EVACUATION STRATEGY FOR SUPER HIGHRISE BUILDINGS

Mingchun Luo and Kelvin H L Wong Arup Fire, Ove Arup & Partners HK Ltd Abstract: Highrise buildings are always a major concern to the life safety of occupants due to the elevated height and extended vertical travel distance for the egress and means of access. The fire safety challenges of super highrise and highrise buildings have been discussed and found that most of the challenges are related to the evacuation component. The existing evacuation strategies for highrise buildings, i.e. total evacuation, phased evacuation and stay-in-place approach, have been discussed in detail. In order to address the feasibility to increase the total building evacuation efficiency of super highrise buildings, a lift evacuation strategy has been discussed in this paper. As an example, the evacuation for a super highrise building with lifts has been studied. The traditional total building evacuation using stairs and the proposed lift evacuation strategy have been simulated using a 3-D evacuation software to demonstrate the evacuation efficiency. The results showed that the total building evacuation time could be shortened significantly. This lift evacuation strategy can be regarded as an enhancement to the evacuation safety of super highrise buildings in case of extreme emergency without significant changes to the traditional evacuation strategy and additional investment in safety provisions. INTRODUCTION Although statistics suggested that highrise buildings have a lower risk of fire per unit floor area (1) , highrise buildings account for a very large share of people and property exposed, especially for the large number of super highrise buildings currently constructing in Asia and Middle East. The definition of super highrise building changes as construction technology and human perception advanced. The US NFPA 101 Life Safety Code (2) defined highrise building with height more than 23m. This is the maximum elevation resulted from the less favorable rescue and fire fighting operations with the use of extendable ladders. Since highrise buildings are unique with regard to their elevated height from conventional lower buildings, different design considerations including additional features are required for fire safety. Prescriptive codes in a number of countries (3, 4) have separate section to cater for highrise building fire safety design. The additional enhancements in the prescriptive codes include suppression system, detection and alarm, but do not include the egress component. The current highrise building evacuation strategies, including the total building evacuation, phased evacuation and stay-in-place approach have been reviewed in this paper. These strategies are regarded as sufficient to handle most of the traditional fire scenarios in highrise buildings. Following the catastrophic terrorist attack on September 11, 2001 to the prominent super highrise building World Trade Center in New York, many questions have been asked about the resilience of highrise buildings to withstand extreme events. There is a trend to investigate the actual performance of buildings and determine what enhancements can be considered when building subjected to the extreme events, especially for the prestigious new super highrise buildings close to 500m in elevation. Evacuation component, such as how to simultaneously evacuate the

building occupants efficiently, is a hot topic for discussion. Without significant violation to existing conventional stair evacuation strategy and additional investment in evacuation safety provisions, a highrise building total evacuation design by using lifts as a supplementary means of escape has been proposed in this paper. Evacuation simulations have also carried out and demonstrated that total building evacuation time can be shortened significantly and the proposed total building lift evacuation design can provide a higher level of evacuation safety for occupants during the potential extreme events. FIRE SAFETY CHALLENGES TO HIGHRISE BUILDINGS The fire safety in highrise buildings has raised special attention by the general public and authorities. The United States Fire Administration has issued a special report on the operation considerations for highrise firefighting ( 5 ). The special fire safety issues related to highrise buildings can be summarized into six major areas: fire department accessibility, egress and people movement, natural forces, increase in occupant and fire load, combination of occupancies, and arrangement of internal utility services. The details on the above fire safety issues have been discussed in NFPA Handbook (6). Among the above fire safety challenges, half of them are directly or indirectly related to the evacuation of building occupants (extended vertical travel distance, high occupant number and different occupant types). Therefore the challenges of highrise building evacuation will be discussed in detail. Due to the height of highrise buildings, it is expected that occupants would take longer time to travel from the level of their original location to the ground level. In addition to the horizontal travel time from their initial position to the staircase lobby on the floor, the occupants are required to travel an extended vertical distance which can up to 500m in the super highrise buildings. Occupants may experience to walk down hundreds of flights or thousands of steps in the staircases. Not to mention the tiredness of occupants, the slow discharge time will result in an extensive queuing in the entrance of staircases on each floor. In some places (3, 7, 8), additional provisions like refuge floors are provided to improve the egress conditions in highrise buildings. The increase in occupant load of highrise buildings due to the stacking of floor upon floor up to 100 for super highrise buildings worsen the egress situation. When compared with the density of occupants per building footprint and per staircase, the highrise buildings are significantly higher than the lower buildings. In addition to the multi-purpose design of modern super highrise buildings, such as observation facilities on the building top, hotel or service apartment on the higher levels, office floors on the lower levels, and retail or exhibition facilities in the podium, different usages and occupancies exist. The difference in occupancies who will have different familiarity with the building and alertness further complicates the evacuation behaviour. CURRENT HIGHRISE BUILDING EVACUTION STRATEGY Although there are a number of prescriptive active or passive fire protection measures imposed in the highrise buildings, the preparation of occupant evacuation is necessary for all highrise buildings. The current highrise building evacuation strategy can be classified into full building evacuation, partial building evacuation or no evacuation as below.

