Você está na página 1de 5

A

S
Latest
Document Title
Revision

Status Code

Submission
Date

Preliminary Design

Cumulative %

Cumulative
Earned Value

WEIGHT
FACTOR

77.5168%

0.739%

0.569%

Project Management
Management (Manuals / Procedures / Plans):

Claim Procedure

REVISION 3
REVISION 0
REVISION 2
REVISION A
REVISION 2
REVISION 3
REVISION 0
REVISION 3
REVISION 2
REVISION 1
REVISION F
REVISION 2
REVISION F
REVISION E
REVISION 0

IFC
IFC
IFC
IFR
IFC
IFC
IFC
IFC
IFC
IFC
IFR
IFC
IFR
IFR
IFC

01-Jun-12
31-May-12
11-Jun-12
08-Jun-12
11-Jun-12
23-Apr-12
11-Jun-12
29-May-12
14-Jun-12
20-Apr-12
27-Apr-12
14-Jun-12
23-Apr-12
26-Apr-12
14-Jun-12

0%
100%
100%
100%
75%
100%
100%
100%
100%
100%
100%
75%
100%
75%
75%
100%

0.0000%
0.0085%
0.0085%
0.0085%
0.0064%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0064%
0.0085%
0.0064%
0.0064%
0.0085%

0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%

0031R-00-A-MN-005-A4
0031R-00-A-MN-006-A4

Occupational Health & Safety Management System Manual


Environmental Manual

REVISION 5
REVISION 5

IFC
IFC

28-May-12
28-May-12

100%
100%

0.0085%
0.0085%

0.0051%
0.0051%

HSE PROCEDURE
0031R-00-N-PR-001-A4

Occupational Health and Safety Management Plan

0031R-00-N-PR-002-A4
0031R-00-N-PR-003-A4

Training Programme for Health, Safety and Environmental and Security Requirement
Security Procedure

0031R-00-N-PR-004-A4
0031R-00-O-PR-002-A4

Emergency & Evacuation Procedure


Environmental Monitoring Procedure

REVISION 4
REVISION 3
REVISION 2
REVISION 2
REVISION 4

IFC
IFC
IFC
IFC
IFC

25-Jun-12
13-Jun-12
13-Feb-12
13-Feb-12
09-Jul-12

100%
100%
100%
100%
100%

0.0085%
0.0085%
0.0085%
0.0085%
0.0085%

0.0051%
0.0051%
0.0051%
0.0051%
0.0051%

0031R-00-A-PR-007-A4
Procedure
0031R-00-Q-PR-001-A4

Inspection and Test Plan Procedure (ITP)

REVISION 3

IFC

31-May-12

100%

0.0085%

0.0051%

Penetrant Test Procedure for Construction

0031R-00-Q-PR-005-A4
0031R-00-Q-PR-006-A4

Earth Work Inspection Procedure


Main Line Welding Procedure

0031R-00-Q-PR-007-A4
0031R-00-Q-PR-008-A4

Welding Procedure Qualification Test For Pipeline


Welder Qualification Test Procedure

0031R-00-Q-PR-009-A4
0031R-00-Q-PR-010-A4

Welder Control Procedure


Radiographic Test Procedure for WPS/PQR

0031R-00-Q-PR-011-A4
0031R-00-Q-PR-012-A4

Welding Electrode Control Procedure


Procedure for Tie In Welding

0031R-00-Q-PR-015-A4
0031R-00-Q-PR-016-A4

Management Review Procedure


Measuring & Test Equipment Procedure

0031R-00-Q-PR-018-A4
0031R-00-Q-PR-019-A4

Magnetic Particle Test Procedure for WPS/PQR


Ultrasonic Test Procedure for Construction

REVISION 0
REVISION B
REVISION 5
REVISION 1
REVISION 1
REVISION 1
REVISION 0
REVISION 2
REVISION 3
REVISION 2
REVISION D
REVISION 2
REVISION 1

06-Feb-12
20-Apr-12
13-Mar-12
06-Feb-12
06-Feb-12
06-Feb-12
06-Feb-12
23-Apr-12
07-Mar-12
29-May-12
26-Apr-12
22-Jun-12
06-Mar-12

0031R-00-Q-PR-020-A4
0031R-00-Q-PR-021-A4
Report

Magnetic Particle Test Procedure for Construction


Radiographic Test Procedure for Construction

REVISION 1

IFC
IFR
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFR
IFC
IFC
IFC

06-Mar-12

100%
75%
100%
100%
100%
100%
100%
100%
100%
100%
75%
100%
100%
0%
100%

0.0085%
0.0064%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0064%
0.0085%
0.0085%
0.0000%
0.0085%

0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%

0031R-00-A-RE-001-A4
0031R-50-Q-RE-001-A4

RAMS Study Report


Approved WPS & PQR

REVISION A
REVISION 0

IFR
IFC

29-Jun-12
03-Jul-12

75%
100%

0.0000%
0.0085%

0.0000%
0.0051%

REVISION 1

IFC
IFR
IFR
IFC

04-May-12

100%
0%
75%
75%
100%

0.0064%
0.0000%
0.0064%
0.0064%
0.0085%

0.0038%
0.0051%
0.0051%
0.0051%
0.0051%

08-Feb-12
16-Mar-12
15-Feb-12
13-Mar-12
22-Jun-12
29-Jun-12
29-May-12
25-Jun-12
18-Apr-12

REVISION A
REVISION 1
REVISION D
REVISION 3
REVISION 0
REVISION B
REVISION A
REVISION 0

IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFR
IFR
IFR
IFR
IFR
IFR
IFR
IFC
IFR
IFC
IFC
IFR
IFR
IFC

20-Mar-12
25-Jun-12
28-Jun-12
22-Jun-12
04-May-12
13-Mar-12
26-Mar-12
28-Jun-12

100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
0%
100%
75%
75%
75%
75%
75%
75%
0%
75%
100%
75%
100%
100%
75%
75%
100%

0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0085%
0.0000%
0.0085%
0.0000%
0.0085%
0.0064%
0.0064%
0.0064%
0.0064%
0.0064%
0.0064%
0.0000%
0.0064%
0.0085%
0.0064%
0.0085%
0.0085%
0.0064%
0.0064%
0.0000%

0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0000%

REVISION 0
REVISION 1
REVISION 0
REVISION 0
REVISION 0
REVISION 0

IFC
IFC
IFC
IFC
IFC
IFC

26-Jun-12
09-Jul-12
26-Jun-12
26-Jun-12
28-Jun-12
26-Jun-12

100%
100%
100%
100%
100%
100%

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%

0%
0%

0.0000%
0.0000%

0.0000%
0.0000%

0031-00-A-MN-001-A4
0031R-00-A-PR-001-A4
0031R-00-A-PR-002-A4

Project Implementation Manual


Document Numbering Procedure
Project Reporting Procedure

0031R-00-A-PR-003-A4
0031R-00-A-PR-005-A4

Document Control Procedure


Commissioning, Completion and Taking Over Quality Plans

0031R-00-A-PR-009-A4
0031R-00-A-PR-010-A4

Project Filing System Procedure


Contractor's Notice Procedure

0031R-00-A-PR-012-A4
0031R-00-A-PR-014-A4

Correspondence Procedure
Permit To Work Procedure

0031R-00-A-PR-015-A4
0031R-00-G-PR-010-A4

General Requirement For Subcontracted Work


Inland Transportation Procedure

0031R-00-B-PR-002-A4
0031R-00-U-PR-005-A4

Progress and Performance Measurement Procedure


Invoicing Procedure

0031R-00-U-PR-001-A4
0031R-00-A-PR-008-A4

Contractor's Interim Payment Statement Procedure


Variation Procedure

0031R-00-A-PR-016-A4
HSE
HSE MANUAL

QA / QC
Plan & ITP

Formats, List / Schedule and Reports:


