Você está na página 1de 2

10.22.

09 1 of 2
25051 East Fifth Street | San Bernardino, CA 92410

909.381.2646 Estimating Fax 909.888.5737

Plan Room Open 5:30 AM to 2:00 PM Monday through Thursday Closed Fridays
Job Bidding: Location: Bond Bid Date: Time: CM / GC: Cat.
Nursing/Science Bldg Riverside Yes 10.29.09 2:00 PM to owner CM 25
DSA File No: 04-109948 Noon to BEC
DVBE Participation Requested X ### Fuel storage system 16480 Motor Control ### Fire alarm
Addenda: F ### Surface Raceway 16500 Lighting Fixtures ### Sound Reinforcing
ARCH: gkk Works ### Panelboards & TC 16575 Dali-Digital Ltg Control 28001-28231 Security System complete
Engineer: FBA ### ATS 16620 Standby Generator ### As Applies
### Switchboards 16631 Emer Inverter

Job Bidding Location: Bond: Bid Date: Time: CM / GC Cat.


Fairplex Exposition Center Pomona No 11.19.09 2:00 PM to owner GC
DSA File # Noon to BEC
DVBE Participation Requested. X 260573 Overcurrent Coordination Study 262200 LV Transformers 265100 Interior Ltg
Addenda: D 260923 Lighting control devices 262413 Switchboards 265100 Ltg Fix cuts
260933 Dimming controls 262416 Panelboards 265600 Exterior Ltg
Arch: Ho+K 260943 Network Ltg controls 263323 Central Bat Equip 265700 Electrical pnl. Schedules
Engineer: Syska & Hennessey 264313 TVSS 265701 short circuit Calcs
division 28

Job Bidding: Location: Bond Bid Date: Bid Time CM/GC CAT
Joseph Gascon ES Montebello No 10.29.09 10:00AM to owner GC
DSA File #03- 10.28.09 5PM to BEC
DVBE Participation: X 260610 Utility Services 265100 Interior Luminaries 269000 Fire Alarm
Addendum: 1 262200 Transformers 265600 Ext. Luminaries
262413 Switchboards 267343 Tele. Comm Cables
ARCH: HMC 262416 Panelboards 268400 Intrusion Detection
ENG: S & K 263300 Emer. Pwr supplie 268700 Integrated Comm

Job Bidding Location BOND Bid Date Bid Time CM/GC CAT
Copper Mountain Remodel Joshua Tree No 10.27.09 2:00PM GC
DSA File #4-109307 Noon to BEC
DVBE Participation X 16138 UF Systems 16521 Exterior Ltg.
Addenda: 2 16441 Switchboards 16721 Fire Alarm system
Arch: AP 16442 Panelboards 16740 Voice Data
ENG: Peter Kwan 16461 Transformers
16511 Interior Ltg.

Job Bidding Location Bond Bid Date Bid Time CM/GC CAT
Mecca Boys & Girls Club Mecca No 10.29.09 1:00PM to owner
DSA File No: 04 10 AM to BEC
DVBE Participation X 16460 Switchboards 16520 Automatic Lighting Control system
Addenda: 16470 Panelboards 16721 Fire Alarm System
Arch: Holt 16480 Transformers
ENG: Design West 16510 Lighting

Job Bidding Location Bond Bid Date Bid Time CM/GC CAT
Central MS Phase II MPR Riverside Yes 10.27.09 2:00PM to owner CM 19
DSA File No: 04-110229 noon to BEC
DVBE Participation X 260000 General Electrical All specifications are listed on the plans and will be part of
Addenda: 2 271000 Info.Technology Specification your quote
Arch: LPA 274116 MP Sound Reinforcement E5.4 & E5.4 Photovoltaic system
Engr: Konsortumi 1 275117 Assisted Listening System E5.3 Invertor
281600 Intrusion Detection System E0.0 & E6.1 Lighting
283100Fire Alarm System

Job Bidding Location Bond Bid Date Bid Time CM/GC CAT
Add. & Admin Bldg Emerson, Mt View & Pachappa ES Riverside Yes 10.28.09 2:00PM CM 19
DSA File No: 04- Noon to BEC
DVBE Participation X 260000 GenePlans coming SEPARATE QUOTES FOR EACH SCHOOL
Addendum: 275117 Assistive Listening System
Arch: HMC 283100 Fire Alarm System
ENG: 281600 Intrusion Alarm System

Job Bidding Location Bond Bid Date Bid Time CM/GC Cat.
Highland Police Station Highland Yes 11.5.09 2:00PM CM 22
DSA File No: 04- Noon to BEC
DVBE Participation X 16426 Switchboards 16950 Electrical Test Alt. Add #1 13630-Photovoltaic System
Addenda: 16461 Dry Type Trans 17050 through 17710 Complete Alter. #2 Certain Security Systems Equip
Arch: STK 16470 Panelboards 17720 Electronic Components 16020 Emergency Gen Set
ENG: Design West 16510 Interior Luminaries 17723 Duress Alarm System 02820 Chain Link Fences Add Alt #1
16530 Site Lighting 17728 Access Control System 16630 ATS
16721 Fire Alarm 17782 Video Surveillance System
16741 Telephone service 16742 Voice & data cabling

Job Bidding Location Bond Bid Date Bid Time CM/GC Cat.
Adelanto HS Increment 2 Adelanto Yes 11.18.09 12:00PM to owner CM 9
DSA File No: 04- 10:00 to BEC
DVBE Participation X Plans coming
Addenda:
Arch:
ENG:

Job Bidding Location Bond Bid Date Bid Time CM/GC


Chaffey College Phys Ed Gym Remodel Rancho Cucamong No 11.12.09 2:00PM to owner GC
DSA File No: 04-108718 noon to BEC
DVBE Participation X 16201 Coordination Study Dry Type Trans 16710-16760 Tele Comm Complete
Addenda: 16321 Pad Mnt Transformer 16470 Panelboards 16802 Intergrated Comm
Arch: NTDS 16360 Secondary Unit 16510 lighting 16906 Occupancy sensors
Eng. P2S engineering 16429 LV districbution 16700 FA System 16907 Lighting Control System

Job Bidding Location Bond Bid Date Bid Time CM/GC Cat.
HS#4 Football Stadium Indio Yes 11.19.09 2:00PM to owner CM 22B
DSA File No: 04-109272 noon to BEC
DVBE Participation X 16160 Panelboards 16500 Lighting fixtures 16760 Integrated Communications
Addenda: 1 16250 ATS 16501 Sports Field Ltg.
Arch: Ruhnau Ruhanau Clark 16425 Switchboards 16592 Track & Field Scoreboard
ENG: FBA 16480 MCC Equipment 16722 Fire alarm

Job Bidding Location Bond Bid Date Bid Time CM/GC Cat.
2:00 PM to owner
DSA File No: 04- Noon to BEC
DVBE Participation X
Addenda:
ARCH:
ENG:

Job Bidding Location Bond Bid Date Bid Time CM/GC Cat
2:00PM
DSA File No: 04- Noon to BEC
DVBE Participation X
Addenda:
Arch:
ENG:

Você também pode gostar