Total Building Evacuation The traditional way of building evacuation design in case of emergency is based on the principle of single staged total evacuation. The evacuation provisions of the building, i.e. escape staircase, are designed to allow all floors to be evacuated simultaneously. In the current Hong Kong MoE Code (7), discharge value tables for staircases are used to prescribe the minimum stair requirement in new building design. These discharge value tables are formulated based on the escape strategy of total evacuation of the building. Using the total building evacuation principle, evacuation provisions are sufficient for all occupants to enter the staircases simultaneously and leave the building. The total building evacuation is the simplest strategy to implement. Once the alarm signal is sounded, all building occupants are expected to evacuate to the staircases which lead to the ground floor. Most of the traditional low-rise buildings evacuation design is based on the principle of total building evacuation. In highrise buildings with large number of occupants and elevated height, total building evacuation of all occupants will result in an extensive queuing before discharge in the staircases. For super highrise buildings like World Trade Center (WTC), it could take an hour to descend downwards from top floors to street level using stairs (9). The large number of occupants descending down the staircase may also hamper the fire-fighting access to the fire floor through staircases. It has been reported by fire fighters (10) that extra one to two minutes were required to ascend each flight of stair with occupants descending downwards simultaneously. In addition, occupants evacuating in stairs could be exposed to other kinds of dangers such as tiredness, becoming dizzy or slipping on surfaces, especially when descending thousands of steps of stairs in highrise buildings. Phased Evacuation In highrise office buildings with large number of occupants, it has been found that the single staged total evacuation is not practical. Therefore many highrise buildings in the world propose to use phased evacuation in case of fire. In phased evacuation, the occupants on the most critical floors like fire floor and floors nearby will be prioritised to evacuate first and queuing time into staircases can be reduced. The remaining occupants of the building are evacuated subsequently as necessary. Guideline is also available to provide the relevant principles and appropriate recommendations in phased evacuation of office buildings (11). The concept of phased evacuation relies heavily on adequate fire compartmentation such that any fire occurring will be contained within the fire compartment prior to the arrival of the fire brigades. It means that only the occupants within the compartment on fire need to be evacuated from the building immediately, whilst the remaining occupants only need to be alerted to an incident. Early detection of a fire and the raising of an alarm, together with a suitable automatic fire extinguishing installation for controlling the size of a fire, are important additional criteria. Facilities should also be provided to enable the fire brigades to have quick access to the location of fire origin. Similarly, well management control with trained fire marshals or fire wardens and well trained and disciplined staff, together with adequate means of communication within the building, are essential to achieve safely and orderly evacuation. It is also important that people remaining in a building in fire are given appropriate information relating to the nature of

