Você está na página 1de 56

canadian institute of steel construction

for structural steel


Code of
Standard
Copyright 2009
by
Canadian Institute of Steel Construction
All rights reserved. This book or any part thereof must
not be reproduced in any form without the written
permission of the publisher.
First Printing, January 2009
ISBN 978-0-88811-123-4
PRINTED IN CANADA
by
Lakeside Group Inc.
Ontario, Canada
7-3
CISC
CODE OF STANDARD PRACTICE
for Structural Steel
Seventh Edition
Published by the
CANADIAN INSTITUTE OF STEEL CONSTRUCTION
3760 14
th
Avenue Suite 200
Markham Ontario L3R 3T7
7-4 CISC Code of Standard Practice
TABLE OF CONTENTS
Preface .....................................................................................................................................7-6
1. General Provisions ............................................................................................................7-8
1.1 Scope ..........................................................................................................................7-8
1.2 Denitions ..................................................................................................................7-8
1.3 Governing Technical Standards ...............................................................................7-10
1.4 Responsibility for Design ........................................................................................ 7-11
1.5 Responsibility for Erection Procedure ..................................................................... 7-11
1.6 Patented Devices ...................................................................................................... 7-11
1.7 Scheduling ............................................................................................................... 7-11
2. Classication of Material ................................................................................................ 7-11
2.1 Structural Steel . ........................................................................................................ 7-11
2.2 Field Connection Material .......................................................................................7-13
2.3 Items Supplied by Others .........................................................................................7-13
3. Quotations and Contracts ................................................................................................7-15
3.1 Standard Form of Contract .......................................................................................7-15
3.2 Types of Contracts ...................................................................................................7-15
3.3 Revisions to Contract Documents ...........................................................................7-15
3.4 Discrepancies ...........................................................................................................7-16
3.5 Computation of Units ..............................................................................................7-16
3.6 Contract Price Adjustments .....................................................................................7-17
3.7 Scheduling ...............................................................................................................7-17
4. Contract Documents ........................................................................................................7-18
4.1 Tender Documents Tender Drawings and Tender Specications .........................7-18
4.2 Architectural, Electrical and Mechanical Drawings .................................................7-18
4.3 Construction Drawings and Construction Specications ........................................7-18
4.4 Architecturally Exposed Structural Steel .................................................................7-19
4.5 Digital Modelling .....................................................................................................7-19
5. Fabrication and Erection Documents ..............................................................................7-19
5.1 Erection Diagrams ....................................................................................................7-19
5.2 Connection Design Details .......................................................................................7-19
5.3 Shop Details .............................................................................................................7-20
5.4 Erection Procedures .................................................................................................7-20
5.5 Field Work Details ...................................................................................................7-20
5.6 Review and Approval ...............................................................................................7-20
5.7 Additions, Deletions or Changes .............................................................................7-21
6. Material, Fabrication, Inspection, Painting and Delivery ...............................................7-21
6.1 Material ....................................................................................................................7-21
6.2 Identication ............................................................................................................7-21
6.3 Preparation of Material ............................................................................................7-22
6.4 Fitting and Fastening ...............................................................................................7-22
7-5 CISC Code of Standard Practice
6.5 Dimensional Tolerances ...........................................................................................7-22
6.6 Inspection of Steelwork ...........................................................................................7-22
6.7 Surface Preparation ..................................................................................................7-22
6.8 Paint .........................................................................................................................7-22
6.9 Marking and Shipping .............................................................................................7-23
6.10 Delivery of Materials .............................................................................................7-23
7. Erection ...........................................................................................................................7-24
7.1 Method of Erection ..................................................................................................7-24
7.2 Erection Safety .........................................................................................................7-24
7.3 Site Conditions .........................................................................................................7-24
7.4 Foundations ..............................................................................................................7-24
7.5 Bearing Surfaces ......................................................................................................7-24
7.6 Building Lines and Bench Marks ............................................................................7-25
7.7 Installation of Anchor Rods and Embedded Items ..................................................7-25
7.8 Bearing Devices .......................................................................................................7-25
7.9 Examination by Erector ...........................................................................................7-26
7.10 Adjustable Shelf Angles and Sash Angles .............................................................7-26
7.11 Loose Lintels, Wall-Bearing Members and Other Pieces .......................................7-26
7.12 Tolerances ..............................................................................................................7-26
7.13 Checking Erected Steelwork ..................................................................................7-26
7.14 Removal of Bracing ...............................................................................................7-26
7.15 Correction of Errors When Material Is Not Erected by the Fabricator .................7-27
7.16 Field Assembly ......................................................................................................7-27
7.17 Accommodation of Other Trades ...........................................................................7-27
7.18 Temporary Floors and Access Stairs ......................................................................7-27
7.19 Touch-Up of Shop Paint .........................................................................................7-27
7.20 Final Painting .........................................................................................................7-27
7.21 Final Cleanup .........................................................................................................7-27
APPENDIX A Structural Steel in Buildings ......................................................................7-28
APPENDIX B Guideline for Unit Price Application for Changes ...................................7-30
APPENDIX C A Suggested Format for Price-per-Unit Contracts ....................................7-32
APPENDIX D Tolerances on Anchor Rod Placement ......................................................7-36
APPENDIX E Conversion of SI Units to Imperial Units .................................................7-37
APPENDIX F Miscellaneous Steel ..................................................................................7-38
APPENDIX G A Suggested Format for a Monthly Progress Payment Claim Form ........7-40
APPENDIX H Suggested Denitions for Progress Invoicing and Substantial
Performance .............................................................................................7-41
APPENDIX I Architecturally Exposed Structural Steel ...................................................7-42
APPENDIX J Digital Modelling ......................................................................................7-48
7-6 CISC Code of Standard Practice
CISC CODE OF STANDARD PRACTICE
for Structural Steel
PREFACE
The CISC Code of Standard Practice for Structural Steel is a compilation of usual in dustry
practices relating to the design, fabrication and erection of structural steel. These practices
evolve over a period of time and are subject to change as improved meth ods replace those of
an earlier period. The Code is revised whenever a sufcient number of changes have occurred
to warrant a new edition.
The rst edition of the Code was adopted and published in November 1958. A second edition
incorporating minor revisions was published in October 1962. The third edition, published
in September 1967 and revised in May 1970, incorporated minor changes throughout with
principal changes in Section 2 - Denition of Structural Steel and Sec tion 3 - Computation of
Weights for Unit Price Bids.
The fourth edition adopted in June 1980, revised December 1980, broadened the scope to in-
clude bridges and other structures. It also incorporated the CISC Guide to Tendering Proced-
ures into Section 3 and Appendices B and C. The Code was converted to SI (metric) units and
provided conversion factors and Imperial units in Appendix E.
The fth edition (1991) reected the steel standards recognition of the preparation of ve types
of fabrication and erection documents which may be produced in fullling a steel construc-
tion contract. These documents may be in the form of drawings, diagrams, sketches, computer
output, hand calculations and other data which can be supplied by the fabricator/erector. This
data is generally referred to in contract documents as shop drawings. The computation of
mass has been changed by deleting the mass of welds and the allowances for paint and other
coatings. Appendix B, Guideline for Unit Price Application for Changes, and Appendix C, A
Suggested Format for Price-Per-Unit of Mass or Price-Per-Item Contracts were substantially
revised. To foster uniformity, two new appendices were added: Miscellaneous Steel and A Sug-
gested Format for a Monthly Progress Claim Form.
The sixth edition (1999) claried the role of the fabricator, the informa tion required, and where
that information is expected, as stipulated in the governing technical standards. Added were:
denitions of Design Drawings and Quotations, clauses on quotations, discrepancies, shims
for bearing surfaces, the allowance for re turn of documents, the information required when
painting is specied, and Appendix H - Suggested Denitions for Progress Invoicing and Sub-
stantial Performance. Changes were also made to Appendix C, the terminology for Unit Price
contracts, connection types, and anchor rods the latter two to be consistent with the changes
in CSA Stan dard CAN/CSA-S16-01.
This seventh edition adds two new appendices: I - Architecturally Exposed Structural Steel
(AESS) and J - Digital Modelling, in order to give guidance to designers, owners, and contract-
ors on these two important topics. As each of these topics involves issues that vary widely and
approaches differ, the Code endeavours to identify and clarify the main points that should be
addressed by the interested parties to avoid conicts during actual construction. In addition,
denitions of AESS, STEEL DETAILER and WORK, and a time frame for accepting erected
steelwork have been added.
7-7 CISC Code of Standard Practice
Whenever a gender-specic term is used, it shall be read as gender-neutral.
By documenting standard practices the Code aims to promote a clear understanding between
the Canadian structural steel fabrication and erection industry and its clients.
Canadian Institute of Steel Construction
Adopted June 6, 2008
7-8 CISC Code of Standard Practice
CISC CODE OF STANDARD PRACTICE
for Structural Steel
1. General Provisions
1.1 Scope
This Code covers standard industry practice with respect to the furnish ing of structural steel.
In the absence of provisions to the contrary contained in contracts to which members of the
Canadian Institute of Steel Construction are contracting par ties, members will abide by the
practices described herein.
1.2 Denitions
Approved-for-Con-
struction Drawings
Drawings and other documents approved by the client authorizing
work to proceed. (May also be called Issued-for-Construction
Drawings).
Architect As dened under the appropriate Architects Act.
Architecturally
Exposed Structural
Steel
Structural steel which is specically designated as architecturally
exposed and the appearance of which is governed by Appendix I,
Architecturally Exposed Structural Steel.
Client A person, corporation, or authority with whom the fabricator has
contracted.
Connection Design
Details
Documents which provide details of standard and non-standard
connections and other data necessary for the preparation of shop
details.
Construction
Drawings
Drawings used to govern the construction of the works.
Construction
Specications
Specications used to govern the construction of the works.
Contract The agreement between the fabricator and/or erector, and the cli ent.
Contract Documents The documents which dene the responsibilities of the parties
involved in tendering, purchasing, supplying, fabricating and
erect ing structural steel, including tender drawings and tender
specications and applicable revisions in effect and agreed to at the
time of contract award.
Cost Plus a Fee
Contract
An Agreement whereby the fabricator and/or erector agrees to full
the contract for a consideration which is calculated on the basis of
the fabricators costs plus a specied fee as dened in the con tract.
Design Drawings Drawings, including computer output, electronic and other data, as
prepared by the designer showing member sizes and dimen sions and
all required forces for connection design, i.e. shears, axial forces,
moments and torsions. (See governing technical standard).
7-9 CISC Code of Standard Practice
Designer The designer of the structure. See Engineer of Record.
Engineer As dened under the appropriate Professional Engineers Act.
Engineer of Record Professional Engineer who designs the structure, as dened under
the appropriate Professional Engineers Act.
Erection Bracing Bracing materials or members which are used to plumb, align and
stabilize structural members or the structure during construction and
are removed when the structural members or the structure is secured
by bolting or welding of structural members.
Erection Diagrams Are general arrangement drawings showing the principal dimensions
and elevations of the steel structure, sizes of the steel mem bers,
piece marks, size (diameter) and type of bolts, bolt installation
requirements, elevations of column bases, all neces sary dimensions
and details for setting anchor rods, and all other information necessary
for the assembly of the structure.
Erection Procedures Outline the construction methods, erection sequence, erection and
temporary bracing requirements, and other engineering details
necessary for shipping, handling, erecting, and maintaining the
stability of the structural steel frame.
Erector Means the party responsible for erection of the steelwork.
Fabricator Means the party responsible for furnishing the structural steel.
