Você está na página 1de 3

Current Mechanical Engineer at Saudi BinLaden Group Past ElectroMechanical Engineer at Parsons International Co.

l Co. LLC, Water & Infrastructure Mechanical Engineer at Wade Adams Mechanical Engineer at kerala ceramics Ltd Education Visvesvaraya Technological University Connections 500+ connections

Abdul Najeem's Summary


An Engineering graduate with 7 years of experience in Construction, of Pump Stations, fountains, Generator plant, chiller plant, Water Treatment plant ,Central waste handling plant &Networks (Water, sewage, storm, Fire Fighting, Chilled water & Water mist Fire system) Installation, Testing & Commissioning of HVAC, Plumbing (Chilled water, Sewage, Drainage &Vent) & Fire Fighting system. Abu Dhabi Municipality (UAE) approved Electro-Mechanical Engineer. Skills in AutoCAD, Ms Office and very good Computer knowledge. Certified in RT, UT, PT&MPT (American Society for Non-destructive Testing-Level II). Preparation of P&ID diagram for Mechanical works. Work Experience in Estimation, Costing & Tendering for Mechanical Works.

Abdul Najeem's Experience


Mechanical Engineer
Saudi BinLaden Group
Construction industry

June 2011 Present (2 years 9 months) Saudi Arabia

Chiller Plant Installation of chiller units (York Titan) Capacity (32 Nos. x 5000 Ton= 1, 60,000 Ton), Cooling tower 32 Nos. (GEA Polaces), Condenser water pump (ITT Bell & Gossett) AFV, Balancing valve, Four way valve, Cooling tower filtration unit (Veolia), Self-cleaning strainer, Dosing system, Air separator (Vessel), Expansion tanks (Amtrol), Primary water pump (315.5 /s @ 180 kpa), Secondary chilled water pump, Overhead crane(50 Ton), Black steel pipes welded (Dia 1400) for chilled water return & supply. Responsible for QC inspection and consultant inspection. Co-coordinating with Civil, Electrical departments & Sub-contractors for co-ordination of work. Maintain the log for shop drawing, IR, Material submittal for follow up. Preparing the weekly Mechanical installation status & civil work status. Generator plant; Installation of diesel generator (16 Nos. 4.4 MV) Make Caterpillar, Radiator (GEA), Daily fuel tank 5000 liter (16 Nos.) Fuel overflow tank 5000L (2 Nos.), underground fuel tank each 100,000 liters (5 Nos.) Fuel transfer pumps (Ewon USA),Overhead crane(10 Ton). Installation of cooling system, Compressed air starting system, Fuel supply & drain system, Lube oil supply & drain system, Combustion air, Exhaust air & breather unit system pipings . Water Treatment Plant: Installation of hydro disc filter system for polishing of treated sewage effluent water Installation of backwash pump, online analyzer, chlorine analyzer, chlorine dosing system, stabilized bromine dosing system, chemical pumps, turbid meter etc. Central waste handling plant: Installation of blower pumps, waste cyclone, dust cyclone, waste compactor, overhead crane (10 ton), and

monorail crane (1.6 Ton), carbon steel pipes. Reviewing the drawings, submittals& discussing the technical issues to Mari matic, Finland.

ElectroMechanical Engineer
Parsons International Co. LLC, Water & Infrastructure
Privately Held; 1001-5000 employees; Civil Engineering industry

February 2009 May 2011 (2 years 4 months) UAE

Duties and Responsibilities: Inspecting the installation of pumps(Grundfos, ITT lowara),Valves(Econosto), penstock, odour control unit, screen filter, pressure vessel, basket strainer, flexible joint, over head crane, Ac units, flow meters etc in pumping station. Supervising the MS pipe galvanizing and VJ coupling installation. Checking and Approving GIR, day work, material submittals, shop drawing, As-built drawing, cost estimates and work orders. Inspecting the installation of submersible pumps, float valve, float switch, filtration system, level sensor, auto back wash valve etc. in the water features. Review the method statement of mechanical works. Inspecting the material storage in the site & ensure it is stored as per the contract recommendations. Checking the hydraulic calculations of pumps. Inspecting the installation of fire pumps as per the NFPA rule. Preparing monthly QA/QC progress report & safety reports and submitting to the client.

Mechanical Engineer
Wade Adams
Privately Held; 10,001+ employees; Construction industry

April 2007 January 2009 (1 year 10 months) Dubai

Construction, Installation, testing & commissioning of Potable Water, Irrigation Water, Sewerage and Fire Fighting Pumping Station. Installation and commissioning of plant equipments, machineries and MEP Works such as HVAC System installation, plumbing of the pumping station facilities. Site Management and supervision of the Construction Site. Responsible for the consultant and clients inspection and acceptance of the construction activities. Materials take off for the construction of Irrigation, Fire Fighting, Sewage Pumping Stations, Networks & related mechanical works of the projects. Sourcing & pricing of materials takeoff from the contract drawings within the limit of BOQ. Major Equipments are Vertical Turbine Pumps, Submersible Pumps, Jockey Pumps, Split Casing Pumps, Fire Fighting Pumps, Mechanical Valves, Hydraulic/Control valves, Filters, Instrumentations, Pressure vessel, Strainers, dosing system, HVAC Equipments etc. Price, delivery and payment terms & condition negotiations with the suppliers / manufacturers. Techno-economical evaluation of the materials to be procured. Preparation & follow up the materials delivery schedule. Responsible for the preparation of shop drawing, as-built drawings, material submittals, getting approvals from the consultants etc. Reporting to Project Manager & Company Manager. Water network line and chamber work.

Mechanical Engineer
kerala ceramics Ltd
March 2006 February 2007 (1 year)

Duties and Responsibilities: Site supervision of civil work in biogas plant and submitting report Maintenance of different types of pumps and motors. Preparing mechanical drawings for fabrication work and pipeline work by using AutoCAD software. Operation and Maintenance of hydraulic Press in the plant. Site supervision of mining area and submitting report. Estimation, Costing and Tendering of work.

Operation and maintenance of gears and agitators in the plant. Fabrication and rubberizing work.