the incident and the action being taken to render it safe. On the other hand, the controlled phase evacuation is relative complex, and there is a need to have relatively sophisticated communication system and training, which are relatively expensive and may introduce delay time before occupants who should evacuate become notified to start their evacuation. Stay-in-place Approach If it was found that all exits from a floor are blocked in case of a fire, it is common to suggest the occupants to go back to their room, close the door and seal the cracks, wave something at the windows and phone for help. For the disabled occupants, the same stay-in-place approach has also long been used since some of the disabled occupants are not able to descend the staircase themselves. Stay-in-place or non-evacuation approach is the occupants remaining in the room with an exterior window, a telephone, and a solid or fire resistant door. That room can be regarded as a fire or smoke barrier and temporary place of safety for occupant staging. The occupant in the room needs to contact the emergency personnel via the phone to report his or her location. The emergency personnel will determine the appropriate method to evacuate the occupant. In the literature (12), it has been suggested that the stay-in-place approach should also be used for the highrise building fires. This suggestion was made after reviewing a number of tragic fires that a number of people have died in the process of evacuating highrise buildings, which the casualties were found in corridors and staircases away from the room of fire origin. The essential components for the proposed stage-in-place approach include occupants located in enclosed compartments (i.e. residential, hotel and dormitory), non-combustible building construction, entry doors with self-closers, and provision of central alarm and voice communication system. PROPOSED HIGHRISE BUILDING EVACUATION STRATEGY Although the phased evacuation or the newly proposed stay-in-place approach are considered effective to cater for most of the building fire scenarios, the community becomes more concerned about the possibility of total building evacuation under the terrorist attacks or natural disasters in the recent years. The terrorist attack on September 11, 2001 to the World Trade Center has also demonstrated that egress design with total building evacuation capacity is necessary and the total building evacuation effectiveness is crucial in ensuring the building occupants safety (13). In these extreme situations, a total evacuation of whole building instead of individual floors is necessary to ensure the occupant safety, especially in the high-profile, highcapacity infrastructures like super highrise or highrise buildings (14). Emergency Lift Evacuation Final report on the Collapse of the World Trade Center Towers by the National Institute of Standards and Technology (NIST) in US (15) recommended that tall buildings should be designed to accommodate timely full building evacuation of occupants. Building size, population, function, iconic status, plus the counter flow due to the emergency personal should be taken into consideration in designing the egress provisions. Without huge investment in additional evacuation provisions like constructing more and wider stairs, lift evacuation has been put in the agenda as one of the means to facilitate the highrise building evacuation. The development of using protected/hardened lift has already been recommended by NIST as the next generation of evacuation technology to be evaluated for future use. It has also recommended to consider the

hardened lift to be used for all occupants in tall buildings. Fire engineering guide in UK (16) has also listed the use of lifts for evacuation as one of the fire safety issues maybe subjected to evaluation as an enhancement during the extreme events. Lift has been used as a means of escape for a limited number of people in buildings like disabled or mobility impaired occupants who cannot descend stairs alone. In addition, lift evacuation has been proposed and endorsed in some special high-rise structures such as the airport control tower (17) with restricted access, and the British Telecom Tower (18) in London and the Stratosphere Tower (19) in Las Vegas that are open to the general public. Lift in fact is an efficient means of evacuation during emergencies in addition to stairs for all occupants in highrise buildings. NIST WTC investigation report indicated that the use of lifts in addition to stairs for WTC 2 top floors have saved roughly 3,000 lives (20). The increased efficiency of lifts in conjunction with stairs emergency evacuation has also been shown in a highrise building evacuation study (21). Nevertheless, there is no official industry or regulatory approval method for designing such emergency lift evacuation system. The areas of concern for lift evacuation system have been listed out in Australia Community Safety Directorate Guideline as design reference (22). Another comprehensive design guideline has been published to identify key issues for designer to consider the usage of lift for emergency evacuation (23). Proposed Lift Evacuation Strategy A refined lift evacuation strategy which consists of combining stair evacuation from a group of occupied floors to a refuge floor followed by lift evacuation from the refuge floor to street level is proposed based on the existing lift evacuation strategies in the literatures ( 24 , 25 , 26 ). The proposed lift evacuation strategy can prevent the major problems in traditional lift evacuation design including smoke spread into lift shafts, water spillage and fire hazard to occupants in lobbies ( 27 , 28 , 29 , 30 ). For the proposed lift evacuation strategy, occupants on each floor will evacuate through the stairs to the refuge floors first, where the occupants can choose to travel down to the street level by using shuttle lifts or stairs. It is recommended that both stairs and lifts are allowed to evacuate occupants from the refuge floors, and lifts would be the primary means in evacuation. The comparison on the proposed lift evacuation strategy with the traditional method has been discussed in detail in the literature (31). Refuge floors are provided in this strategy as a temporary place of safety for occupants to take a rest and wait for the evacuation lifts during emergency evacuation. Refuge floors are seen to act as a safe place for a short rest before people continue to escape downwards or change to another stair when occupants encounter smoke, fire or obstruction in the original staircase. The general requirements of refuge floors are to have adequate height, lighting, ventilation, signage, free from obstruction, and complete with fire rated construction to separate from the rest of the building. Refuge floors are important components in this lift evacuation strategy. The requirements of refuge floor in this strategy will be the same, except that shuttle lifts are able to pick up passengers on the refuge floors. Since refuge floors are originally designed to be a temporary place of safety for the staging of building occupants during the phased evacuation, it is safe for occupants to take rest and stay there to wait for the evacuation lifts. The risk of fire and smoke affecting the occupants waiting in the normal lift lobbies can thus be eliminated.

