METHOD STATEMENT

Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

1 of 35

METHOD STATEMENT

A) Main Power System B) Lighting and Small Power System C) Earthing & lightning Prote tion system!

METHOD STATEMENT:

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

2 of 35

The procedures and methodologies that shall be employed herein shall be done in accordance with the Project's Technical Specification, the Rules and Regulations of the Local Authority, and the latest standards as set forth by the Qatar onstruction Specifications! "mportantly, all testing and commissioning wor#s shall be done in a safe manner so as to a$oid danger to people and to the e%uipment! Testing and c !!issi ning !ust "e ca##ied ut in se$uence as set ut "e% &: Stage 1: Tests before connection of Electrical Supply & To carry out all $isual inspection and electrical tests to ensure that all electrical e%uipment li#e panels , board sand de$ices, cables and wires, etc!, are completed prior to the supply or connection of power! Stage 2: Pre-commissioning Test & To carry out all pre&commissioning test to demonstrate that all electrical e%uipment or de$ices are properly operating in accordance with its re%uired function! Stage 3: Commissioning Test & To carry out the full commissioning test to the following electrical systems' A' Main ( &e# S)ste! *' +ig,ting and S!a%% ( &e# S)ste! -' Ea#t,ing . %ig,tning (# tecti n s)ste!/

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

3 of 35

STA0E 1 TEST BEFORE CONNECTION OF ELECTRICAL SUPPLY

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

4 of 35

1/1 Test/-,ec1s n Main S&itc, * a#d M2 (ANE+S +O-ATION:3 *ASEMENT31


(S) (anufacturer' Ampere*+oltage Rating' )us bar Rating' ,ault Rating' ,orm*Separation' "P Rating' -arthing' .rawing Ref! /o!'
-,ec1s

SCHNEIDER Electric- M/s !in "alib Engineering #$%% &mpere #$%% &mpere '' (& for ) Secon*s form-'! Type# IP -$'
-,ec1ed

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18

hec# e%uipment nameplate data with drawings and specification! "nspect physical and mechanical condition! +erify appropriate anchorage, re%uired clearance, and alignment! "nspect all doors, panels, and sections for corrosion, dents, scratches, etc! +erify that fuse and*or circuit brea#er si0e and types correspond to drawings! hec# all outgoing ( ) ratings with drawings and specifications! Test all outgoing feeder circuits to $erify insulation resistance and continuity All cables including gland connections were chec#ed for tightness! +erify that all Ts, fuses, metering and indicating instruments, and selector switches correspond to drawings! "nspect insulators for e$idence of physical damage or contaminations! +erify if proper labels were pro$ided or mounted on panels! hec# if a laminated single line diagram is posted adjacent to the (S)! +erify all the interfaces with )(S demo s per the appro$ed drawings! hec# all the )attery charged connected 1 wor#ing properly! "nsulation Resistance test shall be done twice the system supply $oltage! hec# cable trench che%uered plates are pro$ided properly +erify R-, relay connection is completed! hec# the entire Pipe slee$es*wall Penetration are sealed by fire sealant! 23 See attached ,actory Test and "nsulation Test Reports at APP-/."4! 53 (+ panel will be energi0ing in the presence of manufacturer and contractor engineer! 63 R-, relay settings will be chec#ed by 7ahrama -ngineer!

N te:

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

5 of 35

1/2 Test/-,ec1s n a%% Su" !ain * a#ds 4SM*s' +O-ATION:3 *ASEMENT31


S() (anufacturer' SCHNEIDER Electric- !in "alib Engineering S() Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s -,ec1ed

'+$ ,olt #$ (& for )s

01 02 03 04 05 06 07 08 09 10 11 12 13 14

hec# sub main board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# ( ) ratings with drawings and specifications Test all outgoing sub feeder circuits to $erify insulation resistance and continually! "nspect dead front co$ers, panel doors for dents, scratches, etc! All cables including gland connections were chec#ed for tightness! hec# main and outgoing ( ) ratings against drawings! "nspect terminations*connections to )s and terminals for tightness! +erify proper labeling and designating of circuits! hec# S() diagram is posted at inside of door! -nsure the operation at full load and no load properly! -arth continuity shall be chec#ed for while the metal bodies!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/3 Test/-,ec1s n a%% Su" !ain * a#ds 4SM*s'