Field Work Details Are details that provide complete information for modifying fabri-
cated members in the eld (e.g. prepare existing steel to receive new
steel).
General Contractor,
Constructor or
Construction
Manager
The person or corporation who constructs, coordinates, and super-
vises the construction of the work.
General Terminology
e.g. Beams, Joists,
Columns, etc.
These terms have the meanings stated or implied in CAN/CSA-S16
(latest edition), CAN/CSA-S6 (latest edition) and Appendix A of
this Code.
Lump Sum Price
Contract
Also called Stipulated Price Contract. An agreement whereby the
fabricator and/or erector contracts to full the contract terms for a
lump sum (stipulated price) consideration.
Miscellaneous Steel Steel items described and listed in Appendix F of this Code.
Others Means a party or parties other than the fabricator and/or erector.
Owner Means the owner of a structure and shall include his authorized
agent and any person taking possession of a structure on the owners
behalf. Depending on the circumstances an authorized agent may
be the architect, engineer, general contractor, construc tion manager,
public authority or other designated representative of the owner.
7-10 CISC Code of Standard Practice
Price-per-Unit
Contract
Also called Unit-Price Contract. An agreement whereby the fabri-
cator and/or erector contracts to full the contract terms for a con-
sideration which is based on the units of steel calculated in accordance
with the CISC Code of Standard Practice for Struc tural Steel.
Quotations Proposals by the fabricator based on structural steel as dened in
Clause 2.1 and as included in the tender documents, and in accor-
dance with the documents outlined in Clause 3.1.1.
Revision A change in the contract documents.
Shop Details Documents which provide complete information for the fabrica tion
of various members and components of the structure, includ ing the
required material and product standards; the location, type, and
size of all mechanical fasteners; bolt installation require ments; and
welds.
Steel Detailer The skilled technicians responsible for the preparation of shop de-
tails and other data necessary for fabrication and/or erection. May
also be the fabricator.
Stipulated Price
Contract
See Lump Sum Price Contract.
Structural Drawings Drawings showing the structural steel required.
Structural Steel Those items listed under Clause 2.1
Structural Steel
Frame
An assemblage of structural steel components (beams, columns,
purlins, girts, etc.) for the purpose of resisting loads and forces. See
Clause 2.1.
Structural Steel
Specications
The portion of the tender specications containing the requirements
for the fabrication and erection of the structural steel.
Temporary Bracing Members designed by the Engineer of Record to be removed at a
later date at his or her instruction.
Tender Documents Drawings, specications, general conditions, addenda, etc., used as
the basis for preparing a tender.
Tender Drawings Drawings used as the basis for preparing a tender.
Tender Specications Specications used as the basis for preparing a tender.
Unit-Price Contract See Price-per-Unit Contract.
Work Dened as the product or services provided by the steel Fabricator
or Erector.
1.3 Governing Technical Standards
The provisions of the latest edition of CAN/CSA-S16 Limits States Design of Steel Struc-
tures shall govern the design, fabri cation and erection of steel structures except bridges. The
provisions of the latest edition of CAN/CSA-S6 Canadian Highway Bridge Design Code, the
7-11 CISC Code of Standard Practice
Ontario Highway Bridge Design Code (in Ontario) or the American Railway Engineering
Associations Specications for Steel Railway Bridges shall govern the design, fabrication
and erection of structural steel for bridges. The provisions of the latest edition of CSA Standard
W59 Welded Steel Construction (Metal-Arc Welding) shall govern arc welding design and
practice. The provisions of other standards shall be applicable if called for in the tender draw-
ings and tender specications.
1.4 Responsibility for Design
When the client provides the structural drawings and specications, the fabricator and the
erector shall not be responsible for determin ing the adequacy of the design nor liable for the
loss or damage resulting from an inade quate design. Should the client desire the fabricator to
assume any responsibility for design beyond that of proposing adequate connections and details,
and, when required, components, members, or assemblies standardized by the fabricator, the
client shall state clearly his requirements in the invitation to tender or in the accompanying
tender drawings and tender specications. Even though proposed connections and design de-
tails may be prepared by the fabricators technical staff, the overall behaviour of the structure
remains the responsibility of the designer of the structure. (See also Clause 5.6).
1.5 Responsibility for Erection Procedure
When the erection of structural steel is part of his contract, the fabricator shall be responsible
for determining the erec tion procedure, for checking the adequacy of the connections for the
uncompleted struc ture and for providing erection bracing or connection details. When the
erection of the structural steel is not part of his contract, the fabricator shall not be responsible
for de termining the erection procedure, for checking the adequacy of the connections for the
uncompleted structure, or for providing erection bracing or connection details not in cluded
in the contract documents, nor shall the fabricator be liable for loss or damage re sulting from
faulty erection. However, the steel fabricator shall be informed by the client of the erection
sequence to be used which may inuence the sequence and process of the manufacturing. (See
also Clauses 5.1 and 5.4).
1.6 Patented Devices
Except when the contract documents call for the design to be furnished by the fabricator or
erector, the fabricator and erector assume that all nec essary patent rights have been obtained by
the client and that the fabricator and erector will be fully protected by the client in the use of
patented designs, devices or parts re quired by the contract documents.
1.7 Scheduling
The client should provide a construction schedule in the tender documents. In the absence of
such a schedule, one should be mutually agreed upon be tween the contracting parties, prior to
the contract award.
2. Classifcation of Material
2.1 Structural Steel
Unless otherwise specied in the tender documents, a con tract to supply, fabricate and deliver
structural steel shall include only those items from the following list which are clearly indicated
as being required by the structural draw ings and tender specications. (See Appendix A).
7-12 CISC Code of Standard Practice
2.1.1
Anchors for structural steel.
Base plates and bearings for structural steel members.
Beams, purlins, girts forming part of the structural steel frame.
Bearing plates and angles for structural steel members and steel deck.
Bins and hoppers of 6 mm plate or heavier, attached to the structural steel frame.
Bracing for steel members, trusses or frames.
Brackets attached to the structural steel.
Bridge bearings connected to the structural steel members.
Cables for permanent bracing or suspension systems.
Canopy framing if attached to the structural steel frame.
Cold-formed channels when used as structural members as listed in the CISC Hand book
of Steel Construction.
Columns.
Conveyor galleries and supporting bents (exclusive of conveyor stringers, deck plate and
supporting posts which are normally part of the conveyor assembly).
Crane rails and stops, excluding unless otherwise noted nal alignment of the rails.
Curb angles and plates attached to the structural steel frame if shown on the structural steel
drawings.
Deck support angles at columns, walls, if shown on the structural steel drawings.
Diaphragms for bridges.
Door frame supports attached to the structural steel frame.
Embedded items connecting structural steel.
Expansion joints connected to the structural steel frame (excluding expansion joints for
bridges).
Field bolts to connect structural steel components.
Floor plates, roof plates (raised pattern or plain) and steel grating connected to the struc-
tural steel frame.
Girders.
Grillage beams of structural steel.
Hangers supporting structural steel framing.
Jacking girders.
Lintels if attached to steel frame and shown on the structural drawings.
Mechanical roof support and oor opening framing shown on structural drawings.
Monorail beams of standard structural steel shapes.
Open-web steel joists, including anchors, bridging, headers and trimmers; also, when
specied to be included in the structural steel contract documents, light-gauge forms
and temperature reinforcement.
Sash angles attached to the structural steel frame.
Separators, angles, tees, clips and other detail ttings essential to the structural steel
frame.
Shear connectors/studs, except when installed through sheet steel deck by deck in staller.
Shelf angles attached to the structural steel frame if shown on structural drawings.
7-13 CISC Code of Standard Practice
Shop fasteners or welds, and fasteners required to assemble parts for shipment.
Steel tubes or cores for composite columns or braces.
Steel window sills attached to the structural steel frame.
Struts.
Suspended ceiling supports of structural steel shapes at least 75 mm in depth.
Temporary components to facilitate transportation to the site.
Tie, hanger and sag rods forming part of the structural steel frame.
Trusses.
2.1.2 Only if shown on the structural drawings and specically noted by the structural engineer
to be supplied by the structural fabricator:
Steel stairs, walkways, ladders and handrails forming part of the structural steelwork.
(See Appendix A).
2.2 Field Connection Material
2.2.1 When the fabricator erects the structural steel, he shall supply all material re quired for
temporary and for permanent connection of the component parts of the struc tural steel.
2.2.2 When the erection of the structural steel is not part of the fabricators contract, unless
otherwise specied, the fabricator shall furnish appropriate bolts and nuts (plus washers, if
required) or special fasteners, of suitable size and in sufcient quantity for all eld connections
of steel to steel which are specied to be thus permanently con nected, plus an over-allowance
of two per cent of each size to cover waste.
Unless otherwise specied in the tender documents, welding electrodes, back-up bars, tempor-
ary shims, levelling plates, tting-up bolts and drift pins required for the struc tural steel shall
not be furnished by the fabricator when the erection of the structural steel is not part of the
fabricators contract.
2.3 Items Supplied by Others
Unless otherwise specied in the tender docu ments, the following steel or other items shall not
be supplied by the structural steel fab ricator.
Bins and hoppers not covered in Clause 2.1 of this Code.
Bolts for wood lagging.
Bridge bearings not connected to structural steel items.
Canopy framing not attached to structural steel.
Catch basin frames.
Concrete for lling HSS or pipe sections. Concrete is to be supplied and poured by others
in the shop or eld with the cooperation of the fabricator/erector.
Connection material for other trades.
Conveyor stringers, deck plate and supporting posts.
Drain pipes.
Door and corner guards.
Door frames not covered in Clause 2.1 of this Code.
7-14 CISC Code of Standard Practice
Drilling of holes into masonry or concrete, including core drilling of anchor rods for
bridges and drilling for deck support angles.
Edge forming less than 3.2 mm thick for steel deck and not covered in Clause 2.1 of this
code.
Embedded steel parts in precast concrete.
Embedded steel parts not required for structural steel or deck.
Flagpoles and supports.
Floor plates, roof plates and grating not covered in Clause 2.1 of this Code.
Grout.
Hoppers and chutes.
Hose and tire storage brackets.
Installation of embedded parts.
Lag bolts, machine bolts and shields or inserts for attaching shelf angles, trimmer an gles
and channels to masonry or concrete.
Lintels over wall recesses.
Lintels which are either an integral part of door frames or not attached to the structural
steel frame.
Machine bases, rollers and pulleys.
Members made from gauge material except cold-formed channels indicated in Clause 2.1.
Metal-clad doors and frames.
Miscellaneous Steel; see Appendix F.
Shear connectors through sheet steel deck by deck installer.
Sheet steel cladding.
Sheet steel deck.
Sheet steel ashing.
Shelf angles not covered in Clause 2.1 of this Code.
Shoring under composite oors and stub girders.
Steel doors.
Steel sash.
Steel stacks.
Steel stairs, landings, walkways, ladders and handrails, not covered in Clause 2.1.2 of this
Code.
Steel tanks and pressure vessels.
Steel window sills not covered in Clause 2.1 of this Code.
Support for sheet steel deck at column cutouts and for openings not requiring framing con-
nected to structural steel.
Temporary bracing for other trades.
Trench covers.
Trim angles, eave angles or fascia plates not directly attached to the structural steel frame.
7-15 CISC Code of Standard Practice
3. Quotations and Contracts
3.1 Standard Form of Contract
Unless otherwise agreed upon, a contract to fab ricate, deliver and/or erect structural steel shall
be the appropriate Standard Construc tion Documents approved by the Canadian Construction
Documents Committee, or the Canadian Construction Association.
3.1.1 Quotations
Quotations from fabricators are based on the following docu ments:
(1) A Standard Form of Contract. The generally accepted standard form of contract is the CCA
1-2008 Stipulated Price Subcontract Form, and
(2) Canadian Institute of Steel Construction (CISC) Code of Standard Practice for Structural
Steel, latest edition
3.1.2 Progress Payment Claim Form
A suggested format for a progress pay ment claim form is provided in Appendix G.
3.1.3 Progress Invoicing and Substantial Completion
For suggested deni tions, see Appendix H.
3.2 Types of Contracts
3.2.1 For contracts stipulating a lump sum price, the work required to be performed by the
fabricator and/or erector must be completely dened by the contract documents.
3.2.2 For contracts stipulating a price per unit, the scope of the work, type of materi als, char-
acter of fabrication, and conditions of erection are based upon the contract docu ments which
must be representative of the work to be performed. For methods of computing mass, area, or
quantity, see Clause 3.5. Also see Appendix C of this Code.
3.2.3 For contracts stipulating cost plus fee, the work required to be performed by the fab-
ricator and/or erector is indenite in nature at the time the contract documents are prepared.
Consequently the contract documents should dene the method of mea surement of work per-
formed, and the fee to be paid in addition to the fabricators costs.
3.3 Revisions to Contract Documents
3.3.1 Revisions to the contract shall be made by the issue of dated new or revised docu ments.
All revisions shall be clearly indicated. Such revisions should be issued by a De tailed Change
Notice.
3.3.2 The fabricator shall advise the client or client representative of any impact such revision
or change will have on the existing agreement between the two parties.
3.3.3 Upon agreement between the fabricator and the client or client representative as to the
revisions impact, the client or his representative shall issue a change order or ex tra work order
for the revisions.
3.3.4 Unless specically stated to the contrary, the issue of revision documents or changes
indicated on drawing approvals is authorization by the client to release these revisions for
construction.
7-16 CISC Code of Standard Practice
3.4 Discrepancies
In case of discrepancies between the structural drawings and specications for build ings, the
specications govern. In case of discrepancies between the structural drawings and speci-
cations for bridges, the structural drawings govern. In case of discrepancies between scale
dimensions on the structural drawings and gures written on them, the gures govern. In case
of discrepancies between the structural drawings and plans for other trades or disciplines, the
structural drawings govern.
3.5 Computation of Units
Unless another method is specied and fully described at the time tenders are re quested, the
computed mass of steel required for the structure shall be determined by the method of compu-
tation described herein. (Although the method of computation de scribed does not result in the
actual mass of fabricated structural steel and other items, its relative simplicity results in low
computational cost and it is based on quantities which can be readily computed and checked by
all parties involved to establish the basis of payment). No additional mass for welds, or mass
allowance for painting, galvanizing, and metallizing is to be included in the computation of
mass.
a) Mass Density. The mass density of steel is assumed to be 7850 kilograms per
cubic metre.
b) Shapes, Bars and Hollow Structural Sections. The mass of shapes, bars and hol-
low structural sections is computed using the nished dimensions shown on shop
details. No deductions shall be made for holes created by cutting, punch ing or
drilling, for material removed by coping or clipping, or for material re moved by