In the lift evacuation strategy, shuttle lifts are used as the evacuation lifts. Local lifts within each zone will not be used to pick up passengers between floors. The use of shuttle lifts can eliminate the complicated control and management to pick up occupants on different levels. These shuttle lifts only travel between the refuge floors and the street level. The shuttle lift shafts are blind shafts where there are no openings on typical floors, therefore the provisions of a practically complicated lift shaft pressurization system and lift lobby water entry protection can be eliminated for these shafts completely. In order to provide a standard for the evacuation lift design, it is suggested that the shuttle lifts for evacuation should be designed according to the standard for firemans lift detailed in the respective countrys standards and regulations (32). LIFT EVACUATION EFFICIENCY CHARACTERIZATION In order to quantify the effectiveness of the proposed lift evacuation design, a building in the design stage has been simulated using a commercial evacuation software STEPS (Simulation of Transient Evacuation and Pedestrian movementS) to compare the traditional stair evacuation design and the proposed lift evacuation design. Building Details Total building evacuation of a proposed 500m, 100 storeys super highrise commercial building has been simulated. The total number of occupants in the building is approximately 21,000, which is estimated according to the prescriptive code occupant load density. Three stairs, each of 1200mm in width, have been provided. The building has four refuge floors, each serving a maximum of 24 storeys, used as the staging area during lift evacuation and there are 14 shuttle lifts located within the building core traveling between the refuge floors and the street level as evacuation lifts. Evacuation Simulation Model With the advancement of computational capacity and software technology, evacuation simulation that can handle the individuals human behaviour for a massive number of occupants becomes feasible. The use of computerized evacuation simulation to characterize the efficiency of lift evacuation has already been discussed in the literature (33). By taking the consideration of each individuals walking speed, escape route finding, familiarity of exits, decision making in choosing the exits, merging between flows into staircase, queuing behaviour, etc., a realistic and comprehensive analysing tool of evacuation can be produced. The specification of the model input parameters consists of describing people types, body dimensions and their associated walking speeds. The maximum walking speed and flow rate values reported in the SFPE Handbook (34) have been adopted in the model. Evacuation Simulations The total building evacuation has been simulated in a way that all the occupants start the evacuation at the same time. This is the worst scenario as far as stair usage is concerned. Two scenarios, traditional evacuation using stairs only, and the proposed lift evacuation strategy of using lifts and stairs together, have been simulated. A number of trials have been simulated for the lift evacuation scenario until the times for the last person from stairs and lifts to reach ground floor are the same in the model, which is the case that the discharge capacities of both stairs and

lifts are fully utilized. The numbers of occupants in the building have been plotted against time in Figure 1.