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

6 of 35

+O-ATION:3 0RO5ND 6+OOR


S() (anufacturer' SCHNEIDER Electric- !in "alib Engineering S() Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s -,ec1ed

'+$ ,olt #$ (& for )s

01 02 03 04 05 06 07 08 09 10 11 12 13 14

hec# sub main board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# ( ) ratings with drawings and specifications Test all outgoing sub feeder circuits to $erify insulation resistance and continually! "nspect dead front co$ers, panel doors for dents, scratches, etc! All cables including gland connections were chec#ed for tightness! hec# main and outgoing ( ) ratings against drawings! "nspect terminations*connections to )s and terminals for tightness! +erify proper labeling and designating of circuits! hec# S() diagram is posted at inside of door! -nsure the operation at full load and no load properly! -arth continuity shall be chec#ed for while the metal bodies!

N te: See attached "nsulation Test Report at APP-/."4! CARRIED OUT BY /ame' Signature' .ate' WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/4 Test/-,ec1s n a%% Su" !ain * a#ds 4SM*s' +O-ATION:3 6IRST 6+OOR
S() (anufacturer' SCHNEIDER Electric- !in "alib Engineering

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

7 of 35

S() Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s -,ec1ed

'+$ ,olt #$ (& for )s

01 02 03 04 05 06 07 08 09 10 11 12 13 14

hec# sub main board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# ( ) ratings with drawings and specifications Test all outgoing sub feeder circuits to $erify insulation resistance and continually! "nspect dead front co$ers, panel doors for dents, scratches, etc! All cables including gland connections were chec#ed for tightness! hec# main and outgoing ( ) ratings against drawings! "nspect terminations*connections to )s and terminals for tightness! +erify proper labeling and designating of circuits! hec# S() diagram is posted at inside of door! -nsure the operation at full load and no load properly! -arth continuity shall be chec#ed for while the metal bodies!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/7 Test/-,ec1s n a%% Su" !ain * a#ds 4SM*s' +O-ATION:3 SE-OND 6+OOR
S() (anufacturer' SCHNEIDER Electric- !in "alib Engineering

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

8 of 35

S() Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s -,ec1ed

'+$ ,olt #$ (& for )s

01 02 03 04 05 06 07 08 09 10 11 12 13 14

hec# sub main board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# ( ) ratings with drawings and specifications Test all outgoing sub feeder circuits to $erify insulation resistance and continually! "nspect dead front co$ers, panel doors for dents, scratches, etc! All cables including gland connections were chec#ed for tightness! hec# main and outgoing ( ) ratings against drawings! "nspect terminations*connections to )s and terminals for tightness! +erify proper labeling and designating of circuits! hec# S() diagram is posted at inside of door! -nsure the operation at full load and no load properly! -arth continuity shall be chec#ed for while the metal bodies!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/8 Test/-,ec1s n a%% Su" !ain * a#ds 4SM*s' +O-ATION:3 THIRD 6+OOR
S() (anufacturer' SCHNEIDER Electric-!in "alib Engineering S() Ref!' +oltage Rating' '+$ ,olt

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

9 of 35

)us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s

#$ (& for )s

-,ec1ed

01 02 03 04 05 06 07 08 09 10 11 12 13 14

hec# sub main board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# ( ) ratings with drawings and specifications Test all outgoing sub feeder circuits to $erify insulation resistance and continually! "nspect dead front co$ers, panel doors for dents, scratches, etc! All cables including gland connections were chec#ed for tightness! hec# main and outgoing ( ) ratings against drawings! "nspect terminations*connections to )s and terminals for tightness! +erify proper labeling and designating of circuits! hec# S() diagram is posted at inside of door! -nsure the operation at full load and no load properly! -arth continuity shall be chec#ed for while the metal bodies!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/9 Test/-,ec1s n a%% Su" !ain * a#ds 4SM*s' +O-ATION:3 ROO6 6+OOR
S() (anufacturer' SCHNEIDER Electric- !in "alib Engineering S() Ref!' +oltage Rating' '+$ ,olt

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

10 of 35

)us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s

#$ (& for )s

-,ec1ed

01 02 03 04 05 06 07 08 09 10 11 12 13 14

hec# sub main board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# ( ) ratings with drawings and specifications Test all outgoing sub feeder circuits to $erify insulation resistance and continually! "nspect dead front co$ers, panel doors for dents, scratches, etc! All cables including gland connections were chec#ed for tightness! hec# main and outgoing ( ) ratings against drawings! "nspect terminations*connections to )s and terminals for tightness! +erify proper labeling and designating of circuits! hec# S() diagram is posted at inside of door! -nsure the operation at full load and no load properly! -arth continuity shall be chec#ed for while the metal bodies!