weld joint preparation. No cutting, milling or planing allowance shall be added to
the nished dimensions. The mass per metre of length for shapes and hollow struc-
tural sections is the published mass. The mass per metre of length for bars is the
published mass, or if no mass is published, the mass com puted from the specied
cross-sectional area.
c) Plates and Slabs. The mass/area of plates and slabs is computed using the rect-
angular dimensions of plates or slabs from which the nished plate or slab pieces
shown on the shop details can be cut. No burning, cutting, trimming or planing
allowance shall be added. When it is practical and economical to do so, several
irregularly-shaped pieces may be cut from the same plate or slab. In this case, the
mass shall be computed using the rectangular dimensions of the plate or slab from
which the pieces can be cut. No cutting or trimming allow ance shall be added. In
all cases, the specied plate or slab thickness is to be used to compute the mass.
The mass of raised-pattern rolled plate is that pub lished by the manufacturer.
d) Bolts. The mass of shop and eld bolts, nuts and washers is computed on the basis
of the shop details and the nominal published mass of the applicable types and
sizes of fastener.
e) Studs. If not included in the contract on a price-per-unit basis, the mass of studs
is computed on the basis of the shop details and/or erection diagrams and the pub-
lished mass of the studs.
7-17 CISC Code of Standard Practice
f) Grating. The mass/area of grating is computed on the basis of the shop details
and/or erection diagrams and published mass of the grating. The area to be used is
the minimum rectangular area from which the piece of grating can be cut.
Where supplied, such items as shims, levelling plates, temporary connection ma- g)
terial, back-up bars and certain eld consumables shall be considered as part of
the structural steel whether or not indicated specically in the contract documents.
Such items then will be added to, and become a part of, computed mass of steel for
the structure.
3.6 Contract Price Adjustments
3.6.1 When the responsibility of the fabricator and/or erector is changed from that pre viously
established by the contract documents, an appropriate modication of the con tract price shall
be made. In computing the contract price adjustment, the fabricator and/or erector shall con-
sider the quantity of work added or deleted, modications in the character of the work, the
timeliness of the change with respect to the status of material ordering, the detailing, fabrica-
tion and erection operations and related impact costs.
3.6.2 Requests for contract price adjustments shall be presented by the fabricator and/or erector
and shall be accompanied by a description of the change in sufcient de tail to permit evaluation
and prompt approval by the client.
3.6.3 Price-per-Unit Contracts
Generally they provide for minor revisions to the quantity of work prior to the time work is
approved for construction. Minor revisions to the quan tity of work should be limited to an in-
crease or decrease in the quantity of any category not exceeding ten percent. Should the quan-
tity of steel of any category vary by more than ten percent, then the contract unit price of that
category may require adjustment. Changes to the character of the work or the mix of the work,
at any time or changes to the quantity of the work after the work is approved for construction,
may require a con tract price adjustment.
3.6.4 A suggested format for accommodating contract price adjustments is contained in Ap-
pendix B.
3.7 Scheduling
3.7.1 The contract documents should specify the schedule for the performance of the work.
This schedule should state when the approved-for-construction drawings will be issued and
when the job site, foundations, cores, walls, piers and abutments will be ready, free from ob-
structions and accessible to the erector, so that erection can start at the designated time and
continue without interference or delay caused by the client or other trades.
3.7.2 The fabricator and/or erector has the responsibility to advise the client of the ef fect any
revision may have on the contract schedule.
3.7.3 If the fabrication and erection schedule is signicantly delayed due to revisions, or for
other reasons which are the clients responsibility, the fabricator and erector shall be compen-
sated for additional costs incurred. Changes to the scope of the work shall provide additional
time to the schedule, if required.
7-18 CISC Code of Standard Practice
4. Contract Documents
4.1 Tender Documents Tender Drawings and Tender Specications
4.1.1 At the time tenders are called, the steel fabricator shall receive a complete set of struc-
tural drawings and a complete set of tender specications. In order to ensure ade quate and com-
plete tenders for Lump Sum Price Contracts
1
, these documents shall in clude complete struc-
tural drawings, conforming to the requirements for design drawings of the governing technical
standard. Structural steel specications should in clude any special requirements controlling
the fabrication and erection of the structural steel, surface preparation and coating, and should
indicate the extent of non-destructive examination, if any, to be carried out.
4.1.2 Design drawings shall be drawn to a scale adequate to convey the required infor mation.
The drawings shall show a complete design of the structure with members suit ably designated
and located, including such dimensions and detailed description as necessary to permit the
preparation of fabrication and erection documents. Floor levels, column centres, and offsets
shall be dimensioned. The term drawings may include com puter output and other data. Stiff-
eners and doubler plates required to maintain stability and which are an integral part of the
main member shall be shown and dimensioned.
4.1.3 Design drawings shall designate the design standards used, shall show clearly the type or
types of construction to be employed, shall show the category of the structural sys tem used for
seismic design, and shall designate the material or product standards appli cable to the members
and details depicted. Drawings shall give the governing combinations of shears, moments,
pass-through forces, and axial forces to be resisted by the connections.
4.1.4. Where connections are not shown, the connections shall be assumed to be in ac cordance
with the requirements of the governing technical standard (see Clause 1.3).
4.2 Architectural, Electrical and Mechanical Drawings
Architectural, elec trical and mechanical drawings may be used as a supplement to the structural
drawing to dene detail congurations and construction information, provided all requirements
for the structural steel are noted on the structural drawings.
4.3 Construction Drawings and Construction Specications
4.3.1 At the time specied in the tender documents or pre-award negotiations (if dif ferent), the
client shall furnish the fabricator with a plot plan of the construction site, and a set of complete
drawings and specications approved for construction consistent with the tender drawings and
tender specications. These construction drawings and specications are required by the fabri-
cator for ordering the material and for the prepa ration and completion of fabrication and erec-
tion documents. The approved-for-con struction drawings shall show:
all changes or revisions to the tender drawings, clearly indicated on the con- a)
struction drawings;
the complete design of the structure with members suitably designated and lo cated, b)
including such dimensions and detailed description as necessary to per mit prep-
aration of the fabrication and erection documents. Floor levels, column centres,
and offsets shall be dimensioned;
1
For other types of contracts, it is desirable for the contract documents to be as complete as possible.
7-19 CISC Code of Standard Practice
all materials to be furnished by the fabricator, together with sufcient informa tion c)
to prepare fabrication and erection documents, including the design stan dards used,
the type or types of construction to be employed, the category of the system used
for seismic design, the applicable material or product standards, and the governing
combinations of shears, moments and axial forces to be re sisted by connections.
The fabricator shall receive a complete set of the tender drawings and tender specica tions.
4.4 Architecturally Exposed Structural Steel
In addition to the preceding requirements, all structural elements, or parts thereof, to be treated
as Architecturally Exposed Structural Steel must be in accordance with the requirements of
Appendix I and clearly shown on the structural drawings.
4.5 Digital Modelling
4.5.1 When a project utilizes digital project models to convey a substantive portion of the pro-
ject information, Appendix J shall be used as a guide.
4.5.2 The owner of the digital model shall be responsible for the accuracy and maintenance of
the digital model unless otherwise stated in the contract documents.
4.5.3 The contract documents shall clearly stipulate the party designated as the owner of the
digital model.
5. Fabrication and Erection Documents
NOTE: The term shop drawings, frequently used in the construction industry, is re-
placed in this Code of Standard Practice by the terms fabrication and erection
docu ments. These terms more correctly describe the following ve separate and
distinct documents that may be prepared by a fabricator/erector. See also Clause
1.2 for denitions. Not all of these documents will be required for every project.
5.1 Erection Diagrams
Unless provided by the client, the fabricator will prepare erection diagrams from the approved
construction drawings. In this regard, the fabrica tor may request reproducible copies of the
structural drawings which may be altered for use as erection diagrams. When using repro-
ducible copies of the structural drawings, the structural engineers name and seal shall be re-
moved. Erection diagrams shall be submitted to the designer for review and approval. Erection
diagrams are general ar rangement drawings showing the principal dimensions of the structure,
piece marks, sizes of the members, size (diameter) and type of bolts, bolt installation require-
ments, elevations of column bases, all necessary dimensions and details for setting anchor rods,
and all other information necessary for the assembly of the structure. Only one repro ducible
copy, or electronic le, of each diagram will be submitted for review and approval unless a
larger number of copies is required by the client as part of the tender documents.
5.2 Connection Design Details
Connection design details shall be prepared in advance of preparing shop details and submitted
to the designer for conrmation that the intent of the design is met. Connection design details
shall provide details of stan dard and non-standard connections, and other data necessary for the
7-20 CISC Code of Standard Practice
preparation of shop details. Connection design details shall be referenced to the design draw-
ings, and/or erection drawings.
5.3 Shop Details
Unless provided by the client, shop details shall be prepared in advance of fabrication from
the information on the approved construction drawings, the connection design details, and
the erection diagrams. Shop details shall provide com plete information for the fabrication of
various members and components of the struc ture, including the required material and product
standards; the location, type, and size of all attachments, mechanical fasteners, and welds.
When shop details are required to be submitted for review and approval, only one reproducible
copy of each shop detail will be submitted, unless a larger number of copies is required by the
client as part of the ten der specications.
5.3.1 Shop Details Furnished by the Client
When the shop details are fur nished by the client, he shall deliver them in time to permit
fabrication to proceed in an orderly manner according to the time schedule agreed upon. The
client shall prepare these shop details, insofar as practicable, in accordance with the detailing
standards of the fabricator. The client shall be responsible for the completeness and accuracy
of shop details so prepared.
5.3.2 Clipped Double Connections
Where two beams or girders, framing at right angles from opposite sides of a supporting mem-
ber, share the same bolts, a clipped dou ble connection shall be used unless a seated connection
or other detail is used to facili tate safe erection of the beams or girders. A clipped double con-
nection is not applicable to a two-bolt connection or when the beams are equal to or deeper than
half the depth of the girder. For a description of a clipped double connection, see Appendix A.
5.4 Erection Procedures
Erection procedures shall outline the construction methods, erection sequence, erection bracing,
temporary bracing if required, and other engineering details necessary for shipping, erecting,
and maintaining the stability of the steel frame. Erection procedures shall be supplemented
by drawings and sketches to identify the location of stabilizing elements. Erection procedures
shall be submitted for review when so specied.
5.5 Field Work Details
Field work details shall be submitted to the designer for review and approval. Field work de-
tails shall provide complete information for modify ing fabricated members on the job site. All
operations required to modify the member shall be shown on the eld work details. If extra
materials are necessary to make modi cations, shop details may be required.
5.6 Review and Approval
Erection diagrams, non-standard connection design details, shop details and eld work details
are normally submitted for review and ap proval. The fabricator includes a maximum allowance
of fourteen (14) calendar days in his schedule for the return of all documents submitted for ap-
proval. Approval, by the de signer, of shop details submitted by the fabricator indicates that the
fabri cator has interpreted correctly the contract requirements. Approval by the designer of shop
details submitted by the fabricator does not relieve the fabricator of the responsibil ity for accur-
acy of the detail dimensions on shop details, nor of the general t-up of parts to be assembled.
7-21 CISC Code of Standard Practice
The preparation of fabrication and erection documents is governed by the following se quence
of procedures.
Sufcient information must be indicated in the construction drawings as stipu lated a)
in Clause 4.3 of this Code to permit the completion of fabrication and erection
documents.
The fabrication and erection documents are prepared by steel detailers us ing indus- b)
try and company standards, and represent the fabricators interpre tation of intent
of the contract documents, particularly as described by the construction drawings.
Connection design details are reviewed by the fabrica tors technical staff prior to
submission to the designer.
The connection design details, shop details, erection diagrams and eld work de- c)
tails are submitted to the designer for review and approval. Erection proce dures
are submitted when so specied.
It is assumed by the fabricator that the fabrication and erection documents, when d)
approved, have been reviewed by the client for accuracy in the interpre tation of the
contract requirements. Connection design details and shop details are reviewed and
approved by the designer for structural adequacy and to en sure conformance with
the loads, forces and special instructions contained in the contract documents.
Shop details are prepared from the approved connection design details and erec- e)
tion diagrams.
If the client does not wish to review and approve the fabricators fabrication and erection
documents, the basis for interpreting the contract requirements, as well as the ade quacy of con-
nection details, is limited to the information contained in the structural steel specications and
shown on the structural drawings. This information shall be suf cient, as indicated in Clause
4.3, to permit proper execution of the work. However, the Engineer of Record is ultimately
responsible for the structural integrity of the structure and the connections.
5.7 Additions, Deletions or Changes
Additions, deletions or changes, when ap proved, will be considered as contract revisions and
constitute the clients authorization to release the additions, deletions or revisions for construc-
tion. See also Clauses 3.3 and 3.6.
6. Material, Fabrication, Inspection, Painting and Delivery
6.1 Material
Materials used by the fabricator for structural use shall conform to structural steel material
standards of the Canadian Standards Association, or the American Society for Testing and Ma-
terials, or to other published material specica tions, in accordance with the requirements of the
construction drawings and construc tion specications.
6.2 Identication
6.2.1 The method of identication stipulated in CAN/CSA-S16 shall form the basis for a fab-
ricators identication of material. Control and identication procedures may dif fer to some
extent from fabricator to fabricator.
7-22 CISC Code of Standard Practice
6.3 Preparation of Material
6.3.1 Flame cutting of structural steel may be by hand or mechanically guided means.
6.3.2 Surfaces noted as nished on the drawings are dened as having a roughness height
