Watson, Bruce Wednesday, April 20, 2011 2:58 PM Watson, Bruce; Hoc, PMT12 Hart, Michelle RE: Point of Contact for NARAC

On 4/20/11 I emailed John Nasstom that the Sandia contact is Randy Gauntt. This task is closed. Bruce A. Watson, CHP Chief - Reactor Decommissioning Branch US Nuclear Regulatory Commission Rockville, MD 20852 301-415-6221 Office

From: Watson, Bruce Sent: Wednesday, April 20, 2011 12:51 PM To: Hoc, PMT12 Cc: Hart, Michelle Subject: RE: Point of Contact for NARAC 4/20/11 @1300: 1 called John Nasstrom at NARAC to follow up on his request from last week. John confirmed that He was aware thru his contacts with DOE in Japan that Sandia NL was working for NRC on possibly recreating the source terms using MELCOR. He asked that if we had any specific contact names in Japan, he would contact them otherwise he would depend on his DOE contacts. Bruce A. Watson, CHP Chief- Redctor Decommissioning Brarch US Nuclear Regulatory Commission Rockville, MD 20852 301-415-6221 Office

From: Hoc, PMT12 Sent: Friday, April 15, 2011 9:26 AM To: Watson, Bruce Subject: RE: Point of Contact for NARAC Bruce Thanks for the update. Keep those cards and fetters coming - so we can keep the ET advised of the situation and know when we have completed the action. Sandi Wastler PMT/PAAD

DK 1812 of 1892

from: Watson, Bruce Sent: Friday, April 15, 2011 6:52 AM To: Hoc, PMT12; Steve LaVie; Hart, Michelle Cc: Hiland, Patrick; Gibson, Kathy; Rosenberg, Stacey; Wastler, Sandra Subject: RE: Point of Contact for NARAC PMT, Disregard the previous email, somehow I send it before completing the message. I hope this clarifies any issues. Here is the chronology of events: On 4/13 at 8:52 PM, the PMT sent an email to the RAADs requesting that one of us call NARAC. After getting clarification from Kathy Brock, PMT on 4/11 around 1030 AM, I called NARAC to set up a call with John Nasstrom. On 4/14 at 1342, Michele and I requested Kathy Brock send out the following email based on our conversation with John Nasstrom. Hello RST and Japan Team, Can you please respond to these two questions to assist the staff in answering a question from NARAC on the development of new source terms. Please respond to ali. NRC staff points of contact are Bruce Watson and Michelle Hart. This is not an action, just a question - we are just looking for information. * * Do we have anyone recreating the source term from the reactors and SFP based on plant conditions or field measurement readings? Are there updates on releases or degree of core damage based on plant data?

After K. Brock's email, I decided to document our conversation with NARAC which is my - 1430 email as follows: On 4/14 at 1245, Michele Hart and I had a call with John Nasstrom at NARAC. At the request of DOE/OSTP (Dr. Fetter at the White House). NARAC is attempting to recreate the source term/releases from Fukushima using deposition data. NARAC would like to know if the NRC-RST or the Japan Team have tried to recreate the source termrfreleases and would be share the data with them. John will email the 4/12 Japan press release citing their source term estimates. He will also email the Dr. Fetter's spreadsheet comparing source terms; the Japan estimates, the IAEA estimate. and what John believes is the NRC "Realistic Plausible" case.

(b)(5)

Bruce A. Watson, CHP Chief - Reactor Decommissioning Branch US Nuclear Regulatory Commission Rockville, MD 20852 301-415-6221 Office

DK 1813 of 1892

From: Hoc, PMT12 Sent: Friday, April 15, 2011 5:20 AM To: Watson, Bruce; Steve LaVie; Hart, Michelle Cc: Hiland, Patrick; Gibson, Kathy Subject: RE: Point of Contact for NARAC Bruce, Would you mind clarifying the steps that you plan on taking in helping NARAC? There is some confusion in the PMT as to exactly what steps are going to be taken. Than ks. -Jessica Kratchman PMT PAAD From: Watson, Bruce Sent: Thursday, April 14, 2011 2:16 PM To: Hoc, PMT12; Steve LaVie; Hart, Michelle Subject: RE: Point of Contact for NARAC