0031-50-G-PR-007-A4
Drawing Formats Control Procedure
0031-50-G-PR-009-A4
0031-50-G-PR-010-A4

Specification & Data Sheet Formats Control Procedure


Calculation Format Control Procedure

0031-00-A-SC-013-A4
0031-00-N-RE-002-A4

Construction Time Line Diagram


Hazard Identification & Risk Assessment Report

REVISION B
REVISION E
REVISION 2

08-Jun-12
24-Apr-12
28-May-12

Procurement
Manuals / Procedures / Plans
Request For Quotation (RFQ)
Bid Evaluation
Un-price Purchase Order
List
Construction (Manual/Procedure/Plan)

REVISION 1
REVISION 6
REVISION 7
REVISION 5
REVISION 2
REVISION 6
REVISION 5
REVISION 5
REVISION 3

0031R-50-C-PR-002-A4
0031R-50-C-PR-003-A4

ROW Clearing and Grading Procedure


Material Handling and Storage Procedure

0031R-50-C-PR-004-A4
0031R-50-C-PR-005-A4

Hauling & Stringing Procedure


Field Bending Procedure

0031R-50-C-PR-006-A4
0031R-50-C-PR-007-A4

Trench Excavation Procedure


Lowering-in and Backfilling Procedure

0031R-50-C-PR-008-A4
0031R-50-C-PR-009-A4

Field Joint Coating Procedure


Pipe Crossing Open Cut Procedure

0031R-50-C-PR-011-A4
0031-50-C-PR-012-A4

Thrust Boring Procedure


Piping and Sectional Valve Installation and Testing Procedure

0031-50-C-PR-013-A4
0031-50-C-PR-014-A4
0031R-50-C-PR-015-A4

Painting Procedure
Pipeline Swabbing, Drying and Purging Procedure
Pipeline Drying and Nitrogen Purging Procedure

0031R-50-C-PR-017-A4
0031R-50-C-PR-018-A4

Civil Work Procedure


Temporary Cathodic Protection Instalation Procedure

0031R-50-C-PR-019-A4
0031R-50-C-PR-020-A4

Temporary Cathodic Protection Testing And Commisioning Procedure


Permanent Cathodic Protection Instalation Procedure

0031R-50-C-PR-021-A4
0031R-50-C-PR-022-A4

Permanent Cathodic Protection Testing And Commisioning Procedure


Termit Welding Procedure

0031-50-C-PR-023-A4
0031R-50-C-PR-025-A4

Handling, Transportation and Storage Procedure for Employer's Free-Issue Materials for WPS & WPQT
Internal and External Coating Procedure for Hot Bend Pipe

0031R-50-C-PR-027-A4
0031R-50-C-PR-028-A4

Reinstatement and Restoration


Procedure for Caliper Pig Survey

0031-50-C-PR-032-A4
0031R-50-C-PR-033-A4

Pipeline Installation Inside Toll Road


Pipe Laying Procedure By Push Pull Method at Swamp Area

0031R-50-C-PR-034-A4
0031R-50-C-PR-035-A4
0031R-50-C-PR-036-A4

Procedure Hydrostatic Test For Installed Pipeline by Previous Contractor


Bored Pile Procedure
Final Tie-In Procedure

REVISION 0
REVISION 0
REVISION B
REVISION A
REVISION A
REVISION A
REVISION A
REVISION A

Commissioning
Pre-Commissioning:
Commissioning:
0031R-00-A-MN-003-A4

Training Manual Procedure

0031R-50-C-MN-030-A4
0031R-50-C-MN-037-A4

Mechanical Completion Manual


Operation And Maintenance Manual

0031R-50-D-MN-006-A4
0031R-50-D-PR-002-A4

Commissioning Manual
Commissioning Procedure

0031R-50-D-PR-003-A4
Report

Emergency Response Plan (ERP) for Commissioning

0031-50-D-RE-001-A4
0031-50-D-RE-002-A4
Spare Parts (List)

Pre-Commissioning Report
Commissioning Report

24" Onshore Pipeline System Design

Page 1 of 5

24-Apr-12
28-Jun-12
14-Jun-12
26-Apr-12
01-May-12
26-Apr-12
01-May-12
01-May-12

B
U
P
lI
L
a
T
80% ###
n
IDV

Plan

A
S
Latest
Document Title

Cumulative %

Cumulative
Earned Value

WEIGHT
FACTOR

Revision

Status Code

Submission
Date

Safety Analysis Function Evaluation (SAFE) Chart

REVISION 0

IFC

29-May-12

100%

0.0085%

0.0051%

Specification
0031-50-L-SP-015-A4

Specification for Thrust Boring

REVISION 1

Specification for Non Destructive Examination


Specification for Hydrotest

0031-50-L-SP-020-A4
0031-50-L-SP-021-A4

Specification for External Coating for Steel Casing Pipe


Specification for Internal Coating For Hot Bend

0031-50-L-SP-022-A4
Calculation
0031-50-L-CA-004-A4

Specification for Anchor Flange

REVISION 1

IFC
IFC

01-May-12

0031-50-L-SP-016-A4
0031-50-L-SP-017-A4

100%
0%
0%
0%
0%
100%

0.0085%
0.0000%
0.0000%
0.0000%
0.0000%
0.0085%

0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%

Pipeline Stress Analysis Calculation

0031-50-L-CA-005-A4
0031-50-L-CA-012-A4

Pipeline Free Span Calculation


Pipeline Lowering-in Analysis

REVISION 1
REVISION 1
REVISION 3

15-May-12
09-Jul-12
05-Mar-12

0031-50-L-CA-013-A4
0031-50-L-CA-014-A4

Calculation Pertagas Pipeline for Access Road Crossing (Special Crossing)


Pipeline Lowering-in Analysis at Limited Space

REVISION C

IFC
IFC
IFC
IFR

100%
100%
100%
0%
75%

0.0085%
0.0085%
0.0085%
0.0000%
0.0064%

0.0051%
0.0051%
0.0051%
0.0051%
0.0051%

Data Sheet
0031-50-L-DS-007-A4

Data Sheet for Anchor Flange

100%

0.0085%

0.0051%

Process
Calculation
Report
0031-50-P-RE-001-A4
Data Sheet
Drawing
Pipeline / Piping

09-Jul-12

09-Jul-12

Drawing
Piping Drawing
0031-50-L-DG-210-A3
River Crossing Drawing

0%

0.0000%

0.0038%

REVISION 3

IFC

04-May-12

100%

0.0064%

0.0038%

REVISION D
REVISION C
REVISION C
REVISION 2
REVISION 2
REVISION 1

IFR
IFR
IFR
IFC
IFC
IFC
-

09-Jul-12
09-Jul-12
09-Jul-12
09-Jul-12
09-Jul-12
09-Jul-12

75%
75%
75%
100%
100%
100%
0%

0.0064%
0.0064%
0.0064%
0.0085%
0.0085%
0.0085%
0.0000%

0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%
0.0051%

Piping Drawing Index

0031-50-L-DG-002-A3
Typical Drawing for Roads and Railway Crossings
Detailed Over Pass / Under Pass Crossing in MMS - Toll Road Area
Sectional PGN's Pipeline Within MMS - Toll Road Area
Material Take Off (MTO)
0031-50-L-MT-003-A4
MTO for Flange and Blind Flange
0031-50-L-MT-004-A4
0031-50-L-MT-005-A4

