1. Initial Meeting/Survey with Building Owner (Constructed Buildings) or Consultants (Buildings nder Construction) 1.1 !o discuss "tisalat #e$uire%ents 1.1.1 Main Equipment Room BTS Location

a) Power 1. To provide 415V ! " p#a$e % & % E in 4 wa' ! P(B wit# )" i$o*ator+EL!B , two twin $oc-et$ in eac# equipment room wit# MB.5 BTS or &ode B. /. To provide two twin $oc-et$ 0/41V !2 1" ) in eac# room wit# RR3 or BB3. ". To provide te*ecom 4round+eart# 5ar in eac# Equipment room. 5) !oo*in4 1. To provide /1 de4 !e*$iu$ coo*in4 in$ide t#e room /. ""16511 cu5ic 7eet per minute 0!8M) air 7*ow c) 8ire (etection 1. To provide $mo-e detector d) 8ire Suppre$$ion 1. To provide 7ire e9tin4ui$#er dr' powder or 4a$ 5a$ed $'$tem e) Room 1. "m 9 "m 05*oc- wa**$) /. 8!32 water pipe$ , water $prin-*er 7or 7ire protection $#ou*d not 5e in$ta**ed in$ide t#e Equipment Room$. ". !orin4 $#ou*d 5e provided to 5e u$ed 7or #ori:onta* and vertica* 7eeder ca5*e run$ 7rom t#e equipment to t#e antenna$. 7) Room Securit' , cce$$i5i*it' 1. Loc-ed , $ecured /. cce$$i5*e /4+; 7or maintenance , trou5*e$#ootin4 purpo$e$ ". 8ree 7rom o5$truction , com5u$ti5*e materia*$ 1.1./ Radio Remote 3nit Room$

a) Power 1. To provide two twin $oc-et$ 0/41V !2 1" ) /. To provide te*ecom 4round+eart# 5ar ". To provide 3PS in eac# room wit# RR3 or BB3 0recommended 5ut not required). 5) !oo*in4 1. To provide venti*ation in$ide t#e room 0*ouver) c) 8ire (etection 1. $ per !ivi* (e7en$e d) 8ire Suppre$$ion 1. $ per !ivi* (e7en$e e) Room 1. 1.5m 9 1.5m wa** $pace /. !orin4 $#ou*d 5e provided to 5e u$ed 7or #ori:onta* and vertica* 7eeder ca5*e run$ 7rom t#e equipment to t#e antenna$. 7) Room Securit' , cce$$i5i*it' 1. Loc-ed , $ecured /. cce$$i5*e /4+; 7or maintenance , trou5*e$#ootin4 purpo$e$ ". 8ree 7rom o5$truction , com5u$ti5*e materia*$ 1.1." 1.1.4 1.1.5 1.1.) !a5*e Tra'$ <ori:onta* and Vertica* in a** area$ wit# or wit#out 7a*$e cei*in4. cce$$ Pane*$ 7or *ocation$ o7 $p*itter$ 0)1 = )1 cm) !orin4 7or #ori:onta* 0wa**) and vertica* 0ri$er$) ca5*e run$ (u S#arin4 (ou5*e t#e requirement$

1.& Site In'or%ation Gathering 1./.1 1././ a) 5) c) d) e) 7) 1./." Bui*din4 >wner+!ontact Per$on$ (rawin4$ 0 3T>! (2 Sca*ed 8ormat2 8ina*) rc#itectura* La'out$ E*evation P*an$ Re7*ected !ei*in4 P*an$ Location o7 cce$$ Pane*$ >ccupanc' Loadin4 8or Su5$cri5er !apacit' E$timation !a5*e Tra' (rawin4$ Te*ep#one Room La'out$ rea$ to 5e covered and re$tricted area$

a) To a**ow antenna$ in$ide 7*at$ 1./.4 a) 5) c) d) 1./.5 8or Bui*din4$ under con$truction !on$truction Sta4e 8a*$e !ei*in4 !*o$ure Sc#edu*e 0dead*ine 7or t#e de$i4n) E9pected !omp*etion (ate MEP contractor$ $#ou*d provide & mont#$ notice period 5e7ore c*o$e t#e 7a*$e cei*in4 8or !omp*eted Bui*din4$

a) &>! to proceed wit# t#e .BS (e$i4n. 1.( Minutes o' Meeting should )e su)%itted to trac* site status/condition. &. Initial Design &.1 +ntenna ,ocations a) 5) c) d) e) &.& ?5@ !overa4e pro5a5i*it' at 6;5 dBm 7or ASM ?11 , 6B5 dBm 7or 3MTS &ot more t#an "1@ covera4e over*appin4 5etween antenna$ Simu*ation te$t or R86Vu prediction 7or comp*eted 5ui*din4$ R86Vu prediction 7or $ite$ under con$truction (edicated ntenna 7or Li7t$

"$ui-%ent ,ocation. Ca)le #outing and #iser /eri'ication a) .nitia* $ite $urve' 7or comp*eted 5ui*din4$ 5) >n paper veri7ication wit# con$u*tant$ i7 5ui*din4 i$ $ti** under con$truction.