rating not exceeding 500 (12.5 m ) as dened in CSA Standard B95, Surface Tex ture (Rough-
ness, Waviness and Lay), unless otherwise specied. Any fabricating tech nique that produces
such a nish may be used.
6.4 Fitting and Fastening
6.4.1 Projecting elements of connection attachments need not be straightened in the con-
necting plane if it can be demonstrated that installation of the connectors or tting aids will
provide adequate contact between faying surfaces.
6.4.2 When runoff tabs are used, the fabricator or erector need not remove them unless speci-
ed in the contract documents, required by the governing technical standard or the steel is
exposed to view. When their removal is required, they may be hand ame-cut close to the edge
of the nished member with no more nishing required, unless other nishing is specically
called for in the contract documents or governing technical stan dard.
6.5 Dimensional Tolerances
Tolerances on fabricated members shall be those prescribed in the applicable governing tech-
nical standard. Tolerances on steel material supplied by the fabricator shall meet those pre-
scribed in Canadian Standards Associa tion Standard G40.20.
6.6 Inspection of Steelwork
Should the client wish to have an independent in spection and non-destructive examination of
the steelwork, he shall reserve the right to do so in the tender documents. Arrangements should
be made with the fabricator for in spection of steelwork at the fabrication shop by the clients
inspectors. The cost of this in spection and testing is the responsibility of the client. Inspectors
are to be appointed prior to start of fabrication, and the client is to advise the fabricator of the
arrangement made.
6.7 Surface Preparation
If paint is specied, the fabricator shall clean all steel surfaces to be painted of loose rust, loose
mill scale, prominent spatter, slag or ux de posit, oil, dirt and other foreign matter by wire
brushing or other suitable means. Unless specied, the fabricator shall not be obliged to blast-
clean, pickle or perform any specic surface preparation operation aimed at total or near-total
removal of tight mill scale, rust or non-deleterious matter.
6.8 Paint
When structural steel is specied to receive a shop coat of paint, the fabri cator shall be re-
sponsible only to the extent of performing the surface preparation and painting in the specied
manner. The painting requirements specied in the tender doc uments for the shop coat should
include the identication of the members to be painted, surface preparation, paint specica-
tion, if applicable, the manufacturers product iden tication, and the required minimum and
maximum dry lm thickness. Unless other wise agreed upon as part of the contract documents,
the fabricator shall not be responsible for the deterioration of the paint that may result from
exposure to the weather for more than ninety days after completion of the painting.
7-23 CISC Code of Standard Practice
6.9 Marking and Shipping
6.9.1 Except for weathering steel surfaces exposed to view and for architecturally ex posed
structural steel (AESS) (see also Appendix I), erection marks shall be painted or otherwise legi-
bly marked on the mem bers. Preferably, members which are heavy enough to require special
erection equipment shall be marked to indicate the computed or scale mass and the centre of
gravity for lifting.
6.9.2 Bolts of the same length and diameter, and loose nuts and washers of each size shall be
packaged separately. Pins, bolts, nuts, washers and other small parts shall be shipped in boxes,
crates, kegs or barrels, none of which exceed 135 kg gross mass. A list and description of ma-
terial contained therein shall be marked plainly on the outside of each container.
6.9.3 When requested by the erector, long girders shall be loaded and marked so that they will
arrive at the job site in position for handling without turning. Instructions for such delivery
shall be given to the carrying agency when required.
6.9.4 For each shipment, the fabricator shall furnish a shipping bill listing the items in the ship-
ment. Such bill shall show the erection mark, the approximate length, the de scription (whether
beam, column, angle, etc.) of each item. Such bill shall be signed by the receiver and returned
to the fabricator within 48 hours of receipt of the shipment with a note regarding shortages or
damages, if any, and the bill shall act as a receipt for the shipment. When the shipments are
made by truck transport, the bills should accom pany the shipment. When shipments are made
by rail or water, the bills shall be sent to the receiver to arrive on or before receipt of the ship-
ment.
6.9.5 Unless otherwise specied at time of tender, steel during shipment will not be covered
by tarpaulins or otherwise protected. When such protection is specied, the shipper is to notify
the carrier of the protection requirements.
6.10 Delivery of Materials
6.10.1 Fabricated structural steel shall be delivered in a sequence which will permit the most
efcient and economical performance of shop fabrication and erection. If the client contracts
separately for delivery and erection, he must coordinate planning be tween the fabricator, erect-
or and general contractor.
6.10.2 Anchor rods, washers and other anchorages, grillages, or materials to be built into ma-
sonry or concrete should be shipped so that they will be on hand when needed. The client must
give the fabricator sufcient notice to permit fabrication and shipping of materials before they
are needed.
6.10.3 The quantities of material shown by the shipping bill are customarily accepted by the
client, fabricator and erector as correct. If any shortage or damage is claimed, the client or
erector should, within 48 hours, notify the carrier and the fabricator in order that the claim may
be investigated.
6.10.4 The size and mass of structural steel assemblies may be limited by the shop ca pabilities,
the permissible mass and clearance dimensions of available transportation or government regu-
lations and the job site conditions. The fabricator determines the num ber of eld splices con-
sistent with economy.
7-24 CISC Code of Standard Practice
6.10.5 On supply-only contracts the unloading of steel is the responsibility of others. Unless
stated otherwise, the unloading of steel is part of the steel erection.
7. Erection
7.1 Method of Erection
Unless otherwise specied or agreed upon, erection shall proceed according to the most ef-
cient and economical method available to the erector on the basis of continuous operation
consistent with the drawings and specications.
7.1.1 Temporary Bracing
Temporary bracing of the steel frame shall only be re moved on instruction from the Engineer
of Record.
7.2 Erection Safety
Erection shall be done in a safe manner and in accordance with applicable provincial legisla-
tion.
7.3 Site Conditions
The client shall provide and maintain adequate, all-weather access roads cleared of snow and
ice and other material that impedes entry into and through the site for the safe delivery of
derricks, cranes, other necessary equipment, and the material to be erected. The client shall
provide for the erector a rm, properly graded, drained, convenient and adequate space and
laydown area for steel of sufcient load-carrying capacity at the site for the operation of erec-
tion equipment and shall re move at the clients cost all overhead obstructions such as power
lines, telephone lines, etc., in order to provide a safe and adequate working area for erection of
the steelwork. The erector shall provide and install the safety protection required for his own
opera tions or for his work forces to meet the safety requirements of applicable Acts or Codes.
The general contractor shall install protective covers to all protruding rebar, machinery, anchor
rods, etc., which are a hazard to workers. Any protection for pedestrians, prop erty, other trades,
etc., not essential to the steel erection activity is the responsibility of the client. When the
structure does not occupy the full available site, the client shall pro vide adequate storage space
to enable the fabricator and erector to operate at maximum practicable speed and efciency.
Cleaning of steelwork required because of site condi tions, mud, site worker trafc, etc., shall
not be to the fabricators/erectors account.
7.4 Foundations
The tender specications preferably shall specify the time that foundations will be ready, free
from obstruction and accessible to the erector. Unless otherwise agreed upon, the work of erec-
tion shall be tendered on the basis that it will start at the time designated in the tender specica-
tions without interference or delay caused by others. Neither the fabricator nor the erector shall
be responsible for the accu rate location, strength and suitability of foundations.
7.5 Bearing Surfaces
Levelling plates shall be set by others true, level and to the correct elevation.
7-25 CISC Code of Standard Practice
7.6 Building Lines and Bench Marks
The erector shall be provided with a plot plan accurately locating building lines and bench
marks at the site of the structure.
7.7 Installation of Anchor Rods and Embedded Items
7.7.1 Anchor rods and foundation rods shall be set by the client in accordance with the erection
diagrams. They must not vary from the dimensions shown on the erection dia grams by more
than the following (see also Appendix D):
3 mm centre-to-centre of any two rods within an anchor rod group, where an an- a)
chor rod group is dened as the set of anchor rods which receives a single fabri-
cated steel shipping piece;
6 mm centre-to-centre of adjacent anchor rod groups; b)
Maximum accumulation of 6 mm per 30 000 mm along the established column c)
line of multiple anchor rod groups, but not to exceed a total of 25 mm. The estab-
lished column line is the actual eld line most representative of the centres of the
as-built anchor rod groups along a line of columns;
6 mm from the centre of any anchor rod group to the established column line d)
through that group.
Shims: the nished tops of all footings shall be at the specied level which will not e)
exceed the maximum specied grouting allowance to predetermine the amount of
shimming that will be required.
The tolerances of paragraphs (b), (c), and (d) also apply to offset dimensions, shown on the
construction drawings, measured parallel and perpendicular to the nearest estab lished column
line for individual columns shown on the drawings to be offset from estab lished column lines.
7.7.2 Unless shown otherwise, anchor rods shall be set perpendicular to the theoreti cal bearing
surface, threads shall be protected, free of concrete, and nuts should run freely on the threads.
Shear pockets shall be cleaned of debris, formwork, ice and snow by the client prior to steel
erection.
7.7.3 Other embedded items or connection materials between the structural steel and the work
of others shall be located and set by the client in accordance with approved erection diagrams.
Accuracy of these items must satisfy the erection tolerance require ments of Clause 7.12.
7.7.4 All work performed by the client shall be completed so as not to delay or interfere with
the erection of the structural steel.
7.8 Bearing Devices
The client shall set to lines and grades all levelling plates and loose bearing plates which can
be handled without a derrick or crane. All other bear ing devices supporting structural steel
shall be set and wedged, shimmed or adjusted with levelling screws by the erector to lines and
grades established by the client. The fabricator and/or erector shall provide the wedges, shims
or levelling screws that are re quired, and shall scribe clearly the bearing devices with working
lines to facilitate proper alignment. Promptly after the setting of any bearing devices, the client
7-26 CISC Code of Standard Practice
shall check lines and grades, and grout as required. The nal location and proper grouting of
bearing devices are the responsibility of the client.
When steel columns, girders or beams which will be supported on concrete or masonry have
base plates or bearing plates fabricated as an integral part of the member, the bearing area of
the support shall be suitably prepared by others so as to be at exact grade and level to receive
the steelwork.
7.9 Examination by Erector
Prior to eld erection, the erector shall do a random check to examine the work of all others on
which his work is in any way dependent and shall report to the client any errors or discrepan-
cies as discovered that may affect erec tion of structural steel before or during erection. The
accurate placement and integrity of all anchor rods /embedment etc., remains the responsibility
of the client.
7.10 Adjustable Shelf Angles and Sash Angles
The erector shall position at time of erection all adjustable shelf angles and sash angles attached
to the steel frame true and level within the tolerances permitted by the governing technical stan-
dard. Any subsequent adjustment that may be necessary to accommodate the work of others
shall be performed by others.
7.11 Loose Lintels, Wall-Bearing Members and Other Pieces
Unless otherwise specied, loose lintels, shelf angles, wall-bearing members and other pieces
not attached to the structural steel frame shall be received and set by others.
7.12 Tolerances
Unless otherwise specied, tolerances on erected structural steel shall be those prescribed in
the applicable governing technical standard.
7.13 Checking Erected Steelwork
Prior to placing or applying any other materi als, the owner is responsible for determining that
the location of the structural steel is acceptable for plumbness, level and alignment within toler-
ances with bolts correctly in stalled and welds inspected. The erector is given timely notice of
acceptance by the owner or a listing of specic items to be corrected in order to obtain accept-
ance. Such no tice is rendered immediately upon completion of any part of the work and prior
to the start of work by other trades that may be supported, attached or applied to the struc tural
steelwork. Should such notice not be received within 14 days, the erected steel work is taken
to have been accepted.
7.14 Removal of Bracing
7.14.1 Removal of Erection Bracing
Guys, braces and falsework or cribbing sup plied by the erector shall remain the property of the
erector. The erector shall remove them when the steel structure is otherwise adequately braced
unless other arrange ments are made. Guys and braces temporarily left in place under such other
arrange ments shall be removed by others provided prior permission by the erector for their re-
moval has been given, and returned to the erector in good condition. See Clause 7.14.2.
7-27 CISC Code of Standard Practice
7.14.2 Removal of Temporary Bracing
Temporary bracing required by the de signer shall only be removed on instruction from the
Engineer of Record.
7.15 Correction of Errors When Material Is Not Erected by the Fabricator
Correction of minor mists and a moderate amount of cutting, welding, and reaming shall be
considered a part of the erection; in the same manner as if the Fabricator were erecting the
work. Any major rework required due to incorrect shop work shall be im mediately reported
to the Fabricator, before rework commences. The Fabricator shall then either correct the error,
resupply the item within a reasonable time period, or ap prove the method of correction includ-
ing applicable costs, whichever is the most eco nomical.
7.16 Field Assembly
Unless otherwise specied, the fabricator shall provide for suitable eld connections that will,
in his opinion, afford the greatest overall economy.
7.17 Accommodation of Other Trades
Neither the fabricator nor the erector shall cut, drill or otherwise alter the work of others or his
own work to accommodate other trades unless such work is clearly dened in the tender draw-
ings and tender speci cations and unless detailed information is provided before the erection
diagrams are approved. Any subsequent cutting, drilling or other alteration of the structural
steel performed by the fabricator or the erector for the accommodation of other trades, shall be
specically agreed upon and authorized by the client before such work is commenced.
7.18 Temporary Floors and Access Stairs
Unless otherwise required by law, all temporary access stairs shall be provided by others, except
for the oor upon which erecting equipment is located. On this oor the erector shall provide
such temporary ooring as he requires, moving his planking, etc., as the work progresses.
7.19 Touch-Up of Shop Paint
Unless so specied, the fabricator/erector will not spot-paint eld fasteners and eld welds nor
touch-up abrasions to the shop paint.
7.20 Final Painting
Unless so specied, the fabricator/erector will not be responsi ble for cleaning the steel after
erection in preparation for eld painting, nor for any gen eral eld painting that may be re-
quired.
7.21 Final Cleanup
Except as provided in Clause 7.14, upon completion of erec tion and before nal acceptance,
the erector shall remove all falsework, rubbish and temporary building furnished by him.
7-28 CISC Code of Standard Practice
APPENDIX A Structural Steel in Buildings
1
0
1
5
2
3
4
4
6
7
8
2
9
2
8
1
1
1
8
2
8
3
3
2
8
2
3
3
4
1
2
3
8
3
8
2
6
1
6
3
7
2
1
3
3
3
0
3
2
1
0
2
4
3
7
3
7
3
6
2
5
2
5
1
6
2
2
2
0
1
4
2
7
1
2
1
3
1
7
2
5
1
9
2
8
3
1
2
1
2
1
.