N te: See attached "nsulation Test Report at APP-/."4! CARRIED OUT BY /ame' Signature' .ate' WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/: Test/-,ec1s n a%% - nt# % (ane%s;


( ( (anufacturer' Ref!' Bin Galib Engineering AHUs CONTROL PANELS

+oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!' IP-$

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

11 of 35

-,ec1s

-,ec1ed

01 02 03 04 05 06 07 08 09 10 11 12 13 14

hec# ontrol panel8s data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# isolator and ( )s ratings with drawings and specifications! Test all outgoing sub feeder circuits to $erify insulation resistance and continuity "nspect dead front co$ers, panel doors for dents, scratches, etc! ircuit homeruns were chec#ed for its designated phase colures! All cables including gland connections were chec#ed for tightness! "nspect terminations*connections to )s and terminals for tightness! +erify proper labeling and designating of branch circuits! hec# if a laminated control panel drawing is posted at inside of door! +erify all the metal parts are connected by -arth continuity conductor! -nsure the polarities and phase rotation of all the rotating machines!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/< Test/-,ec1s n a%% Dist#i"uti n * a#ds 4D*s' +O-ATION:3 *ASEMENT31


( (anufacturer' SCHNEIDER !IN "&.I! .) Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating'

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

12 of 35

.rawing Ref! /o!'


-,ec1s -,ec1ed

01 02 03 04 05 06 07 08 09 10 11 12

hec# distribution board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# main isolator, and all outgoing branch ( )s with drawings and specifications! "nspect terminations*connections to ( )s and terminals for tightness! Test all outgoing branch circuits to $erify insulation resistance and continuity! "nspect dead front co$ers, panel doors for dents, scratches, etc! hec# cable gland connection if terminated properly! +erify proper labeling and designating of circuits! hec# .) Schedule is posted at inside of door! +erify all the metal parts are connected by -arth continuity conductor!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/10
(

Test/-,ec1s n a%% Dist#i"uti n * a#ds 4D*s'


(anufacturer' SCHNEIDER !IN "&.I!

+O-ATION:3 0RO5ND 6+OOR


.) Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

13 of 35

-,ec1s

-,ec1ed

01 02 03 04 05 06 07 08 09 10 11 12

hec# distribution board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# main isolator, and all outgoing branch ( )s with drawings and specifications! "nspect terminations*connections to ( )s and terminals for tightness! Test all outgoing branch circuits to $erify insulation resistance and continuity! "nspect dead front co$ers, panel doors for dents, scratches, etc! hec# cable gland connection if terminated properly! +erify proper labeling and designating of circuits! hec# .) Schedule is posted at inside of door! +erify all the metal parts are connected by -arth continuity conductor!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/11
(

Test/-,ec1s n a%% Dist#i"uti n * a#ds 4D*s'


(anufacturer' SCHNEIDER !IN "&.I!

+O-ATION:3 6IRST 6+OOR


.) Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s -,ec1ed

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

14 of 35

01 02 03 04 05 06 07 08 09 10 11 12

hec# distribution board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# main isolator, and all outgoing branch ( )s with drawings and specifications! "nspect terminations*connections to ( )s and terminals for tightness! Test all outgoing branch circuits to $erify insulation resistance and continuity! "nspect dead front co$ers, panel doors for dents, scratches, etc! hec# cable gland connection if terminated properly! +erify proper labeling and designating of circuits! hec# .) Schedule is posted at inside of door! +erify all the metal parts are connected by -arth continuity conductor!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/12
(

Test/-,ec1s n a%% Dist#i"uti n * a#ds 4D*s'


(anufacturer' SCHNEIDER !IN "&.I!