Figure 1 Comparison of Evacuation Times When comparing the total building evacuation times, it can be seen that using lifts and stairs in this evacuation strategy can reduce the evacuation time by 36%. For the case of any undetermined human factors, such as occupants hesitating and refusing to take the evacuation lifts and insisting to use stairs for evacuation, the simulated evacuation times will be bounded by the two cumulative percentage curves in Figure 1. Besides the total evacuation time, the time for a certain percentage of occupants who evacuated from the building can be another indicator to quantify the evacuation efficiency. In most cases, the total evacuation time is dominated by a few occupants who leave the building very late. From Table 1, it is apparent that the evacuation time can be shortened by up to 58% if a combined lift and stair evacuation strategy is adopted. This shows that the proposed lift evacuation strategy is more effective in evacuating a large number of occupants at the early stage of evacuation. Table 1 Comparison on Percentage of Occupants Evacuated Percentage evacuated stair lift + stair Difference 25% 26 mins 11 mins 58% 50% 53 mins 25 mins 53% 75% 80 mins 41 mins 49% 90% 96 mins 53 mins 45% Sensitivity Analysis on Occupant Load Number Sensitivity analysis has also been carried out by changing the occupant load factors on different floors to simulate the different operation hours of the building (33). Base on the prescriptive

occupant load factors, the total number of occupants inside the building is estimated to be about 21,000. Since the building consists of different functions, the whole building would not be the peak usage at the same time, such as during the office days the office floors would be in peak load and observation deck would be of less visitors. Adjustments have been made on the building occupant load as the sensitivity analysis. From the statistics on similar buildings, the office days and holidays occupant loads are obtained and the above prescriptive peak occupant load number is modified for a more natural representation of building occupancy for design and management consideration. The simulation results are summarized in Table 2. Table 2 Sensitivity Analysis on Different Number of Building Occupants Scenarios occupants no. stairs lift + stair Difference Prescriptive peak load ~ 21,000 110 mins 70 mins 36% Office days ~ 19,000 102 mins 69 mins 32% Holidays ~ 6,000 62 mins 46 mins 26% It can be found that the evacuation time has been reduced significantly for both the stair and lift evacuation strategy. The reduction in evacuation time using the proposed lift evacuation strategy is more obvious for the scenarios with larger number of occupant, i.e. the prescriptive peak load and office days scenarios. Sensitivity Analysis on Using Double Deck Shuttle Lift Nowadays more highrise buildings prefer to use double deck lift as shuttle lift to increase the lift shaft handling capacity (35). Sensitivity analysis has also been carried out to compare the use of either the lower deck or both decks of shuttle lift in the proposed lift evacuation strategy (36). The double deck lift can be programmed to park the lower deck on refuge floor first and then the upper deck after filling up the lower deck with occupants. When the double deck lift arrives the street level, the doors of both decks will open to allow occupants to evacuate simultaneously. The simulation results are summarized in Table 3. Table 3 Sensitivity Analysis on Different Number of Building Occupants Scenarios stair lift + stair Difference Single deck lift 110 mins 70 mins 36% Double decks lift 110 mins 51 mins 54% It shows that the building evacuation time for using single deck or both decks are different significantly. For the case using both decks for evacuation, it has been observed from the simulation that there is extra capacity for lift since the lift handling capacity on refuge floor is higher than the discharge rate from stairs to refuge floor. It has been found that the efficiency of the proposed lift evacuation is dependent on a number of variables such as building height, stair width, occupant distribution and number. The proposed lift evacuation strategy should be tailor made using performance based fire engineering design for individual building to optimise the evacuation efficiency and safety of occupants.

