(RED 1) HUANCACHUPA
PROYECTO
UBICACIN
HECHO POR
815
habitantes
Para poder determinar la poblacion futura se ase uso del Metodo Aritmetico.
Pf = Po (1 + r * t )
Considerando una tasa de crecimiento de
:
Para un periodo de diseo de
:
P2029 =
1304
r =
t =
habitantes
3
20
%
aos
( Solo lo Beneficiado )
1.811
lts./seg.
Qmd =
2.354 lts./seg.
Qmh =
4.528 lts./seg.
UBICACIN
HECHO POR
QLL =
0.453 lts./seg.
0.743
0.264
0.453
1.460
lts./seg.
lts./seg.
lts./seg.
lts./seg.
5.082 lts./seg.
3209.29
0.00158 lts./seg./mts.
mts.
CAUD. UNITARIO DESAGUE:
UBICACIN
HECHO POR
N Buzon
Arriba
Altura Buzon
Abajo
PERFIL 1
1
2
3
4
11
20
PERFIL 2
1
22
6
7
9
10
PERFIL 3
6
5
8
PERFIL 4
1
23
24
25
PERFIL 5
24
PERFIL 6
7
Q : m3/seg.
V : m/seg.
d : mt.
S : mt / mt.
Long.
Cota Terreno
Cota F. Buzon
Arriba
Abajo
(mts.)
A.Arriba
A.Abajo
A.Arriba
A.Abajo
2
3
4
11
20
21
1.20
1.20
1.20
3.40
2.00
2.00
1.20
1.20
3.40
2.00
2.00
3.70
53.00
25.71
51.46
28.06
32.56
32.57
2204.88
2201.58
2200.43
2195.31
2190.52
2187.32
2201.58
2200.43
2195.31
2190.52
2187.32
2183.16
2203.68
2200.38
2199.23
2191.91
2188.52
2185.32
2200.38
2199.23
2191.91
2188.52
2185.32
2179.46
22
6
7
9
10
11
1.20
1.20
1.20
1.20
1.20
1.45
1.20
1.20
1.20
1.20
1.45
2.00
29.36
13.43
49.79
48.76
22.16
50.75
2204.88
2201.61
2200.60
2196.48
2190.56
2190.59
2201.61
2200.60
2196.48
2190.56
2190.59
2190.52
2203.68
2200.41
2199.40
2195.28
2189.36
2189.14
2200.41
2199.40
2195.28
2189.36
2189.14
2188.52
5
8
4
1.20
2.00
1.80
2.00
1.80
3.40
25.92
48.18
32.41
2200.60
2201.18
2196.79
2201.18
2196.79
2195.31
2199.40
2199.18
2194.99
2199.18
2194.99
2191.91
23
24
25
26
1.20
1.20
1.20
1.20
3.70
1.50
1.50
1.50
34.77
32.14
54.76
57.05
2204.88
2206.61
2203.42
2196.10
2206.61
2203.42
2196.10
2190.04
2203.68
2205.41
2202.22
2194.90
2202.91
2201.92
2194.60
2188.54
22
1.20
1.20
36.02
2203.42
2201.61
2202.22
1.20
1.80
25.46
2196.48
2196.79
2195.28
Colector contribuyente
Descrip.
Caudal cont.
0.00158
3209.29
60
0.010
lts./seg./mts.
ml.
Und.
(Tubo PVC)
Gastos (lt/seg)
Pend.
Diamet.
D.Comer
A. Arriba
en Tramo
A. Abajo
10/1000
(pulg.)
(pulg.)
Qo
Gastos
Q/Qo
(mt/seg)
Veloc.