L
i
g
h
t
-
g
a
u
g
e

c
o
l
d
-
f
o
r
m
e
d

s
t
e
e
l

u
s
e
d

t
o

s
u
p
p
o
r
t

f

o
o
r

a
n
d

r
o
o
f
s
*
*
2
2
.

L
i
n
t
e
l
s

a
t
t
a
c
h
e
d

t
o

s
t
e
e
l

f
r
a
m
e
2
3
.

M
a
r
q
u
e
e

o
r

c
a
n
o
p
y

(
s
t
r
u
c
t
u
r
a
l

f
r
a
m
e

o
n
l
y
)

w
h
e
n

f
o
r
m
i
n
g

a
n

i
n
t
e
g
r
a
l

p
a
r
t

o
f

t
h
e

s
t
e
e
l

f
r
a
m
e
2
4
.

M
o
n
o
r
a
i
l

b
e
a
m
s

o
f

s
t
a
n
d
a
r
d

s
t
r
u
c
t
u
r
a
l

s
h
a
p
e
s
,

a
t
t
a
c
h
e
d

t
o

s
t
e
e
l

f
r
a
m
e
2
5
.

O
p
e
n
-
w
e
b

s
t
e
e
l

j
o
i
s
t
s
,

b
r
i
d
g
i
n
g

a
n
d

a
c
c
e
s
s
o
r
i
e
s

w
h
e
n

s
u
p
p
l
i
e
d

w
i
t
h

s
t
e
e
l

j
o
i
s
t
s
2
6
.

P
u
r
l
i
n
s
2
7
.

S
a
s
h

a
n
g
l
e
s

c
o
n
n
e
c
t
e
d

t
o

t
h
e

s
t
e
e
l

f
r
a
m
e
2
8
.

S
e
p
a
r
a
t
o
r
s
,

a
n
g
l
e
s
,

t
e
e
s
,

c
l
i
p
s

a
n
d

o
t
h
e
r

d
e
t
a
i
l

f

t
t
i
n
g

e
s
s
e
n
t
i
a
l

t
o

t
h
e

s
t
r
u
c
t
u
r
a
l

s
t
e
e
l

f
r
a
m
e
2
9
.

S
h
e
a
r

c
o
n
n
e
c
t
o
r
s
3
0
.

S
h
e
l
f

a
n
g
l
e
s

a
t
t
a
c
h
e
d

t
o

t
h
e

s
t
e
e
l

f
r
a
m
e

3
1
.

S
t
e
e
l

c
o
r
e
s

f
o
r

c
o
m
p
o
s
i
t
e

c
o
l
u
m
n
s
3
2
.

S
t
e
e
l

w
i
n
d
o
w

s
i
l
l
s

a
t
t
a
c
h
e
d

t
o

t
h
e

s
t
e
e
l

f
r
a
m
e
3
3
.

S
t
e
e
l

s
t
a
i
r
s

a
n
d

h
a
n
d
r
a
i
l
s
3
4
.

S
t
r
u
t
s
3
5
.

S
t
u
b

g
i
r
d
e
r
s
*
3
6
.

S
u
s
p
e
n
d
e
d

c
e
i
l
i
n
g

s
u
p
p
o
r
t
s

o
f

s
t
r
u
c
t
u
r
a
l

s
t
e
e
l

s
h
a
p
e
s

7
5

m
m

o
r

g
r
e
a
t
e
r

i
n

d
e
p
t
h
3
7
.

T
i
e
s
,

h
a
n
g
e
r
s

a
n
d

s
a
g

r
o
d
s

f
o
r
m
i
n
g

p
a
r
t

o
f

t
h
e

s
t
r
u
c
t
u
r
a
l

f
r
a
m
e
3
8
.

T
r
u
s
s
e
s

a
n
d

b
r
a
c
e
d

f
r
a
m
e
s
*

S
e
e

s
e
p
a
r
a
t
e

d
i
a
g
r
a
m





*
*

S
u
p
p
l
i
e
d

b
y

o
t
h
e
r
s

1
.

A
n
c
h
o
r
s

(
w
a
l
l
)

f
o
r

b
e
a
m
s

o
r

o
p
e
n
-
w
e
b

s
t
e
e
l

j
o
i
s
t
s
2
.

A
n
c
h
o
r

r
o
d
s

f
o
r

s
t
r
u
c
t
u
r
a
l

s
t
e
e
l
3
.

B
a
s
e

p
l
a
t
e
s

o
f

s
t
e
e
l

f
o
r

s
t
e
e
l

c
o
l
u
m
n
s
4
.

B
e
a
m
s

5
.

B
e
a
r
i
n
g

p
l
a
t
e
s

f
o
r

s
t
r
u
c
t
u
r
a
l

s
t
e
e
l
6
.

B
o
l
t
s

7
.

B
r
a
c
i
n
g

f
o
r

s
t
e
e
l

m
e
m
b
e
r
s

o
r

f
r
a
m
e
s
8
.

B
r
a
c
k
e
t
s

a
t
t
a
c
h
e
d

t
o

t
h
e

s
t
e
e
l

f
r
a
m
e
9
.

C
l
i
p
p
e
d

d
o
u
b
l
e

c
o
n
n
e
c
t
i
o
n
*
1
0
.

C
o
l
u
m
n
s
1
1
.

C
o
n
v
e
y
o
r

s
t
r
u
c
t
u
r
a
l

s
t
e
e
l

f
r
a
m
e
w
o
r
k

1
2
.

C
r
a
n
e
,

g
i
r
d
e
r
s
,

r
a
i
l
s

a
n
d

s
t
o
p
s
1
3
.

D
o
o
r

f
r
a
m
e
s

c
o
n
s
t
i
t
u
t
i
n
g

p
a
r
t

o
f

a
n
d

c
o
n
n
e
c
t
e
d

t
o

t
h
e

s
t
e
e
l

f
r
a
m
e
1
4
.

F
l
o
o
r

a
n
d

r
o
o
f

p
l
a
t
e
s

(
r
a
i
s
e
d

p
a
t
t
e
r
n

o
r

p
l
a
i
n
)
,

g
r
a
t
i
n
g
,

c
o
n
n
e
c
t
e
d

t
o

s
t
e
e
l

f
r
a
m
e
1
5
.

G
e
r
b
e
r

g
i
r
d
e
r
*

1
6
.

G
i
r
d
e
r
s
1
7
.

G
i
r
t
s
1
8
.

G
r
i
l
l
a
g
e

b
e
a
m
s

o
f

s
t
e
e
l

1
9
.

H
e
a
d
e
r
s

o
r

t
r
i
m
m
e
r
s

f
o
r

s
u
p
p
o
r
t

o
f

o
p
e
n
-
w
e
b

s
t
e
e
l

j
o
i
s
t
s

w
h
e
r
e

s
u
c
h

h
e
a
d
e
r
s

o
r

t
r
i
m
m
e
r
s

f
r
a
m
e

i
n
t
o

s
t
r
u
c
t
u
r
a
l

s
t
e
e
l

m
e
m
b
e
r
s

2
0
.

H
o
l
l
o
w

s
t
r
u
c
t
u
r
a
l

s
e
c
t
i
o
n

(
H
S
S
)

c
o
l
u
m
n
7-29 CISC Code of Standard Practice
APPENDIX A Structural Steel in Buildings (continued)
C
L
I
P
P
E
D

2
-
L
C
O
N
N
E
C
T
I
O
N
C
L
I
P
P
E
D
E
N
D

P
L
A
T
E
C
O
N
N
E
C
T
I
O
N
8
0
8
0
8
0

t
o

1
2
0
t
y
p
i
c
a
l
C
l
i
p
p
e
d

f
o
r

e
r
e
c
t
i
o
n
9
.


C
L
I
P
P
E
D

D
O
U
B
L
E





C
O
N
N
E
C
T
I
O
N
C
a
n
t
i
l
e
v
e
r

s
e
g
m
e
n
t
C
a
p

p
l
a
t
e
D
r
o
p
-
i
n

s
e
g
m
e
n
t
S
t
i
f
f
e
n
e
r
L
a
t
e
r
a
l

s
u
p
p
o
r
t
L
a
t
e
r
a
l

s
u
p
p
o
r
t
1
5
.


G
E
R
B
E
R

G
I
R
D
E
R
H
V
A
C

D
u
c
t
i
n
g
I
n
t
.

S
t
u
b
E
x
t
.

S
t
u
b

G
e
r
b
e
r


S
y
s
t
e
m
D
r
o
p
-
i
n

B
e
a
m
C
a
n
t
i
l
e
v
e
r
B
e
a
m
3
5
.


S
T
U
B
-
G
I
R
D
E
R
7-30 CISC Code of Standard Practice
APPENDIX B
Guideline for Unit Price Application for Changes
Unit rates shall apply on their own, only up until commencement of material order or shop 1.
detail drawings, whichever is the earlier.
The following amounts, additional to the unit rate, shall be charged on additions at the vari- 2.
ous stages of the contract.
If the addition affects drawings (e.g. of support members) already in progress or a)
complete, then the changes to such drawings or redetailing shall be charged extra
at an agreed hourly rate.
If the addition requires additional work to material manufacture or erection (e.g. b)
supporting members) in progress or complete, then such additional work shall be
charged extra at an agreed hourly rate.
Detail or Connection materials added to existing or supporting members, c)
whether due to an additional member or not, shall be charged on a cost-plus ba-
sis.
If the timing of the addition causes the added material to be shipped as a part d)
load, then transportation shall be charged extra at cost plus an agreed percent age
markup.
The following amounts, additional to the unit rate, shall be charged for deletions at the vari- 3.
ous stages of the contract.
If the deleted material has been ordered or delivered and cannot be used else where, a)
then a restocking charge shall be levied.
If the deleted member has been detailed or drawings are in progress, then the cost b)
of such drawings shall be charged extra at an agreed hourly rate.
If the deletion affects drawings already completed or in progress, then the chan- c)
ges to such drawings or the redetailing shall be charged extra at an agreed hourly
rate.
If the deleted member has been manufactured or erected, or manufacture or erec- d)
tion is in progress, then the cost of such manufacture or erection shall be charged
extra at an agreed hourly rate.
If the deletion affects members already manufactured (e.g. supporting mem bers), e)
then the changes to such members shall be charged extra at an agreed hourly rate.
If the deleted member has already been shipped, then no credit shall be given. f)
All unit rates shall be applied in accordance with the CISC Code of Standard Practice, 4.
Clause 3.5.
7-31 CISC Code of Standard Practice
Hourly Rates are as follows: 5.
Engineering Design $ / labour hour a)
Detailing Labour $ / labour hour b)
Shop Labour $ / labour hour c)
Field Labour $ / labour hour d)
Equipment used for revisions will be charged at negotiated rental rates, ac cording e)
to Canadian Construction Association standard practice.
Revisions involving the use of grades of steel, sources of supply, or types of sections other 6.
than specied will be subject to price adjustments.
Units will be computed in accordance with Clause 3.5 of the CISC Code of Standard Prac- 7.
tice for Structural Steel.
7-32 CISC Code of Standard Practice
APPENDIX C
A Suggested Format for Price-per-Unit Contracts
The following is a list of suggested categories for which unit prices could be tendered, such
categories being selected or added to, depending upon the nature of the project.
For payment purposes, the connection material required to connect an individual mem ber to
its supporting member is assumed to be part of the member to which it is attached for shipping
purposes.
Structural Steel A.
Columns 1.
Rolled Shapes a)
Up to and including 30 kg/m 1.
2. Over 30 up to and including 60 kg/m
3. Over 60 up to and including 90 kg/m
4. Over 90 up to and including 150 kg/m
5. Over 150 kg/m
b) WWF or Plate Fabricated
1. Up to and including 90 kg/m
2. Over 90 up to and including 150 kg/m
3. Over 150 kg/m
c) Hollow Structural Sections
1. Up to and including 30 kg/m
2. Over 30 up to and including 60 kg/m
3. Over 60 up to and including 90 kg/m
4. Over 90 up to and including 150 kg/m
5. Over 150 kg/m
Beams 2.
Rolled Shapes a)
Up to and including 30 kg/m 1.
Over 30 up to and including 60 kg/m 2.
Over 60 up to and including 90 kg/m 3.
Over 90 up to and including 150 kg/m 4.
Over 150 kg/m 5.
WWF or Plate Fabricated b)
Up to and including 90 kg/m 1.
Over 90 up to and including 150 kg/m 2.
Over 150 kg/m 3.
Stud Shear Connectors c)
___diam. ___mm long
7-33 CISC Code of Standard Practice
Crane Rails 3.
a) Rail Complete with Rail Clips
1. Up to and including 30 kg/m
2. Over 30 kg/m
b) Stops
c) Monorails
1. Straight
2. Curved
4.1 Trusses Where Principal Members Are:
Tees, Angles or W-Shapes a)
Hollow Structural Sections b)
4.2 Open-Web Steel Joists
Bracing 5.
Rolled Shapes a)
Up to and including 30 kg/m 1.
Over 30 kg/m 2.
Hollow Structural Sections b)
Up to and including 30 kg/m 1.
Over 30 kg/m 2.
WT Sections c)
Up to and including 30 kg/m 1.
Over 30 kg/m 2.
Purlins, Girts and Sag Rods 6.
Rolled Shapes a)
Up to and including 30 kg/m 1.
Over 30 kg/m 2.
Cold-Formed Sections b)
Up to and including 5.75 kg/m 1.
Over 5.75 kg/m 2.
Hollow Structural Sections c)
Up to and including 30 kg/m 1.
Over 30 kg/m 2.
Sag Rods d)
Framing 7.
Wall and Roof Openings
Stair Stringers 8.
7-34 CISC Code of Standard Practice
Ladders 9. (Galvanized or Painted)
Without safety cage a)
With safety cage b)
Utility Bridges 10. (Plus Interior Framing)
Tees, Angles or W-Shapes a)
Hollow Structural Sections b)
Conveyor Galleries 11.
Tees, Angles or W-Shapes a)
Hollow Structural Sections b)
Open Conveyor Trusses c)
Miscellaneous Platforms 12. (Tees, Angles or W-Shapes)
Up to and including 30 kg/m 1.
Over 30 kg/m 2.
Miscellaneous Steel & Grating B.
Grating 1.
Floors a)
Galvanized 1.
Painted 2.
Stair Landings b)
Galvanized 1.
Painted 2.
Checkered Plate 2. (6 mm Thick)
Steel Galvanized a)
Steel Painted b)
Stair Treads 3. (Maximum 1000 mm Long)
Grating Galvanized a)
Grating Painted b)
Handrail 4. (Without Kickplate)
Horizontal a)
Steel Galvanized 1.
Steel Painted 2.
Sloping b)
Steel Galvanized 1.
Steel Painted 2.
7-35 CISC Code of Standard Practice
Kickplate 5.
Plate attached to handrail a)
Steel Galvanized 1.
Steel Painted 2.
Banding attached to grating b)
Steel Galvanized 1.
Steel Painted 2.
Mobilization and Demobilization C.
Mobilization for erection and demobilization 1.
Unit Rates for Extra Work D.
For extra engineering design __________ /hr. 1.
For extra detailing work __________ /hr. all inclusive (composite rate) 2.
For extra shop labour __________ /hr. all inclusive (composite rate) 3.
For extra feld erection __________ /hr. all inclusive (composite rate) 4.
Field labour work week __________ /hrs. per week 5.
NOTE: All inclusive shall mean all labour cost including overheads and prots, and in the
eld all small tools (up to $1000 value).
7-36 CISC Code of Standard Practice
APPENDIX D
Tolerances on Anchor Rod Placement
n
n
-
1
6
5
4
3
2
1
6 mm
max. deviation
6 mm
max. deviation
3 mm