MTO for Gasket


MTO for Bolt and Nuts

0031-50-L-MT-012-A4
0031-50-L-MT-015-A4

MTO for Casing Accessories


MTO for Restriction Orifice

0031-50-L-MT-016-A4
0031-50-L-MT-017-A4

MTO for Anchor Flange


MTO for Painting

Instrument
Data Sheet
Drawing
Material Take Off (MTO)
Electrical
Report
Procedure
0031-50-E-PR-001-A4
Calculation

Cathodic Protection Installation Procedure

REVISION 4

IFC

09-Jul-12

100%

0.0085%

0.0051%

0031R-50-E-CA-001-A4
0031R-50-E-CA-002-A4

Cathodic Protection Design Concept


Cathodic Protection Design Calculation for Main Pipeline

0031R-50-E-CA-003-A4
Specification

Cathodic Protection Design Calculation for Casing Pipe

REVISION 5
REVISION 6
REVISION C

IFC
IFC
IFR

12-Apr-12
10-May-12
23-Apr-12

100%
100%
75%

0.0000%
0.0000%
0.0064%

0.0000%
0.0000%
0.0051%

Overall Layout For Permanent Cathodic Protection System


Typical Installation of Test Station at Foreign Pipeline Crossing

REVISION 0
REVISION 0

IFC
IFC

23-Apr-12
23-Apr-12

100%
100%

0.0064%
0.0064%

0.0038%
0.0038%

0%

0.0000%

0.0038%

Data Sheet
Drawing
0031R-50-E-DG-202-A3
0031-50-E-DG-207-A3
Material Take Off (MTO)

0031-50-E-MT-001-A4

MTO for Permanent and Temporary Cathodic Protection

Civil
Specification
0031-50-S-SP-001-A4

Design Specification for Civil and Structural

REVISION 2
REVISION D

IFC
IFR

04-May-12
04-May-12

100%
75%

0.0085%
0.0064%

0.0051%
0.0051%

REVISION E
REVISION 0
REVISION F
REVISION F
REVISION A
REVISION A

IFR
IFC
IFR
IFR
IFR
IFR

04-May-12
10-May-12
03-Apr-12
26-Mar-12
03-Jul-12
10-Jul-12

75%
100%
75%
75%
75%
75%

0.0064%
0.0085%
0.0064%
0.0064%
0.0000%
0.0000%

0.0051%
0.0051%
0.0051%
0.0051%
0.0000%
0.0000%

Typical Toll Road Fence Reinstatement


Typical Sectional Valve Box & Support Foundation (sheet 1 of 2)

REVISION A

IFR

26-Apr-12

0%
0%
75%

0.0000%
0.0000%
0.0048%

0.0038%
0.0038%
0.0038%

0031R-50-S-DG-202-A3

Typical Sectional Valve Box & Support Foundation (sheet 2 of 2)

REVISION A

IFR

26-Apr-12

75%

0.0048%

0.0038%

0031-50-S-DG-203-A3

Typical Anchor Block

0031-50-S-DG-204-A3
0031-50-S-DG-205-A3

Typical Pipe Support


Typical Access Road

0031R-50-S-DG-210-A3
0031R-50-S-DG-210-A3

Typical Drawing for Warning Marker Tape (sheet 1 of 2)


Typical Drawing for Warning Marker Tape (sheet 2 of 2)

0031-50-S-DG-025-A3
0031-50-S-DG-026-A3

Traffic Signs & Traffic Control Devices


Traffic Management Layout (Sheet 1 of 2)

0%
0%
0%
100%
100%
0%
100%

0.0000%
0.0000%
0.0000%
0.0064%
0.0000%
0.0000%
0.0064%

0.0038%
0.0038%
0.0038%
0.0038%
0.0000%
0.0038%
0.0038%

0031-50-S-DG-026-A3

Traffic Management Layout (Sheet 2 of 2)

0031-50-S-SP-002-A4
Calculation

Specification for Civil Work

0031R-50-S-CA-001-A4
0031R-50-S-CA-002-A4

Stability of Slope Calculation


Sectional Valve Box and Valve Support Calculation

0031R-50-S-CA-003-A4
0031R-50-S-CA-004-A4

Anchor Block Calculation


Pipe Support Calculation

0031R-50-S-CA-005-A4
0031R-50-S-CA-006-A4

Future Connection Valve Box KP.15+600 & Valve Support Calculation


Future Connection Valve Box KP.32+777 & Valve Support Calculation

Drawing
0031-50-S-DG-200-A3

Civil Drawing List

0031-50-S-DG-006-A3
0031R-50-S-DG-202-A3

REVISION 0
REVISION 0

IFC
IFC
-

29-May-12
29-May-12

100%

0.0064%

0.0038%

67.5595%

0.8336%

0.540%

15-May-12

100%

0.0044%

0.002%

04-May-12
04-May-12
04-May-12

0%
0%
0%
0%
100%
100%
100%

0.0000%
0.0000%
0.0000%
0.0000%
0.0044%
0.0044%
0.0044%

0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%

100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%

0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0000%
0.0000%
0.0000%
0.0000%

0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%

Topography and Alignment Sheet


Detailed Design
24" Onshore Pipeline System Design
General
0031R-00-G-RE-005-A4
Process Drawing

Pre-Construction Survey Report

0031-50-P-DG-100-A1

Process Drawing Index

0031-50-P-DG-001-A1

P & ID Legend Sheet Symbols and Notes (Sheet 1 of 3)

0031-50-P-DG-001-A1
0031-50-P-DG-001-A1

P & ID Legend Sheet Symbols and Notes (Sheet 2 of 3)


P & ID Legend Sheet Symbols and Notes (Sheet 3 of 3)

0031R-52-P-DG-001-A1
0031R-53-P-DG-001-A1

P & ID - Tie In Point at Pig Launcher Bojonegara Station


P & ID - 24" Under Ground Pipeline Bojonegara Station - Cikande Offtake Station

0031R-56-P-DG-001-A1
Pipeline / Piping

P & ID - Cikande Offtake Station Main Branch

Specification
0031R-50-L-SP-002-A4

Specification for Ball & Plug Valves

0031R-50-L-SP-003-A4
0031R-50-L-SP-004-A4
0031R-50-L-SP-005-A4

Specification for Pipe Fittings


Specification for Heat Shrinkable Sheet and Coating Repair Material
Specification for Concrete Coating

0031R-50-L-SP-006-A4
0031R-50-L-SP-007-A4

Specification for Barred Tee


Specification for Hot Bend

0031R-50-L-SP-009-A4
0031R-50-L-SP-010-A4

Specification for Painting & Coating


General Specification for Gasket

0031R-50-L-SP-011-A4
0031R-50-L-SP-013-A4

General Specification for Bolt and Nuts


General Specification for Flange and Blind Flange

0031-50-L-SP-015-A4
0031-50-L-SP-016-A4

Specification for Pipeline Design


Specification for Non Destructive Examination

REVISION 1

IFC

REVISION 5
REVISION 5
REVISION 5

IFC
IFC
IFC

REVISION 5
REVISION 4
REVISION 1
REVISION 2
REVISION 1
REVISION 1
REVISION 2
REVISION 2

Page 2 of 5

IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
-

29-May-12
01-Jun-12
01-May-12
27-Apr-12
01-May-12
01-May-12
29-May-12
01-May-12

B
U
P
lI
L
a
T
80% ###
n
IDV

Plan

A
S
Latest
Document Title

0031-50-L-SP-017-A4
0031-50-L-SP-020-A4
0031-50-L-SP-021-A4

Specification for Hydrotest


Specification for External Coating for Steel Casing Pipe
Specification for Internal Coating For Hot Bend