+O-ATION:3 SE-OND 6+OOR


.) Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s -,ec1ed

01

hec# distribution board's data with drawings and specification!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

15 of 35

02 03 04 05 06 07 08 09 10 11 12

"nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components! hec# main isolator, and all outgoing branch ( )s with drawings and specifications! "nspect terminations*connections to ( )s and terminals for tightness! Test all outgoing branch circuits to $erify insulation resistance and continuity! "nspect dead front co$ers, panel doors for dents, scratches, etc! hec# cable gland connection if terminated properly! +erify proper labeling and designating of circuits! hec# .) Schedule is posted at inside of door! +erify all the metal parts are connected by -arth continuity conductor!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/13
(

Test/-,ec1s n a%% Dist#i"uti n * a#ds 4D*s'


(anufacturer' SCHNEIDER !IN "&.I!

+O-ATION:3 THIRD 6+OOR


.) Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s -,ec1ed

01 02 03

hec# distribution board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

16 of 35

04 05 06 07 08 09 10 11 12

"nspect bus bar, neutral 1 earth terminals, and internal components! hec# main isolator, and all outgoing branch ( )s with drawings and specifications! "nspect terminations*connections to ( )s and terminals for tightness! Test all outgoing branch circuits to $erify insulation resistance and continuity! "nspect dead front co$ers, panel doors for dents, scratches, etc! hec# cable gland connection if terminated properly! +erify proper labeling and designating of circuits! hec# .) Schedule is posted at inside of door! +erify all the metal parts are connected by -arth continuity conductor!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/14
(

Test/-,ec1s n a%% Dist#i"uti n * a#ds 4D*s'


(anufacturer' SCHNEIDER !IN "&.I!

+O-ATION:3 ROO6 6+OOR


.) Ref!' +oltage Rating' )us bar Rating' ,ault Rating' "P Rating' .rawing Ref! /o!'
-,ec1s -,ec1ed

01 02 03 04

hec# distribution board's data with drawings and specification! "nspect physical and mechanical condition! +erify mounting at wall, anchorage, clearances, and alignment! "nspect bus bar, neutral 1 earth terminals, and internal components!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

17 of 35

05 06 07 08 09 10 11 12

hec# main isolator, and all outgoing branch ( )s with drawings and specifications! "nspect terminations*connections to ( )s and terminals for tightness! Test all outgoing branch circuits to $erify insulation resistance and continuity! "nspect dead front co$ers, panel doors for dents, scratches, etc! hec# cable gland connection if terminated properly! +erify proper labeling and designating of circuits! hec# .) Schedule is posted at inside of door! +erify all the metal parts are connected by -arth continuity conductor!

N te: See attached "nsulation Test Report at APP-/."4!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/17

Tests/-,ec1s n ( &e# 6act # - ##ecti n 5nits; (6-5s SCHNEIDER !IN "&.I!

(anufactures' .rawing Ref! /o!'


-,ec1s

-,ec1ed

01 02 03 04 05 06 07 08 09

hec# e%uipment nameplate data with drawings and specification! "nspect physical and mechanical condition! +erify appropriate anchorage, re%uired clearance, and alignment! "nspect all doors, panels, and sections for corrosion, dents, scratches, etc! +erify that fuse and*or circuit brea#er si0e and types correspond to drawings! hec# all outgoing ( ) ratings with drawings and specifications! Test all outgoing feeder circuits to $erify insulation resistance and continuity All cables including gland connections were chec#ed for tightness! +erify that all Ts, fuses, metering and indicating instruments, and selector switches

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

18 of 35

correspond to drawings! 10 11 12 13 14 "nspect insulators for e$idence of physical damage or contaminations! +erify if proper labels were pro$ided or mounted on panels! hec# if a laminated single line diagram is posted adjacent to the (S)! hec# all the metal bodies are connected by ! +erify all the interface connections with )(S done by properly

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

1/18

Tests/-,ec1s n a%% E%ect#ica% . Au=i%ia#) >i#ing Devices; Switches, Soc#et 9utlets, ,le: 9utlets, .P Switches, Switched 1 ;n&switched Spur ;nits

.e$ice (anufacturer' .esignations' .rawing Ref! /o!'