(b)(5)

Bruce A. Watson, CHP Chief- Reactor Decommissioning Branch US Nuclear Regulatory Commission Rockville, MD 20852 301-415-6221 Office

From: Hoc, PMT12 Sent; Wednesday, April 13, 2011 8:22 PM To: Steve LaVie; Hart, Michelle; Watson, Bruce Subject: Point of Contact for NARAC All

(b)(5)

Would you be able to be the contact person for this action? Please let the PMT PAAD know as soon as possible if one of you can assist in this manner. Also let the PMT PAAD know if I need to send this request to your management. NRC needs to get back to NARAC soon.
3

DK 1814 of 1892

Sandra Wastler PMT PAAD

DK 1815 of 1892

US DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1816 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained in this document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Departnent of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1817 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been venfied. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1818 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1819 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1820 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Deparlment of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

DK 1821 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

DK 1822 of 1892

U..DEPARTMENT OF

ENERGY
Nuclear Energy

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1823 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1824 of 1892

UDEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

10

DK 1825 of 1892

. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

11

DK 1826 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contactors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

12

DK 1827 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

13

DK 1828 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

14

DK 1829 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5}

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

15

DK 1830 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

16

DK 1831 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

17

DK 1832 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained in this document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

18

DK 1833 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

this document has not been verified. Do NOT distribute to the public or outside the Working Draft- Information contained in U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

19

DK 1834 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

20

DK 1835 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distibute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

21

DK 1836 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Worling Draft - Information contained inthis document has not been verfied. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

22

DK 1837 of 1892

Uc lEPARTMENT OF

EERGY

Nuclear Energy

(b)(5)

Woriing Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

23

DK 1838 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

24

DK 1839 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

25

DK 1840 of 1892

U..DEPARTMENT OF

ENERGY
Nuclear Energy I

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

26

DK 1841 of 1892

U..DEPARTMENT OF

NENERGY Nuclear Energy

(b)(5)

. II

this document has not been verified. Do NOT distribute to the public or outside the Working Draft - Information contained in U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

27

DK 1842 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1843 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy
-m

(b)(5)

Workdng Draft. Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contmctors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1844 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contrctors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1845 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1846 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained in this document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1847 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1848 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Workng Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1849 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

this document has not been verified. Do NOT distribute to the public or outside the Working Draft. Information contained in U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

DK 1850 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distibute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

DK 1851 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Workdng Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

10

DK 1852 of 1892

U..DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

11

DK 1853 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Workng Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

12

DK 1854 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT disltibute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

13

DK 1855 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contmctors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

14

DK 1856 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

15

DK 1857 of 1892

Uc lEPARTMENT OF

EERGY

Nuclear Energy

(b)(5)

Working Draft. Information contained in this document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

16

DK 1858 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

17

DK 1859 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

18

DK 1860 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distibute to the public or outside the U.S. Federal Government community (staff, contactors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

19

DK 1861 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Informaton contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from te U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

20

DK 1862 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained in this document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

21

DK 1863 of 1892

. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

this document has not been verified. Do NOT distribute to the public or outside the Working Draft - Information contained in U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

22

DK 1864 of 1892

U..DEPARTMENT OF

QENERGY
Nuclear Energy

(b)(5)

Working Draft- Information contained in this document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contrctors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

23

DK 1865 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained in this document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

24

DK 1866 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Draft- Informaton contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

25

DK 1867 of 1892

ENERGY
U.S. DEPARTMENT OF

Nuclear Energy

(b)(5)

Working Drafi. Informaton contained in this document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nudear.energy.gov)

26

DK 1868 of 1892

U.S. DEPARTMENT OF

ENERGY
Nuclear Energy

(b)(5)