&.( ( 0 0.1

+--roval 'ro% "tisalat and Building Owner/Consultant Branch Survey 'or B!S roo% a--roval with "tisalat Design Stage Design Considerations a) (u $#arin4 con$ideration$ 1. /. Trip*e9er to com5ine ASM ?112 (!S 1B11 , 3MTS " dB <'5rid !oup*er to com5ine Eti$a*at and (u 3MTS carrier$

5) 3MTS (e$i4n con$ideration$

1. <uawei (BS "?11 PM % BB3 % RR3 0$u5Cect to c#an4e a$ per equipment avai*a5i*it' and c*ient reque$t) 1.1 1./ 1." 1.4 1.5 1.) /. Ma9imum o7 5 BB3$ per PM Ma9imum o7 / $ector$ per BB3 Ma9imum o7 ) ce**$ per BB3 0/ ce**$ per RR3 i7 /nd carrier i$ activated) Ma9imum o7 " RR3$ per BB3 i7 $econd carrier i$ activated "4.;;1/ dBm !P.!< power per RR3 0/nd carrier activated) ";.;B15 dBm !P.!< power per RR3 0$in4*e carrier activated)

<uawei BTS "?11 /.1 " Sector$ per &ode B /./ "" dBm !P.!< Power 0/nd carrier activated) /." ") dBm !P.!< Power 0$in4*e carrier activated)

". Ba*anced E.RP 7or a** antenna$ wit# con$ideration to t#e 7o**owin4 covera4e criteria ".1 "./ 6B5 dBm at t#e ed4e o7 t#e 5ui*din4 Si4na* to 5e contained in$ide t#e 5ui*din4 to avoid $pi**a4e

c) ASM (e$i4n con$ideration$ 1. criteria 1.1 1./ /. ". 6;5 dBm at t#e ed4e o7 t#e 5ui*din4 Si4na* to 5e contained in$ide t#e 5ui*din4 to avoid $pi**a4e Ba*anced E.RP 7or a** antenna$ wit# con$ideration to t#e 7o**owin4 covera4e

4.

5.

). ;.

B. 5ui*din4$

<i4# Power TRE$ 4" dBm output power VLL !on7i4uration 7or 4<PTRE+$ector a) 4" dBm output power+antenna output 5) / antenna output$ 7rom BTS c) 1 e9terna* com5inin4 $ta4e VLL !on7i4uration 7or B<PTRE+$ector a) 4" dBm output power+antenna output 5) 4 antenna output$ 7rom BTS c) / e9terna* com5inin4 $ta4e$ LL !on7i4uration 7or 1/TRE+$ector a) "B dBm output power+antenna output 5) 4 antenna output$ 7rom BTS c) / e9terna* com5inin4 $ta4e$ !apacit' 5a$ed on >ccupanc' Loadin4 3$e Twin TRE 7or #i4# capacit' 5ui*din4$ a) 41 dBm output power 5) /4TR=$ per racc) MB.5 B Variant rac3$e M5M 7or 5ui*din4$ wit# no $uita5*e equipment room+ *ow capacit' d) "B.45 dBm output power+antenna output e) / TR= per unit 7) 1 e9terna* com5inin4 $ta4e

d) !a5*e Routin4 con$ideration

1. 11@ additiona* ca5*e per run 0mar4in o7 error) /. /M Cumper to 5e con$idered 7or ;+BD ca5*e$ and component to component connection e) Sc#ematic con$ideration 1. 3$e o7 / wa' or 4 wa' $p*itter a$ main $p*itter 7or ea$e o7 mu*ti6operator com5inin4 7) Power 5ud4et con$ideration 1. /. a. 5. c. d. e. 7. 4. #. i. C. 1. /. ". 4. 5. ). ". To inc*ude Cumper$2 connector$ and com5inin4 component$ in t#e power 5ud4et ca*cu*ation 7or 5ot# ASM , 3MTS ASM Lo$$e$ /6wa' $p*itter "./ dB "6wa' $p*itter 5 dB 46wa' $p*itter )./ dB )6wa' $p*itter B." dB !onnector Lo$$ 1.15 dB+ connector L(8 ED ;.1/ dB+ 111 meter L(8 ;+BD 4.1/ dB+111 meter Trip*e9er 1./ dB <'5rid !oup*er "." dB dCu$ta5*e $'mmetric Sp*itter 0(irectiona* !oup*er) Settin4 at 5 dB ). " dB <i4# Lo$$ port 1." dB Low Lo$$ port Settin4 at ) dB ;.1 dB <i4# Lo$$ port 1.1 dB Low Lo$$ port Settin4 at B dB B.; dB <i4# Lo$$ port 1.; dB Low Lo$$ port Settin4 at 11 dB 11.5 dB <i4# Lo$$ port 1.5 dB Low Lo$$ port Settin4 at 1" dB 1". " dB <i4# Lo$$ port 1." dB Low Lo$$ port Settin4 at 15 dB 15./ dB <i4# Lo$$ port 1./ dB Low Lo$$ port