3

m
m


6

m
m


6

m
m
m
a
x
.

d
e
v
i
a
t
i
o
n
3
0

0
0
0


6

m
m
V
a
r
i
e
s

f
r
o
m

0

t
o

L


3
0

0
0
0

m
m
n

=

t
o
t
a
l

n
u
m
b
e
r

o
f

c
o
l
u
m
n
s
L


2
5

m
m
If column offset
from main column line
GRID
C
L
G
R
I
D
C
L
ANCHOR RODS
C
L
A
N
C
H
O
R

R
O
D
S
C
L
7-37 CISC Code of Standard Practice
APPENDIX E
Conversion of SI Units to Imperial Units
When Imperial units are used in contract documents, unless otherwise stipulated, the SI units
used in the CISC Code of Standard Practice for Structural Steel shall be re placed by the Imper-
ial units shown, for the clause as noted.
Clause 3.5 (a). Unit Weight. The unit weight of steel is assumed to be 0.2833 pounds per cubic
inch.
For other clauses, the standard conversion factors (for length, mass, etc.) stipulated in CISC
Handbooks should be used.
Note: Imperial projects should be entirely in the imperial designation including shape sizes.
Metric projects should be entirely in the SI designation, including shape sizes. Units should not
be intermixed on the same project.
7-38 CISC Code of Standard Practice
APPENDIX F
Miscellaneous Steel
Unless otherwise specied in the tender documents, the following items are considered miscel-
laneous steel of ferrous metal only, fabricated from 2.0 mm (14 ga.) and more of metal, includ-
ing galvanizing, cadmium and chrome plating, but not stainless steel and cast iron items.
This list of items is to be read in conjunction with Clause 2.1 Structural Steel and Clause 2.3
Items Supplied by Others, and shall include all steel items not included in Clauses 2.1 and 2.3
unless specied otherwise.
Access doors and frames except trade-name items and those required for servicing
mechanical and electrical equipment.
Angles and channel frames for doors and wall openings drilling and tapping to be speci-
ed as being done by others.
Benches and brackets.
Bollards, bumper posts and rails
Bolts only includes those bolts and anchors required for anchoring miscellaneous steel
supplied under this list.
Burglar/security bars.
Clothes line poles, custom-fabricated types only.
Coat rods, custom-fabricated types only.
Corner protection angles.
Expansion joint angles, plates custom-fabricated, etc., including types made from steel, or
a combination of steel and non-ferrous metal.
Fabricated convector frames and enclosures.
Fabricated items where clearly detailed or specied and made from 2.0 mm (14 ga.) and
heavier steel, except where included in another division.
Fabricated steel framing for curtain walls and storefronts where not detailed on struc tural
drawings and not enclosed by architectural metal.
Fabricated wire mesh and expanded metal partitions and screens.
Fire escapes.
Flag poles steel custom-fabricated. (Excluding hardware)
(Custom-fabricated) Footscrapers, mud and foot grilles, including pans, but less drains.
Frames, grating and plate covers for manholes, catch basins, sumps, trenches, hatches, pits,
etc., except cast iron, frames and covers and trade-name oor and roof drains.
Gates, grilles, grillwork and louvres, excluding baked enamel or when forming part of
mechanical system.
Grating-type oors and catwalks excluding those forming part of mechanical system.
Handrails, balusters and any metal brackets attached to steel rail including plastic cover,
excluding steel handrails forming part of structural steel framing.
Joist hangers, custom-fabricated types only.
Joist strap anchors.
Lintels, unless shown on structural drawings.
Mat recess frames, custom-fabricated types only.
7-39 CISC Code of Standard Practice
Mobile chalk and tackboard frames, custom-fabricated types only.
Monorail beams of standard shapes, excluding trade-name items, unless shown on struc-
tural drawings.
Shop drawings and/or erection diagrams.
Shop preparation and/or priming.
Sleeves if specied, except for mechanical and electrical division.
Stair nosings, custom-fabricated types only.
Steel ladders and ladder rungs not forming part of structural steel or mechanical work.
Steel stairs and landings not forming part of structural steel.
Table and counter legs, frames and brackets, custom-fabricated types only.
Thresholds and sills, custom-fabricated types only.
Vanity and valance brackets, custom-fabricated types only.
Weatherbars steel.
Miscellaneous Steel Items Excluded
Bases and supports for mechanical and electrical equipment where detailed on me chanical
or electrical drawings.
Bolts other than for anchoring items of miscellaneous steel.
Cast iron frames and covers for manhole and catch basins.
Chain link and woven wire mesh.
Glulam connections and anchorages.
Joist hangers, trade-name types.
Metal cladding and covering, less than 2.0 mm (14 ga.).
Precast concrete connections and anchorages in building structure.
Reinforcing steel or mesh.
Roof and oor hatches when trade-name items.
Sheet metal items, steel decking and siding and their attachments, closures, etc., less than
2.0 mm (14 ga.).
Shoring under composite oors and stub-girders.
Steel reinforcement for architectural metal storefronts, curtainwalls and windows.
Steel stacks.
Stone anchors.
Stud shear connectors when used with steel deck.
Temporary bracing for other trades.
Thimbles and breeching, also mechanical re dampers.
Window and area wells.
When miscellaneous steel fabricator erects miscellaneous steel, all material required for tem-
porary and/or permanent connections of the component parts of the miscella neous steel shall
be supplied.
7-40 CISC Code of Standard Practice
APPENDIX G
A Suggested Format for a
Monthly Progress Payment Claim Form
M
O
N
T
H
L
Y

P
R
O
G
R
E
S
S

C
L
A
I
M

F
O
R
M















F
I
R
M

N
A
M
E
:


























































































P
R
O
J
E
C
T
:













































































C
O
N
T
R
A
C
T

N
O
:



































































P
R
O
G
R
E
S
S

C
L
A
I
M

N
O
:























































D
A
T
E
:




















































































I
T
E
M
O
R
I
G
I
N
A
L

B
A
S
E

C
O
N
T
R
A
C
T
A
P
P
R
O
V
E
D

C
H
A
N
G
E
S

T
O

D
A
T
E
R
E
V
I
S
E
D

B
A
S
E

C
O
N
T
R
A
C
T
P
R
O
G
R
E
S
S

T
O

D
A
T
E
P
R
E
V
I
O
U
S

A
M
O
U
N
T

C
L
A
I
M
E
D
T
H
I
S

P
R
O
G
R
E
S
S


C
L
A
I
M
%

C
O
M
P
L
E
T
E
1
.


E
N
G
I
N
E
E
R
I
N
G

&

D
E
T
A
I
L
I
N
G
2
.


R
A
W

M
A
T
E
R
I
A
L
S

I
N

Y
A
R
D
3
.


F
A
B
R
I
C
A
T
I
O
N
4
.


F
R
E
I
G
H
T

T
O

S
I
T
E
5
.


E
R
E
C
T
I
O
N
6
.


P
L
U
M
B

/

B
O
L
T

/

C
L
E
A
N
U
P
7
.


T
O
T
A
L

G
R
O
S
S

A
M
O
U
N
T
8
.


H
O
L
D
B
A
C
K

_
_
_
_
_
_
_
_
_
%
9
.


N
E
T

A
M
O
U
N
T
1
0
.

G
S
T

_
_
_
_
_
_
_
_
%

O
F

L
I
N
E

9
1
1
.

T
O
T
A
L

A
M
O
U
N
T

D
U
E
A
P
P
R
O
V
E
D

C
H
A
N
G
E

O
R
D
E
R
(
S
)

T
O

D
A
T
E
:





























































