Escolar Documentos
Profissional Documentos
Cultura Documentos
1 October 2007
CONTENTS
2 October 2007
Aerospace
Products of Kawasaki
Egypt
Japan
World First
World top class World top class energy efficiency energy efficiency
1964 1970
Japan First
Double-Effect S.F.C.
World First
1959 1965
1980
1985
1990
1995
2000
2005
year
Condenser
Condenser Compressor
Q01
37
Electric Motor
Q01 37 Qi1
8kPa
Q01 Qi1
Gas or Oil or Steam etc
Cooling 32 Water
1000kPa
High Pressure
290 kPa
Qi2
Qi2
HFC-134a
(LiBr)
Water/LiBr
0%
50%
100%
0%
50%
100%
Load(%)
Load(%)
O 0.02 D P 0 0
Water
500 1000
HFC - 1 3 4 a
HFC - 4 0 7 c
HFC - 4 1 0 a
1500
2000
Project
150 100 50 0
Operator
152 Projects
90 Operators
1972 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02
District Cooling Project in Japan
User
Absorption 57%
Pipe Line
13 October 2007
14 October 2007
60 50 40 30 20 10 0
NUMBER OF UNITS
48 3 5 8 10 12 15 20 30
19 99
20 00
20 01
20 02
20 03
20 04
20 05
20 06
YEARS
October 2007
20 07
15
16 October 2007
Cooling capacity(Ton Refrigerant) Chiller Elec. Consumption Operating system Operating hours / year Natural gas consumption Total energy cost Annual operating Cost
TR KW/hr
0 193.5 609,900
LE
362,855
713,900
51%
17
DESCRIPTION
Unit
Water cooled Absorption System Natural Gas 700 Natural Gas 0.25 0.3 1
Conventional System by electricity 700 Electricity 0 0.3 1 3000 0 700 25 125 850.0 0 0 255.0 255.0 1.2 1.2 256 768,600 80,000 848,600 920,000 17,892,000 9,943,500
Cooling capacity TR Operating system Utilities tariffs: 3 a- Natural Gas LE/m b- Electricity LE/KW 3 c- Water LE/m Operating hours / year Hour 3 Natural gas consumption m /hr Electricity consumption a-Machine KW/hr b-Cooling Towers KW/hr c-Cooling Towers pumps KW/hr Total electricity consumption KW/hr Energy cost a-Natural gas LE/hr b- Diesel LE/hr c- Electricity LE/hr Total energy cost LE/hr Cooling tower water consump m3/hr Water cost LE/hr Hourly operating cost LE Annual operating Cost LE Annual maintenance cost LE including spare parts. Total annual running cost LE Major over-haul & LE replacements ** in 20 years Life cycle cost for 20 years Life cycle cost difference when using gas fired Absorption system in 20 years Annual operation cost difference when using gas fired Absorption system Saving In Electrical Power Saving In Annual Operating Cost LE LE
179 14 30 160 204 44.8 0 61.2 106.0 1.5 1.5 107 322,425 40,000 362,425 700,000 7,948,500 0
LE % %
0 58% 57%
497,175
18
19 October 2007
THANK YOU
Gas Chill