Boiling
Boiling Liquid Boiling Level Boiling Liquid
Liquid
Expanding Expanding Entering
7 Expand BLEVE Escaping A
Vapour Vapour Vapour
Vapour
Explosion Explosion Explosion
Expansion
What is the design temperature of LPG cylinders and 60 deg C & 65 deg C & 65 deg C & 40 deg C &
8 C
LPG storage vessels? 50 deg C 50 deg C 55 deg C 80 deg C
9 What is the periodicity of testing of SRVs? 6 months 1 year 2 years 5 years B
1.5 times 1.3 times 1.2 times 1.1 times
10 What is the testing pressure for SRVs? design design design design D
pressure pressure pressure pressure
Once in 2 Once in 4 Once in 6 Once in a
11 What is the periodicity of testing of TLD hoses? B
months months months year
How many pressure relief valves are provided in the
12 one two three four B
Storage Vessels sphere/bullet?
13 What is the periodicity of testing of POP Action Valve? 2 years six months 1 Year 5 years C
14 What is the ISI number for LPG hoses used in TLD? IS-9547 IS-5947 IS-9537 IS-9500 C
15 Which type of LPG hose is used in TLD Type - I Type - II Type - III Type - IV B
visual
inspection Electrical
Hydrostatic
16 What are the tests to be conducted for TLD bay hoses? and continuity All of them. D
test
pneumatic test
test
What is the bursting pressure at which TLD bay hoses
17 50 kgf/sqcm 82 kgf/sqcm 90 kgf/sqcm 102 kgf/sqcm D
are tested at the time of manufacture?
1
Q Answe
Question optionA optionB optionC optionD
no r
What is the rating of the electrical system of the master
26 300 A 325 A 120 A 210 A A
cut off switch?
Recommended material of construction for sphere/
bullet, for Refinery service where H2S presence can ASTM A516 A 537 ASTM A416 ASTM A216
27 A
not be ruled out,____________ shall be used (BS-5500 Gr. 60 CLASS 1 Gr. 50 Gr. 60
shall not be used for the above).
20 kg/sqcm 25 kg/sqcm 30 kg/sqcm 25.35
What is hydro-static test pressure and time for testing
28 for 25 for 25 for 25 kg/sqcm for D
new LPG cylinders?
seconds seconds seconds 30 seconds
33.3 +3% 23.3 +3% 33.3 +0% 33.3 +0%
29 What is volumetric capacity of 14.2 kg. LPG cylinder? A
-0% liters -0% liters -3% liters -0% liters
What is the torque to be applied while fixing a new
30 20+ - 2 kgm 18+ - 2 kgm 20+ - 1 kgm 30+ - 2 kgm A
valve in LPG cylinder?
Cylinder's hydrostatic test (first test) is done after
______ years from the date of first
31 5, 5 7, 5 5, 7 6, 6 B
testing(manufacturing) and subsequent tests after
every ______ years.
What is the pneumatic pressure and time, to which a
cylinder shall be subjected to at the time of carrying out 7 kg/cm2 for 3 kg/cm2 for 5 kg/cm2 for 7 kg/cm2 for
32 A
the ST testing, to check the tightness of the valve / 60 seconds 60 seconds 30seconds 30 seconds
cylinder?
What is the periodicity of testing of above ground pipe Once in one Once in two Once in three Once in five
33 D
line used for LPG ? year years years years
A cylinder can be HR repaired only ________ in its
34 once twice thrice none A
life-time.
TLD hoses should be subjected to hydro-static
35 30 25 45 60 B
pressure for ______ kg/cm2.
TLD hoses should be subjected to hydro-static
36 3 4 5 10 C
pressure for _______ minutes.
TLD hoses should be subjected to hydro-static test
37 2 4 6 12 B
every _______ months.
Mean
Mean Mean Medium
Velocity
Velocity Velocity Wind Velocity
38 What is MVWSS? Water C
Water Spray Spray Water Spray
Storage
System System System
System
Manual
Manual Call Mechanical Master Call
39 MCP stands for? Correction A
Point Call Phone Point
Point
79 Deg C 50 Deg C 60 Deg C 79 Deg C
40 What is the bursting temperature of quartzoidal bulb? D
min. max. max. max.
Perssurised Percurssive
Percurssive Percurssive
Unconfined Undefined
Unconfined Unconfined
41 What is PUVCE? Vapour Vapour A
Vapour Cloud Vapour Cloud
Cloud Cloud
Explosion. Expansion.
Explosion. Explosion.
What should be the minimum distance between
42 1 meter 2 meters 3 meters. 4 meters. C
shadow of sphere/bullet and location of ROV?
The filling pressure should not exceed working
43 15 kg/sqcm 15.5 kg/sqcm 16.9 kg/sqcm 18 kg/sqcm C
pressure of cylinder i.e. ______ at 65 deg.C.
-27 deg to -27 deg to -20 deg to -27 deg to
44 What is the design temperature for sphere/bullet? A
+55 deg C +45 deg C +55 deg C +65 deg C
What is the duration for which the test pressure has to
45 be maintained during the hydrostatic test of Horton One hour. Two hours Three hours. Four hours. A
sphere?
What is the corrosion allowance being adopted while 2 mm 3 mm 1.5 mm 5 mm
46 C
designing storage vessels? minimum minimum minimum minimum
2
Q Answe
Question optionA optionB optionC optionD
no r
First level and second level alarms of GMS are set at 10% and 20% and 20% and 40% and
47 C
_______ and _______ repectively. 30% of LEL 30% of LEL 60% of LEL 30% of LEL
What is the periodicity of hydro-static testing of storage
48 1 year 2 years 4 years 5 years D
vessels?
SMPV rule is applicable for vessels exceeding storage
49 1000 2000 3000 500 A
capacity of ________litres.
Gas Cylinder Rules is applicable for vessels upto
50 500 800 1000 2000 C
capacity of _______ litres.
Spheres and bullets shall be treated as separate
51 groups with minimum ________ safety distance 20 meters. 30 meters 40 meters 50 meters B
between two groups.
The concrete flooring of the ground under vessel shall
52 be provided from the edge of the Horton Spheres with a 1:50 1:100 1:1000 1:200 B
slope of _________ (min.).
What can be the maximum number of LPG tank lorry
53 5 6 7 8 D
bays in one group?
What should be the minimum safety distance between
54 20 meters 30 meters 50 meters 100 meters C
two groups of TLD bays?
What should be the minimum width of TLD pipeline
55 island to be provided for permanent protection of 1 meter 2 meters 3 meters 5 meters A
manifold from tank lorries in TLD bay?
What should be the slope of nozzle / inlet outlet
56 1.5 degrees 2 degrees 3 degrees 4.5 degrees A
pipeline provided at sphere/bullet?
What can be the maximum setting of high level alarm in
57 70 % 85 % 90 % 100 % B
storage vessels?
In storage area QB detectors shall be provided
0.5 meter,
encircling each vessel, equispaced with a maximum 1 meter, 1.5 2 meter, 1.0 3 meter, 1.5
58 1.0 to 2.0 A
spacing of ______ at an elevation of about ______ to 2.0 meter to 2.0 meter to 2.0 meter
meter
from bottom of vessel.
The fire water deluge valves shall be kept outside the
kerb wall at a safe distance in case of sphere/ bullet,
59 10 meters 20 meters 15 meters 50 meters C
and located ________ away from limits of other sheds
or shadows of spheres.
What should be minimum percentage of spare hoses to
60 40% 50% 60% 30% B
be kept in a plant?
63 mm dia 40 mm dia 50 mm dia 20 mm dia
What shall be the diameter and length of the hoses
61 and 15 mtrs. and 10 mtrs. and 20 mtrs. and 5 mtrs. A
used for fire fighting?
Length Length Length Length
Self Self Saturated
Self Confined
Contained Controlled Carbon
62 What is SCBA? Breathing A
Breathing Bathing Bathing
Apparatus
Apparatus Apparatus Apparatus
What should be minimum and maximum height of none of the
63 .3 m and .6 m .2 m and .5m .4m and .7m A
KERB wall? above
Vessels shall be arranged into groups, each having a
64 4 5 6 7 C
maximum of _____ vessels.