0.00
0.08
0.12
0.21
0.46
0.91
0.08
0.04
0.08
0.04
0.05
0.05
0.084
0.125
0.206
0.460
0.907
0.959
62.26
44.73
142.25
120.81
98.28
179.90
0.6
0.7
0.7
0.9
1.3
1.1
6
6
6
6
6
6
46.96
39.80
70.98
65.41
59.00
79.82
0.002
0.003
0.003
0.007
0.015
0.012
2.57
2.18
3.89
3.59
3.23
4.38
0.00
0.05
0.07
0.20
0.28
0.32
0.05
0.02
0.08
0.08
0.04
0.08
0.046
0.068
0.204
0.281
0.316
0.396
111.38
75.20
82.75
121.41
9.93
12.22
0.4
0.5
0.7
0.8
1.3
1.4
6
6
6
6
6
6
62.81
51.61
54.14
65.58
18.75
20.80
0.001
0.001
0.004
0.004
0.017
0.019
3.44
2.83
2.97
3.59
1.03
1.14
08 AL 04
10 AL 11
0.209
0.396
24 AL 22
0.057
07 AL 08
0.040
0.00
0.04
0.12
0.04
0.08
0.05
0.041
0.117
0.209
8.49
86.97
95.03
0.6
0.6
0.7
6
6
6
17.34
55.50
58.02
0.002
0.002
0.004
0.95
3.04
3.18
0.064
0.00
0.00
0.06
0.05
0.06
0.05
0.09
0.09
0.055
0.051
0.142
0.206
22.15
108.59
139.15
111.48
0.6
0.4
0.6
0.7
6
6
6
6
28.01
62.02
70.20
62.84
0.002
0.001
0.002
0.003
1.54
3.40
3.85
3.44
2200.41
0.00
0.06
0.057
50.25
0.5
42.19
0.001
2.31
2194.99
0.00
0.04
0.040
11.39
0.6
20.09
0.002
1.10
07 AL 25
UBICACIN
HECHO POR
N Buzon
Arriba
21
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
Altura Buzon
Abajo
PERFIL 7
7
PERFIL 8
9
12
26
13
14
15
16
17
18
19
PERFIL 9
27
PERFIL 10
Q : m3/seg.
V : m/seg.
d : mt.
S : mt / mt.
Long.
Cota Terreno
Cota F. Buzon
lts./seg./mts.
ml.
Und.
(Tubo PVC)
Gastos (lt/seg)
Pend.
Diamet.
D.Comer
A. Arriba
en Tramo
A. Abajo
10/1000
(pulg.)
(pulg.)
Qo
Q/Qo
(mt/seg)
2194.90
0.00
0.06
0.064
9.35
0.7
18.20
0.004
1.00
2189.36
2188.24
2188.24
2187.84
2187.45
2184.65
2184.33
2184.04
2180.65
2180.04
2188.24
2187.64
2187.84
2187.45
2184.65
2184.33
2184.04
2180.65
2180.04
2179.46
0.00
0.05
0.07
0.11
0.17
0.21
0.34
0.41
0.48
0.57
0.05
0.02
0.04
0.06
0.04
0.06
0.06
0.07
0.10
0.08
0.047
0.070
0.112
0.172
0.210
0.345
0.406
0.478
0.573
0.655
37.40
42.08
15.02
10.40
115.99
7.86
7.51
74.20
10.17
11.21
0.5
0.6
0.8
1.0
0.7
1.4
1.5
1.0
1.6
1.7
6
6
6
6
6
6
6
6
6
6
36.39
38.60
23.07
19.19
64.09
16.69
16.31
51.26
18.98
19.93
0.001
0.002
0.005
0.009
0.003
0.021
0.025
0.009
0.030
0.033
2.00
2.12
1.26
1.05
3.51
0.91
0.89
2.81
1.04