-,ec1s -,ec1ed

01 02 03 04 05 06

ompare nameplate with drawings and specification! "nspect for any missing components or loose parts, defects, etc! "nspect for proper terminations, and wire management! hec# for plate co$er mounting as to alignment and tightness! "nspect plate co$ers for dirt, scratches, dents, etc! hec# all the earth wires are connected properly!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

19 of 35

07 08

hec# the effecti$eness of completed earthing installation earth fault loop impedance test Test continuity of ring main circuits of all final power!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

STA0E 2

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

20 of 35

PRE-COMMISSIONING TEST

O?e#ati na%/6uncti na% Test @ t,e @ %% &ing:

-,ec1s

-,ec1ed

01 02 03 04

Test on (ain Switch )oard Test on S(.)'s Test on all ontrol Panels Test on -arthing and lightning protection system!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

21 of 35

N !es/C ""en!s#

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

2/1 Tests n Main S&itc, * a#d; -nsure all incoming * outgoing )rea#er A )s will be #ept off before!

-,ec1s

-,ec1ed

01 02 03 04 05 06 07

hec# the power supply is a$ailable on the incomer A ) and indication lights are wor#ing normal! hec# the system $oltage on each phases 1 neutral! -nsure all the incoming brea#ers of all S(.)'s are #ept open position! 7ept off all 9*< )rea#ers while harge the power supply of (+ panel incomer A ) hec# the $oltages and phases on the front panel! lose the ( )'s of outgoing feeders step by step and chec# the $oltages 1 phase indication are properly wor#ing on the S(.)'s! R,- relay functions to be chec#ed by 7ahramaa -ngineer while energi0ing the (+ panel

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

22 of 35

08

hec# the battery harger $oltage showing properly!

N te: (+ panel supply will be energi0ed with the presence of manufacturer,7ahramaa and contractor!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

2/2 Test n SMD*As;

-,ec1s

-,ec1ed

01 02 03 04 05 06 07

hec# the system $oltage and phase indication are showing properly on the S(.)'s front panel! -nsure all the outgoing brea#ers are #ept off before switch on the main incomer! Switch on the main incomer! Switch on the outgoing brea#ers one by one after switch the main brea#er! -nsure the .) incomer isolators will be #ept off while switch on the outgoing brea#ers! -nsure all the outgoing ,eeders are found normal! hec# the panels connected with full load!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

23 of 35

N te:

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

2/3 Test n a%% - nt# % (ane%s;

-,ec1s

-,ec1ed

01 02 03 04 05 06 07

hec# the system $oltage and phase indication are wor#ing normal! 7ept off all the outgoing brea#ers before switch on the main isolator! hec# the power supply a$ailable at isolator end after switch on the sub feeders! Then switch on the isolator and chec# the rotation is wor#ing normal! hec# all the )(S 1 fire alarm interface controls are wor#ing properly! +erify all the metal bodies are connected by ! +erify the polarity and phase rotation of all rotating e%uipments!

N te:

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

24 of 35

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

2/4 Test n Ea#t,ing and %ig,tning ?# tecti n s)ste!

-,ec1s

-,ec1ed

01 02 03 04 05 06

hec# the -arth resistance is showing according to the 7ahramaa regulations! -nsure the electrical -arth resistance reading found normal! hec# the Qtel -arth resistance not grated than 2 9hm! hec# the cut ape*installations are done properly! +erify all the mechanical e%uipments are connected through networ#! hec# earth fault loop impedance test of all the effecti$eness earthing system installation

N te:

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

25 of 35

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

STA0E 3

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

26 of 35

COMMISSIONING TEST

- !!issi ning Test @ t,e @ %% &ing:

-,ec1s

-,ec1ed

Test on (ain Switch )oard Test on all Sub main )oards =S()s3 Test on all ontrol Panels! orrection ;nits Test on all .istribution )oards =.)s3 Tests on Power ,actor Tests on all -lectrical 1 Au:iliary >iring .e$ices

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

27 of 35

/otes' 23 ,ound the (+ panels, P, ;, S(.)'s, .)'s 1 control panels wor#ing in normal conditions! 53 -nsure all the electrical wiring de$ices are wor#ing properly!

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

APPENDIX

In A((ENDIBC attac, a%% Test Resu%ts as #e$ui#edC -a%i"#ati n -e#ti@icate @ t,e Test Inst#u!ent usedC and a%% t,e# attac,!ents as necessa#) t c !?%ete t,is D cu!ent/

2& (+ panel factory test reports! Sub main board factory test reports!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

28 of 35

Power factor correction unit8s factory test reports! 5& alibration certificates of insulation Tester and multi meter! And earth resistance tester!