3MTS Lo$$e$ a. 5. c. d. e. 7. 4. #. i. C. /6wa' $p*itter ".4 dB "6wa' $p*itter 5./ dB 46wa' $p*itter ).4 dB )6wa' $p*itter B.5 dB !onnector Lo$$ 1.1B dB+ connector L(8 ED 11./ dB+ 111 meter L(8 ;+BD ).4) dB+111 meter Trip*e9er 1.5 dB <'5rid !oup*er ".) dB dCu$ta5*e $'mmetric Sp*itter 0(irectiona* !oup*er)

1.Settin4 at 5 dB ). " dB <i4# Lo$$ port 1." dB Low Lo$$ port /.Settin4 at ) dB ;.1 dB <i4# Lo$$ port 1.1 dB Low Lo$$ port ".Settin4 at B dB B.; dB <i4# Lo$$ port 1.; dB Low Lo$$ port 4.Settin4 at 11 dB 11.5 dB <i4# Lo$$ port 1.5 dB Low Lo$$ port 5.Settin4 at 1" dB 1". " dB <i4# Lo$$ port 1." dB Low Lo$$ port ).Settin4 at 15 dB 15./ dB <i4# Lo$$ port 1./ dB Low Lo$$ port 4) BTS , PM $#ou*d 5e in t#e $ame *ocation 7or ASM , 3MTS Site .(+!ode rea$on$ 0.& +chieved "I#1 ,evel. Ca-acity. Sectoring and ty-e/nu%)er o' "$ui-%ent should )e discussed with and a--roved )y "tisalat -lanning tea%.

2 2.1

Design Su)%issions "tisalat

a) #3S 1. ntenna Location$ 0FPEA2 P(8) 0Site &ame $#ou*d 5e mentioned in eac# *a'out) 2. Bi** o7 Guantitie$ 0MS E=!EL) a) 5) c) d) e) 7) 4) 11 @ more additiona* ca5*e in t#e 4rand tota* B>G 0wa$ta4e) )1@ $trai4#t connector$ , 41@ an4*e connector$ BTS *cate* MB.52 M5M &ode B <uawei BTS "?11 BB3 <uawei BB3 "?11 RR3 <uawei RR3"B14c outdoor t'pe ac vo*ta4e PM <uawei PM"1<

3. Bui*din4 rea !a*cu*ation 0MS E=!EL) 4. Bui*din4 (e$cription 0MS H>R() a) 5) c) d) e) 5. 6. Bui*din4 Location &um5er o7 8*oor$ T'pe o7 room$+7*at$ on eac# 7*oor &um5er o7 Li7t$ Li7t covera4e

!ontact Per$on$ 0MS H>R() Equipment Room La'out 0FPEA2 P(8) 0$ite name $#ou*d 5e mentioned in eac# *a'out) a) 5) c) d) e) 7) 4) (etai*ed *a'out inc*udin4 a** requirement$ 7rom Eti$a*at $ per a4reed *ocation in t#e 5ranc# $urve' ** equipment *ocation$ BTS2 Recti7ier2 BB3 , RR3 BTS 0< 9 H 9 () 6 /111mm 9 )11mm 9 451mm PM 0< 9 H 9 () 6 ;11mm 9 )11mm 9 4B1mm RR3 0< 9 H 9 () 6 4B5mm 9 /B5mm 9 /51mm RE!T.8.ER 0< 9 H 9 () 6 /111mm 9 )11mm 9 )11mm

7. 8. 9. 10. 11. 12.

ASM , 3MTS Power5ud4et ASM , 3MTS Sectorin4 0FPEA) Sc#ematic (ia4ram$ BB36RR3 !on7i4uration 0FPEA) !a5*e Mar-in4$ 0MS E=!EL) Site P#oto$ , Map 0FPEA)

a) La5e* a** 5ui*din4$ in ca$e o7 mi96u$e deve*opment$ 5) Lon4itude , *atitude 13. (e$i4n 8i*e$ 0Hor-$pace$) a) Lo47i*e$ 7or e9i$tin4 and $imu*ation te$t$ 0TEMS ?) 0proper*' named $ite name 7*oor I) 5) ntenna Location$ , Equipment Location$ 0Micro4ra7i9 0(S8 7i*e$)2 ! (2 MS Hord) c) Sc#ematic (ia4ram$ 0Micro4ra7i92 ! () d) Simu*ation P*ot$+Prediction P*ot$ 0MS PPT2 FPEA2 E.RP $#ou*d 5e mentioned at eac# te$t point) 14. (e$i4n Report$ 0MS Hord)

2.& d)