NA NA NA NA Pass Pass Pass Pass Pass Pass NA NA NA NA NA NA 0 0

Tributary Tests Pass Pass NA NA

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

9. RSL (Turn-Up DLP-114)


Site To/From Tester Equipment ID RA Tx Frequency Power Power Level Check ( ODU 300, MPT-HC, MPT-HL ) Move to RSL tab Channel 1 Tx power value (dBm) Calculated Rx level (dBm) (from link budget) Rx level reading (dBm) Check for interfering signal Yes Pass/Fail* Expected RSL met? * If RSL does not meet +/- 2 dB specification and there are no mitigating issues identified on the existing / incumbent path, then follow normal troubleshooting practices to identify where the losses are occurring. Use the area below to document: 1) troubleshooting steps performed 2) results of the troubleshooting steps 3) an explanation of why this defect is not attributable to ALU-provided: hardware installation Description of why Expected RSL does not meet specification No Value Pass/Fail* Channel 0 0 0 0

Near-End Tx Output Power and RSL Tabular View, Main Channel #1 Paste Near-End TX Output Power and RSL Tabular View, Main Channel #1 below.
Screenshot Add Macro

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Near-End Tx Output Power and RSL Tabular View, Spare Channel #0 Paste Near-End TX Output Power and RSL Tabular View, Spare Channel #0 below.
Screenshot Add Macro

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

10. ODU300/MPT-HC/9558HC RX Sensitivity Test


(Turn-Up DLP-116)
Site To/From Tester Equipment ID 0 0 0

ODU300/MPT-HC/9558HC RX Sensitivity Test Results: Far End TX Fade TX power (far end) per RF design RSL (near end) per RF design RSL (near end) actual TX power (far end) @ minimum RSL (near end) @ min TX power Pass A (Main) B (Spare) Near End TX Fade TX power (near end) per RF design RSL (far end) per RF design RSL (far end) actual TX power (near end) @ minimum RSL (far end) @ min TX power Pass A (Main) B (Spare)

* Near end receiver power level must follow the delta of the far end transmitter power level within 4 dB. If the difference between the change in far end Tx power and near end Rx power is greater than 4 dB, the Rx * Near End Fade only needed if Far End TX fade shows radio sensitivity does not meet specifications per ALU path caluculations referenced above. A Far End Fade Test that does not pass could indicate a possible interference problem. To eliminate the Near E A-A ODU Receiver sensitivity Paste A-A PM Radio power measurement graphical view
Screenshot Add Macro

Paste A-A PM Radio power measurement tabular view


Screenshot Add Macro

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

A-A ODU Receiver sensitivity Paste B-B PM Radio power measurement graphical view
Screenshot Add Macro

Paste B-B PM Radio power measurement tabular view


Screenshot Add Macro

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

11. MPT-HL RX Sensitivity Test (Turn-Up DLP-117)


Site To/From Tester Equipment ID 0 0 0

MPT-HL RX Sensitivity Test Results: Far End TX Fade Spec'ed RX 10 -6 Threshold Actual RX 10 -6 Threshold Fade Margin A (Main) B (Spare) Near End RX Fade* Spec'ed RX 10 -6 Threshold Actual RX 10 -6 Threshold Fade Margin A (Main) B (Spare)

0.0

0.0

0.0

0.0

* Receiver Threshold specification should be obtained from the Alcatel-Lucent path calculations. * Near End Fade only needed if Far End TX fade shows radio sensitivity does not meet specifications per ALU path caluculations referenced above. A Far End Fade Test that does not pass could indicate a possible interference problem. To eliminate the Near End RX as being a problem, the Near End RX Fade would be performed

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

12. Protection Switching (Turn-Up DLP-116 for ODU300/MPT-HC/9558HC, DLP-117 for MPT-HL)
Site To/From Tester 0 Equipment ID Radio Channel Protection Switching (1+1 only) EPS Protection RPS Protection HSB Tx Protection Main to Protection OK OK OK Protection to Main OK OK OK 0 0

Revertive Revertive Revertive Revertive

Protection 1+1 1+1 1+1

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

13. Protection Scheme (Turn-Up DLP-120)


Site To/From Tester Equipment ID Protection Scheme Protection Scheme Tab (MSS-4/MSS-8) Paste Protection Scheme Tab Screenshot below:
Screenshot Add Macro

0 0 0

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

14. Radio BER Hop Stability Test (Turn-Up DLP-115)


Site To/From Tester Equipment ID 0 0 0

Radio BER Hop Stability Test Results: Radio BER Hop Stability Test A-A (Main-Main) B-B (Spare-Spare) (If Applicable) A-A Throughput (2 hours min.): Frame Size (bytes) 1518 Frame Size (bytes) 1518 TX Rate (Mbps) TX Rate (frames/sec) RX Rate (Mbps) RX Rate (frames/sec) Frame Loss (%) #DIV/0! Frame Loss (%) #DIV/0! Pass/Fail Bit Errors Record Actual Test Elapsed Test Signal (DS1/DS3/OC-3/Ethernet) DS1 DS1 DS3 DS3 OC-3 OC-3 Ethernet Ethernet

B-B Throughput (2 hours min.): TX Rate (Mbps) TX Rate (frames/sec) RX Rate (Mbps) RX Rate (frames/sec) Pass/Fail