0031-50-L-SP-022-A4
MTO

Specification for Anchor Flange

0031-50-L-MT-012-A4
Data Sheet

MTO for Casing and Accessories

0031-50-L-DS-001-A4
0031-50-L-DS-002-A4

Data Sheet for Piping


Data Sheet for Valve

0031-50-L-DS-004-A4
0031-50-L-DS-005-A4

Data Sheet for Hot Bends


Data Sheet for Barred Tee

0031-50-L-DS-006-A4
Piping Drawing

Data Sheet for End Seal and Spacer

0031R-50-L-DG-211-A3
0031R-50-L-DG-211-A3
0031R-50-L-DG-212-A3

Piping Plan Typical Sectional Valve KP.08+002, KP.16+575, KP.29+914 (sheet 1 of 2)


Piping Plan Typical Sectional Valve KP.23+536 (sheet 2 of 2)
Piping Plan Typical Future Connection

0031R-50-L-DG-213-A3
0031R-50-L-DG-214-A3

Piping Isometric Drawing Future Connection at KP 15+840


Piping Isometric Drawing Typical Sectional Valve at KP.08+002 (sheet 1 of 4)

0031R-50-L-DG-214-A3
0031R-50-L-DG-214-A3

Piping Isometric Drawing Typical Sectional Valve at KP.16+575 (sheet 2 of 4)


Piping Isometric Drawing Typical Sectional Valve at KP.23+536 (sheet 3 of 4)

0031R-50-L-DG-214-A3
0031R-50-L-DG-215-A3

Piping Isometric Drawing Typical Sectional Valve at KP.29+914 (sheet 4 of 4)


Piping Plan Isometric Drawing Tie-In Isolation Valve at Cikande Station KP.32+764 (sheet 1 of 2)

0031R-50-L-DG-215-A3
0031R-50-L-DG-216-A3

Piping Plan Isometric Drawing Tie-In Isolation Valve at Cikande Station KP.32+764 sheet 2 of 2
Piping Plan and Isometric Drawing Future Conection at Cikande Station KP 32+777 Sheet 1 of 2

0031R-50-L-DG-216-A3
0031R-50-L-DG-217-A3

Piping Plan and Isometric Drawing Future Conection at Cikande Station KP 32+777 Sheet 2 of 2
Piping Isometric Drawing Typical Portable Vent Stack Sectional Valve KP.08+002, KP.16+575, KP.29+914
(sheet Isometric
1 of 2)
Piping
Drawing Typical Portable Vent Stack Sectional Valve KP.23+536 (sheet 2 of 2)

0031R-50-L-DG-217-A3
0031R-50-L-DG-218-A3

Piping Plan and Isometric Drawing Portable Vent Stack Future Connection Cikande Station KP.32+777
Piping Isometric Drawing Typical Drain Pipe Section Valve Box KP.08+002
Piping Isometric Drawing Typical Drain Pipe Section Valve Box KP.16+575
Piping Isometric Drawing Typical Drain Pipe Section Valve Box KP.23+536

0031R-50-L-DG-219-A3
0031R-50-L-DG-220-A3

Piping Isometric Drawing Typical Drain Pipe Section Valve Box KP.29+914

0031R-50-L-DG-221-A3
0031R-50-L-DG-222-A3

Piping Isometric Drawing Drain Pipe Future Connection Box KP.32+777


Piping Isometric Drawing Drain Pipe Tie-In Isolation KP.32+764

0031R-50-L-DG-223-A3
0031-50-L-DG-201-A3

Portable Vent Stack Vent Cover


Sectional Valves & Future Connection Location

River Crossing Drawing


0031-50-L-DG-230-A3

Major River Crossing Detail

0031-50-L-DG-231-A3
0031-50-L-DG-233-A3

Minor River Crossing Detail


Pipe Crossing at Main Irrigation River Pamarayan Barat Location KP 07+690 Serang (Sheet 1 of 2)

0031-50-L-DG-233-A3
0031-50-L-DG-234-A3
0031-50-L-DG-235-A3

Pipe Crossing at Main Irrigation River Pamarayan Barat Location KP 07+690 Serang (Sheet 2 of 2)
Pipe Crossing at Kali Banten River Location KP 12+525 Serang
Pipe Crossing at Main Irrigation River Ciujung Location KP 29+300 Serang

Piping Isometric Drawing Drain Pipe Future Connection Box KP.15+840

Railway Crossing Detail Index


Layout Railway Crossing Location KM Railway 115+712 & 129+042 Serang, Bojonegara - Cikande Pipeline

0031R-50-L-DG-252-A3
0031R-50-L-DG-252-A3

Thrust Boring Railway Crossing KP Toll 02+900 sheet 1 of 2


Thrust Boring Railway Crossing KP Toll 02+900 sheet 2 of 2

0031R-50-L-DG-253-A3

Thrust Boring Railway Crossing KP Toll 13+210 (sheet 1 of 2)

0031R-50-L-DG-253-A3

Thrust Boring Railway Crossing KP Toll 13+210 (sheet 2 of 2)

Detailed Over Pass / Under Pass Crossing in MMS - Toll Road Area
0031R-50-L-DG-270-A3
Major Road Crossing Details (sheet 1 of 4)

WEIGHT
FACTOR

Status Code

REVISION 3
REVISION 2

IFC
IFC
-

29-May-12
29-May-12

0%
100%
100%
0%

0.0000%
0.0059%
0.0059%
0.0000%

0.003%
0.003%
0.003%
0.003%

0%

0.0000%

0.003%

REVISION 3
REVISION 5
REVISION 2
REVISION 2
REVISION 5

IFC
IFC
IFC
IFC
IFC

01-May-12
01-Jun-12
01-May-12
01-Jun-12
29-May-12

100%
100%
100%
100%
100%

0.0059%
0.0059%
0.0059%
0.0059%
0.0059%

0.003%
0.003%
0.003%
0.003%
0.003%

REVISION 7
REVISION 6
REVISION 5
REVISION 4
REVISION 7
REVISION 7
REVISION 7
REVISION 7
REVISION 5
REVISION 4
REVISION 4
REVISION 4
REVISION 0
REVISION 0
REVISION 1
REVISION 1
REVISION 1
REVISION 1
REVISION 1
REVISION 0
REVISION 0
REVISION 1
REVISION A

IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFR
-

29-May-12
26-Apr-12
19-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
19-Jun-12
04-May-12
04-May-12
19-Jun-12
19-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
25-Jun-12
19-Jun-12
19-Jun-12
25-Jun-12
26-Apr-12

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
75%
0%

0.0044%
0.0000%
0.0044%
0.0044%
0.0044%
0.0000%
0.0000%
0.0000%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0000%
0.0000%
0.0000%
0.0044%
0.0044%
0.0044%
0.0033%
0.0000%

0.002%
0.000%
0.002%
0.002%
0.002%
0.000%
0.000%
0.000%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.000%
0.000%
0.000%
0.002%
0.002%
0.002%
0.002%
0.002%

REVISION 0

IFC
-

26-Apr-12

100%
0%
0%
0%
0%
0%
0%

0.0044%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%

0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%

0.0000%
0.0000%
0.0000%
0.0000%
0.0044%

0.002%
0.002%
0.002%
0.002%
0.002%

0031-50-L-DG-236-A3
Pipe Crossing at Ciujung River Location KP 32+520 Serang
Detailed Railways Crossing Drawing
0031-50-L-DG-250-A3
0031-50-L-DG-251-A3

Cumulative
Earned Value

Revision

0031R-50-L-DG-219-A3
0031R-50-L-DG-219-A3
0031R-50-L-DG-219-A3

Cumulative %

Submission
Date

REVISION 2

IFC

30-Mar-12

0%
0%
0%
0%
100%

REVISION 2

IFC

30-Mar-12

100%

0.0044%

0.002%

IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC

24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
29-Jun-12
29-Jun-12
24-Apr-12
24-Apr-12
29-Jun-12
29-Jun-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%

