Escolar Documentos
Profissional Documentos
Cultura Documentos
Design Development
Table of Contents
Design Development
ARCHITECT
H+K Architects 5485 Reno Corporate Drive, Suite 100 Reno, Nevada 89511 (775) 332-6640 F(775) 332-6642 Jeff Klippenstein, AIA, Principal Email: jeff@hkarchitects.com Mark Johnson, AIA Email: mark@hkarchitects.com
ELECTRICAL ENGINEER
PK Electrical, Inc. 681 Sierra Rose Drive, Suite B Reno, Nevada 89511 (775) 826-9010 F(775) 826-9030 Karen Purcell, PE Email: kpurcell@pkelectrical.com Scott Pruter Email: spruter@pkelectrical.com
CIVIL ENGINEER
Odyssey Engineering, Inc. 895 Roberta Lane, Suite 104 Sparks, Nevada 89431 (775) 359-3303 F(775) 359-3329 Jerry Walsh, PE Email: jerry@odysseyreno.com
STRUCTURAL ENGINEER
Hyytinen Engineering 5458 Longley Lane, Suite B Reno, NV 89511 (775) 826-3019 F(775) 826-3076 Chris Roper, SE Email: croper@hyytinenengineering.com
MECHANICAL ENGINEER
CR Engineering 5434 Longley Lane Reno, Nevada 89511 (775) 836-1919 F(775) 826-1918 Chris Rounds, PE Email: crounds@cr-eng.com Chun Lee Email: chun@cr-eng.com
2 Project Team
Design Development
In order to accomplish this, the following modications were made to the overall scope of the project: The New CTE Building has been eliminated The Welding Shop remains in Building 500 Four classrooms were added to the STEM building A summary of the revisions and changes follows.
400
600
500
100 200
New STEM
North
Architectural Narrative
Design Development
BUILDING 500 MODIFICATIONS (Page 10) A number of additional upgrades were incorporated into the renovation of Building 500 to completely refresh the building. The work includes full replacement of carpet, ceiling tile, and paint throughout the interior. The student toilet rooms will be renovated to meet ADA requirements and include new xtures and partitions. The exterior work will include the addition of a new roof, replacement of the wood fascia and soft with prenished metal panels, and replacement of the concrete sidewalk on the north side of the building to correct the site drainage issues. It was determined during the Design Development that the Welding Shop would remain in Building 500. The shop will remain on the east end of the building, but the space will be completely remodeled to meet the requirements of the Education Specication. This renovation includes the Welding Shop, Classroom, Shop Storage, separate Tank Storage Room and Air Compressor Room, and screened exterior yard for material storage. Adjacent to the Welding Shop is a recongured Project Room and recongured Electrical Room with exterior access only. A number of minor modications were also incorporated into the building plan to better address the various uses within. A Special Education Suite was created using the space formerly included in the entryway allowing the Teacher Workroom to remain in its existing location. The Silk Screen Shop and Auto Shop were both modied to allow for exterior access only - eliminating the ability for odor transmission into the hallway. That change combined with the mechanical system replacement will address the odor problem currently present in the building.
Architectural Narrative
Design Development
PARKING RECONFIGURATION The existing parking lot will be re-striped to separate the student, visitor, and bus trafc. This includes the creation of student drop off areas on the south and east sides of the campus and elimination of vehicular trafc adjacent to the STEM Building. A raised crosswalk will be provided from Highway 88 across the parking area to increase student safety.
STEM Building
North
Architectural Narrative
Design Development
Kitchen
Servery
Commons
Administration
North
Design Development
Design Development
Design Development
Design Development
Project Room
PB
PB
Special Education
North
PB
PB
Design Development
11
Design Development
UP
Elec. Mach.
Passenger Elevator
Psych.
Riser
Cust.
North
Design Development
Classroom
Classroom
Classroom
Passenger Elevator
Mechanical Shaft
Mechanical Shaft
Chemistry
Chemistry
North
13
Design Development
Design Development
15