1.09
2185.85
2185.62
2184.65
0.00
0.07
0.070
21.84
0.6
27.81
0.003
1.52
2177.22
2171.32
2166.17
2161.85
2156.54
2151.19
2146.19
2139.76
2133.78
2127.51
2121.22
2116.33
2111.61
2105.38
2098.32
2092.10
2082.52
2077.20
2071.68
2067.11
2063.55
2056.81
2053.72
2051.72
2049.42
2048.50
2047.44
2044.32
2041.41
2039.57
2179.46
2175.72
2169.82
2164.67
2160.35
2155.04
2149.69
2144.69
2138.26
2132.28
2126.01
2119.72
2114.83
2109.11
2102.88
2094.82
2089.10
2079.02
2075.70
2070.18
2065.61
2059.55
2052.81
2052.22
2050.22
2047.92
2047.00
2045.94
2042.82
2039.91
2175.72
2169.82
2164.67
2160.35
2155.04
2149.69
2144.69
2138.26
2132.28
2126.01
2119.72
2114.83
2109.11
2102.88
2094.82
2089.10
2079.02
2075.70
2070.18
2065.61
2059.55
2052.81
2052.22
2050.22
2047.92
2047.00
2045.94
2042.82
2039.91
2038.07
0.00
1.71
1.80
1.90
1.98
2.08
2.17
2.27
2.36
2.46
2.55
2.65
2.74
2.84
2.93
3.03
3.12
3.22
3.31
3.41
3.50
3.60
3.70
3.79
3.89
3.98
4.08
4.17
4.27
4.36
0.10
0.09
0.10
0.09
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.02
1.709
1.802
1.897
1.985
2.080
2.175
2.270
2.365
2.460
2.555
2.650
2.745
2.840
2.935
3.030
3.125
3.220
3.315
3.410
3.505
3.600
3.695
3.790
3.885
3.980
4.075
4.170
4.265
4.360
4.385
62.33
100.63
85.83
77.63
88.50
89.17
83.33
107.17
99.67
104.50
104.83
81.50
95.33
103.83
134.33
95.33
168.00
55.33
92.00
76.17
101.00
112.33
9.83
33.33
38.33
15.33
17.67
52.00
48.50
118.25
1.7
1.6
1.7
1.8
1.7
1.8
1.8
1.8
1.8
1.8
1.9
2.0
1.9
1.9
1.9
2.0
1.8
2.3
2.1
2.2
2.1
2.1
3.3
2.6
2.6
3.1
3.1
2.5
2.6
2.2
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
46.99
59.70
55.14
52.43
55.99
56.20
54.33
61.61
59.41
60.84
60.93
53.73
58.11
60.64
68.98
58.11
77.14
44.27
57.08
51.94
59.81
63.08
18.66
34.36
36.85
23.30
25.01
42.92
41.45
64.72
0.036
0.030
0.034
0.038
0.037
0.039
0.042
0.038
0.041
0.042
0.043
0.051
0.049
0.048
0.044
0.054
0.042
0.075
0.060
0.067
0.060
0.059
0.203
0.113
0.108
0.175
0.167
0.099
0.105
0.068
2.58
3.27
3.02
2.87
3.07
3.08
2.98
3.38
3.26
3.34
3.34
2.95
3.19
3.32
3.78
3.19
4.23
2.43
3.13
2.85
3.28
3.46
1.02
1.88
2.02
1.28
1.37
2.35
2.27
3.55
Arriba
Abajo
(mts.)
