SUNRISE CITY - PLOT V PROJECT

METHOD STATEMENT
for

Plumbing an Drainag! Pi"ing In#$alla$ion %or&# R!'( )*

Prepared by:

Gilbert A. Neptuno
Senior Site Manager Thang Long Fire Co.

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

TABLE OF CONTENTS
page no.

1.0 Purpose...........................................................................................2 2.0 Definitions.......................................................................................3 2.1 Party..............................................................................................3 ..............................................................................................3 3.0 Specific Standards...........................................................................3 3.1 References and Standard............................................................3 4.0 Materials.........................................................................................3 4.1 uPVC Pipes De N at..................................................................3 4.2 PPR Pipes !"uat er#...............................................................4 Mac inery and $ools........................................................................% 4.3 Mac inery and tools for construction...........................................% 4.4 Mac inery and tools for testin&...................................................% '.0 Preparation (or)s * Procedure..........................................................+ +.0 (or) ,lo- C art......................................................................... ..0 Construction Met od......................................................................... ..1 PPR Pipes and ,ittin&s /nstallation............................................... ..2 uPVC Pipes and ,ittin&s /nstallation (or)s................................24 ..3 Cast /ron Pipes and ,ittin&s /nstallation.....................................33 0.0 1uality Control...............................................................................30 $est Met od and $est Plan2 $est Record ,or#s2 /nspection ,or#s.........42 1. $est Met od........................................................................42 2. /nspection and $est Plan.........................................................44 10.0 Safety Plan..................................................................................4% 11.0 !ppendi3.....................................................................................4%

1.0 Purpose The objective i to de cribe the in tallation o! Plu"bing # $rainage Sy te" a ociated %ith in tallation o! internal pipe to en ure co"pliance %ith contract re&uire"ent '

Page 2 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

approved hop dra%ing' co"bine and coordinated all ervice and tructural penetration hop dra%ing ' "aterial' peci!ication and &uality control. 2.0 Definitions Thi Method State"ent de cribe the %or( e)ecution on the in tallation o! pipe !or plu"bing y te" and piping %or( . 2.1 Party All M # * %or( +Plu"bing # $rainage Sy te", !or -a e"ent ./ # .0' Ma ter Ground Floor' Podiu" and 10 # 12 To%er %ill be carried out by Thang Long Fire Co. Lt . 2.2 S!ope of "or#s Thi procedure e tabli he the in truction !or the preparation and control o! 3n pection and Te t Plan +3TP, !or !ield con truction activitie and noti!ication to 4%ner5 project "anage"ent !or their elected in pection point in a ti"ely "anner. The "ethod tate"ent i applied to the in tallation o! %ater upply pipe and anitation e&uip"ent !or Sunri e City Project 6 Plot 1. $.0 Spe!ifi! Stan ar s $.1 %eferen!es an Stan ar &ateria's uP1C pipe !or Soil' 7a te' 1ent and $rain Sy te" PP9 pipe !or Cold and :ot 7ater Pipe Sy te" Ca t 3ron Pipe !or Soil' 7a te # $rain at -a e"ent high level and tran !er !loor (.0 &ateria's (.1 uP)C Pipes *De Nhat The e uP1C pipe and :$P* pipe ha regi tered and te ted product &uality at $irectorate !or Standard and >uality A urance and Te ting center 2 on u e purpo e : Pipe !or 3ndu trie Pipe !or 7ater Supply Pipe !or 7ater $rainage Pipe !or *lectrical Conduit 3n addition' all "aterial have been te ted and delivered %ith good &uality and a urance o! ?Top >uality in the Mar(et@ policy. The !ir t uP1C and :$P* pipe y te" could have good per!or"ance in the !ield o! application a : Stan ar SS 0/2 # SS 080 $3N ;.88<;.8; ASTM A8=