Working Draft - Information contained inthis document has not been verified. Do NOT distribute to the public or outside the U.S. Federal Government community (staff, contractors, and consultants) without permission from the U.S. Department of Energy. CONTACT: Damian Peko (phone: 301-903-7283; email: Damian.Peko@nuclear.energy.gov)

27

DK 1869 of 1892

Date: 3/23 0600


Plant Reactor Vessel Flow
Rate (gpm)

Information from Fukushima Units 1-4 - NISA is the Source of this Data
Unit 1 - 79 gpm Unit 2 No data Unit 3 No data Unit 4
(de-fueled)

NRC Data Analysis Comments

Current flow rates are likely inadequate to


remove decay heat.

Reactor Vessel Level Below TAF


(feet/inches)

- 5 feet 8 inches

4 feet 4 inches

6 feet 10 inches

Level instrumentation is suspect - reference legs may be less than full. Instruments U3 are not tracking together. Zero reactor pressure would not be an expected indication if the reactor is at saturation conditions. Lower plenum temperature - do not correlate to vessel
pressures - suspect data

Reactor Vessel Pressure (psig)

42 psig

~0 psig

5 psig to 0 psig

Reactor Vessel Temperature Drywell/ Suppression Pool pressure (psia)

752 F (above crit. temp.) 36 psia

221 F (17 psig)

513 F (770 psig)

- 15.9 psia (virtually no pressure in dw)

14.5 psia (no pressure in dw/sc)

There is virtually no indication of pressure in U2/U3. If containment were intactexpectations would be for containment to be
pressurizing.

Containment Venting

Unknown

Unknown

Unknown

Unknown

Based on visual observations - unit 2/3 containments may be venting steam out of the primary containment.

CAMS D/W CAMS S/C Spent Fuel Pool Level Spent Fuel Pool Makeup

4600 R/hr 3160 R/hr Level Unknown

Spent Fuel
Pool Temp. I

No data

5200 R/hr 180 R/hr Level unknown Water added via normal injection 3/22 124 F

6050 R/hr 175 R/hr Level unknown Wateradded via overhead spray 3/22 No data

N/A N/A Level unknown Water added via overhead spray 3/22 No data

TEPCO plans to do a helicopter flight over the U3/4 SFP on 3/23 to confirm SFP status. Reasonable SFP
temperature

DK 1870 of 1892

The Request to the US Government from the Government of Japan

25 March 2011 1. conduct of aerial survey (for AMS measurements) (sharing of the data and its analysis)
[MEXT, NSC, NISA]

2.

provision of radiation monitoring devices on the ground (mobile and stationary type) [MEXT NSC, NISA]

3. conduct of the simulation by the radiation diffusion model (comparison with the SPEEDI simulation by the Japan side) [NSC, MEXTI 4. provision of the germanium semiconductor detectors (for measuring the extent to which water and foods are exposed to radiation) [MEXT NISA] 5. provision of robotic devices (for monitoring) [METI, NISA, MOD] 6. provision of robotic devices (for rubble removal) [METI, NISA, MOD]

7. provision of the data (image, level of radiation) obtained by UAVs [MOD, MOFA] 8. provision of unmanned helicopter (K-MAX) [MOD, NISA, MOFA] 9. provision of the carriage of fresh water by barges and provision of the water supply pumps for the water [MOD, NISA, MLIT, JCG] 10. provision of high-quality pumps and hoses [NISA] 11. provision of the sets of protective body armors, radioactive survey meters and individual dosimeters, radioactive measuring instruments, masks for iodine adsorption, and separation materials (quantity specification to be discussed later) [NISA, MODI 12. provision of iodine preparation (iodide of potash) (quantity specification to be discussed later with due consideration of US offer of 1 million bottles) [NISA, MHLW, MOFA] 13. provision of extinguishant / coolant [NISA] 14. provision of plastic bottles of drinkable water for the infant / baby use [MHLW

We (GoJ) would like to request further information from US Government on the following items

DK 1871 of 1892

to further consider the request from the government of Japan Menus/technical specs 1. UGVs (unmanned ground vehicle) [MOD, METI] 2. technical support regarding the radiation technology, nuclear technology and its effects on human health [MOD, MHLW] 3. medical triage related to the exposure to radiation [MOD MHLW] *The underlined agency (e.g. MOD) is expected to play a leading role for each request item.