7-41 CISC Code of Standard Practice
APPENDIX H
Suggested Defnitions for Progress Invoicing
and Substantial Performance
Progress Invoicing 1.
The submission of erection diagrams and/or shop details will initiate progress in- a)
voicing. Payments of invoices will be in accordance with the terms of the con-
tract.
Any and all materials fabricated will initiate additional progress invoicing with b)
payment as per contract.
Any and all materials shipped to the site and/or erected in place will initiate ad- c)
ditional progress invoicing with payment as per contract.
Final invoicing will be made after all steel has been delivered to site, erected and d)
all work completed.
Substantial completion is based on the completion of the WORK of the steel Fab- e)
ricator or Erector, and therefore release of holdback will be 41 days (or as per
applicable lien legislation) after issuance of the Certicate of Completion of this
WORK.
Substantial Performance 2.
The word WORK shall be dened as the product or services provided by the a)
steel Fabricator or Erector.
Substantial performance and total performance shall be directly related to product b)
or services provided by the steel Fabricator or Erector.
Certication of completion by the owners representative applies to the WORK c)
performed by the steel Fabricator or Erector.
Payment shall be governed by certied completion of the WORK. d)
7-42 CISC Code of Standard Practice
APPENDIX I
Architecturally Exposed Structural Steel (AESS)
I1. Scope and Requirements
I1.1 General Requirements. When members are specically designated as Architecturally
Exposed Structural Steel or AESS in the Contract Documents, the requirements in Sections
1 through 7 shall apply as modied by this Appendix. AESS members or components shall be
fabricated and erected with the care and dimensional tolerances that are stipulated in Sections
1.2 through 1.5.
I1.2 Denition of Categories. Categories are listed in the AESS Matrix shown in Table I1
where each Category is represented by a set of Characteristics. The following Categories shall
be used when referring to AESS:
AESS 1: Basic Elements
Suitable for basic elements which require enhanced workmanship.
AESS 2: Feature Elements Viewed at a Distance > 6 m
Suitable for feature elements viewed at a distance greater than six metres.
The process involves basically good fabrication practices with enhanced
treatment of weld, connection and fabrication detail, tolerances for gaps, and
copes.
AESS 3: Feature Elements Viewed at a Distance 6 m
Suitable for feature elements where the designer is comfortable allowing
the viewer to see the art of metalworking. Welds are generally smooth but
visible; some grind marks are acceptable. Tolerances are tighter than normal
standards. The structure is normally viewed closer than six metres and is fre-
quently subject to touching by the public.
AESS 4: Showcase Elements
Suitable for showcase or dominant elements where the designer intends
the form to be the only feature showing in an element. All welds are ground,
and lled edges are ground square and true. All surfaces are sanded/lled.
Tolerances of fabricated forms are more stringent generally one-half of the
standard tolerance. All surfaces are to be glove smooth.
AESS C: Custom Elements
Suitable for elements which require a different set of Characteristics than
specied in Categories 1, 2, 3 or 4.
I1.3 Additional Information. The following additional information shall be provided in the
Contract Documents when AESS is specied:
Specic identication of members or components that are AESS using the AESS a)
Categories listed in I1.2. Refer to Table I1;
7-43 CISC Code of Standard Practice
Fabrication and/or erection tolerances that are to be more restrictive than provided b)
for in this Appendix;
For Categories AESS 2, 3, 4 requirements, if any, of a visual sample or rst-off c)
component for inspection and acceptance standards prior to the start of fabrica-
tion;
For Category AESS C, the AESS Matrix included in Table I1 shall be used to speci- d)
fy the required treatment of the element.
I2. Shop Detail, Arrangement and Erection Drawings
I2.1 Identication. All members designated as AESS members are to be clearly identied with
a Category, either AESS 1, 2, 3, 4 or C, on all shop detail, arrangement and erection drawings.
I2.2 Variations. Any variations from the AESS Categories listed must be clearly noted. These
variations could include machined surfaces, locally abraded surfaces, and forgings. In addi-
tion:
If a distinction is to be made between different surfaces or parts of members, the a)
transition line/plane must be clearly identied/dened on the shop detail, arrange-
ment and erection drawings;
Tack welds, temporary braces and xtures used in fabrication are to be indicated b)
on shop drawings;
All architecturally sensitive connection details will be submitted for approval by c)
the Architect/Engineer prior to completion of shop detail drawings.
I3. Fabrication
I3.1 General Fabrication. The fabricator is to take special care in handling the steel to avoid
marking or distorting the steel members.
All slings will be nylon-type or chains with softeners or wire rope with softeners. a)
Care shall be taken to minimize damage to any shop paint or coating. b)
If temporary braces or xtures are required during fabrication or shipment, or to c)
facilitate erection, care must be taken to avoid and/or repair any blemishes or un-
sightly surfaces resulting from the use or removal of such temporary elements.
Tack welds shall be ground smooth. d)
I3.2 Unnished, Reused or Weathering Steel. Members fabricated of unnished, reused or
weathering steel that are to be AESS may still have erection marks, painted marks or other
marks on surfaces in the completed structure. Special requirements shall be specied as Cat-
egory AESS C.
I3.3 Tolerances for Rolled Shapes. The permissible tolerances for depth, width, out-of- square,
camber and sweep of rolled shapes shall be as specied in CSA G40.20/21 and ASTM A6. The
following exceptions apply:
For Categories AESS 3 and 4: the matching of abutting cross-sections shall be a)
required;
For Categories AESS 2, 3 and 4: the as-fabricated straightness tolerance of a mem- b)
ber is one-half of the standard camber and sweep tolerance in CSA G40.20/21.
7-44 CISC Code of Standard Practice
I3.4 Tolerances for Built-up Members. The tolerance on overall section dimensions of mem-
bers made up of plates, bars and shapes by welding is limited to the accumulation of permis-
sible tolerances of the component parts as provided by CSA W59 and ASTM A6. For Categor-
ies AESS 2, 3 and 4, the as-fabricated straightness tolerance for the built-up member is one-half
of the standard camber and sweep tolerances in CSA W59.
I3.5 Joints. For Categories AESS 3 and 4, all copes, miters and butt cuts in surfaces exposed
to view are made with uniform gaps, if shown to be open joint, or in uniform contact if shown
without gap.
I3.6 Surface Appearance. For Categories AESS 1, 2 and 3, the quality surface as delivered by
the mills will be acceptable. For Category AESS 4, the steel surface imperfections should be
lled and sanded.
I3.7 Welds. For corrosive environments, all joints should be seal welded. In addition:
For Categories AESS 1, 2 and 3, a smooth uniform weld will be acceptable. For a)
Category AESS 4, the weld will be contoured and blended.
For Categories AESS 1, 2, 3 and 4, all weld spatter is to be avoided/removed where b)
exposed to view.
For Categories AESS 1 and 2, weld projection up to 2 mm is acceptable for butt c)
and plug-welded joints. For Categories AESS 3 and 4, welds will be ground
smooth/lled.
I3.8 Weld Show-through. It is recognized that the degree of weld show-through, which is any
visual indication of the presence of a weld or welds on the opposite surface from the viewer, is
a function of weld size and material thickness.
For Categories AESS 1, 2 and 3, the members or components will be acceptable as a)
produced.
For Category AESS 4, the fabricator shall minimize the weld show-through. b)
I3.9 Surface Preparation for Painting. Unless otherwise specied in the Contract Docu-
ments, the Fabricator will clean AESS members to meet the requirement of SSPC-SP 6 Com-
mercial Blast Cleaning (sandblast or shotblast). Prior to blast cleaning:
Any deposits of grease or oil are to be removed by solvent cleaning, SSPC-SP 1; a)
Weld spatter, slivers and surface discontinuities are to be removed; b)
Sharp edges resulting from ame cutting, grinding and especially shearing are to c)
be softened.
I3.10 Hollow Structural Sections (HSS) Seams
For Categories AESS 1 and 2, seams of hollow structural sections shall be accept- a)
able as produced.
For Category AESS 3, seams shall be oriented away from view or as indicated in b)
the Contract Documents.
For Category AESS 4, seams shall be treated so that they are not apparent. c)
7-45 CISC Code of Standard Practice
I4. Delivery of Materials
I4.1 General Delivery. The Fabricator shall use special care to avoid bending, twisting or
otherwise distorting the Structural Steel. All tie-downs on loads will be either nylon strap or
chains with softeners to avoid damage to edges and surfaces of members.
I4.2 Standard of Acceptance. The standard for acceptance of delivered and erected members
shall be equivalent to the standard employed at fabrication.
I5. Erection
I5.1 General Erection. The Erector shall use special care in unloading, handling and erecting
the AESS to avoid marking or distorting the AESS. The Erector must plan and execute all oper-
ations in a manner that allows the architectural appearance of the structure to be maintained.
All slings will be nylon-strap or chains with softeners. a)
Care shall be taken to minimize damage to any shop paint or coating. b)
If temporary braces or xtures are required to facilitate erection, care must be taken c)
to avoid and/or repair any blemishes or unsightly surfaces resulting from the use or
removal of such temporary elements.
Tack welds shall be ground smooth and holes shall be lled with weld metal or d)
body ller and smoothed by grinding or lling to the standards applicable to the
shop fabrication of the materials.
All backing bars shall be removed and ground smooth. e)
All bolt heads in connections shall be on the same side, as specied, and consistent f)
from one connection to another.
I5.2 Erection Tolerances. Unless otherwise specied in the Contract Documents, members
and components are plumbed, leveled and aligned to a tolerance equal to that permitted for
structural steel.
I5.3 Adjustable Connections. When more stringent tolerances are specically required for
erecting AESS, the Owners plans shall specify/allow adjustable connections between AESS
and adjoining structural elements, in order to enable the Erector to adjust and/or specify the
method for achieving the desired dimensions. Adjustment details proposed by the Erector shall
be submitted to the Architect and Engineer for review.
7-46 CISC Code of Standard Practice
T
A
B
L
E

I
1

-

A
E
S
S

C
a
t
e
g
o
r
y

M
a
t
r
i
x
S
S
S
S
t
a
n
d
a
r
d

S
t
r
u
c
t
u
r
a
l

S
t
e
e
l
C
S
A

S
1
6
A
E
S
S

1
B
a
s
i
c
E
l
e
m
e
n
t
s

A
E
S
S

2
F
e
a
t
u
r
e
E
l
e
m
e
n
t
s
V
i
e
w
e
d

a
t

a

d
i
s
t
a
n
c
e

>

6

m

o
p
t
i
o
n
a
l

A
E
S
S

3
F
e
a
t
u
r
e
E
l
e
m
e
n
t
s
V
i
e
w
e
d

a
t

a

d
i
s
t
a
n
c
e


6

m

o
p
t
i
o
n
a
l

o
p
t
i
o
n
a
l
A
E
S
S

4
S
h
o
w
c
a
s
e
E
l
e
m
e
n
t
s

o
p
t
i
o
n
a
l

o
p
t
i
o
n
a
l

A
E
S
S

C
C
u
s
t
o
m
E
l
e
m
e
n
t
s
C
a
t
e
g
o
r
y
C
h
a
r
a
c
t
e
r
i
s
t
i
c
s
S
u
r
f
a
c
e

p
r
e
p
a
r
a
t
i
o
n

t
o

S
S
P
C
-
S
P

6
S
h
a
r
p

e
d
g
e
s

g
r
o
u
n
d

s
m
o
o
t
h
C
o
n
t
i
n
u
o
u
s

w
e
l
d

a
p
p
e
a
r
a
n
c
e
S
t
a
n
d
a
r
d

s
t
r
u
c
t
u
r
a
l

b
o
l
t
s
W
e
l
d

s
p
a
t
t
e
r

r
e
m
o
v
e
d
V
i
s
u
a
l

s
a
m
p
l
e
s
O
n
e
-
h
a
l
f

s
t
a
n
d
a
r
d

f
a
b
r
i
c
a
t
i
o
n

t
o
l
e
r
a
n
c
e
s
F
a
b
r
i
c
a
t
i
o
n

m
a
r
k
s

n
o
t

a
p
p
a
r
e
n
t
W
e
l
d
s

u
n
i
f
o
r
m

a
n
d

s
m
o
o
t
h
M
i
l
l

m
a
r
k
s

r
e
m
o
v
e
d
B
u
t
t

a
n
d

p
l
u
g

w
e
l
d
s

g
r
o
u
n
d

s
m
o
o
t
h

a
n
d

f

l
l
e
d
H
S
S

w
e
l
d

s
e
a
m

o
r
i
e
n
t
e
d

f
o
r

r
e
d
u
c
e
d

v
i
s
i
b
i
l
i
t
y
C
r
o
s
s
-
s
e
c
t
i
o
n
a
l

a
b
u
t
t
i
n
g

s
u
r
f
a
c
e

a
l
i
g
n
e
d
J
o
i
n
t

g
a
p

t
o
l
e
r
a
n
c
e
s

m
i
n
i
m
i
z
e
d
A
l
l

w
e
l
d
e
d

c
o
n
n
e
c
t
i
o
n
s
H
S
S

s
e
a
m

n
o
t

a
p
p
a
r
e
n
t
W
e
l
d
s

c
o
n
t
o
u
r
e
d

a
n
d

b
l
e
n
d
e
d
S
u
r
f
a
c
e
s

f

l
l
e
d

a
n
d

s
a
n
d
e
d
W
e
l
d

s
h
o
w
-
t
h
r
o
u
g
h

m
i
n
i
m
i
z
e
d
I
D
1
.
1
1
.
2
1
.
3
1
.
4
1
.
5
2
.
1
2
.
2
2
.
3
2
.
4
3
.
1
3
.
2
3
.
3
3
.
4
3
.
5
3
.
6
4
.
1
4
.
2
4
.
3
4
.
4
C
.
1
C
.
2
C
.
3
C
.
4
C
.
5
7-47 CISC Code of Standard Practice
T
A
B
L
E

I
1

-

A
E
S
S

C
a
t
e
g
o
r
y

M
a
t
r
i
x

(
C
o
n
t

d
)
N
o
t
e
s
P
r
i
o
r

t
o

b
l
a
s
t

c
l
e
a
n
i
n
g
,

a
n
y

d
e
p
o
s
i
t
s

o
f

g
r
e
a
s
e

o
r

o
i
l

a
r
e

t
o

b
e

r
e
m
o
v
e
d

b
y

s
o
l
v
e
n
t

c
l
e
a
n
i
n
g
,

S
S
P
C
-
S
P

1
.
R
o
u
g
h

s
u
r
f
a
c
e
s

a
r
e

t
o

b
e

d
e
b
u
r
r
e
d

a
n
d

g
r
o
u
n
d

s
m
o
o
t
h
.

S
h
a
r
p

e
d
g
e
s

r
e
s
u
l
t
i
n
g

f
r
o
m

f

a
m
e

c
u
t
t
i
n
g
,

g
r
i
n
d
i
n
g

a
n
d

e
s
p
e
c
i
a
l
l
y

s
h
e
a
r
i
n
g

a
r
e

t
o

b
e

s
o
f
t
e
n
e
d
.

I
n
t
e
r
m
i
t
t
e
n
t

w
e
l
d
s

a
r
e

m
a
d
e

c
o
n
t
i
n
u
o
u
s
,

e
i
t
h
e
r

w
i
t
h

a
d
d
i
t
i
o
n
a
l

w
e
l
d
i
n
g
,

c
a
u
l
k
i
n
g

o
r

b
o
d
y

f

l
l
e
r
.

F
o
r

c
o
r
r
o
s
i
v
e

e
n
v
i
r
o
n
m
e
n
t
s
,

a
l
l

j
o
i
n
t
s

s
h
o
u
l
d

b
e

s
e
a
l

w
e
l
d
e
d
.

S
e
a
m
s

o
f

h
o
l
l
o
w

s
t
r
u
c
t
u
r
a
l

s
e
c
t
i
o
n
s

s
h
a
l
l

b
e

a
c
c
e
p
t
a
b
l
e

a
s

p
r
o
d
u
c
e
d
.
A
l
l

b
o
l
t

h
e
a
d
s

i
n

c
o
n
n
e
c
t
i
o
n
s

s
h
a
l
l

b
e

o
n

t
h
e

s
a
m
e

s
i
d
e
,

a
s

s
p
e
c
i
f

e
d
,

a
n
d

c
o
n
s
i
s
t
e
n
t

f
r
o
m

o
n
e

c
o
n
n
e
c
t
i
o
n

t
o

a
n
o
t
h
e
r
.
W
e
l
d

s
p
a
t
t
e
r
,

s
l
i
v
e
r
s

a
n
d

s
u
r
f
a
c
e

d
i
s
c
o
n
t
i
n
u
i
t
i
e
s

a
r
e

t
o

b
e

r
e
m
o
v
e
d
.