Page 3 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

$rin(ing %ater' indu trial proce %ater' do"e tic < indu trial %a te %ater treat"ent' drain %ater < %a te %ater di charge' %ell drilling' agriculture irrigation' a&uaculture' electrical and teleco". The !ir t uP1C # :$P* pipe are "anu!actured in co"pliance: AuP1C pipe: ASTM 00=/' TC1N B/C/' 3S4 0C2/' AS /=88' CNS /0DD' SS 0/2 e&uivalent to -S 2C.C' 3S4 ==00' -S=C/=' -S C0CC' AS /=/C. A:$P* pipe The uP1C and :$P* pipe y te" have been %idely (no%n by pro!e ional and proven !or their characteri tic : a. b. c. d. e. !. g. h. Light %eight' ea y in handling and ave operating co t . S"ooth ur!ace and greater hydraulic capacity. Strong "echanical trength' good re i tance to i"pact and pre ure. Corro ion re i tance !ro" electrolyte ero ion' bacterial attac( and che"ical ero ion. NonEto)ic' no in!luence on %ater &uality. Good in ulation and !ire retardation. Provide e)cellent protection !or electrical %iring y te". Si"ple and readily joined' ea y in tallation %or(. S"all !riction !actor.
4.2

PP% Pipes * A+uather, pecial characteri tic

A&uather" i a pipe y te" %ith "any application due to it and ver atility.

Pota-'e .ater pipe net.or#s: !or cold and hot %ater in tallation !or re idential building ' ho pital ' hotel ' o!!ice and chool building etc. hou e connection ' boiler connection ' %ater di tribution' ri er and %ater point connection. /eating pipes for resi entia' houses: heat generator connection ' heating "ani!old ' ri er ' high ri e' "ani!old connection and radiator connection . This pipe syste, is app'ie in a'' fie' s of ne. insta''ation0 repair an reno1ation. According to $3N /D;; T0 all in tallation part co"ing directly in contact %ith potable %ater are co""odity good according to the La% o! Food and Co""odity Good . All piping y te" and !itting y te" have F1 tabiliGer to bridge tran port and in tallation ti"e . Ma)i"u" torage ti"e in the open air i B "onth . For the application in open air A&uather" o!!er co"po ite pipe %ith F1Eprotective layer "ade !ro" polyethylene' %hich e)clude da"age cau ed by unlight.

Page 4 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

The ound in ulation &ualitie o! the PP9 Pipe y te"' related to %ater !lo% and hydraulic hoc( %ithin a building' provide a ound proo!ing e!!ect on noi e tran "i ion. There!ore the ound tran "i ion i "uch lo%er co"pared to "etallic pipe . Thi pipe y te" co"plie %ith the re&uire"ent o! the !ire cla i!ication -0 $3N =/.0 +nor"al in!la""able,. Co"pared to natural product li(e %ood' cor( or %ool. A&uather" don5t produce any ga to)icity. To avoid !ire and "o(e tran "i ion a&uather" advi e the u e o! !ire retardant eal and the !ire re i tance period i the "ini"u" period in "inute . PPE9 pipe i connected %ith the %elding "ethod u ed in %elding and electricity to heat %ith. Thi "aterial i applicable to both cold # hot %ater upply piping' !itting !or do%n !eed line and di tribution line y te". &a!hinery an Too's (.$ &a!hinery an too's for !onstru!tion =.2./ =.2.0 =.2.2 =.2.= =.2.C =.2.B =.2.8 =.2.; =.2.D =.2./. =.2.// =.2./0 =.2./2 =.2./= (.( Po%er drill :and hac( a% S&uare end a%ing vice SiGing tool 9ea"er # and paper Scre% gauge $rill Pre Machine Fire *)tingui her :and tool Sca!!old Clean rug and cloth 1inyl Sheet 1inyl Tape -ru h +*na"el and 7ire,

&a!hinery an too's for testing =.=./ =.=.0 =.=.2 =.=.= =.=.C Portable MotoriGed Te t Pu"p Manual :and Pu"p 7ater Pre ure Gauge Air -leeding 1alve Te t Plug