What should be the minimum distance between two
65 30 m 40 m 50 m 20 m A
groups of storage vessels?
Space for turning with minimum radius of _______ for
66 tank lorries shall be provided commensurate with the 20 m 30 m 40 m 10 m A
capacities of the tank trucks.
Service Water shall be provided at a pressure of about
67 2 3 5 7 B
_____ Kg/sq.cm.g.
68 What is the IS code for Antistatic mastic flooring? IS 8857 IS 4569 IS 8374 IS 2254 C
LPG
Name the facilities which are required to be fully Storage
69 Sheds,TLD Pump House All of them D
covered by medium velocity water spray system. Vessels.
Bays,
3
Q Answe
Question optionA optionB optionC optionD
no r
20 Meters in
10 Meters in 30 Meters in 30 Meters in
Hazardous
Hazardous Hazardous Hazardous
area and 40
What is the spacing between hydrant monitors in the area and 20 area and 50 area and 45
70 meters in C
firewater ring main. meters in non meters in non meters in non
non
hazardous hazardous hazardous
hazardous
area. area. area.
area.
The Static
The Liquefied
and Mobile
Petroleum
Pressure
Gas Factories Act
Vessels
(Regulation - 1948
(Unfired)
of Supply & (Amended as None of
72 Bulk storage of LPG is governed by______________. Rules 1981 B
Distribution Factories them
(amended in
Order),1993 (Amendment)
1998) under
and Act, 1987)
Indian
Amndment
Explosive Act
Order, 1994
1884.
114 _______ spare Hoses shall be stored in the LPG plant. 25% 50% 100% 30% B
6
Q Answe
Question optionA optionB optionC optionD
no r
Fixed water cooling spray systems on storage tanks
128 four six two three B
should be tested at least once in _____ months.
Deluge systems on LPG spheres and bullets should be
129 tested at least once in _______ months for proper four one two three D
performance.
Spray system in the plant should be tested at least
130 week month quarter year C
once in every ________ .
All the fire hoses should be hydraulically tested at least
131 two three four six D
once in ______ months.
The operability of Detectors should be tested once in
132 three four two six A
every _______ months.
Calibration of gas detectors using test gas should be
133 done once in every _______ months or as per two three six four C
manufacturer's recommendation, whichever is earlier
A mock fire drill should be conducted once in a
134 week month fortnight year B
_______ to rehearse the fire emergency procedures
The assessed maximum temperature for uninsulated
135 pressure vessels as per Statutory Rules is ______ deg 45 65 55 69 C
C.
Flange connections shall be a minimum of _________
136 ANSI-300 ANSI-400 ANSI-200 ANSI-100 A
lb flange Class .
All fittings (I.E.flange connections) in storage vessel
137 10 30 40 20 D
pipelines shall be of minimum _____ mm thickness.
139 LPG tank truck Design Pressure is ______ kg/cm2 14 15.55 16.65 19.25 C
Working pressure for LPG Tank Trucks is _____
140 15.85 14 19.25 16.65 A
kg/cm2
141 Test pressure for LPG Tank Trucks is _____ kg/cm2 21.65 19.25 16.65 25.35 A
142 Design Temp.for LPG Tank Trucks is_________ deg c -6 to +40 -6 to +35 -10 to +55 -6 to +55 D
Corrosion Allowance Tank Truck vessel thickness is
143 .3 mm .5 mm .4 mm .8 mm B
____ mm.
BT Extension to chassis, if any, shall not be more
144 than ________ mm and the extension piece shall not 200 400 300 500 C
be welded to the chassis.
145 All Bts must carry _____ nos.10 Kg DCP (ISI marked). 1 4 3 2 D
7
Q Answe
Question optionA optionB optionC optionD
no r
In case of
lightening
when the
The transfer operation of LPG is stopped and all Uncontrolled A fire in the
150 operation All of them D
valves are closed in case of _______ . leakage vicinity
involves
venting of
LPG.
Generally, endorsement for carrying out the operation
151 from ____ to ______ is given by CCOE for the LPG 6 pm, 10 pm 8 pm, 10 pm 6 am, 10 pm 4 pm, 10 pm A
plants on applying for the same.
The periodicity of checking 10 Kg. DCP shall be
152 week month year fortnight B
minimum once in a _______.
Delrin Dupont
153 Safety cap is manufactured out of _________ material. polyethylene teflon Any of them B
500
Safety cap can withstand a maximum working
154 3.45 1.45 2.45 2.15 C
pressure of ________ M Pa of LPG.
Pressure Regulator is designed to regulate LPG in
vapour phase from maximum inlet pressure of 16.9
155 20 10 15 30 D
kgf/cm2(g) in the cylinder to a nominal outlet pressure
of _____ gf/cm2(g).
156 The electronic scale can check ______ cyls/hr. 1000 800 1200 1600 C
Minimum ______ of saleable cylinders filled in a shift
157 1% 2% 3% 2.50% A
production should be subjected to SQC.
Rejection in SQC should not exceed _____ of the total
158 1% 2% 3% 2.50% D
cylinders checked.
159 Cylinder bung are cleaned with ____ inch NGT Tap. 1/2 1/4 3/4 1 C
Cylinder bung is checked with _____ (Go gauge ) &
160 L2, L5 L3,L6 L1, L9 L4,L8 C
_____ (No Go gauge) gauges.
ST tested Cylinders
Cylinders falling into any of the following categories New and Hot that may be
164 All of them D
require purging : cylinders repaired suspected to
cylinders contain air
8
Q Answe
Question optionA optionB optionC optionD
no r
Empty new cylinders in a stake truck can be loaded
169 vertically maximum _____ high or horizontally _____ 1, 2 2, 3 2, 4 3, 5 D
high max.
The truck MUST be parked minimum _____ metres
170 away from the filled or empty cylinder shed within the 5 15 10 20 B
plant.
171 Cylinders must not be _____________. thrown dropped dragged All of them D
The period of re-test currently specified under the rules
172 7 6 5 4 A
is ___ years from the date of manufacture of cylinders.
173 Hydrostatic test pressure for cylinders is _____ Mpa. 1.45 3.45 2.45 3.15 C
During hydrostatic test (statutory testing) of the cylinder
174 20 seconds 30 seconds 40 seconds 60 seconds B
the test pressure should be maintained for ______.
Electrical continuity test of hoses should be done any of the none of the
189 before after B
______ completion of hydrostatic and pneumatic test. two two
9
Q Answe
Question optionA optionB optionC optionD
no r
The thickness test of the above ground water lines
190 a year 2 years 3 years 5 years A
must be done once in ______.
The water in the hydrant pipe line must be flushed at
191 least once in a _________ to prevent corrosion due to week fortnight month year B
bacterial action.
All the valves on the ring main / hydrants / monitors
192 shall be checked for leaks / operation and lubricated week fortnight month year C
once in a _______.
The fire extinguishers must be checked once in a
193 week fortnight month year C
_______.
The fire extinguishers must be hydro-tested once in
194 three two one five A
_____ years.
Interlock shutdown system should be checked once in
195 a ________ for its operation and fidelity for complying week fortnight year month D
with the installed scheme.
The GMS sensors should be calibrated once in a
196 week fortnight quarter month C
_____.
For new and HR cylinders, the thickness of the zinc
197 layer on the cylinders should be minimum 25 37 30 45 B
________microns.
Liquid Level
Light End None of
199 What is LEV? Equivalent of Equalising A
Value them
Vapour. Valve
_______ out of every 100 incoming empty cylinders
from each new/ST tested/Hot Repaired cylinders shall
200 5 10 20 30 B
be lifted and turned upside down to detect the presence
of any foreign matter inside the cylinder.