A.Arriba
A.Abajo
A.Arriba
A.Abajo
25
1.20
1.20
40.65
2196.48
2196.10
2195.28
12
26
13
14
15
16
17
18
19
21
1.20
1.80
1.80
2.00
1.40
1.20
1.25
1.40
1.20
3.00
1.80
1.80
2.00
1.40
1.20
1.25
1.40
1.20
3.00
3.70
29.95
14.26
26.63
37.49
24.14
40.69
38.61
45.69
60.00
51.74
2190.56
2190.04
2190.04
2189.84
2188.85
2185.85
2185.58
2185.44
2181.85
2183.04
2190.04
2189.44
2189.84
2188.85
2185.85
2185.58
2185.44
2181.85
2183.04
2183.16
15
1.20
1.20
44.42
2186.82
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
3.70
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
2.50
2.50
3.50
3.00
3.50
1.50
1.50
1.50
4.00
4.00
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
2.50
2.50
3.50
3.00
3.50
1.50
1.50
1.50
4.00
4.00
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
60.00
58.63
60.00
55.65
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
60.00
15.56
2183.16
2177.22
2171.32
2166.17
2161.85
2156.54
2151.19
2146.19
2139.76
2133.78
2127.51
2121.22
2116.33
2111.61
2105.38
2098.32
2092.10
2082.52
2077.20
2071.68
2067.11
2063.55
2056.81
2053.72
2051.72
2049.42
2048.50
2047.44
2044.32
2041.41
Colector contribuyente
0.00158
3209.29
60
0.010
Descrip.
27 AL 15
del 20 al 21 y
19al 21
Caudal cont.
0.070
1.614
Gastos
Veloc.
UBICACIN
HECHO POR
N Buzon
Arriba
57
58
59
Q : m3/seg.
V : m/seg.
d : mt.
S : mt / mt.
Altura Buzon
Abajo
58
59
60
Long.
Cota Terreno
Cota F. Buzon
Arriba
Abajo
(mts.)
A.Arriba
A.Abajo
A.Arriba
A.Abajo
1.50
1.90
1.90
1.90
1.90
2.30
71.02
69.05
52.90
2039.57
2039.38
2038.90
2039.38
2038.90
2038.88
2038.07
2037.48
2037.00
2037.48
2037.00
2036.58
RESUMEN:
* Longitud total de tuberia es:
* La cantidad total de buzones es:
3181.40 mts.
60
buzones
(RED 1) HUANCACHUPA
Total de tuberia de D = 6"
Total de tuberia de D = 8"
Total de tuberia de D = 10"
3209.29
0.00
0.00
Colector contribuyente
Descrip.
Caudal cont.
0.00158
3209.29
60
0.010
lts./seg./mts.
ml.
Und.
(Tubo PVC)
Gastos (lt/seg)
Pend.
Diamet.
D.Comer
A. Arriba
en Tramo
A. Abajo
10/1000
(pulg.)
(pulg.)
Qo
Q/Qo
(mt/seg)
4.38
4.50
4.61
0.11
0.11
0.08
4.497
4.606
4.690
8.31
6.95
7.94
3.6
3.8
3.7
6
6
6
17.15
15.69
16.77
0.262
0.294
0.280
0.94
0.86
0.92
se proyecta tuberas PVC-UF NTP ISO 4435-2005, Serie 25, que segn especificaciones tcnicas estn diseadas para soportar velocidades de hasta 5.5mts/seg
Gastos
Veloc.
UBICACIN
HECHO POR
380
habitantes
para 61 lotes
Para poder determinar la poblacion futura se ase uso del Metodo Aritmetico.
Pf = Po (1 + r * t )
Considerando una tasa de crecimiento de
:
Para un periodo de diseo de
:
P2029 =
608
r =
t =
habitantes
3
20
%
aos
( Solo lo Beneficiado )
1.548
lts./seg.
Qmd =
2.013 lts./seg.
Qmh =
3.870 lts./seg.
UBICACIN
HECHO POR
291.149
0.097
0.387
291.633
lts./seg.
lts./seg.
lts./seg.
lts./seg.
294.729 lts./seg.
1257763.50 mts.
0.00023 lts./seg./mts.
UBICACIN
HECHO POR
N Buzon
Arriba
Abajo
Q : m3/seg.
V : m/seg.
d : mt.
S : mt / mt.
Altura Buzon
Arriba
Abajo
Long.
(mts.)
Cota Terreno
A.Arriba
Cota F. Buzon
Colector contribuyente
0.00158
1257.76
22
0.010
lts./seg./mts.
ml.
Und.
(Tubo PVC)
Gastos (lt/seg)
Pend.