CONCLUSION An emergency lift evacuation strategy has been proposed and discussed which can be put into practical use without significant violation to existing stair evacuation strategy and additional investment in evacuation safety provisions. The shuttle lifts have been used in the proposed strategy which can eliminate the dedicated lift shaft pressurization and water spillage protection since there is no shaft opening on typical floors. Using refuge floors as lift evacuation pick up and occupant staging floors can protect the occupants from fire and smoke hazards since refuge floors are designed to be a temporary place of safety for occupants refuge. A computational simulation using a proposed super highrise building as an example has been carried out to demonstrate the effectiveness of the proposed lift evacuation strategy. It has been shown that the proposed strategy of lift evacuation has advantages over stair evacuation in terms of total building evacuation time and percentage of occupants discharged. Sensitivity analyses have also been carried out based on different occupant number and the use of lower deck or both decks of shuttle lifts for evacuation to investigate the changes in effectiveness of lift evacuation. It has been found that the evacuation time is dependent on a number of variables such as building height, staircase width, occupant distribution and number which the proposed lift evacuation strategy should be tailor made using performance based fire engineering design for individual building. It is demonstrated that the proposed lift evacuation strategy of combining stair and lift evacuation can be integrated in new buildings to enhance total building evacuation safety without the addition of relatively complicated implementation procedures and violation of traditional stair evacuation strategy. REFERENCES
1

2 3 4 5 6

7 8

Hall, J.R., US Highrise Fires: The Big Picture, NFPA Journal 88 (2), March April 1994, pp.47-53, 1994. Cote, R. ed., NFPA 101 Life Safety Code Handbook, 8th ed., National Fire Protection Association, Quincy, 2000. Code for Fire Protection Design of Tall Buildings, GB 50045-95, 2005 ed., National Standard of The Peoples Republic of China, Beijing, 2005. NFPA 5000, Building Construction and Safety Code, 2006 ed., National Fire Protection Association, Quincy, 2006. Operational Considerations for Highrise Firefighting Special Report, USFA-TR-082, United States Fire Administration, Federal Emergency Management Agency, 1996. Caldwell, C., Occupancies in Special Structures and Highrise Buildings, Section 9-1, Fire Protection Handbook, 18th ed., Cote. E.A. ed., National Fire Protection Association, Quincy, 1997. Code of Practice for the Provisions of Means of Escape in Case of Fire, Building Authority Hong Kong, 1996. Regulamento de Segurana contra Incndios, 1995 ed., Imprensa Oficial de Macau, Macau, 1995.

10

11 12 13 14

15

16 17 18 19

20

21

22

23 24

Fahy R.F., and Proulx G., A Comparison of the 1993 and 2001 evacuations of the World Trade Center, Proceedings of Fire Risk and Hazard Assessment Symposium, Baltimore, MD, pp. 111-117, 2002. Burns, D.J., Operation in Tower 1, The World Trade Centre Bombing: Report and Analysis, United States Fire Administration, Federal Emergency Management Agency, Maryland, pp. 49-56, 1993. Fire Safety Guide No.3, Phased Evacuation from Office Buildings, London District Surveyors Association, London, 1990. Proulx, G., Highrise Evacuation: A Questionable Concept, NRCC-44675, National Research Council Canada, 2001. Fahy, R.F. and Proulx, G., A Comparison of the 1993 and 2001 Evacuations of the WTC, Proceeding of Fire Risk and Hazard Assessment Symposium, Baltimore, MD, 2002. Wong, H.L.K, and Luo, M.C., Computational Tool in Infrastructure Emergency Total Evacuation Analysis, Lecture Notes in Computer Science, Vol. 3495/2005, ISI IEEE International Conference on Intelligence and Security Informatics, pp.536-541, 2005. Federal Building and Fire Safety Investigation of the World Trade Center Disaster: Final Report on the Collapses of the World Trade Center Towers, NIST NCSTAR 1, National Institute of Standards and Technology, Gaithersburg, MD, 2005. CIBSE Guide E, Fire Engineering, Chartered Institution of Building Services Engineers, London, 2003. Klote J.H., Feasibility of Fire Evacuation by Elevators at FAA Control Towers, National Institute of Standards and Technology Report NISTIR 5445, Gaithersburg, MD, 1994. Howkins, R., Lift Modernization BT Tower London, Arup Journal 3/2000: 30-31, 2000. Quiter, J.R., An Application of Performance Based Concepts at the Stratosphere Tower Las Vegas Nevada, Proceedings of Fire Risk and Hazard Assessment Symposium, Research and Practice: Bridging the Gap, National Fire Protection Research Foundation, pp. 118-126, 1996. Averill, J.D., Mileti, D.S., Peacock, R.D., Kuligowski, E.D., Groner, N., Proulx, G., Reneke, P.A., and Nelson, H.E., Federal Building and Fire Safety Investigation of the World Trade Center Disaster Occupant Behaviour, Egress, and Emergency Communications, NIST NCSTAR 1-7, National Institute of Standards and Technology, Gaithersburg, MD, 2005. Guo, D.G., Wong, K.H.L., Luo, M.C., Kang, L., and Shi B.B., Lift Evacuation Design of Ultra High Rise Building, Proceedings of the Fire Conference 2004 Total Fire Safety Concept, Hong Kong SAR, pp. 151-158, 2004. Single Fire Stairs and Lifts in Highrise Buildings, Metropolitan Fire & Safety Services Board Community Safety Directorate, MFESB Community Safety Policy Group, Australia, Version No.4, 2005. Emergency Evacuation Elevator Systems Guideline, Council on Tall Buildings and Urban Habitat, Chicago, 2004. Pauls, J., Management and Movement of Building Occupants in Emergencies, Proceedings of Second Conference on Designing to Survive Severe Hazards, IIT Research Institute, Chicago, pp.103-130, 1977.