1.5% of 0.15% of 0.10% of 1.3% of
201 What is the KRA for bung leak? B
Bottling bottling bottling. bottling
1.5% of 0.15% of 0.10% of 1.3% of
202 What is the KRA for Valve leak? A
Bottling bottling bottling. bottling
1.5% of 0.15% of 0.10% of 1.3% of
203 What is the KRA for Market Returns? C
Bottling bottling bottling. bottling
1.5% of 0.15% of 0.10% of 1.3% of
204 What is the KRA for cold repair (valve consumption)? D
Bottling bottling bottling. bottling
What is the KRA for Statutory Testing (valve 0.3% of 0.15% of 0.10% of 1.3% of
205 A
consumption)? Bottling bottling bottling. bottling
4.5% of 0.15% of 0.10% of 1.3% of
206 What is the KRA for safety cap consumption? A
Bottling bottling bottling. bottling
10
Q Answe
Question optionA optionB optionC optionD
no r
For safeyty valves minimum ____ nos relieving loads
212 shall be installed, each having _________ relieving 3, 33% 2, 100% 2, 50% 4, 25% B
capapcity
Each vessel shall have atleast two SRVs, each set at
not more than ____ of design pressure of the vessel
213 and having the relieving capacity adequate for limiting 100%, 150% 120%, 150% 150%, 160% 110%, 120% D
the pressure build up in the vessel not more than
_____ of design pressure.
The ____________ on the sphere/ bullet connected
214 ROVs ball valves EFCVs All of them A
lines shall be fire-safe type
For SRVs, a _________ with a nipple at low point shall
None of
215 be provided on the vent pipe in order to drain the rain large hole weephole Any of them B
them.
water which may get accumulated otherwise.
The LPG line exit from cylinder evacuation area to be
Quick shut
216 provided with a __________ before joining the main EFCV NRV All of them C
valve
LPG return header.
The cylinder should be fabricated out of steel sheets IS:6200-1976 IS:6240-1976 IS:6400-1976 IS:5240-
217 manufactured conforming to ___________ as amended or IS:1007- or IS:10787- or IS:10087- 1976 or IS: B
from time to time. 1984 1984 1984 9787-1984
For connecting liquid and vapour hoses to TTs only studs only bolts and only washer only gasket
244 A
_______ to be used. and nuts nuts and nuts and bolts
The maximum running distance to locate an
245 extinguisher in the working areas shall not exceed 10 12 15 20 C
______ meters.
The top surface of the extinguisher shall not be
246 1 2 2.5 1.5 D
more than _______ metres high.
Yellow Green Grey Black
background background background background
247 What is the colour coding for liquid LPG line? A
and black and white and white and yellow
lettering lettering lettering lettering
White Green Green Black
background background background background
248 What is the colour coding for LPG vapour line? B
and green and white and black and white
lettering lettering lettering lettering
Yellow Green Grey Black
background background background background
249 What is the colour coding for compressed air line? C
and black and white and white and white
lettering lettering lettering lettering
Yellow Green Grey Black
background background background background
250 What is the colour coding for service water line? D
and black and white and white and white
lettering lettering lettering lettering
251 What is the colour coding for pressure relief valves? Black Red Yellow Blue D
12
Q Answe
Question optionA optionB optionC optionD
no r
What should be the minimum thickness of the sheet of
252 2.4 mm 3 mm 1.5 mm 2 mm A
foot-ring for 14.2 kg cylinders?
What should be the minimum wall thickness of the
253 3 mm 1.5 mm 2 mm 2.4 mm D
cylinder for 14.2 kg cylinders?
For fire engines,functioning of protective devices to be
254 week month fortnight quarter A
checked once in a ______.
The effective water storage capacity shall be not less
255 than _______ aggregate working capacity of Fire Water 2 hrs 3 hrs 4 hrs 5 hrs C
pumps.
What type of pumps shall be used in fire water pump None of
256 Centrifugal Reciprocating Any of them A
house? them.
One monitor is equivalent to how many hydrant points 3 hydrant 2 hydrant 5 hydrant 4 hydrant
257 D
for the purpose of calculatin jockey pump capacity? points points. points. points.
What should be the minimum flow rate for the jockey
258 15 Cu.M./Hr 10 Cu.M./Hr 20 Cu.M./Hr 30 Cu.M./Hr B
pump?
Fire water pumps shall have what type of driving
259 Diesel Petrol Battery Any of them A
engine?
What should be the fuel capacity of the engines for the
260 2 hrs running 4 hrs running 6 hrs running 8 hrs running C
fire water pumps?
13
Q Answe
Question optionA optionB optionC optionD
no r
10% of 20% of 1% of
What is the maximum allowed loss in weight for a 5% of original
277 original original original A
cylinder? weight
weight weight weight
Visual inspection of the cylinder is carried out as per
278 IS 5545 IS 5825 IS 5845 IS 5800 C
which code?
What is the IS code for Hydrostatic testing of the
279 IS 7768 IS 8868 IS 6568 IS 8800 B
cylinders?
What is the test pressure for checking old vales to be
280 6 kg/sqcm 5 kg/sqcm 4 kg/sqcm 7 kg/sqcm D
refitted in the cylinders?
What is the periodicity of the calibration of the pressure once in 3 once in 2 once in 4 once in 6
281 A
gauges used for Pneumatic test of the cylinders? weeks weeks weeks weeks
14
Q Answe
Question optionA optionB optionC optionD
no r
During ST testing, each Cylinder shall have the
external surface thoroughly cleaned by ________
None of
299 solution, non-ferrous wire brush and water jet. Care sulphuric acid caustic soda Any of them B
them.
shall be taken to ensure that the body of cylinder is not
damaged.
During statutory testing of vessels, only after repeated
readings are taken at intervals of a few minutes, which
300 show the concentration of gas below _______ of the 10% 20% 15% 8% A
lower flammable limit, may a person be allowed to
enter into the vessel.
_________ connections of the vessel should not be
301 disconnected even after the vessel is empty during Liquid line Vapour line Earthing All of them C
inspection and testing.
While a person is inside the vessel during inspection a fresh air a lifting belt
flameproof
302 and testing, the other person on watch duty must at all breathing and a safety All of them D
torch
times have _____________________. apparatus line.
__________ indicating devices attached to the shell of
Any of the None of
303 the vessel should be removed for calibration and Temperature Pressure C
above them.
replaced, if necessary.
Considering the characteristics of LPG, ____________
finish paints have been standardized for painting of the white/Alumini
304 yellow/brass black Any of them B
storage vessels, to keep interal temperature/ pressure um
lower.
It is to be ensured that the fasteners used for flange low alloy carbon steel,
mild steel, None of
305 joints are studs of______ and in no case _________ steel, carbon low alloy A
carbon steel. them.
bolts are used. steel steel
In case of minor repairs to LPG pumps, it is absolutely
essential that the valves connected to the pump are open, closed, None of
306 Any of them B
________ and preferably _________ before starting through locked them.
repairs.
low suction
pressure, high liquid
What are the alarm and tripping devices for LPG high low lube oil level in the
307 All of them D
vapour compressors? discharge pressure suction
pressure & volume bottle
temperature
___________ should not be repaired but replaced, if
308 Gate Valve NRV EFCV All of them C
found defective.
LPG hoses in India are manufactured as per
309 ISI 9573 ISI 9073 ISI 5730 ISI 9090 A
__________.
For testing of LPG hoses, with the hose completely
filled with water, pressure should be gradually
310 0.5 to 1.0 1.0 to 2.0 0.1 to 0.7 1.5 to 2.5 C
increased at the rate of _________ kg/cm2 (g) per
second using the hydraulic pump
The pressure gauge used for hydro testing of LPG
311 hose should be calibrated and its range should three times two times same four times B
preferably be ________ as that of test pressure.
During hydro testing of LPG hoses, if a variation in
length with pressure is more than _____ when
312 10% 2% 4% 5% D
compared to the original length (without pressure) the
hose should be discarded from LPG service.
The hose end connections should be tested with air
313 pressure of ________kg/cm2 (g) with the hose end 2.5 3.5 4.5 5.0 B
connections plugged and submerged in water.