Diamet.
D.Comer
A.Abajo
A.Arriba
A.Abajo
Descrip.
Caudal cont.
A. Arriba
en Tramo
A. Abajo
10/1000
(pulg.)
(pulg.)
Qo
Gastos
Q/Qo
(mt/seg)
Veloc.
2113.08
2110.41
2107.78
2103.19
2100.23
2095.42
2090.09
2083.21
2077.14
2072.93
2069.69
2067.02
2067.31
2060.92
2054.44
2049.66
2047.89
2046.66
2044.75
2042.36
2039.97
2110.95
2110.28
2109.21
2106.58
2101.19
2099.03
2094.22
2088.89
2082.01
2075.94
2071.73
2068.49
2065.52
2064.81
2059.72
2053.24
2047.16
2046.69
2045.46
2043.55
2041.16
2110.28
2109.21
2106.58
2101.19
2099.03
2094.22
2088.89
2082.01
2075.94
2071.73
2068.49
2065.52
2064.81
2059.72
2053.24
2047.16
2046.69
2045.46
2043.55
2041.16
2038.77
HUAYLLABAMBA
1.33
0.00
1.43
1.52
1.62
1.71
1.81
1.90
2.00
2.09
2.19
2.28
2.38
2.47
2.57
2.66
2.76
2.85
2.95
3.04
3.14
3.23
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.05
1.425
1.520
1.615
1.710
1.805
1.900
1.995
2.090
2.185
2.280
2.375
2.470
2.565
2.660
2.755
2.850
2.945
3.040
3.135
3.230
3.277
11.17
17.83
43.83
89.83
36.00
80.17
88.83
114.67
101.17
70.17
54.00
49.50
11.83
84.83
108.00
101.33
7.83
20.50
31.83
39.83
79.99
2.2
2.1
1.8
1.6
2.0
1.7
1.7
1.7
1.7
1.9
2.0
2.1
2.8
1.9
1.9
1.9
3.1
2.6
2.5
2.4
2.1
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
19.89
25.13
39.40
56.41
35.71
53.29
56.09
63.73
59.86
49.85
43.73
41.87
20.47
54.81
61.85
59.91
16.66
26.95
33.58
37.56
53.23
0.072
0.060
0.041
0.030
0.051
0.036
0.036
0.033
0.037
0.046
0.054
0.059
0.125
0.049
0.045
0.048
0.177
0.113
0.093
0.086
0.062
1.09
1.38
2.16
3.09
1.96
2.92
3.07
3.49
3.28
2.73
2.40
2.30
1.12
3.00
3.39
3.28
0.91
1.48
1.84
2.06
2.92
UBICACIN
HECHO POR
N Buzon
Arriba
Abajo
Q : m3/seg.
V : m/seg.
d : mt.
S : mt / mt.
Altura Buzon
Arriba
Abajo
RESUMEN:
* Longitud total de tuberia es:
* La cantidad total de buzones es:
Long.
(mts.)
Cota Terreno
A.Arriba
A.Abajo
Cota F. Buzon
A.Arriba
A.Abajo
Colector contribuyente
Descrip.
Caudal cont.
A. Arriba
0.00158
1257.76
22
0.010
Gastos (lt/seg)
Pend.
Diamet.
D.Comer
en Tramo
10/1000
(pulg.)
(pulg.)
A. Abajo
1229.88 mts.
22
buzones
(RED 2) HAYLLABAMBA
Total de tuberia de D = 6"
1257.76
Total de tuberia de D = 8"
0.00
Total de tuberia de D = 10"
0.00
se proyecta tuberas PVC-UF NTP ISO 4435-2005, Serie 25, que segn especificaciones tcnicas estn diseadas para soportar velocidades de hasta 5.m/seg
lts./seg./mts.
ml.
Und.
(Tubo PVC)
Gastos
Qo
Q/Qo
Veloc.
(mt/seg)