C.. &ateria's /an 'ing0 Storage an De'i1ery C./ PF9P4S*

Page 5 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Thi purpo e i to provide in truction !or the control and receipt o! "aterial' e&uip"ent and upplie purcha ed' !urni hed or controlled by Thang Long !or Sunri e City Plot 1 Project. C.0 SC4P* Thi procedure i applicable to receiving' handling' torage' "aintenance and in pection o! ite" received by Thang Long !or the con truction o! Sunri e City Plot 1 Project. C.2 9*SP4NS3-3L3TH a, Thang Long engineer hall be re pon ible !or the i"ple"entation o! receiving in pection and noti!ying 4%ner5 Project *ngineer +/ day in advance, o! the arrival o! "aterial u ing the "aterial delivery 3$P !or" !or the "aterial %<c Thang Long purcha ed in the local "ar(etI and !or over ea ' the arrival o! "aterial hall be advi ed to Client<Project *ngineer on the hip"ent date and *TA in :CM. Thang Long *ngineer hall noti!y the Client<Project *ngineer upon arrival in :CM one day in advance !or receiving in pection to ite. The Client<Project *ngineer hall de ignate the lay do%n area !or the bul( "aterial . b, The Subcontractor hall place ite" in the torage area to %hich they are a igned. c, The Subcontractor hall record each ite" on the "aterial toc( inventory report and hall be ub"itted to J*C !or "onitoring. C.= G*N*9AL a, Material Control # 9eceiving hall con i t pri"arily o! co""ercial receipt including count' condition and identi!ication. b, 9eceiving hall be per!or"ed in conjunction %ith in pection by J*C *ngineer. c, 9eceiving in pection hall be per!or"ed ba ed on the re&uire"ent o! the late t approved "aterial and procure"ent docu"ent . C.B 9*C*313NG 9eceiving in pection hall be per!or"ed by the J*C engineer and Client<Project *ngineer !or "aterial and e&uip"ent received ST49AG* a, Storage Area /. Acce to torage area authoriGed per onnel.
Page 6 of 46

hall be controlled and li"ited only to

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

0. Cleanline and good hou e(eeping practice ti"e in the torage area

hall be en!orced at all

2. J*C engineer hall per!or" the periodic in pection !or torage area every %ee(. C.8 MA9J3NG The ubcontractor hall en ure that "aterial delivered to ite are neatly arranged' pac(ed and labeled a per ite" again t the pac(ing li t or receipt !ro" the "anu!acturer. C.; M*T:4$S a, All ite" hall be tored in uch a "anner a to per"it ready acce !or in pection and "aintenance %ithout e)ce ive handling in order to "ini"iGe ri ( or da"age. b, 3te" tac(ed !or torage hall be arranged o that the rac( ' cribbing or crate are bearing the !ull %eight %ithout di tortion o! the ite". 2.0 Preparation "or#s 3 Pro!e ure /. For ite in pection' Thang Long *ngineer hall prepare the 9e&ue t !or 3n pection and noti!y to the *ngineer not le than one %or(ing day in advance !or re&uired hold and %itne point. 0. 3TP hall be prepared by re pon ible Thang Long *ngineer according to con truction detail chedule on the ba i o! the applicable hop dra%ing ' "ethod tate"ent and<or peci!ication. 2. Thang Long *ngineer hall !ollo% up the in pection activitie in accordance %ith the ?3TP@. =. Fpon co"pletion o! the %or( operation' the re pon ible Thang Long *ngineer hall revie% ite" covered by the applicable 3TP to a ure that the %or( ha been co"pleted ati !actorily and that the 3TP and all upple"entary docu"entation i attached and ub"itted to the *ngineer. C. Thang Long hall re&ue t the *ngineer !or vi ual chec( on ite' to %itne PP9' uP1C and C.3. pipe are cut' heated and cooled' joined together. ho% the

Page 4 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

4.0 "or# F'o. Chart

1. Materials 2. Shop Drawing 3. Method Statement


:e;e!ted

7ngineer8s//onsultant9s /omments
6ppro-ed

Materials pro!urement * deli-er) to site.