The check scale of ICU should be checked at various
314 loads with standard weights at the beginning of the shift hour three hours two hours four hours C
and then every ___________.
15
Q Answe
Question optionA optionB optionC optionD
no r
The evacuation vessel should be hydrostatically tested
315 once in ______ years or as required by the statutory 2 3 4 5 D
regulations.
high
high
discharge
What are the alarm and tripping devices for air cooling water discharge
316 pressure, low All of them D
compressors? flow, temperature
lube oil
and overload
pressure
16
Q Answe
Question optionA optionB optionC optionD
no r
17
Q Answe
Question optionA optionB optionC optionD
no r
Pressure switches, Temperature gauges, Temperature
switches, Level switches & other trips and alarms in the
349 quarter six months year two years B
plant have to be tested and calibrated once in
________.
As a general guideline, empty cylinders to cover ____
hours bottling and filled cylinders equivalent to _____
350 hours bottled should be kept in stock. However, stock 3, 1 2, 4 3, 6 4, 2 D
of filled cylinders should be limited to the licensed
capacity .
As all the new, ST completed and HR completed
cylinders are to be purged with LPG, around
351 100 150 200 250 C
_______ gms per cylinder should be considered as
purging loss.
In case water is detected in LPG, draining of water
should be done at the designated place, where the
352 OISD CCOE BIS All of them B
facility for water drainage exists or is provided duly
approved by _________.
After product transfer, to ensure accurate gauging, a
settling time of minimum _______ must be allowed
353 for turbulence (boiling off) caused due to the one hour two hours three hours four hours A
differences of product temperatures to subside and
after carrying out water draining.
18
Q Answe
Question optionA optionB optionC optionD
no r
Siren shouldbe tested by straight run for ______
365 one two three four B
minutes.
Pyrophoric Iron sulphide is a highly ____________
compound formed due to the reaction of sulphur and its
366 inflamable volatile corrosive All of them A
compounds with the loose iron/ iron oxide on a ferrous
surface.
totally
reducing the
eliminating
loose iron
highly
oxide by
corrosive
thoroughly
hydrogen
The pyrophoric Iron Sulphide can be controlled by cleaning the
367 sulphide,limiti Any of them both of them D
___________________. storage
ng the total
vessels
volatile
internally
sulphur to
during the
0.02% by
outage.
mass
CCOE license, which remain in force till _______ of the 31st 30th
368 31st March 30th June. C
year are generally valid for period of 3 years (max.). December September
19
Q Answe
Question optionA optionB optionC optionD
no r
388 What is the capacity of LPG pump at Cuddapah BP? 800 LPM 600 LPM 400 LPM 1000 LPM A
How many air compressors are there in Cuddapah
389 1 2 3 4 C
Plant?
390 What is the rating of air compressors at Cuddapah BP? 10 hp. 20 hp. 40 hp. 50 hp. D
How many security Air compressors are there in
391 1 no. 2 nos. 3 nos. 4 nos. B
Cuddapah BP?
What is the rating of security air compressors at
392 7.5 hp 8.5 hp 10 hp 15 hp A
Cuddapah BP?
393 What is the rating of LPG pump at Cuddapah bp? 20 hp. 30 hp. 40 hp. 50 hp. C
How many service water pumps are there in Cuddapah
394 1 2 3 4 D
BP?
Within the Within the
same month two months
Any of the none of the
395 Compensatory holiday can be availed in which the immediately C
above above
holiday were following that
due month.
No worker shall work for more than _____ hours
396 before he has had an interval for rest of at least _____ 3, 1/2 4, 1 6, 1/2 5, 1/2 D
hour.
A child or an adolescent shall not be required or
allowed to work in any factory unless a _________ certificate of certificate of certificate of
397 none of them B
granted with reference to him is in the custody of the age fitness education
manager of the factory.
Certificate of fitness shall be valid for a period of
398 six months two years one year three years C
________ .
Female adolescent or a male adolescent who has not
attained the age of seventeen years but been granted a
399 certificate of fitness to work as an adult, shall be 6,7 6,8 7, 8 8, 8 A
required or allowed to work only between (6/7/8) AM
and (6/7/8) PM.
No female child shall be required or allowed to work in
400 any factory except between _______ (7/8/9) AM and 8, 8 8, 7 6, 7 6, 8 B
______ (6/7/8) PM
‘Adult’ means a person who has completed his ______
401 16th 21st 18th 20th C
year of age.
‘Adolescent’ means a person who has completed his
402 ______ year of age but has not completed his ______ 15th, 18th. 12th, 16th. 14th, 18th. 10th, 16th. A
year.
hazardous
process
hazardous
takes place None of
415 Safety Committee will be set up in every factory where substances Any of them C
or hazardous them.
are handled.
substances
are used.
21
Q Answe
Question optionA optionB optionC optionD
no r
If a workman is coming to office beyond ten minutes
and if he is allowed to start work, _______ times of
426 one two three four C
such late coming in a month will be adjusted in a month
against one day’s casual leave.
The workman can avail permission not exceeding
______ hours at the most, for the reasons beyond his
427 one two three four A
control to start work at establishment without deduction
for the late coming.
If the workman remains absent beyond ______ days
continuously without prior permission or intimation, he
428 15 20 21 30 C
shall be treated to have voluntarily abandoned the
Corporation’s service.
The Managing Director may close down temporarily
any Establishment or Unit of a department or sections
429 21 10 12 15 A
thereof on business grounds by giving _______ day/s’
notice to the workmen concerned.
If a workman fails to receive the wages on payday, he
Unclaimed
can collect the same only on a/an
430 holiday Wage Pay Sunday working day B
______________________________ which will be
day.
notified by the Corporation.
22
section corans
LPG Set 1 propane/butane
LPG Set 1 approx. 10900
LPG Set 1 1.8% - 9%
LPG Set 1 2000 / 2850
LPG Set 1 410
LPG Set 1 Temperature
Boiling Liquid
LPG Set 1 Expanding
Vapour Explosion
65 deg C & 55
LPG Set 1
deg C
LPG Set 1 1 year
1.1 times design
LPG Set 1
pressure
LPG Set 1 Once in 4 months
LPG Set 1 two
LPG Set 1 1 year
LPG Set 1 IS-9537
LPG Set 1 Type - II
LPG Set 1 All of them.
LPG Set 1 102 kgf/sqcm
1.5 kgf/sqcm
minimum but not
LPG Set 1 below
atmospheric
pressure
Pressure
LPG Set 1
Differential
LPG Set 1 IS 3196
LPG Set 1 250
Starvation,
LPG Set 1 Smothering and
Cooling.
Tariff Advisory
LPG Set 1
Committee
LPG Set 1 BS 5500
Liquid and vapour
LPG Set 1
line
LPG Set 2 300 A
ASTM A516 Gr.
LPG Set 2
60
25.35 kg/sqcm for
LPG Set 2
30 seconds
33.3 +3% -0%
LPG Set 2
liters
LPG Set 2 20+ - 2 kgm
LPG Set 2 7, 5
7 kg/cm2 for 60
LPG Set 2
seconds
LPG Set 2 Once in five years
LPG Set 2 once
LPG Set 2 25
LPG Set 2 5
LPG Set 2 4
Medium Velocity
LPG Set 2 Water Spray
System
LPG Sheds,TLD
Bays, Pump
LPG Set 3
House and
Storage Vessels.
30 Meters in
Hazardous area
LPG Set 3 and 45 meters in
non hazardous
area.
Increased safety,
LPG Set 3 Less maintenance
cost, convenient.