DK 1872 of 1892

NRC INSPECTION MANUAL


Change Notice 11-006
DELETED: Number 1. 2. 3. IP 71111.05TTP None 04/19/11 IP 71111.05T Date 09/30/10 TRANSMITTED: Number IP 71111.05T IP 71111.05XT Date

DIRS

04/19/11 04/19/11

TRAINING:

REMARKS: IP 71111.05T (Fire Protection (Triennial)) has been revised to combine IP 71111.05T, "Fire Protection (Triennial)," and IP 71111.05TTP, "Fire Protection - NFPA 805 Transition Period (Triennial)," to provide guidance for inspecting fire-induced circuit failures at all plants except those actively engaged in transitioning to National Fire Protection Association (NFPA) Standard 805. In addition, this revision incorporates enhancements to various sections to provide additional clarity for inspectors. This revision will take effect on August 1, 2011. IP 71111.05XT .Fire Protection - NFPA 805 (Triennial)) is issued to provide inspection guidance for plants that have transitioned to the NFPA 805 fire protection program. This revision will take effect on August 1, 2011. IP 71111.05TTP (NFPA 805 Transition Period (Triennial)) has been deleted because the pertinent guidance is now included in IP 71111.05T. DISTRIBUTION: Standard END

Issue Date: 04/19/11

-1-

11-006 DK 1873 of 1892

Example Assessment of Radiological Release in Sea Water


In the March 22, 2001, 10 AM (EST) The Federation of Electric Power Companies of Japan (FEPC) Washington DC Office provide an update that include the following table: Measurement at 2:30 PM UST) on March 21, 2011 From Sampling of Sea Water near Sea Water Discharge Point of Unit 1-4 (south side) Radioactive Nuclides Concentration (Bq/cm 3) Maximum Permissible Water Concentration (Bq/cm 3 )
1 x 100

Co-58 1-131 1-132 Cs-134 Cs-138 Cs-137

5.955 x 10-2 5.066 x 100 2.136 x 100 1.486 x 100 2.132 x 10-1 1.484 x 100

4 x 10-2 3 x 100 6 x 10-2 3 x 10-1 9 x 10-2

A plot of the 1-132/1-131 ratio from ORIGEN calculations as a function of decay time is shown in the figure below (obtained by plotting the data from Chuck Weber). The fact that there is 1-132 present indicates that the iodine is not from fuel in the spent fuel pools, which has all been cooled for more than 100 days. The ratio of 1-132/1-131 in the measured data is 0.42, which corresponds to about 10 day decay time in the plot below. This roughly corresponds to the elapsed time from the earth quake (March 11, 2:46 PM - March 21, 2:30 PM, JST) indicating that the iodine is from freshly irradiated fuel. The Cs ratios are a little less clear. A separate ORIGEN calculation, indicates that the Cs134/Cs-137 ratio at 10 days should be about 1.24, whereas the table above has a value of 1. Perhaps this is within the measurement uncertainty. The Cs-138 indicated above is likely at typo and should be Cs-136. This Cs-136/Cs-137 ratio is also shown on the chat below and seems to be in agreement that material is from recently irradiated fuel with roughly 10 days of cooling time.

DK 1874 of 1892

Isotope Ratios For Irradiated BWR Fuel vs Decay Time

Reported Measurements From Sea Water - March 22, 2:30 PM AST


it 0

C -3,:c..137

L.'

.............................. i.:...I ..Q1


-.L-"J ,l -"t.

"32"-131Q
-...

D.2

*Q.

Li U k: U2 tC S.1 TU 1:).,

DeCalTine (DAYS)

DK 1875 of 1892

Você também pode gostar