W
e
l
d

p
r
o
j
e
c
t
i
o
n

u
p

t
o

2

m
m

i
s

a
c
c
e
p
t
a
b
l
e

f
o
r

b
u
t
t

a
n
d

p
l
u
g
-
w
e
l
d
e
d

j
o
i
n
t
s
.
V
i
s
u
a
l

s
a
m
p
l
e
s

a
r
e

e
i
t
h
e
r

a

3
-
D

r
e
n
d
e
r
i
n
g
,

a

p
h
y
s
i
c
a
l

s
a
m
p
l
e
,

a

f

r
s
t
-
o
f
f

i
n
s
p
e
c
t
i
o
n
,

a

s
c
a
l
e
d

m
o
c
k
-
u
p

o
r

a

f
u
l
l
-
s
c
a
l
e

m
o
c
k
-
u
p
,

a
s

s
p
e
c
i
f

e
d

i
n

C
o
n
t
r
a
c
t

D
o
c
u
m
e
n
t
s
.
T
h
e
s
e

t
o
l
e
r
a
n
c
e
s

a
r
e

r
e
q
u
i
r
e
d

t
o

b
e

o
n
e
-
h
a
l
f

o
f

t
h
o
s
e

o
f

s
t
a
n
d
a
r
d

s
t
r
u
c
t
u
r
a
l

s
t
e
e
l

a
s

s
p
e
c
i
f

e
d

i
n

C
S
A

S
1
6
.
M
e
m
b
e
r
s

m
a
r
k
e
d

w
i
t
h

s
p
e
c
i
f

c

n
u
m
b
e
r
s

d
u
r
i
n
g

t
h
e

f
a
b
r
i
c
a
t
i
o
n

a
n
d

e
r
e
c
t
i
o
n

p
r
o
c
e
s
s
e
s

a
r
e

n
o
t

t
o

b
e

v
i
s
i
b
l
e
.
A
l
l

m
i
l
l

m
a
r
k
s

a
r
e

n
o
t

t
o

b
e

v
i
s
i
b
l
e

i
n

t
h
e

f

n
i
s
h
e
d

p
r
o
d
u
c
t
.
C
a
u
l
k
i
n
g

o
r

b
o
d
y

f

l
l
e
r

i
s

a
c
c
e
p
t
a
b
l
e
.
S
e
a
m
s

s
h
a
l
l

b
e

o
r
i
e
n
t
e
d

a
w
a
y

f
r
o
m

v
i
e
w

o
r

a
s

i
n
d
i
c
a
t
e
d

i
n

t
h
e

C
o
n
t
r
a
c
t

D
o
c
u
m
e
n
t
s
.
T
h
e

m
a
t
c
h
i
n
g

o
f

a
b
u
t
t
i
n
g

c
r
o
s
s
-
s
e
c
t
i
o
n
s

s
h
a
l
l

b
e

r
e
q
u
i
r
e
d
.
T
h
i
s

c
h
a
r
a
c
t
e
r
i
s
t
i
c

i
s

s
i
m
i
l
a
r

t
o

2
.
2

a
b
o
v
e
.


A

c
l
e
a
r

d
i
s
t
a
n
c
e

o
f

3

m
m

b
e
t
w
e
e
n

a
b
u
t
t
i
n
g

m
e
m
b
e
r
s

i
s

r
e
q
u
i
r
e
d
.
H
i
d
d
e
n

b
o
l
t
s

m
a
y

b
e

c
o
n
s
i
d
e
r
e
d
.
H
S
S

s
e
a
m
s

s
h
a
l
l

b
e

t
r
e
a
t
e
d

s
o

t
h
a
t

t
h
e
y

a
r
e

n
o
t

a
p
p
a
r
e
n
t
.
I
n

a
d
d
i
t
i
o
n

t
o

a

c
o
n
t
o
u
r
e
d

a
n
d

b
l
e
n
d
e
d

a
p
p
e
a
r
a
n
c
e
,

w
e
l
d
e
d

t
r
a
n
s
i
t
i
o
n
s

b
e
t
w
e
e
n

m
e
m
b
e
r
s

a
r
e

a
l
s
o

r
e
q
u
i
r
e
d

t
o

b
e

c
o
n
t
o
u
r
e
d

a
n
d

b
l
e
n
d
e
d
.
S
t
e
e
l

s
u
r
f
a
c
e

i
m
p
e
r
f
e
c
t
i
o
n
s

s
h
o
u
l
d

b
e

f

l
l
e
d

a
n
d

s
a
n
d
e
d
.
T
h
e

b
a
c
k

f
a
c
e

o
f

a

w
e
l
d
e
d

e
l
e
m
e
n
t

c
a
u
s
e
d

b
y

t
h
e

w
e
l
d
i
n
g

p
r
o
c
e
s
s

c
a
n

b
e

m
i
n
i
m
i
z
e
d

b
y

h
a
n
d

g
r
i
n
d
i
n
g

t
h
e

b
a
c
k

s
i
d
e

o
f

t
h
e

w
e
l
d
.

T
h
e

d
e
g
r
e
e

o
f

w
e
l
d

s
h
o
w
-
t
h
r
o
u
g
h

i
s

a

f
u
n
c
t
i
o
n

o
f

w
e
l
d

s
i
z
e

a
n
d

m
a
t
e
r
i
a
l
.
A
d
d
i
t
i
o
n
a
l

c
h
a
r
a
c
t
e
r
i
s
t
i
c
s

m
a
y

b
e

a
d
d
e
d

f
o
r

c
u
s
t
o
m

e
l
e
m
e
n
t
s
.
1
.
1
1
.
2
1
.
3
1
.
4
1
.
5
2
.
1
2
.
2
2
.
3
2
.
4
3
.
1
3
.
2
3
.
3
3
.
4
3
.
5
3
.
6
4
.
1
4
.
2
4
.
3
4
.
4
C
.
7-48 CISC Code of Standard Practice
APPENDIX J
Digital Modelling
This Appendix is intended to facilitate the understanding and use of digital modelling technol-
ogy in the design and construction of steel structures. No long-established standard of practice
exists; therefore, it is the intent of this Appendix to provide guidance when its use is contem-
plated.
J1. Digital Building Product Models
When the contract documents indicate that a three-dimensional digital Building Product Mod-
el (BPM sometimes referred to as a Building Information Model (BIM)) replaces contract
drawings and is to be used as the primary means of designing, representing, and exchanging
structural steel data for the project, the provisions in this Appendix shall apply. In this case, all
references to the Design Drawings in this Code shall instead apply to the Design Model, and
all references to Fabrication (Shop Details formerly Shop Drawings) and Erection Docu-
ments in the Code shall instead apply to the Manufacturing Model. The CIS/2 Logical Product
Model (LPM) shall be used as the Building Product Model for structural steel. The CIS/2 LPM
for structural steel may exist solely as the projects BPM or may be integrated into a multi-
disciplinary BPM for projects adopting greater digital model design application. Refer to the
Electronic Data Interchange Project Flowchart at the end of this Appendix to understand this
interoperability. In the context of the structural discipline, the BIM is sometimes referred to as
the SBIM (Structural Building Information Model).
If the primary means of project communication reverts from a model-based (electronic) sys-
tem to a paper-based system, the requirements in this Code other than in this Appendix shall
apply.
J2. Denitions
Building Product
Model
A digital information structure of the objects making up a building
or structure, capturing the form, function, behaviour and relations of
the parts and assemblies within one or more building systems, such
as architectural, structural and mechanical. The data in the model
is created, manipulated (edited), evaluated, reviewed and presented
using computer-based design, engineering and manufacturing appli-
cations. Traditional two-dimensional drawings may be one of many
reports generated by the Building Product Model.
CIS/2 (CIM Steel
Integration Standards/
Version 2)
The specication providing the Building Product Model for struc-
tural steel and format for Electronic Data Interchange (EDI) among
software applications dealing with steel design, analysis, and manu-
facturing.
7-49 CISC Code of Standard Practice
Logical Product
Model (LPM)
The CIS/2 Building Product Model which supports the engineering of
low-, medium-, and high-rise construction in domestic, institutional,
commercial and industrial contexts. All elements of the structure are
covered, including main and secondary framing and connections. The
connections used can be of a variety of structural shape or element.
The LPM addresses the exchange of data between structural steel
software applications. It is meant to support a heterogeneous set of
software applications over a broad portion of the steel information
development conveyance life cycle. It is organized around the
three different sub-models: the Analysis Model (data represented in
structural analysis), the Design Model (data represented in frame
design layout) and the Manufacturing Model (data represented in
detailing for fabrication).
Data Management
Conformance (DMC)
The capability of the CIS/2 BPM (or LPM) to include optional data
entities for managing and tracking additions, deletions and modi-
cations to a model, including who made the change and when the
change was made for all editing instances.
J3. Standards
Where three-dimensional digital Building Product Model data is specied for information con-
veyance between the design and construction teams of a project, the CIM Steel Integration
Standards Release 2: Second Edition P265: CIS/2.1: Volumes 1 through 4 shall be followed.
J4. Contract Documents
In addition to the requirements in Clause 4, the following requirements shall apply to the De-
sign Model.
J4.1 The Design Model shall:
Consist of Data Management Conformance Classes. a)
Contain Analysis Model data so as to include load calculations as indicated in the b)
Contract Specications referencing jurisdictional codes.
Include entities that fully dene each steel element, and the extent of detailing of c)
each element, as would be recorded on an equivalent set of structural steel design
drawings (see Clause 4.1.2).
Include all steel elements (primary and secondary structural), as well as any other d)
entities required for strength and stability of the completely erected structure.
Govern over all other forms of information, including drawings, sketches, etc. e)
J4.2 The Owner shall designate an Administrator for the LPM, who shall:
Control the LPM by providing appropriate access privileges (read, write, etc.) to a)
all relevant parties.
Maintain the security of the LPM. b)
Guard against data loss of the LPM. c)
7-50 CISC Code of Standard Practice
Be responsible for updates and revisions to the LPM as they occur and archive all d)
versions with appropriate annotations.
Inform all involved parties regarding changes to the LPM. e)
NOTE: When a project is designed and constructed using EDI, it is imperative that
an individual entity on the team be responsible for maintaining the LPM. This is
to assume protection of data through proper back-up, storage and security and to
provide coordination of the ow of information to all team members when information
is added to the model. Team members exchange information to revise the model with
this Administrator. The Administrator will validate all changes to the LPM. This
ensures proper tracking and control of revisions. The Administrator can be one of
the design team members such as an Architect, Structural Engineer, or a separate
entity on the design team serving this purpose who is well experienced with applicable
(sophisticated) software. The Administrator can also be the Fabricators Detailer or
a separate entity on the construction team serving this purpose. Currently, numerous
rms within the Detailer Industry in Canada are well versed in this model management
and information protocol for steel-framed structures.
J5. Fabrication and Erection Documents
In addition to the requirements in Clause 5, the following requirements shall apply:
When the Design Model is used to develop the Manufacturing Model, the Fabricator shall ac-
cept the information under the following conditions:
When the design information is to be conveyed to the Fabricator by way of the De- a)
sign Model, in the event of a conict between the model and any Design Drawings,
the Design Model will govern.
The ownership of the information added to the LPM in the Manufacturing Model b)
should be dened in the Contract Documents. In the absence of terms for owner-
ship regarding the information added by the Fabricator to the LPM in the Contract
Documents, the ownership will belong to the Fabricator, dependent on which party
provided the expertise for the information to be incorporated to the LPM. See Note
below.
During the development of the Manufacturing Model, as member locations are c)
adjusted to convert the modelled parts from a Design Model, these relocations will
only be done with approval of the Designer.
The Fabricator and Erector shall accept the use of the LPM and Design Model d)
under the same conditions as set forth in Clause 4.3.1, except as modied in J5.
When approval of the detailed material is to be done by using the Manufacturing e)
Model, the version of the submitted model shall be identied. Comments attached
to the individual elements as specied in the CIS/2 Standard shall be used to anno-
tate the Manufacturing Model. The Fabricator will issue the revised Manufacturing
Model for review, and the version of the model submitted will be tracked as previ-
ously dened.
NOTE: Approval of the Manufacturing Model by the Designer can replace the approval
of actual Fabrication and Erection Documents. For this method to be effective, a
system must be in place to record review, approval, correction and nal release of the
7-51 CISC Code of Standard Practice
Manufacturing Model for fabrication of structural steel. The versions of the model
must be tracked with review comments and approvals permanently attached to the
versions of the model to the same extent as such data is maintained with conventional
hard copy approvals. The CIS/2 Standard provides this level of tracking.
7-52 CISC Code of Standard Practice
E
l
e
c
t
r
o
n
i
c

D
a
t
a

I
n
t
e
r
c
h
a
n
g
e

P
r
o
j
e
c
t

F
l
o
w
c
h
a
r
t
D
e
s
i
g
n
D
e
v
e
l
o
p
m
e
n
t
A
n
a
l
y
s
i
s
M
o
d
e
l
T
e
n
d
e
r
P
r
e
p
a
r
a
t
i
o
n
D
e
s
i
g
n
M
o
d
e
l
O
p
e
n

B
i
d
T
e
n
d
e
r
R
e
s
p
o
n
s
e
N
e
g
o
t
i
a
t
i
o
n
Q
u
a
n
t
i
t
y

T
a
k
e
-
o
f
f
&

P
r
i
c
i
n
g
D
e
s
i
g
n

D
r
a
w
i
n
g
s
C
o
n
t
r
a
c
t
A
w
a
r
d
S
t
r
u
c
t
u
r
a
l
C
o
m
p
l
e
t
i
o
n
M
a
n
a
g
e
m
e
n
t

I
n
f
o
r
m
a
t
i
o
n

S
y
s
t
e
m
s

D
e
t
a
i
l
i
n
g
E
l
e
c
t
r
o
n
i
c
A
p
p
r
o
v
a
l
s
M
a
n
u
f
a
c
t
u
r
i
n
g
M
o
d
e
l

(
L
P
M
)
F
a
b
r
i
c
a
t
i
o
n
F
i
e
l
d
I
n
f
o
r
m
a
t
i
o
n
A
u
t
o
m
a
t
e
d
E
q
u
i
p
m
e
n
t
E
r
e
c
t
i
o
n
C
o
m
p
l
e
t
i
o
n
C
o
n
s
t
r
u
c
t
i
o
n
C
o
o
r
d
i
n
a
t
i
o
n
A
r
c
h
i
v
i
n
g
M
a
i
n
t
e
n
a
n
c
e

&
U
p
g
r
a
d
e
s

D
e
s
i
g
n
B
P
M
O
p
t
i
o
n
a
l
E n g i n e e r i n g
A r c h . & E n g .
S p e c i f i c a t i o n s
Estimating
Material Order
D M C
CNC Data
3D at Site
Record Files
L
e
g
e
n
d
:
C
I
S
/
2
B
P
M

=

S
B
I
M
R
e
p
o
r
t
B
P
M
B
P
M
B
P
M
B
P
M
B
P
M
B
P
M
B
P
M
NOTES
NOTES
ISBN 978-0-88811-123-4

Você também pode gostar