CCOE (by
telegram followed
by letter within 24
LPG Set 5
hrs), OISD and
nearest Police
station
Constructive
LPG Set 5 Appraisal of Plant
Operations
LPG Set 5 100
LPG Set 5 dished ends
LPG Set 5 two
LPG Set 5 8
one gantry
LPG Set 5
(600MT)
LPG Set 5 30
LPG Set 5 45
LPG Set 5 one
LPG Set 5 1.2
LPG Set 5 3.5
LPG Set 5 100% , 50%
LPG Set 5 50%
LPG Set 5 2 Nos
LPG Set 5 one
LPG Set 5 week
three, thirty,
LPG Set 5
fifteen
LPG Set 5 three, two
LPG Set 5 one, two
LPG Set 5 week
LPG Set 5 a year
LPG Set 5 six
LPG Set 5 one
LPG Set 5 half, two
LPG Set 6 year
LPG Set 6 month
LPG Set 6 six
LPG Set 6 three
LPG Set 6 quarter
LPG Set 6 six
LPG Set 6 three
LPG Set 6 six
LPG Set 6 month
LPG Set 6 55
LPG Set 6 ANSI-300
LPG Set 6 20
LPG Set 6 2, 3.5
LPG Set 6 16.65
LPG Set 6 15.85
LPG Set 6 21.65
LPG Set 6 -6 to +55
LPG Set 6 .5 mm
LPG Set 6 300
LPG Set 6 2
LPG Set 6 front
LPG Set 6 welded
LPG Set 6 300
LPG Set 6 1
Uncontrolled
leakage, A fire in
the vicinity and In
case of lightening
LPG Set 6
when the
operation involves
venting of LPG.
LPG Set 7 7
LPG Set 7 2
LPG Set 7 0.1
LPG Set 7 3
LPG Set 7 3, 5
LPG Set 7 15
thrown, dropped,
LPG Set 7
dragged
LPG Set 7 7
LPG Set 7 2.45
LPG Set 7 30 seconds
LPG Set 7 7
LPG Set 8 60 seconds
LPG Set 8 5/10 gms
LPG Set 8 30
LPG Set 8 Vishwakarma
LPG Set 8 six
LPG Set 8 year
LPG Set 8 1000
LPG Set 8 5
LPG Set 8 year
LPG Set 8 1.5
LPG Set 8 30
LPG Set 8 10
LPG Set 8 0.75
LPG Set 8 after
LPG Set 8 a year
LPG Set 8 fortnight
LPG Set 8 month
LPG Set 8 month
LPG Set 8 three
LPG Set 8 month
LPG Set 8 quarter
LPG Set 8 37
LPG Set 8 7
Liquid Equivalent
LPG Set 8
of Vapour.
LPG Set 8 10
LPG Set 9 0.15% of bottling
LPG Set 9 1.5% of Bottling
LPG Set 9 0.10% of bottling.
LPG Set 9 1.3% of bottling
LPG Set 9 0.3% of bottling
LPG Set 9 4.5% of bottling.
Electrical
Inspector of the
LPG Set 9
State
Government.
LPG Set 9 5 years
Excess Flow
LPG Set 9
Check Valve.
LPG Set 9 Once
ASTM A 516 Gr.
LPG Set 9 70 or A 537
CLASS 1
LPG Set 9 2, 100%
LPG Set 9 110%, 120%
LPG Set 9 ROVs
LPG Set 9 weephole
LPG Set 9 NRV
IS:6240-1976 or
LPG Set 9
IS:10787-1984
LPG Set 9 1.5 meters
LPG Set 9 5 meters.
1 M and .6 M
LPG Set 9
respectively
3 M and .6 M
LPG Set 9
respectively.
LPG Set 9 IS 3196
LPG Set 9 quarter
LPG Set 9 yellow
LPG Set 9 fire red
300 mm to 400
LPG Set 10
mm
LPG Set 10 6
LPG Set 10 7, 60
LPG Set 10 5%
infra low voltage
LPG Set 10
lamp
LPG Set 10 30
LPG Set 10 one
LPG Set 10 CCE
LPG Set 10 microcracks
LPG Set 10 1000
LPG Set 10 six
Maximum of 0.35
LPG Set 10
kg/cm2 absolute
LPG Set 10 one
LPG Set 10 ¾” NGT tap
LPG Set 10 1.5 kg/cm2 or less
LPG Set 10 Beyond .5gm/hr
LPG Set 10 1%
Gas Cylinder
Rules 1981, The
Standards of
Weight and
Measures Rules
1987 under
LPG Set 10 Weight &
Measures Act
1976 and The
LPG Regulation of
Supply &
Distribution Order
1993
Grey background
LPG Set 10
and white lettering
Black background
LPG Set 10
and white lettering
LPG Set 11 Blue
LPG Set 11 2.4 mm
LPG Set 11 2.4 mm
LPG Set 11 week
LPG Set 11 4 hrs
LPG Set 11 Centrifugal
LPG Set 11 4 hydrant points.
LPG Set 11 10 Cu.M./Hr
LPG Set 11 Diesel
LPG Set 11 6 hrs running
LPG Set 11 60 meters
LPG Set 11 30 meters
LPG Set 11 4
10 deg C/minute,
LPG Set 11
79 deg C.
LPG Set 11 625 +- 5 mm
LPG Set 11 IS 8737
LPG Set 11 40 kgf/sq mm
LPG Set 11 25.35 kgf/sqcm.
LPG Set 11 17 kgf/sqcm.
LPG Set 11 7.5 gms
LPG Set 11 2
LPG Set 11 beyond 0.5 gm/hr.
near atmospheric
LPG Set 11
pressure.
LPG Set 11 6
Wet Fluoroscent
LPG Set 11 Magnetic Particle
Testing.
LPG Set 12 7 years
5% of original
LPG Set 12
weight
LPG Set 12 IS 5845
LPG Set 12 IS 8868
LPG Set 12 7 kg/sqcm
LPG Set 12 once in 3 weeks
LPG Set 12 +/- 50, IS 2
LPG Set 12 25 mm
LPG Set 12 18 mm
LPG Set 12 10.2 LPM/sqM
LPG Set 12 20.4 LPM/sqM
LPG Set 12 10.2 LPM/sqM
LPG Set 12 10.2 LPM/sqM
LPG Set 12 15 meters
LPG Set 12 7 kgf/sqcm.
LPG Set 12 4 hrs
LPG Set 12 100
LPG Set 12 150%, 65%.
LPG Set 12 60 meters.
LPG Set 12 120%.
2 hoses and one
LPG Set 12
nozzle.
LPG Set 12 3, 5%
LPG Set 12 2.5
LPG Set 12 caustic soda
LPG Set 12 10%
LPG Set 13 Earthing
flameproof torch,
a fresh air
breathing
LPG Set 13
apparatus, a lifting
belt and a safety
line.
Temperature and
LPG Set 13
Pressure
LPG Set 13 white/Aluminium
low alloy steel,
LPG Set 13
carbon steel
LPG Set 13 closed, locked
low suction
pressure, high
discharge
pressure &
LPG Set 13 temperature, low
lube oil pressure,
high liquid level in
the suction
volume bottle
LPG Set 13 EFCV
LPG Set 13 ISI 9573
LPG Set 13 0.1 to 0.7
LPG Set 13 two times
LPG Set 13 5%
LPG Set 13 3.5
LPG Set 13 two hours
LPG Set 13 5
high discharge
pressure, low lube
oil pressure,
LPG Set 13 cooling water flow,
high discharge
temperature and
overload
safety reports,
LPG Set 15 audits and
incident enquiries
Cuddapah BP 50 MT
Cuddapah BP 3
Cuddapah BP 28
Cuddapah BP 800 LPM
Cuddapah BP 3 nos
Cuddapah BP 50 hp
Cuddapah BP 2 nos
Cuddapah BP 7.5 hp
Cuddapah BP 40 hp
Cuddapah BP 4 Nos
a. Within the
same month in
which the holiday
were due OR b.
Factories Act & CDA Within the two
months
immediately
following that
month.
Factories Act & CDA 5, 1/2
certificate of
Factories Act & CDA
fitness
Factories Act & CDA one year
Factories Act & CDA 6,7
Factories Act & CDA 8, 7
Factories Act & CDA 18th.
