Você está na página 1de 6

PROCESS GROUP SPREADSHEET-BASED SOFTWARE

Priority Rev. STD Calculation No.

Name

Short Description

Owner Program
Type

Use

By

MJA RL
MJA RL

1
2

PEL-BMS-CAL-P-0100
PEL-BMS-CAL-P-1200

Control valve.xls
line sizing rev1.xls

Control valve sizing program


Line sizing program, Pump cals, hydraulic circuit

MJA
MJA

In house
In house

2, 4
1,2,4

PEL-BMS-CAL-P-0200

Vertical Separator.xls

Vertical separator sizing

CW

In house

1,2,4

PEL-BMS-CAL-P-1100

Horizontal separator.xls

Horizontal separator sizing

DBB

In house

1,2,4

5
6
6
7
7
8

0
0
0
0
0
0

PEL-BMS-CAL-P-1000
PEL-BMS-CAL-P-0300
PEL-BMS-CAL-P-0600
PEL-BMS-CAL-P-0400
PEL-BMS-CAL-P-0700
PEL-BMS-CAL-P-0800

Drum.xls
Relief valve sizing.xls
relief rate.xls
Air cool quick sizing .xls
Exchanger Adequacy Check.xls
RO-sizing.xls

Horizontal and vertical drum adequacy check


PSV Sizing program
Relief rate calculation
Air cooler size estimation
Shell + tube exchanger rating check
Restriction orifice comparison, 4 calc methods

RK
MJA
UD
ITB
ITB
AO

In house
In house
In house
In house
In house
In house

1,2,3,4

9
11
10
12
13
14
15
16
17
18

1
0

PEL-BMS-CAL-P-0900
PEL-BMS-CAL-P-0500
PEL-BMS-CAL-P-1200

0
0
0
0
0

PEL-BMS-CAL-P-1400
PEL-BMS-CAL-P-1500
PEL-BMS-CAL-P-1600
PEL-BMS-CAL-P-1700
PEL-BMS-CAL-P-1800

Sizes a Flare K.O.Drum (API520 method)


Glycol contactor sizing
Model of Amine Sweetening Unit
Evap. Pond surface area
Diesel consumption of Caterpillar diesels
Calculates rates of hydrate inhibitors
Calculates pump duty and NPSH
horizontal and vertical 2 phase separator sizing

AJMc
JB
NF
GJ
GJ
MJC
GB
PB
GB
GB

In house
In house

API521 Flare Drum.xls


TEG-contactor.xls
Amine_Prog1.xls
Evaporation Pond.xls
Diesel Consumption.xls
Hydrate Inhibitor Rate.xls
Pump Calculation
2 phase separator
Compressor settleout
Steam Balance

GB

In house

19

PEL-BMS-CAL-P-1900

Fuel Gas Demand Calculator

calculates the LHV for a user defined fuel gas


composition and fuel gas demand for specified
users

Date

LJF
LJF

15/04/03
12/8/2003

AB

11/16/2007

DBB RL

LJF

13/05/03

2
2
2,3,4

RK
MJA
JS
ITB
ITB
AO

RL
RL
RL
RL
RL
RL

LJF
AB
LJF
LJF

15/04/03
11/16/2007
22/04/03
14/04/03

1,2,3,4
1,2,4

SC
JB

RL
RL

AB

11/12/2007

JS

RL

AB

MC
GB
PB
JS
GB

RL
MHT
RL
RL
PB

AB
AB
AB
AB
AB

CH

RL

AB

In house
In house
In house
In house
In house
In house

Chk App

1,2,3
1,2,3

PB

RL

11/20/2007
11/8/2007
11/16/2007
11/20/2007
11/20/2007

Program Valid for use:


1. Studies
2. Preliminary Sizing
3. Feed / Detailed Engineering
4. Vendor Data Check / Bid Evaluation

file:///var/www/apps/conversion/tmp/scratch_2/219188822.xls

03/27/2014

Priority Rev. STD Calculation No.