0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%

0031R-50-L-DG-270-A3
0031R-50-L-DG-270-A3
0031R-50-L-DG-270-A3

Major Road Crossing Details (sheet 2 of 4)


Major Road Crossing Details (sheet 3 of 4)
Major Road Crossing Details (sheet 4 of 4)

0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3

Minor Road Crossing Details KP 00+580 (sheet 1 of 18)


Minor Road Crossing Details KP 00+580 (sheet 2 of 18)

0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3

Minor Road Crossing Details KP 00+580 (sheet 3 of 18)


Minor Road Crossing Details KP 00+580 (sheet 4 of 18)

0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3

Minor Road Crossing Details KP 00+580 (sheet 5 of 18)


Minor Road Crossing Details KP 00+580 (sheet 6 of 18)

0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3

Minor Road Crossing Details KP 00+580 (sheet 7 of 18)


Minor Road Crossing Details KP 00+580 (sheet 8 of 18)

0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3

Minor Road Crossing Details KP 00+580 (sheet 9 of 18)


Minor Road Crossing Details KP 00+580 (sheet 10 of 18)

0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3

Minor Road Crossing Details KP 00+580 (sheet 11 of 18)


Minor Road Crossing Details KP 00+580 (sheet 12 of 18)
Minor Road Crossing Details KP 00+580 (sheet 13 of 18)

0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3

Minor Road Crossing Details KP 00+580 (sheet 14 of 18)


Minor Road Crossing Details KP 00+580 (sheet 15 of 18)

0031R-50-L-DG-271-A3
0031R-50-L-DG-271-A3

Minor Road Crossing Details KP 00+580 (sheet 16 of 18)


Minor Road Crossing Details KP 00+580 (sheet 17 of 18)

0031R-50-L-DG-271-A3
0031R-50-L-DG-272-A3

Minor Road Crossing Details KP 00+580 (sheet 18 of 18)


Details Overpass Crossing KP 18+140 Bojonegara - Cikande Pipeline (sheet 1 of 2)

0031R-50-L-DG-272-A3
0031-50-L-DG-273-A3

Details Overpass Crossing KP 18+140 Bojonegara - Cikande Pipeline (sheet 2 of 2)


Details Toll Road Crossing KP 16+650 Bojonegara - Cikande Pipeline (Sheet 1 of 2)

0031-50-L-DG-273-A3
0031R-50-L-DG-274-A3

Details Toll Road Crossing KP 16+650 Bojonegara - Cikande Pipeline (Sheet 2 of 2)


Details Overpass Crossing KP.17+940 Bojonegara-Cikande Pipeline (sheet 1 of 2)

0031R-50-L-DG-274-A3
0031R-50-L-DG-275-A3

Details Overpass Crossing KP.17+940 Bojonegara-Cikande Pipeline (sheet 2 of 2)


Details Toll Road Crossing KP.18+460 Bojonegara-Cikande Pipeline (sheet 1 of 2)

0031R-50-L-DG-275-A3
0031R-50-L-DG-276-A3
0031R-50-L-DG-276-A3

Details Toll Road Crossing KP.18+460 Bojonegara-Cikande Pipeline (sheet 2 of 2)


Details Toll Road Crossing KP.20+070 Bojonegara-Cikande Pipeline (sheet 1 of 2)
Details Toll Road Crossing KP.20+070 Bojonegara-Cikande Pipeline (sheet 2 of 2)

0031R-50-L-DG-277-A3
0031R-50-L-DG-277-A3

Details Toll Road Crossing KP.21+318 Bojonegara-Cikande Pipeline (sheet 1 of 2)


Details Toll Road Crossing KP.21+318 Bojonegara-Cikande Pipeline (sheet 2 of 2)

REVISION 0
REVISION 0
REVISION 0
REVISION 0
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 0
REVISION 0
REVISION 2
REVISION 2
REVISION 0
REVISION 0
REVISION 0
REVISION 0
REVISION 0
REVISION 0

0031R-50-L-DG-278-A3

Details Overpass Crossing KP.23+540 Bojonegara-Cikande Pipeline (sheet 1 of 2)

REVISION 0

IFC

24-Apr-12

100%

0.0044%

0.002%

0031R-50-L-DG-278-A3

Details Overpass Crossing KP.23+540 Bojonegara-Cikande Pipeline (sheet 2 of 2)

REVISION 0

IFC

24-Apr-12

100%

0.0044%

0.002%

0031R-50-L-DG-279-A3

Details Overpass Crossing KP.24+910 Bojonegara-Cikande Pipeline (sheet 1 of 2)

REVISION 0

IFC

24-Apr-12

100%

0.0044%

0.002%

0031R-50-L-DG-279-A3

Details Overpass Crossing KP.24+910 Bojonegara-Cikande Pipeline (sheet 2 of 2)

REVISION 0

IFC

24-Apr-12

100%

0.0044%

0.002%

0031R-50-L-DG-280-A3

Details Overpass Crossing KP.26+840 Bojonegara-Cikande Pipeline (sheet 1 of 2)

REVISION 0

IFC

24-Apr-12

100%

0.0044%

0.002%

0031R-50-L-DG-280-A3

Details Overpass Crossing KP.26+840 Bojonegara-Cikande Pipeline (sheet 2 of 2)

0031R-50-L-DG-281-A3
0031R-50-L-DG-281-A3

Details Overpass Crossing KP.27+840 Bojonegara-Cikande Pipeline (sheet 1 of 2)


Details Overpass Crossing KP.27+840 Bojonegara-Cikande Pipeline (sheet 2 of 2)

0031-50-L-DG-282-A3

Details Overpass Crossing KP 29+580 Bojonegara - Cikande Pipeline (sheet 1 of 2)

0031-50-L-DG-282-A3
0031-50-L-DG-283-A3

Details Overpass Crossing KP 29+580 Bojonegara - Cikande Pipeline (sheet 2 of 2)


Details Toll Road Crossing KP 30+550 Bojonegara - Cikande Pipeline (sheet 1 of 2)

0031-50-L-DG-283-A3
0031-50-L-DG-284-A3

Details Toll Road Crossing KP 30+550 Bojonegara - Cikande Pipeline (sheet 2 of 2)


Details Toll Road Crossing KP 29+680 Bojonegara - Cikande Pipeline (sheet 1 of 2)

0031-50-L-DG-284-A3
0031-50-L-DG-285-A3

Details Toll Road Crossing KP 29+680 Bojonegara - Cikande Pipeline (sheet 2 of 2)


Details RC /RIC KP 07+950 Bojonegara - Cikande Pipeline (Sheet 1 of 2)

REVISION 0
REVISION 0
REVISION 0
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 0
REVISION 0

24-Apr-12
24-Apr-12
24-Apr-12
29-Jun-12
29-Jun-12
29-Jun-12
29-Jun-12
24-Apr-12
24-Apr-12

0031-50-L-DG-285-A3
0031R-50-L-DG-285-A3

Details RC /RIC KP 07+950 Bojonegara - Cikande Pipeline (Sheet 1 of 2)


Open Cut RC-RIC KP 07+950

IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC

100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
100%

0.0044%
0.0044%
0.0044%
0.0044%
0.0000%
0.0044%
0.0000%
0.0044%
0.0000%
0.0000%
0.0000%
0.0044%

0.002%
0.002%
0.002%
0.002%
0.000%
0.002%
0.000%
0.002%
0.000%
0.002%
0.002%
0.002%