Factories Act & CDA 15th, 18th
Factories Act & CDA January
Factories Act & CDA 15th
child and
Factories Act & CDA
adolescent
Factories Act & CDA different, day
Factories Act & CDA 14.2 Cu M
Factories Act & CDA 4.2
Factories Act & CDA 250
clean, lubricate or
Factories Act & CDA
adjust
Factories Act & CDA 24
Factories Act & CDA flameproof
atmospheric
Factories Act & CDA
pressure
Director General
of Factory Advise
Service and
Labour Institutes
or Any institution
Factories Act & CDA specialised in
matters relating to
standards of
safety in
hazardous
process
hazardous
process takes
place or
hazardous
Factories Act & CDA substances are
used. Or
hazardous
substances are
handled
Factories Act & CDA 150
Factories Act & CDA State Government
Factories Act & CDA 250
Factories Act & CDA 150
Factories Act & CDA 500
Factories Act & CDA 48
Factories Act & CDA 10
Factories Act & CDA 9
Factories Act & CDA 12
Factories Act & CDA 10
Factories Act & CDA three
Factories Act & CDA one
Factories Act & CDA 21
Factories Act & CDA 21
Unclaimed Wage
Factories Act & CDA
Pay day
Page 37 of 62
What is the design temperature of LPG cylinders and LPG storage 60 deg C & 50 deg 65 deg C & 50
8 65 deg C & 55 deg C 40 deg C & 80 deg C
vessels? C deg C
9 What is the periodicity of testing of SRVs? 6 months 1 year 2 years 5 years
1.5 times design 1.3 times design 1.2 times design 1.1 times design
10 What is the testing pressure for SRVs?
pressure pressure pressure pressure
11 What is the periodicity of testing of TLD hoses? Once in 2 months Once in 4 months Once in 6 months Once in a year
How many pressure relief valves are provided in the Storage
12 one two three four
Vessels sphere/bullet?
13 What is the periodicity of testing of POP Action Valve? 2 years six months 1 Year 5 years
14 What is the ISI number for LPG hoses used in TLD? IS-9547 IS-5947 IS-9537 IS-9500
15 Which type of LPG hose is used in TLD Type - I Type - II Type - III Type - IV
visual inspection Electrical continuity
16 What are the tests to be conducted for TLD bay hoses? Hydrostatic test All of them.
and pneumatic test test
What is the bursting pressure at which TLD bay hoses are tested at
17 50 kgf/sqcm 82 kgf/sqcm 90 kgf/sqcm 102 kgf/sqcm
the time of manufacture?
1.5 kgf/sqcm
1 kgf/sqcm 2 kgf/sqcm minimum
minimum but not 3.5 kgf/sqcm minimum
What is the pressure up to which vapor from BT should be minimum but not but not below
18 below but not below
decanted? below atmospheric atmospheric
atmospheric atmospheric pressure
pressure pressure
pressure
Page 38 of 62
What is the principle being adopted for unloading of liquid LPG from Pressure
19 Gravity Flow Mechanical pump Any of them
BT? Differential
20 What is the IS specification for LPG cylinders? IS 3196 IS 3257 IS 4453 IS 2234
21 Liquid LPG expands to ______ times of vapour. 100 125 250 300
22 What are the principles being adopted in extinguishing the fire? Starvation Smothering Cooling All of them
Tariff Advisory Tariff Advisory
23 What is TAC? Tare Added Cylinder none
Committee Council
What is the British standard code adopted for design of storage
24 BS 5000 BS 6000 BS 5500 BS 4330
vessels?
Liquid and vapour
25 EFCV shall be provided for Sphere/ Bullets at _________. Liquid line Vapour line None.
line
What is the rating of the electrical system of the master cut off
26 300 A 325 A 120 A 210 A
switch?
Recommended material of construction for sphere/ bullet, for
Refinery service where H2S presence can not be ruled
27 ASTM A516 Gr. 60 A 537 CLASS 1 ASTM A416 Gr. 50 ASTM A216 Gr. 60
out,____________ shall be used (BS-5500 shall not be used for the
above).
What is hydro-static test pressure and time for testing new LPG 20 kg/sqcm for 25 25 kg/sqcm for 30 kg/sqcm for 25 25.35 kg/sqcm for 30
28
cylinders? seconds 25 seconds seconds seconds
23.3 +3% -0%
29 What is volumetric capacity of 14.2 kg. LPG cylinder? 33.3 +3% -0% liters 33.3 +0% -3% liters 33.3 +0% -0% liters
liters
What is the torque to be applied while fixing a new valve in LPG
30 20+ - 2 kgm 18+ - 2 kgm 20+ - 1 kgm 30+ - 2 kgm
cylinder?
Cylinder's hydrostatic test (first test) is done after ______ years
31 from the date of first testing(manufacturing) and subsequent tests 5, 5 7, 5 5, 7 6, 6
after every ______ years.
What is the pneumatic pressure and time, to which a cylinder shall
7 kg/cm2 for 60 3 kg/cm2 for 60 5 kg/cm2 for
32 be subjected to at the time of carrying out the ST testing, to check 7 kg/cm2 for 30 seconds
seconds seconds 30seconds
the tightness of the valve / cylinder?
What is the periodicity of testing of above ground pipe line used for Once in two
33 Once in one year Once in three years Once in five years
LPG ? years
34 A cylinder can be HR repaired only ________ in its life-time. once twice thrice none
TLD hoses should be subjected to hydro-static pressure for ______
35 30 25 45 60
kg/cm2.
TLD hoses should be subjected to hydro-static pressure for
36 3 4 5 10
_______ minutes.
TLD hoses should be subjected to hydro-static test every _______
37 2 4 6 12
months.
Mean Velocity Mean Velocity
Medium Velocity Mean Velocity Water
38 What is MVWSS? Water Spray Wind Spray
Water Spray System Storage System
System System
Manual Mechanical Call
39 MCP stands for? Manual Call Point Master Call Point
Correction Point Phone
Page 39 of 62
40 What is the bursting temperature of quartzoidal bulb? 79 Deg C min. 50 Deg C max. 60 Deg C max. 79 Deg C max.
Percurssive
Percurssive Perssurised Percurssive Undefined
Unconfined
41 What is PUVCE? Unconfined Vapour Unconfined Vapour Vapour Cloud
Vapour Cloud
Cloud Explosion. Cloud Explosion. Explosion.
Expansion.
What should be the minimum distance between shadow of
42 1 meter 2 meters 3 meters. 4 meters.
sphere/bullet and location of ROV?
The filling pressure should not exceed working pressure of cylinder
43 15 kg/sqcm 15.5 kg/sqcm 16.9 kg/sqcm 18 kg/sqcm
i.e. ______ at 65 deg.C.
-27 deg to +55 deg -27 deg to +45
44 What is the design temperature for sphere/bullet? -20 deg to +55 deg C -27 deg to +65 deg C
C deg C
What is the duration for which the test pressure has to be
45 One hour. Two hours Three hours. Four hours.
maintained during the hydrostatic test of Horton sphere?
What is the corrosion allowance being adopted while designing
46 2 mm minimum 3 mm minimum 1.5 mm minimum 5 mm minimum
storage vessels?
First level and second level alarms of GMS are set at _______ and 10% and 30% of 20% and 30% of
47 20% and 60% of LEL 40% and 30% of LEL
_______ repectively. LEL LEL
48 What is the periodicity of hydro-static testing of storage vessels? 1 year 2 years 4 years 5 years
SMPV rule is applicable for vessels exceeding storage capacity of
49 1000 2000 3000 500
________litres.
Gas Cylinder Rules is applicable for vessels upto capacity of
50 500 800 1000 2000
_______ litres.
Spheres and bullets shall be treated as separate groups with
51 20 meters. 30 meters 40 meters 50 meters
minimum ________ safety distance between two groups.
The concrete flooring of the ground under vessel shall be provided
52 from the edge of the Horton Spheres with a slope of _________ 1:50 1:100 1:1000 1:200
(min.).
What can be the maximum number of LPG tank lorry bays in one
53 5 6 7 8
group?
What should be the minimum safety distance between two groups
54 20 meters 30 meters 50 meters 100 meters
of TLD bays?
What should be the minimum width of TLD pipeline island to be
55 provided for permanent protection of manifold from tank lorries in 1 meter 2 meters 3 meters 5 meters
TLD bay?