Name

Check Level

1
2

PEL-BMS-CAL-P-0100
PEL-BMS-CAL-P-1200

Control valve.xls
line sizing rev1.xls

approved
approved

PEL-BMS-CAL-P-0200

Vertical Separator.xls

approved

PEL-BMS-CAL-P-1100

Horizontal separator.xls

approved

5
6
6
7
7
8

0
0
0
0
0
0

PEL-BMS-CAL-P-1000
PEL-BMS-CAL-P-0300
PEL-BMS-CAL-P-0600
PEL-BMS-CAL-P-0400
PEL-BMS-CAL-P-0700
PEL-BMS-CAL-P-0800

Drum.xls
Relief valve sizing.xls
relief rate.xls
Air cool quick sizing .xls
Exchanger Adequacy Check.xls
RO-sizing.xls

approved
approved
approved
approved

9
11
10
12
13
14
15
16
17
18

1
0

PEL-BMS-CAL-P-0900
PEL-BMS-CAL-P-0500

PEL-BMS-CAL-P-1200

0
0
0
0
0

PEL-BMS-CAL-P-1400
PEL-BMS-CAL-P-1500
PEL-BMS-CAL-P-1600
PEL-BMS-CAL-P-1700
PEL-BMS-CAL-P-1800

API521 Flare Drum.xls


TEG-contactor.xls
Amine_Prog1.xls
Evaporation Pond.xls
Diesel Consumption.xls
Hydrate Inhibitor Rate.xls
Pump Calculation
2 phase separator
Compressor settleout
Steam Balance

19

PEL-BMS-CAL-P-1900

Fuel Gas Demand Calculator

approved

approved
approved
approved
approved
approved

Program Valid for use:


1. Studies
2. Preliminary Sizing
3. Feed / Detailed Engineering
4. Vendor Data Check / Bid Evaluation

file:///var/www/apps/conversion/tmp/scratch_2/219188822.xls

03/27/2014

VALIDATION PROGRESSION
STATUS

Priority Rev. STD Calculation No.

Name

Rev A For Approval


(60%)
Start

By

Checking (25%)
Start

By

Independent
Calculation (10%)
Start

By

Approval (5%)
Start

Notes

Progress

By
07/04

1
2

PEL-BMS-CAL-P-0100
PEL-BMS-CAL-P-1200

Control valve.xls
line sizing rev1.xls

02/01/03
28/05/03

MA
BM/MA

14/04/03
31/07/03

RL
RL

15/04/03
08/04/03

A McG
ACO

15/04/03
08/12/03

LJF
LJF

100%
100%
100%

PEL-BMS-CAL-P-0200

Vertical Separator.xls

05/11/07

PB

12/11/06

RL

14/11/06

RL

16/11/07

AB

100%

PEL-BMS-CAL-P-1100

Horizontal separator.xls

08/05/03

DBB

14/05/03

RL

16/07/03

AO

13/05/03

LJF

5
6
6
7
7
8

0
0
0
0
0
0

PEL-BMS-CAL-P-1000
PEL-BMS-CAL-P-0300
PEL-BMS-CAL-P-0600
PEL-BMS-CAL-P-0400
PEL-BMS-CAL-P-0700
PEL-BMS-CAL-P-0800

Drum.xls
Relief valve sizing.xls
relief rate.xls
Air cool quick sizing .xls
Exchanger Adequacy Check.xls
RO-sizing.xls

28/04/03
10/04/03
06/11/07
09/04/03
22/04/03
23/04/03

RK
MA
JS
IB
IB
AO

13/05/03
15/04/03
12/11/07
15/04/03
30/04/03
05/07/03

RL
RL
RL
RL/BC
RL
RL

07/02/03
22/04/03
12/11/07
06/05/03
07/07/03
07/05/03

CW
AO
RL
BC
AO
RB

9
11
10
12
13
14
15
16
17
18

1
0

PEL-BMS-CAL-P-0900
PEL-BMS-CAL-P-0500

24/04/03
15/04/03

A McG
JB

15/05/03
07/03/03

RL
RL

07/10/03
07/08/03

PEL-BMS-CAL-P-1200

19/11/07

JS

19/11/07

RL

0
0
0
0
0

PEL-BMS-CAL-P-1400
PEL-BMS-CAL-P-1500
PEL-BMS-CAL-P-1600
PEL-BMS-CAL-P-1700
PEL-BMS-CAL-P-1800

API521 Flare Drum.xls


TEG-contactor.xls
Amine_Prog1.xls
Evaporation Pond.xls
Diesel Consumption.xls
Hydrate Inhibitor Rate.xls
Pump Calculation
2 phase separator
Compressor settleout
Steam Balance