REVISION 3

Page 3 of 5

24-Apr-12

B
U
P
lI
L
a
T
80% ###
n
IDV

Plan

A
S
Latest
Document Title
Revision

Status Code

Submission
Date

0031-50-L-DG-285-A3
Details RC /RIC KP 07+950 Bojonegara - Cikande Pipeline (Sheet 2 of 2)
0031-50-L-DG-285-A3
Details RC /RIC KP 07+950 Bojonegara - Cikande Pipeline (Sheet 2 of 2)
Sectional PGN's Pipeline Within MMS - Toll Road Area

Cumulative %

Cumulative
Earned Value

WEIGHT
FACTOR

0%
0%

0.0000%
0.0000%

0.002%
0.002%

0031-50-L-DG-290-A3

Sectional PGN's Pipeline within Toll Road Area KM Toll 76+926 - KM 76+661.36 Bojonegara - Cikande
Pipeline

REVISION 0

IFC

19-Jun-12

100%

0.0044%

0.002%

0031-50-L-DG-291-A3

Sectional PGN's Pipeline within Toll Road Area KM Toll 60+336 - KM 60+238 Bojonegara - Cikande Pipeline

REVISION 1

IFC

19-Jun-12

100%

0.0044%

0.002%

0031-50-L-DG-292-A3

Sectional PGN's Pipeline within Toll Road Area KM Toll 60+084 - KM 59+918 Bojonegara - Cikande Pipeline

REVISION 2

IFC

19-Jun-12

100%

0.0044%

0.002%

0031-50-L-DG-293-A3

Sectional PGN's Pipeline within Toll Road Area KM Toll 59+048 - KM 58+800 Bojonegara - Cikande Pipeline

REVISION 2

IFC

19-Jun-12

100%

0.0044%

0.002%

REVISION 0
REVISION 0
REVISION 0
REVISION 1
REVISION 1
REVISION 1
REVISION 1

IFC
IFC
IFC
IFC
IFC
IFC
IFC

24-Apr-12
24-Apr-12
24-Apr-12
29-Jun-12
29-Jun-12
29-Jun-12
29-Jun-12

100%
100%
100%
100%
100%
100%
100%

0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%

0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%

Foreign Pipeline Crossing (Pertagas Pipeline)


0031-50-L-DG-300-A3
Details Pertagas Pipeline Crossing KP 02+060 Bojonegara - Cikande Pipeline
0031-50-L-DG-301-A3
0031-50-L-DG-302-A3

Details Pertagas Pipeline Crossing KP 03+070 Bojonegara - Cikande Pipeline


Details Pertagas Pipeline Crossing KP 17+560 Bojonegara - Cikande Pipeline

0031R-50-L-DG-303-A3
0031R-50-L-DG-303-A3

Ditch Crossing Detail (sheet 1 of 4)


Ditch Crossing Detail (sheet 2 of 4)

0031R-50-L-DG-303-A3
0031R-50-L-DG-303-A3

Ditch Crossing Detail (sheet 3 of 4)


Ditch Crossing Detail (sheet 4 of 4)

Instrument
Data Sheet
Data Sheet for Pressure Gauge

0%

0.0000%

0.003%

Instrument Hook Up for Pressure Gauge

0%

0.0000%

0.003%

MTO for Pressure Gauge

0%

0.0000%

0.003%

0031-50-E-CA-001-A4
0031-50-E-CA-002-A4

Cathodic Protection Design Concept


Cathodic Protection Design Calculation for Main Pipeline

0031-50-E-CA-003-A4
Specification

Cathodic Protection Design Calculation for Casing Pipe

0%
0%
0%

0.0000%
0.0000%
0.0000%

0.003%
0.003%
0.003%

0031-50-I-DS-001-A4
Drawing
0031-50-I-DG-201-A3
Material Take Off (MTO)
0031-50-I-MT-001-A4
Electrical
Calculation

Data Sheet
0031-50-E-DS-001-A4

Data Sheet for Magnesium Anodes

0031-50-E-PR-001-A4
0031-50-E-PR-002-A4

Cathodic Protection Installation Procedure


Cathodic Protection Testing & Commissioning Procedure

0031-50-E-PR-003-A4
0031R-50-E-PR-018-A4
0031R-50-E-PR-020-A4

Close Interval Potensial Survey Procedure


Temporary Cathodic Protection Installation Procedure
Permanent Cathodic Protection Installation Procedure

Drawing
0031-50-E-DG-200-A3

Cathodic Protection Drawing Index

0031-50-E-DG-201-A3
0031-50-E-DG-202-A3

Overall Layout for Cathodic Protection Systems


Overall Layout for Permanent Cathodic Protection Systems

0031-50-E-DG-203-A3
0031-50-E-DG-204-A3

Typical Installation of Temporary Cathodic Protection system and Test Stations


Typical Installation of Permanent Cathodic Protection System and Test Stations

0031-50-E-DG-205-A3
0031-50-E-DG-206-A3

Typical Installation of Temporary Catodic Protection System


Magnesium Anode Details

0031-50-E-DG-207-A3
Material Take Off (MTO)

Typical Installation at Foreign Pipeline Crossing

REVISION 3
REVISION 6
REVISION 5
REVISION A
REVISION A

IFC
IFC
IFC
IFR
IFR

05-Mar-12
01-May-12
08-Jun-12
26-Apr-12
26-Apr-12

100%
100%
100%
75%
75%

0.0059%
0.0059%
0.0059%
0.0000%
0.0000%

0.003%
0.003%
0.003%
0.003%
0.000%
0.000%

REVISION 2
REVISION 2
REVISION 0
REVISION 4
REVISION 5
REVISION 5
REVISION 3
REVISION 0

IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC

01-May-12
01-May-12
23-Apr-12
01-May-12
01-May-12
01-May-12
01-May-12
23-Apr-12

100%
100%
100%
100%
100%
100%
100%
100%

0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%
0.0059%

0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%
0.003%

0.0000%
0.0000%
0.0044%
0.0044%
0.0044%
0.0044%
0.0000%
0.0044%
0.0044%
0.0044%
0.0044%
0.0000%
0.0000%
0.0044%
0.0044%
0.0000%
0.0044%
0.0044%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%

0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%

24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12
24-Apr-12

0%
0%
100%
100%
100%
100%
0%
100%
100%
100%
100%
0%
0%
100%
100%
0%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%

Civil
Drawing
0031-50-S-DG-400-A3

Civil Drawing Index (Detailed Design)

0031-50-S-DG-401-A3
0031R-50-S-DG-402-A3

Temporary Sheet Piling Installation for Slope Protection


Typical Sign Board and Marker Detail Marker Post Details (sheet 1 of 4)

0031R-50-S-DG-402-A3
0031R-50-S-DG-402-A3

Typical Sign Board and Marker Detail Marker Post for Crossing (sheet 2 of 4)
Typical Sign Board and Marker Detail Tiang Marker Post Details (sheet 3 of 4)

0031R-50-S-DG-402-A3
0031-50-S-DG-403-A3

Typical Sign Board and Marker Detail Patok Gas Details (sheet 4 of 4)
Soil Erosion Control Measures - Details Ditch Breaker at KP 09+940 to KP 09+990, KP 10+010 to KP 10+145