What should be the slope of nozzle / inlet outlet pipeline provided at
56 1.5 degrees 2 degrees 3 degrees 4.5 degrees
sphere/bullet?
What can be the maximum setting of high level alarm in storage
57 70 % 85 % 90 % 100 %
vessels?
In storage area QB detectors shall be provided encircling each
1 meter, 1.5 to 2.0 2 meter, 1.0 to 0.5 meter, 1.0 to 2.0
58 vessel, equispaced with a maximum spacing of ______ at an 3 meter, 1.5 to 2.0 meter
meter 2.0 meter meter
elevation of about ______ from bottom of vessel.
Page 40 of 62
The fire water deluge valves shall be kept outside the kerb wall at a
59 safe distance in case of sphere/ bullet, and located ________ away 10 meters 20 meters 15 meters 50 meters
from limits of other sheds or shadows of spheres.
What are the advantages of providing unloading arms instead LPG Less
75 Increased safety convenient All of them
hoses in TLD? maintenance cost
For disaster: Same type of siren as in the case of major fire but the
14 same will be sounded for ______ times at an interval of ______ two, two three, two four, one three, one
minutes.
It is recommended to provide the minimum rating for fire proofing as
follows :LPG storage vessel & connected lines up to the fire safe
15 two, two one , three two, three one, two
ROVs - ______ hour, Supporting legs of all above - _______ hours
respectively.
If the storage vessels and other fixed equipment within the plant are
16 protected by fixed water sprays, they should be tested minimum month week fortnight year
once in a _________.
As per DMP, on site, mock drills to be conducted minimum once in
17 a month a week a year a fortnight
_______.
Each fire water pump should be checked for performance once in
18 two three four six
______ months.
Each pump should be checked and tested and the shut off pressure
19 one two three four
observed and logged once in ______ month(s).
Every pump should be test run for at least ________hour minimum
20 half, three half, two half, four one, two
______ times a week.
The ring main should be checked once in a _______ for the leaks
21 etc. by operating one or more pumps with the hydrant points kept month week fortnight year
closed as required to get the maximum operating pressure.
All fire main valves should be checked for operation and lubricated
22 month week fortnight year
once in a ________.
Fixed water cooling spray systems on storage tanks should be
23 four six two three
tested at least once in _____ months.
Deluge systems on LPG spheres and bullets should be tested at
24 four one two three
least once in _______ months for proper performance.
Spray system in the plant should be tested at least once in every
25 week month quarter year
________ .
All the fire hoses should be hydraulically tested at least once in
26 two three four six
______ months.
The operability of Detectors should be tested once in every
27 three four two six
_______ months.
Calibration of gas detectors using test gas should be done once in
28 every _______ months or as per manufacturer's recommendation, two three six four
whichever is earlier
A mock fire drill should be conducted once in a _______ to
29 week month fortnight year
rehearse the fire emergency procedures
The assessed maximum temperature for uninsulated pressure
30 45 65 55 69
vessels as per Statutory Rules is ______ deg C.
Page 45 of 62
In case of lightening
The transfer operation of LPG is stopped and all valves are Uncontrolled A fire in the when the operation
45 All of them
closed in case of _______ . leakage vicinity involves venting of
LPG.
Generally, endorsement for carrying out the operation from ____ to
46 ______ is given by CCOE for the LPG plants on applying for the 6 pm, 10 pm 8 pm, 10 pm 6 am, 10 pm 4 pm, 10 pm
same.
The periodicity of checking 10 Kg. DCP shall be minimum once in a
47 week month year fortnight
_______.
Delrin Dupont
48 Safety cap is manufactured out of _________ material. polyethylene teflon Any of them
500
Safety cap can withstand a maximum working pressure of
49 3.45 1.45 2.45 2.15
________ M Pa of LPG.
Page 46 of 62
96 What is the KRA for bung leak? 1.5% of Bottling 0.15% of bottling 0.10% of bottling. 1.3% of bottling
97 What is the KRA for Valve leak? 1.5% of Bottling 0.15% of bottling 0.10% of bottling. 1.3% of bottling
98 What is the KRA for Market Returns? 1.5% of Bottling 0.15% of bottling 0.10% of bottling. 1.3% of bottling
99 What is the KRA for cold repair (valve consumption)? 1.5% of Bottling 0.15% of bottling 0.10% of bottling. 1.3% of bottling
100 What is the KRA for Statutory Testing (valve consumption)? 0.3% of Bottling 0.15% of bottling 0.10% of bottling. 1.3% of bottling
Page 49 of 62
206 What is the KRA for safety cap consumption? 4.5% of Bottling 0.15% of bottling 0.10% of bottling. 1.3% of bottling
Electrical
Under (INDIAN ELECTRICITY RULES MARCH, 1980: AMENDED agencies holding the
Inspector of the
207 UPTO 1988) the installation must be inspected and approved by licenced contractors certificate of Any of them
State
_____________________ before commissioning. competency
Government.
The cylinder should be fabricated out of steel sheets manufactured IS:6200-1976 or IS:6240-1976 or IS:6400-1976 or IS:5240-1976 or IS:
217
conforming to ___________ as amended from time to time. IS:1007-1984 IS:10787-1984 IS:10087-1984 9787-1984
For purging of cylinders, the pressure in cylinder is brought down to Minimum of 0.35 Minimum of 0.65 Maximum of 0.35 Maximum of 0.35
237
_______________ . kg/cm2 gauge kg/cm2 absolute kg/cm2 gauge kg/cm2 absolute
For connecting liquid and vapour hoses to TTs _______ to be only bolts and
244 only studs and nuts only washer and nuts only gasket and bolts
used. nuts
The maximum running distance to locate an extinguisher in the
245 10 12 15 20
working areas shall not exceed ______ meters.
The top surface of the extinguisher shall not be more than
246 1 2 2.5 1.5
_______ metres high.
Green
Yellow background Grey background Black background and
247 What is the colour coding for liquid LPG line? background and
and black lettering and white lettering yellow lettering
white lettering
Green
White background Green background Black background and
248 What is the colour coding for LPG vapour line? background and
and green lettering and black lettering white lettering
white lettering
Green
Yellow background Grey background Black background and
249 What is the colour coding for compressed air line? background and
and black lettering and white lettering white lettering
white lettering
Green
Yellow background Grey background Black background and
250 What is the colour coding for service water line? background and
and black lettering and white lettering white lettering
white lettering
251 What is the colour coding for pressure relief valves? Black Red Yellow Blue
Page 52 of 62
While a person is inside the vessel during inspection and testing, a fresh air
a lifting belt and a
302 the other person on watch duty must at all times have flameproof torch breathing All of them
safety line.
_____________________. apparatus
low suction
high liquid level in
What are the alarm and tripping devices for LPG vapour pressure, high low lube oil
307 the suction volume All of them
compressors? discharge pressure pressure
bottle
& temperature
Page 55 of 62
For testing of LPG hoses, with the hose completely filled with water,
310 pressure should be gradually increased at the rate of _________ 0.5 to 1.0 1.0 to 2.0 0.1 to 0.7 1.5 to 2.5
kg/cm2 (g) per second using the hydraulic pump
The pressure gauge used for hydro testing of LPG hose should
311 be calibrated and its range should preferably be ________ as three times two times same four times
that of test pressure.
For Storage water tank, it should be ensured that the annular plate
319 water deposite concrete All of them
at the bottom of the tank is clear of __________________ .
For Storage water tank as per OISD Std. 129, external inspections
320 (visual and ultrasonic thickness tester) should be carried out once in 2, 4 3, 6 5, 8 1, 5
______ years and internal inspection once in _______ years.
Bucholz relay, oil and winding temperature alarm and trips for the
339 week year month quarter
transformer should be tested once in a ______.
Diesel Generating Set should be started daily and the following coolant frequency and
340 oil pressure All of them
parameters be checked. temperature output voltage
For DG sets, alignment of the engine to the alternator and
341 half-yearly monthly quarterly yearly
insulation resistance shall be checked __________.