:e;e!ted

5.0 Constru!tion &etho


5.1

Inspe!tion
6ppro-ed

Installation of pipe opening through / on PP% Pipes an Fittings 6nsta''ation sla" * walls

a, Adhe ive -onding Koint !or PP9 Pipe and Fitting


Inspe!tion

:e;e!ted :e;e!ted

1) Cutting of the pipe E Mar(


:e;e!ted

6ppro-ed

1. 'angers / Supports Installation Pipe installation "ased on appro-ed pipe2. according to the nece ary length. shop drawings

E Cut the pipe !ollo%ing the "ar(ing. Cut the pipe at right angle to the pipe Inspe!tion a)i .
6ppro-ed

')drauli! % /old"achine * 'ot 0ater fittings,et!. E For bigger1. pipe u e.est cutting aPiping, ho%n belo%
:e;e!ted

2. 0ater 1ea2 .est% Soil, 0aste, 3ent * Drainage pipe Inspe!tion


6ppro-ed

:e;e!ted

1. 2. 3. 4.

Pipe insulation where appli!a"le# Pipe penetration seals $ire stopping %$S &ne 'iltii (rand# Pipe s)stem !leaning * flushing Inspe!tion
6ppro-ed

1. Installation of e+uipment 2. $inal !onne!tion to e+uipment, -al-es and a!!essories

2) Heating of pipe and fitting E Pu h the end o! the pipe up to the %elding depth into the %elding tool. - A!ter the tipulated heating ti"e ' &uic(ly re"ove pipe and !itting !ro" the %elding tool +See table /,
Page 5 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

- Koin the" i""ediately until the "ar(ed %elding depth i covered by the PPE 9 bead !ro" the !itting. - -e!ore tarting the !u ion' chec( i! the alu"inu"EPPE co"po ite layer ha been co"pletely re"ove. - All u ed device and tool "u t have reached the nece ary operating te"perature o! 0B. deg. C. - Suitable "ea uring in tru"ent have to "ea ure a te"perature up to 2C. deg C.

Page < of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

2) Weld in saddles E 7eld in addle are available !or pipe outer dia"eter o! =.' C.' B2' 8C' D.' //.' /0C' /B.' 0.. and 0C. "". The "a)i"u" en or %ell dia"eter i peci!ied in the !ollo%ing Table. 0 E 7eld in addle are u ed !or: i. ii. iii. -ranch connection in e)i ting in tallation . The ub titution o! a tee. -ranch connection in ri er . Sen or %ell ' etc.

Page 1= of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

E $rill through the pipe %all at the intended outlet point by u ing the drill. E 3n ert the heating tool on the concave ide o! the %eldEin addle tool into the hole drilled in the pipe %all until the tool i co"pletely in contact %ith the outer %all o! the pipe. E Fu ing the %eldEin addle %ith the pipe the outer ur!ace and the pipe inner %all connection reache highe t tability. E The %elding device< addle %elding tool "u t have reached the re&uired operating te"perature o! 0B. deg. C E The 7elding ur!ace have to be clean and dry. E 3n ert the heating tool on the concave ide o! the %eldEin addle tool into the hole drilled in the pipe %all until the tool i co"pletely in contact %ith the outer %all o! the pipe. Ne)t the %eldEin addle tool i in erted in to the heating leeve until the addle ur!ace i up again t the conve) ide o! the %elding tool. The heating ti"e o! the ele"ent i generally 2. ec. E 3n ert the %eldEin addle in to the heated drilled hole. Pre ed and %ait !or /C ec. 7ait !or /. "in . to cool be!ore e)po ed to !ull loading.

Page 11 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Page 12 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Page 13 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

3) Butt Welding Pipe and !itting are !u ed' a e)plained belo% by butt %elding +pipe di"en ion /B.' 0..' and 0C. "", E Cut pipe into re&uired length. E Pla tic pipe are aligned and !i)ed by "ean o! the cla"ping ele"ent . E Pu h the pipe onto the heating place %ith a de!ined adju ting pre ure. E 7hen heating ti"e ha e)pired' divide the "achine lide' re"ove heating ele"ent &uic(ly and joint the pipe +by putting both part o! the lide together,. E 7elded connection can be uncla"ped and %elding proce i !ini hed.

Page 14 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

4) Repair E $a"aged pipe "ay be repaired by "ean o! !u ion. E 3n addition to thi the o!!er the po ibility o! the pipe repair tic(. E The in tallation: a"e tep !or %eldEin addle.