0031R-50-S-DG-404-A3
0031R-50-S-DG-405-A3

Sectional Valve Pit & Fencing Plan at KP 08+000


Sectional Valve Pit & Fencing Plan at KP 16+100

0031R-50-S-DG-406-A3
0031R-50-S-DG-407-A3

Sectional Valve Pit & Fencing Plan at KP 23+536


Sectional Valve Pit & Fencing Plan at KP 31+960

0031-50-S-DG-408-A3
0031-50-S-DG-409-A3

Sectional Valve Pit & Fencing Plan at KP 15+600 Future Connection


Sectional Valve Pit Plan at Cikande Offtake Station

0031R-50-S-DG-410-A3
0031R-50-S-DG-410-A3
0031-50-S-DG-411-A3

Sectional Valve Pit & Fencing Detail for KP.08+000, KP.16+575, KP.29+914 (sheet 1 of 2)
Sectional Valve Pit & Fencing Detail for KP.08+000, KP.16+575, KP.29+914 (sheet 2 of 2)
Sectional Valve Pit & Fencing Detail for KP 15+600 Future Connection

REVISION 0
REVISION 0

0031R-50-S-DG-412-A3
0031R-50-S-DG-412-A3

Typical Sectional Valve Box at KP 08+002, KP 16+575, KP 23+536 and KP 29+914 (sheet 1 of 3)
Typical Sectional Valve Box at KP.23+535 (sheet 2 of 3)

0031R-50-S-DG-412-A3
0031-50-S-DG-413-A3

Typical Sectional Valve Box at KP 08+002, KP 16+575, KP 23+536 and KP 29+914 (sheet 3 of 3)
Sectional Valve Box at KP 15+600 Future Connection

REVISION 1
REVISION 1
REVISION 1

0031-50-S-DG-414-A3
0031-50-S-DG-415-A3

Tie in Valve Box at Cikande Offtake Station


Anchor Block & Piling at Bojonegara Station

0031-50-S-DG-416-A3
0031-50-S-DG-417-A3

Anchor Block & Piling at Cikande Offtake Station


Pipe Support & Piling at Bojonegara Station

0031R-50-S-DG-418-A3
0031R-50-S-DG-419-A3

Access Road at Sectional Valve KP.08+002


Access Road at Sectional Valve KP.15+840

0031R-50-S-DG-420-A3
0031R-50-S-DG-421-A3
0031R-50-S-DG-422-A3

Access Road at Sectional Valve KP.16+575


Access Road at Sectional Valve KP.23+536
Access Road at Sectional Valve KP.29+914

0031-50-S-DG-025-A3
0031R-50-S-DG-026-A3

Traffic Sign and Trafic Control Device


Traffic Management Layout (sheet 1 of 4)

0031R-50-S-DG-026-A3
0031R-50-S-DG-026-A3

Traffic Management Layout (sheet 2 of 4)


Traffic Management Layout (sheet 3 of 4)

0031R-50-S-DG-026-A3
Material Take Off (MTO)

Traffic Management Layout (sheet 4 of 4)

Topography and Alignment Sheets Drawing Index


Topography and Alignment KP 00 + 000 - KP 00 + 500 Bojonegara - Cikande

0031R-50-L-DG-102-A1
0031R-50-L-DG-103-A1

Topography and Alignment KP 00 + 500 - KP 01 + 000 Bojonegara - Cikande


Topography and Alignment KP 01 + 000 - KP 01 + 500 Bojonegara - Cikande

0031R-50-L-DG-104-A1
0031R-50-L-DG-105-A1
0031R-50-L-DG-106-A1

Topography and Alignment KP 01 + 500 - KP 02 + 000 Bojonegara - Cikande


Topography and Alignment KP 02 + 000 - KP 02 + 500 Bojonegara - Cikande
Topography and Alignment KP 02 + 500 - KP 03 + 000 Bojonegara - Cikande

0031R-50-L-DG-107-A1
0031R-50-L-DG-108-A1

Topography and Alignment KP 03 + 000 - KP 03 + 500 Bojonegara - Cikande


Topography and Alignment KP 03 + 500 - KP 04 + 000 Bojonegara - Cikande

0031R-50-L-DG-109-A1
0031R-50-L-DG-110-A1

Topography and Alignment KP 04 + 000 - KP 04 + 500 Bojonegara - Cikande


Topography and Alignment KP 04 + 500 - KP 05 + 000 Bojonegara - Cikande

0031R-50-L-DG-111-A1
0031R-50-L-DG-112-A1

Topography and Alignment KP 05 + 000 - KP 05 + 500 Bojonegara - Cikande


Topography and Alignment KP 05 + 500 - KP 06 + 000 Bojonegara - Cikande

0031R-50-L-DG-113-A1
0031R-50-L-DG-114-A1

Topography and Alignment KP 06 + 000 - KP 06 + 500 Bojonegara - Cikande


Topography and Alignment KP 06 + 500 - KP 07 + 000 Bojonegara - Cikande

0031R-50-L-DG-115-A1
0031R-50-L-DG-116-A1

Topography and Alignment KP 07 + 000 - KP 07 + 500 Bojonegara - Cikande


Topography and Alignment KP 07 + 500 - KP 08 + 000 Bojonegara - Cikande

0031R-50-L-DG-117-A1
0031R-50-L-DG-118-A1
0031R-50-L-DG-119-A1

Topography and Alignment KP 08 + 000 - KP 08 + 500 Bojonegara - Cikande


Topography and Alignment KP 08 + 500 - KP 09 + 000 Bojonegara - Cikande
Topography and Alignment KP 09 + 000 - KP 09 + 500 Bojonegara - Cikande

0031R-50-L-DG-120-A1
0031R-50-L-DG-121-A1

Topography and Alignment KP 09 + 500 - KP 10 + 000 Bojonegara - Cikande


Topography and Alignment KP 10 + 000 - KP 10 + 500 Bojonegara - Cikande

REVISION B

IFR

27-Apr-12

75%

0.0044%

0.003%

Revision 10
Revision 10
Revision 10
Revision 10
Revision 10
Revision 10
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
Revision 9
REVISION 6

IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC

28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0044%

0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%

REVISION 4
REVISION 3
REVISION 3
REVISION 2
REVISION 0
REVISION 0
REVISION 0
REVISION 0

0031-50-S-MT-001-A4
MTO for Civil Work
Topography and Alignment Sheet
0031-50-L-DG-100-A1
0031R-50-L-DG-101-A1

REVISION A
REVISION A
REVISION A
REVISION A
REVISION A
REVISION 2
REVISION 2
REVISION 2
REVISION 2
REVISION 2

IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC

Page 4 of 5

08-Jun-12
29-May-12
29-May-12
29-May-12
19-Jun-12
19-Jun-12
19-Jun-12
19-Jun-12

19-Jun-12
19-Jun-12
06-Jul-12
06-Jul-12

0.002%
0.000%
0.000%
0.000%
0.000%
0.000%
0.002%
0.002%
0.002%
0.002%
0.002%

B
U
P
lI
L
a
T
80% ###
n
IDV

Plan

A
S
Latest
Document Title

0031R-50-L-DG-122-A1
0031R-50-L-DG-123-A1
0031R-50-L-DG-124-A1

Topography and Alignment KP 10 + 500 - KP 11 + 000 Bojonegara - Cikande


Topography and Alignment KP 11 + 000 - KP 11 + 500 Bojonegara - Cikande
Topography and Alignment KP 11 + 500 - KP 12 + 000 Bojonegara - Cikande