A-A Test Result Capture from BER Test Set (Elapsed Time and 0 Bit Errors) Paste photo showing elapsed time and 0 bit errors of A-A Radio BER hop test result below: OR Paste text file showing elapsed time and 0 bit errors of A-A Radio BER hop Test result below:
Photo Add Macro

A-A Test Result Capture from Performance Monitor Craft Terminal (Elapsed Time and 0 Bit Errors) Paste A-A Performance Monitor screenshot below:
Screenshot Add Macro

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

B-B Test Result Capture from BER Test Set (Elapsed Time and 0 Bit Errors) Paste photo showing elapsed time and 0 bit errors of B-B Radio BER hop test result below: OR Paste text file showing elapsed time and 0 bit errors of B-B Radio BER hop Test result below:
Photo Add Macro

B-B Test Result Capture from Performance Monitor Screenshot from Craft Terminal (Elapsed Time and 0 Bit Errors) Paste B-B Performance Monitor screenshot below:
Screenshot Add Macro

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

15. Software License


Site To/From Tester Equipment ID 0 0 0

(Turn-Up DLP-120)

Flash Card Serial Number (Manually Enter): Main Flash Card S/N Spare Flash Card S/N Software License: Software License Screenshot: Paste Software License Screenshot below:
Screenshot Add Macro

License Key: Paste License Key below:

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

16. Configuration File (Turn-Up DLP-120)


Site To/From Tester Equipment ID Configuration File: Configuration File Data: Paste Configuration File below: 0 0 0

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

17. Remote Inventory (Turn-Up DLP-120)


Site To/From Tester Equipment ID Remote Inventory: Remote Inventory: Paste Remote Inventory text below: 0 0 0

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

-Up DLP-120)

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

18. Alarm Monitor / Abnormal Conditions (Turn-Up DLP-122)


Site To/From Tester Equipment ID 0 0 0

Alarm Monitor / Abnormal Conditions: Alarm Monitor Screenshot (Showing no un-explained standing alarms or conditions): Paste Alarm Monitor screenshot below:
Screenshot Add Macro

Abnormal Conditions Screenshot (Showing no un-explained abnormal conditions): Paste Abnormal Conditions screenshot below:
Screenshot Add Macro

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

19. Housekeeping Alarm Verification


Site To/From Tester Equipment ID 0 0 0

16.1 AUX Card


Housekeeping Configuration Alarm Input #1 Alarm Input #2 Alarm Input #3 Alarm Input #4 Alarm Input #5 Alarm Input #6 Alarm Output #7 Alarm Output #8 OK OK OK OK OK OK OK OK NA NA NA NA NA NA NA NA

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

20. RFC2544 Test Results (When purchased as an additional service!)


Site To/From Tester Equipment ID RFC2544 Configuration RFC2544 A-A Test Results - (2 hours min.) Throughput: Frame Size (bytes) 64 128 256 512 1024 1280 1518 Latency: Frame Size (bytes) 64 128 256 512 1024 1280 1518 TX Rate (Mbps) Min. Delay (usec) Average Delay (usec) Max. Delay (usec) Min. DV (usec) Average DV (usec) Max. DV (usec) Frame Loss (%) Pass/Fail TX Rate (Mbps) TX Rate (frames/sec) RX Rate (Mbps) RX Rate (frames/sec) Frame Loss (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Pass/Fail
1+0 1+1 HSB 1+1 HSB/SD 1+1 FD

0 0 0

Frame Loss: Frame Size (bytes) 64 128 256 512 1024 1280 1518 Back-to-Back: Frame Size (bytes) 64 128 256 512 3DB 18528BDAA Port Speed (Mbps) Average Burst (frames) Repeat Pass/Fail TX Rate (Mbps) TX Rate (frames/sec) RX Rate (Mbps) RX Rate (frames/sec) Frame Loss (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Pass/Fail

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

1024 1280 1518 RFC2544 B-B Test Results - (2 hours min.) Throughput: Frame Size (bytes) 64 128 256 512 1024 1280 1518 Latency: Frame Size (bytes) 64 128 256 512 1024 1280 1518 TX Rate (Mbps) Min. Delay (usec) Average Delay (usec) Max. Delay (usec) Min. DV (usec) Average DV (usec) Max. DV (usec) Frame Loss (%) Pass/Fail TX Rate (Mbps) TX Rate (frames/sec) RX Rate (Mbps) RX Rate (frames/sec) Frame Loss (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Pass/Fail

Frame Loss: Frame Size (bytes) 64 128 256 512 1024 1280 1518 Back-to-Back: Frame Size (bytes) 64 128 256 512 1024 1280 1518 A-A RFC 2544 Paste photo showing elapsed time and test results of A-A RFC2544 test results below: OR Paste pdf file showing elapsed time and test results of A-A RFC2544 test results below: Port Speed (Mbps) Average Burst (frames) Repeat Pass/Fail TX Rate (Mbps) TX Rate (frames/sec) RX Rate (Mbps) RX Rate (frames/sec) Frame Loss (%) #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! Pass/Fail

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

Customer's logo

21. Blank Tab


Site To/From Tester Equipment ID 0 0 0

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR

3DB 18528BDAA

Test Result Sheet for Site Acceptance Test Procedure of 9500MPR