25

26

27 28

29 30 31

32

33 34 35 36

Groner, N.E., and Levin, B.M., Human Factors Considerations in the Potential for Using Elevators in Building Emergency Evacuation Plans, National Institute of Standards and Technology Report NIST-GCR-92-615, Gaithersburg, MD, 1992. Klote, J.H., Deal, S.P., Levin, B.M., Groner, N.E., and Donoghue, E.A., Workshop on Elevator Use During Fires, National Institute of Standards and Technology Report NISTIR 4993, Gaithersburg, MD, 1993. Klote, J.H., Elevator Piston Effect and the Smoke Problem, Fire Safety Journal, Vol.11 No.2: 227-233, 1986. Klote, J.H., Analysis of the Lift Safety Consequences of Smoke Migration Through Elevator Shafts, Atlanta Workshop On the Use of Elevator in Fires and Other Emergencies, American Society of Mechanical Engineer, 2004 Klote, J.H., Elevators as a Means of Fire Escape, National Institute of Standards and Technology Report NBSIR 82-2507, Gaithersburg, MD, 1982. Klote, J.H., Deal, S.P., Donoghue, E.A., Levin, B.M., and Groner, N.E., Fire Evacuation by Elevators, Elevator World, Vol.41 No.6: 66-70, 72-75, 1993. Wong H.L.K., Hui M.C., Guo D.G., and Luo M.C., A Refined Concept on Emergency Evacuation by Lift, Proceeding of 8th International Symposium on Fire Safety Science, China, 2005 (in press). Comparison of Worldwide Lift Safety Standards on Lifts for Firefighters, ISO/TR 16765:2003 / Cor 1:2003, International Organisation for Standardization, Geneva, Switzerland, 2003. Wong H.L.K., and Luo M.C., The Application of New Technology in Quantifying the Effectiveness of Lift Evacuation, Proceeding of Fire Australia 2005, Australia, 2005. DiNenno P.J., The SFPE Handbook of Fire Protection Engineering, 3rd ed., National Fire Protection Association, Quincy, MA, 2002. CIBSE Guide D, Transportation Systems in Buildings, Chartered Institution of Building Services Engineers, London, 2005. Wong H.L.K., and Luo M.C., Total Building Evacuation Strategy for High Rise Buildings, Tall Buildings, Cheung, Y.K. and Chau, K.W. ed., Proceeding of 6th International Conference on Tall Buildings, pp. 1113-20, Hong Kong, 2005.