0031R-50-L-DG-125-A1
0031R-50-L-DG-126-A1

Topography and Alignment KP 12 + 000 - KP 12 + 500 Bojonegara - Cikande


Topography and Alignment KP 12 + 500 - KP 13 + 000 Bojonegara - Cikande

0031R-50-L-DG-127-A1
0031R-50-L-DG-128-A1

Topography and Alignment KP 13 + 000 - KP 13 + 500 Bojonegara - Cikande


Topography and Alignment KP 13 + 500 - KP 14 + 000 Bojonegara - Cikande

0031R-50-L-DG-129-A1
0031R-50-L-DG-130-A1

Topography and Alignment KP 14 + 000 - KP 14 + 500 Bojonegara - Cikande


Topography and Alignment KP 14 + 500 - KP 15 + 000 Bojonegara - Cikande

0031R-50-L-DG-131-A1
0031R-50-L-DG-132-A1

Topography and Alignment KP 15 + 000 - KP 15 + 500 Bojonegara - Cikande


Topography and Alignment KP 15 + 500 - KP 16 + 000 Bojonegara - Cikande

0031R-50-L-DG-133-A1
0031R-50-L-DG-134-A1

Topography and Alignment KP 16 + 000 - KP 16 + 500 Bojonegara - Cikande


Topography and Alignment KP 16 + 500 - KP 17 + 000 Bojonegara - Cikande

0031R-50-L-DG-135-A1
0031R-50-L-DG-136-A1
0031R-50-L-DG-137-A1

Topography and Alignment KP 17 + 000 - KP 17 + 500 Bojonegara - Cikande


Topography and Alignment KP 17 + 500 - KP 18 + 000 Bojonegara - Cikande
Topography and Alignment KP 18 + 000 - KP 18 + 500 Bojonegara - Cikande

0031R-50-L-DG-138-A1
0031R-50-L-DG-139-A1

Topography and Alignment KP 18 + 500 - KP 19 + 000 Bojonegara - Cikande


Topography and Alignment KP 19 + 000 - KP 19 + 500 Bojonegara - Cikande

0031R-50-L-DG-140-A1
0031R-50-L-DG-141-A1

Topography and Alignment KP 19 + 500 - KP 20 + 000 Bojonegara - Cikande


Topography and Alignment KP 20 + 000 - KP 20 + 500 Bojonegara - Cikande

0031R-50-L-DG-142-A1
0031R-50-L-DG-143-A1

Topography and Alignment KP 20 + 500 - KP 21 + 000 Bojonegara - Cikande


Topography and Alignment KP 21 + 000 - KP 21 + 500 Bojonegara - Cikande

0031R-50-L-DG-144-A1
0031R-50-L-DG-145-A1

Topography and Alignment KP 21 + 500 - KP 22 + 000 Bojonegara - Cikande


Topography and Alignment KP 22 + 000 - KP 22 + 500 Bojonegara - Cikande

0031R-50-L-DG-146-A1
0031R-50-L-DG-147-A1

Topography and Alignment KP 22 + 500 - KP 23 + 000 Bojonegara - Cikande


Topography and Alignment KP 23 + 000 - KP 23 + 500 Bojonegara - Cikande

0031R-50-L-DG-148-A1
0031R-50-L-DG-149-A1

Topography and Alignment KP 23 + 500 - KP 24 + 000 Bojonegara - Cikande


Topography and Alignment KP 24 + 000 - KP 24 + 500 Bojonegara - Cikande

0031R-50-L-DG-150-A1
0031R-50-L-DG-151-A1
0031R-50-L-DG-152-A1

Topography and Alignment KP 24 + 500 - KP 25 + 000 Bojonegara - Cikande


Topography and Alignment KP 25 + 000 - KP 25 + 500 Bojonegara - Cikande
Topography and Alignment KP 25 + 500 - KP 26 + 000 Bojonegara - Cikande

0031R-50-L-DG-153-A1
0031R-50-L-DG-154-A1

Topography and Alignment KP 26 + 000 - KP 26 + 500 Bojonegara - Cikande


Topography and Alignment KP 26 + 500 - KP 27 + 000 Bojonegara - Cikande

0031R-50-L-DG-155-A1
0031R-50-L-DG-156-A1

Topography and Alignment KP 27 + 000 - KP 27 + 500 Bojonegara - Cikande


Topography and Alignment KP 27 + 500 - KP 28 + 000 Bojonegara - Cikande

0031R-50-L-DG-157-A1
0031R-50-L-DG-158-A1

Topography and Alignment KP 28 + 000 - KP 28 + 500 Bojonegara - Cikande


Topography and Alignment KP 28 + 500 - KP 29 + 000 Bojonegara - Cikande

0031R-50-L-DG-159-A1
0031R-50-L-DG-160-A1

Topography and Alignment KP 29 + 000 - KP 29 + 500 Bojonegara - Cikande


Topography and Alignment KP 29 + 500 - KP 30 + 000 Bojonegara - Cikande

0031R-50-L-DG-161-A1
0031R-50-L-DG-162-A1

Topography and Alignment KP 30 + 000 - KP 30 + 500 Bojonegara - Cikande


Topography and Alignment KP 30 + 500 - KP 31 + 000 Bojonegara - Cikande

0031R-50-L-DG-163-A1
0031R-50-L-DG-164-A1
0031R-50-L-DG-165-A1

Topography and Alignment KP 31 + 000 - KP 31 + 500 Bojonegara - Cikande


Topography and Alignment KP 31 + 500 - KP 32 + 000 Bojonegara - Cikande
Topography and Alignment KP 32 + 000 - KP 32 + 500 Bojonegara - Cikande

0031R-50-L-DG-166-A1
Vendor Document

Topography and Alignment KP 32 + 500 - KP 32 + 720 Bojonegara - Cikande

Cumulative
Earned Value

WEIGHT
FACTOR

Revision

Status Code

REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 8
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 8
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 6
REVISION 7
REVISION 6
Revision 9

IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC
IFC

28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12
28-Jun-12

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%
0.0044%

0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%

25-Jun-12

75%
0%
0%
100%

0.0044%
0.0000%
0.0000%
0.0059%

0.003%
0.003%
0.003%
0.003%

100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%

0%
0%
0%

0.0000%
0.0000%
0.0000%

Ball Valve
Coating Pipe
Acceptance Design
0031R-50-C-PR-030-A4

Mechanical Completion Manual

0031-50-C-PR-031-A4
0031-50-C-RE-032-A4

Commissioning Design
Mechanical Completion Dossier (Draft)

REVISION B

REVISION 1

0031-50-G-RE-005-A4
Pre-Construction Survey Report
Final Documentation and As-Built:
0031-50-L-DG-210-A3
0031-50-P-DG-102-A1

Piping Drawing Index


Process Flow Diagram South Sumatra - West Java Gas Distribution Pipeline

0031-50-P-DG-104-A1
0031-50-P-DG-105-A1
0031-50-C-PR-032-A4

Material Balance Table Base Case for South Sumatra - West Java Gas Distribution Pipeline
Material Balance Table Step-1 Initial Case for South Sumatra - West Java Gas Distribution Pipeline
Mechanical Completion Dossier

REVISION 1
REVISION 1
REVISION 1

As-Built Documentation - Other Material (Other than Pipeline)


As-Built Documentation - Distribution Pipeline Installation
As-Built Documentation - Ancillary Facilities Construction
As-Built Documentation - Pre-Commissioning and Commissioning Implementation Report
As-Built Survey Report
As-Built Documentation - As-Built Drawings
Non-Conformance Reports and Corrective Action Reports
Technical Queries and the Engineer Responses
Radiographic Films
Agreed Variations Issued by the Engineer
Project Photograph Report
Final Mechanical Completion Dossier
Report

0031-50-G-RE-003-A4

Cumulative %

Submission
Date

Hazard and Operability (HAZOP) Study Report

REVISION 0

IFR
IFC
IFC
IFC
IFC
IFC

15-May-12

0.002%
04-May-12
04-May-12
04-May-12

26-Jun-12

Detailed Railways Crossing Drawing


Procedure
Report

Operation and Maintenance Manuals


Mechanical Completion Manual

Page 5 of 5

0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.002%
0.000%

B
U
P
lI
L
a
T
80% ###
n
IDV

Plan

Você também pode gostar