19/11/07
31/07/07
12/11/07
###
###

MC
GB
PB
JS
gb

20/11/07
15/10/07
14/11/07
19/11/07
19/11/07

19

PEL-BMS-CAL-P-1900

Fuel Gas Demand Calculator

###

CH

22/11/07

readily for approval


independent cals done
retured to RK with
cmments

15/04/03
16/11/07
22/04/03
14/04/03

LJF
AB
LJF
LJF

AO
A McG

07/02/03

LJF

20/11/07

RL

20/11/07

AB

RL
MHT
RL
RL
pb

20/11/07
15/10/07
14/11/07
19/11/07
19/11/07

RL
MHT
RL
RL
pb

20/11/07
08/11/07
15/11/07
20/11/07
20/11/07

AB
AB
AB
AB
AB

RL

26/11/07

RL

100%

ready for approval


readily for approval
readily for approval
readily for approval

90%
100%
85%
100%
100%
95%

readily for approval

100%

Ind Cal started

85%

100%
100%
85%
100%
100%

Program Valid for use:


1. Studies
2. Preliminary Sizing
3. Feed / Detailed Engineering
4. Vendor Data Check / Bid Evaluation

file:///var/www/apps/conversion/tmp/scratch_2/219188822.xls

03/27/2014

Hrs

Priority Rev. STD Calculation No.

Ach.
Hrs

Name

1
2

PEL-BMS-CAL-P-0100
PEL-BMS-CAL-P-1200

Control valve.xls
line sizing rev1.xls

40
40
80

40
40
80

PEL-BMS-CAL-P-0200

Vertical Separator.xls

50

50

PEL-BMS-CAL-P-1100

Horizontal separator.xls

50

50

5
6
6
7
7
8

0
0
0
0
0
0

PEL-BMS-CAL-P-1000
PEL-BMS-CAL-P-0300
PEL-BMS-CAL-P-0600
PEL-BMS-CAL-P-0400
PEL-BMS-CAL-P-0700
PEL-BMS-CAL-P-0800

Drum.xls
Relief valve sizing.xls
relief rate.xls
Air cool quick sizing .xls
Exchanger Adequacy Check.xls
RO-sizing.xls

25
25
25
30
30
25

22.5
25
21.25
30
30
23.75

9
11
10
12
13
14
15
16
17
18

1
0

PEL-BMS-CAL-P-0900
PEL-BMS-CAL-P-0500

25
30

25
0
25.5

PEL-BMS-CAL-P-1200

0
0
0
0
0

PEL-BMS-CAL-P-1400
PEL-BMS-CAL-P-1500
PEL-BMS-CAL-P-1600
PEL-BMS-CAL-P-1700
PEL-BMS-CAL-P-1800

API521 Flare Drum.xls


TEG-contactor.xls
Amine_Prog1.xls
Evaporation Pond.xls
Diesel Consumption.xls
Hydrate Inhibitor Rate.xls
Pump Calculation
2 phase separator
Compressor settleout
Steam Balance

30
30

30
25.5

19

PEL-BMS-CAL-P-1900

Fuel Gas Demand Calculator

Program Valid for use:


1. Studies
2. Preliminary Sizing
3. Feed / Detailed Engineering
4. Vendor Data Check / Bid Evaluation

file:///var/www/apps/conversion/tmp/scratch_2/219188822.xls

03/27/2014

PROCESS GROUP VENDOR SOFTWARE

Priority Version Name


ESI
Sulzer tray design
Shell DEP
Fisher valve sizing

Short Description

Owner

Single, 2-phase and compressible flow pressure


drop
Tray design software
Vertical and Horizontal separator design
Control valve sizing software

Network
BC
LH
RA

Program
Type
DOS
DOS
DOS

Use

Nominated
Used in Project Checker
Various
Various
Various
Various

Check Level
High level
High level
High level
High level

Calculation Validation Check list


Is calculation in Petrofac Format
Check formula are correct
attach sources
Check look-up tables are correct
attach sources
Attach hand checked calc.
and alternative method?
Are necessary cells locked
Inputs only
Are unit conversions correct.

Você também pode gostar