6& "nsulation and continuity report of (+ panels, S(.)'s out going ,eeder cables! ?& "nsulation and continuity test report of distribution board final circuits for lighting and power system! @& hic# lists!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

29 of 35

PROCEDURES

13 E+E-TRI-A+ +I0HTIN0 AND (O>ER SDSTEM 23 EARTHIN0 AND +I0HTNIN0 (ROTE-TION SDSTEM 33 TOO+S . SA6ETD (RO-ED5RES

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

30 of 35

(RO-ED5RES 1.0 ELECTRICAL LIGHTING AND POWER SYSTEM

(# cedu#es:

23 All electrical "nstallations to be completed and appro$ed by the consultant prior to start the Testing and commissioning! 53 63 ?3 (+ panels, S(.)'s1 P, ;'s are tested at factory witnessed by the onsultant! "nsulation and ontinuity test sheets pro$ided along with inspection of each S(.)'s and .)'s incoming and outgoing cables and final circuits! ontinuity* insulation test will be ta#e each phase to phase, phase to neutral and neutral to earth conductors! @3 Test will be conducted within all the brea#ers in open position to confirm no short circuits in the feeders! A3 -arth Lea#age circuits will be tested for tripping the brea#ers properly!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

31 of 35

B3 -nsure main isolator of (+P, S(.)'s1 .)'s will be #ept off while energi0ing the power supply! C3 hec# the system +oltage reading by the selector switch on the front panel! =Phase to phase and phase to neutral3 and 6 phase supply a$ailable indication are showing properly! D3 9utgoing feeders of (+P, S(.)'s1 final circuits of .)'s close one by one! 2E3 -nsure all the feeders, sub feeders and final circuits are wor#ing in normal condition! 223 +erify the Polarity and phase rotation of all ,uses, control switches "solators and (otor*Pumps etcF! 253 A test shall be made to $erify the ontinuity of all conductors =including ring circuits and all reading shall be tabulated /otes' 2& -arth continuity shall be chec#ed for all the metal connecting points! 5& hec#ed all the wiring de$ices are connected and wor#ing properly! 6& "nsulation resistance test shall be conducted twice the system supply $oltage! 3 of e$ery

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

32 of 35

(RO-ED5RES 2.0 EARTHING AND LIGHTING PROTECTION SYSTEM

(# cedu#es:

23 ALL -arthing and lighting protection system installation to be completed and appro$ed prior to start Testing and ommissioning! 53 All -arth Pits shall be tested indi$idually by the earth resistance tester and record the $alues on the attached table while installation! 63 @3 hec# the electrical earth resistance up to the (+P, <enerator and reading to be record! -arthing for lightning protection system shall be tested from the down conductors to earth pit! ?3 QT-L and low current earth pit shall be tested separately!

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

33 of 35

A3 9$er all earth resistance readings to be ta#en for the lightning protection system earthing and shall not be greater than 2E 9hms! B3 +erify all mechanical e%uipments are connected to the networ#! C3 -arth fault loop impedance test conducted for the complete earthing system installation!
N tes:

CARRIED OUT BY /ame' Signature' .ate'

WITNESSED / APPROVED BY CONSULTANT /ame' Signature' .ate'

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

34 of 35

3.0 TOOLS & SAFETY PROCEDURES

3/1 Testing and c !!issi ning t

%s:

23 (ulti meter for continuity testing and $oltage chec#! 53 lamp meter 63 -lectrical tool #it ?3 "nsulation resistance tester =(egger3 @3 -arth Resistance Tester
3/2 SA6TD (RO-ED5RES

Project safety plan shall be adhered during the complete Testing 1 ommissioning of Room (anagement System! /ecessary safety precautions shall be ta#en care of'

METHOD STATEMENT
Issue Date Rev # 00 14/10/2013 00

ELECTRICAL TESTING & COMMISSIONING

PAGE DOCUMENT NO.

35 of 35

All employees shall wear PP- which shall be fit for purpose! Safe access to the place of wor# shall be pro$ided for all employees! 9nly %ualified and competent technicians shall perform the wor# in accordance with rele$ant codes and practice! <ood Gouse 7eeping shall be performed prior to lea$ing the wor# area!