Only _____________ bolts should be used to connect the earth
342 galvenized cadmium plated Any of them None of them.
strip with the electrodes.
The resistance value of an earthing system to general mass of the
343 earth should not exceed _____ ohms for electrical systems and 5 4 3 6
metallic structures.
The resistance value of an earthing system to general mass of the
344 5 6 7 8
earth should not exceed _____ ohms for storage tanks.
The resistance value of an earthing system to general mass of the
345 earth should not exceed _____ ohm for main earth grid and 5 4 3 1
bonding connections.
The resistance value of an earthing system to general mass of the
346 earth should not exceed _____ ohms for each electrode to the 2 3 4 5
general mass of the earth.
Pressure gauges mounted on rotary equipment shall be inspected
347 for zero setting once in a fortnight and calibrated once in a month six months quarter year
_______.
The pressure gauges mounted on static equipment like LPG
348 storage vessel shall be checked for zero once in a ________ and week, two month, six quarter, six half year, six
calibrated once in ________ months.
Pressure switches, Temperature gauges, Temperature switches,
349 Level switches & other trips and alarms in the plant have to be quarter six months year two years
tested and calibrated once in ________.
As a general guideline, empty cylinders to cover ____ hours
bottling and filled cylinders equivalent to _____ hours bottled
350 3, 1 2, 4 3, 6 4, 2
should be kept in stock. However, stock of filled cylinders should
be limited to the licensed capacity .
As all the new, ST completed and HR completed cylinders are
351 to be purged with LPG, around _______ gms per cylinder should 100 150 200 250
be considered as purging loss.
Page 58 of 62
reducing the
totally eliminating
loose iron oxide
highly corrosive
by thoroughly
The pyrophoric Iron Sulphide can be controlled by hydrogen
367 cleaning the Any of them both of them
___________________. sulphide,limiting the
storage vessels
total volatile sulphur
internally during
to 0.02% by mass
the outage.
CCOE license, which remain in force till _______ of the year are
368 31st December 30th September 31st March 30th June.
generally valid for period of 3 years (max.).
For CCOE licenses, application for renewal must reach CCE,
369 30 days two months six months 45 days
Nagpur at least ______ prior to expiry of the current licence.
What should be the zone/segment for remote manually operated
370 12 M x 48 M 10 M x 20 M 15 M x 30 M 13 M x 40 M
water spray for LPG shed?
What is the predetermined maximum level of liquid LPG fixed in
371 60% 85% 90% 50%
HLA of storage vessels?
What should be the minimum distance between two groups of TLD
372 30 m 50 m 60 m 100 m
bays?
373 What is the bulk storage capacity of Cuddapah BP? 450MT 600MT 1850 MT 1400MT
374 How many deluge valves are there in cuddapah BP? 15 20 12 23
375 What is the Gas-in date of cuddapah BP? 25th Nov 1997 26th Nov 1998 15th August 1997 16th August 1998
23rd February
376 When the bottling started in Cuddapah BP? 23rd Mach 1998 23rd February 1999 23rd May 1998
1998
23rd September 15th September
377 When double shift bottling started in cuddapah BP? 16th August 1999. 23rd August 1999.
1999. 1999.
378 What is the Plant Area of Cuddapah BP? 50 Acres 60 Acres 70 Acres 80 Acres
379 How many fire engines are the in Cuddapah BP? Total 7 Nos. Total 6 Nos. Total 5 Nos. Total 9 Nos.
380 What is the fire water tank storage capacity of Cuddapah BP? 12000 KL 11100 KL 15000 KL 3700 KL
381 What is the Plant capacity of Cuddapah BP? 22000 MTPA 30000 MTPA 44000 MTPA 60000 MTPA
382 How many jockey pumps are there in Cuddapah BP? 2 nos. 4 nos. 3 nos. 4 nos.
383 How many GMS sensors are there in Cuddapah BP? 15 20 17 22
2 LPG Pumps
2 LPG Pumps and 1 LPG Pump and 3 2 LPG Pumps and 2
How many LPG pums and LPG vapour compressors are there in and 4 LPG
384 3 LPG vapour LPG vapour LPG vapour
Cuddapah BP? vapour
Compressors. Compressors. Compressors.
Compressors.
385 What is the capacity of weigh bridge in Cuddapah Plant? 25 MT 30 MT 50 MT 40 MT
386 How Many DG sets are there in Cuddapah BP? 1 2 4 3
387 How many conveyor drives are there in Cuddapah BP? 23 28 25 30
388 What is the capacity of LPG pump at Cuddapah BP? 800 LPM 600 LPM 400 LPM 1000 LPM
389 How many air compressors are there in Cuddapah Plant? 1 2 3 4
390 What is the rating of air compressors at Cuddapah BP? 10 hp. 20 hp. 40 hp. 50 hp.
Page 60 of 62
391 How many security Air compressors are there in Cuddapah BP? 1 no. 2 nos. 3 nos. 4 nos.
392 What is the rating of security air compressors at Cuddapah BP? 7.5 hp 8.5 hp 10 hp 15 hp
393 What is the rating of LPG pump at Cuddapah bp? 20 hp. 30 hp. 40 hp. 50 hp.
394 How many service water pumps are there in Cuddapah BP? 1 2 3 4
Within the two
Within the same months
395 Compensatory holiday can be availed month in which the immediately Any of the above none of the above
holiday were due following that
month.
No worker shall work for more than _____ hours before he has had
396 3, 1/2 4, 1 6, 1/2 5, 1/2
an interval for rest of at least _____ hour.
A child or an adolescent shall not be required or allowed to work in
certificate of certificate of
397 any factory unless a _________ granted with reference to him is in certificate of age none of them
fitness education
the custody of the manager of the factory.
398 Certificate of fitness shall be valid for a period of ________ . six months two years one year three years
Female adolescent or a male adolescent who has not attained the
age of seventeen years but been granted a certificate of fitness to
399 6,7 6,8 7, 8 8, 8
work as an adult, shall be required or allowed to work only between
(6/7/8) AM and (6/7/8) PM.
401 ‘Adult’ means a person who has completed his ______ year of age. 16th 21st 18th 20th
‘Adolescent’ means a person who has completed his ______ year
402 15th, 18th. 12th, 16th. 14th, 18th. 10th, 16th.
of age but has not completed his ______ year.
‘Calendar Year’ means the period of twelve months beginning with
403 January March April October
the first day of _________ in any year.
404 ‘Child’ means a person who has not completed his ______ year 12th 15th 17th 19th
405 ‘Young Person’ includes child adolescent both None of them.
For computing the number of workers in a factory all the workers in
406 _____ (same/different) groups in a ______ (day/week) shall be different, day. same, day different, group same, group
taken into account.
For a factory built after the commencement of Factories Act, how
407 10 Cu M 9.8 Cu M 12 Cu M 14.2 Cu M
much space should be there for every worker employed?
For the purpose of calculating space for workers, no account shall
408 be taken of any space that is more than ____ meters above the 4 4.1 4.2 5
floor level of the ground.
Page 61 of 62
hazardous process
takes place or hazardous
415 Safety Committee will be set up in every factory where hazardous substances are Any of them None of them.
substances are handled.
used.
At least one first aid box will be provided for every ______ workers
416 150 200 250 300
ordinarily employed in the factory.
The in-charge of the first aid box should hold a certificate in first aid Central State
417 District Authority Any of them
treatment that is recognised by __________. Government Government.
A canteen or canteens shall be provided and maintained by the
418 150 200 250 300
occupier in a factory employing more than _______ workers.
Rest room and lunchroom with the provision of drinking water shall
419 be provided in every factory employing more than ________ 100 200 50 150
workers
Welfare Officer shall be employed in a factory employing _______
420 200 300 500 250
or more workers.
No adult worker shall be required or allowed to work in a factory
421 24 48 36 72
more than _____ hours in any week.
No substitution shall be made which will result in any worker
422 working for more than _______ days consecutively without a 7 10 8 12
holiday for a whole day.
Page 62 of 62