Page 15 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

a# 7>posed pipes

Pipe 'anger shall ha-e neoprene pad.

PPR - Pi"! . uPVCSu""or$ D!$ail# an S/0! ul!

Page 16 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

2 . . ? P I/ 6 1 D 7 . 6 I1 & $ ' 6 @ A 7 : $ & : P P B: * u P 3 /

Page 14 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

b) Concealed PP-R pipes E Mar( location o! pipe and outlet on %all according to approved hop dra%ing . E A!ter layout ha been e tabli hed' "ar( the pipe route on the bric( %all %ith t%o "ar(ed line according to in talled pipe iGe +!ollo% Table 2,.

Page 15 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Ta-'e $7 "a'' Opening Si8e for PP% Pipes Item 1 2 3 4 5 6 Pipe Size (d) mm 20 25 32 40 50 60 Opening (b) mm 60 60 100 100 150 150 Depth (t) mm 35 35 45 50 65 80 Sleeve Size DN 40 DN 40 DN 50 DN 65 DN 80 DN 100

No$!C See shop drawing details for -arious pipe outlet heights as per san. fi>tures supplier re!ommendation.

Page 1< of 46

THANH LON+ ,IRE CO( LTD( Preparation .or#s

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

The con truction dra%ing have been approved and allo%ed %or( at the Sunri e City. The PPE9 pipe and acce orie have been revie%ed and authoriGed !or con truction at the Sunri e City Project ite. Location' the in tallation area ha been chec(ed and per"itted by the re pon ible authority. The %or(er u e heat %elding "achine ha been training' in pected and certi!ied !or %elding pipe PPE9. 7elder %ill be te ted and trained in the ite. 7elder through the te t %ill be given certi!icate !or %elding pipe PPE9 at the ite. The nece ary tool and e&uip"ent !or connection' in tallation have been prepared and chec(ed +pipe cutter' the head' the %elding "achine ' drilling "achine ' hand tool ...,. Appliance thi device "u t be chec(ed and ealed te t period 2 "onth < ti"e,. Sanitary tool !or cleaning ur!ace connection uch a +%iper' andpaper ...,. 7hen per!or"ing on the !ini hing !loor to i"prove pla tic covering and ply%ood /."". -a ed on the con truction dra%ing approved "ar( po ition in talled on a %all' !loor or ceiling depending on the po ition pipe !itting. The po itioning device uch a ridge' %aterElevel "achine' %ater ruler and angle ruler. The %all conceal tube "u t "ar( the location and re&ue t to the re pon ible authority !or in pection be!ore cutting. 3n talling the rac( po ition %a "ar(ed. The rac( "u t be Ginc galvaniGed a!ter proce ing and te ting. Connecting pipe and piping in tallation according to dra%ing . 3n pection %or( .

Page 2= of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

S9PPO%T 6NSTALLAT6ON :BA% /AN;E%S0 %AC<=

Page 21 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

A (ind o! bar hanger' rac( "u t have approved' the location' iGe according to the con truction dra%ing approved peci!ication' the blo% bolt "u t be !itted and drilling accuracy and "a(e ure. The bar hanger' rac( di tance i not higher "ore than the di tance peci!ied in the dra%ing peci!ication. The bar hanger' rac( "u t be traight' bolt "u t be cre%ed and correct po ition. 9ac( hould be cut drilling' and i"proved be!ore being Ginc galvaniGed. The hole hot topper "u t be round' deep and clean. 7hen drilling or %or(ing on a high level ca!!olding "u t be u ed. A= App'i!ation of An!hor Bo'ts an Fi>ing7 /. According to the trength o! concrete or olid "a onry' dia"eter o! the e"bed"ent o! anchor bolt and depth e"bed"ent' the pull out load %ill be "odi!ied. 0. $rillE The holding po%er o! any anchor i directly related to the dia"eter o! the e"bed"ent hole. So it5 i"portant to u e the right iGe o! e"bed"ent hole. 3nappropriate iGe "ay cau e une)pected re ult . The drill carbide bit "u t be o! the correct dia"eter !or the re pective anchor hole dia"eter. 3n general' carbide bit con!or"ing to the !ollo%ing %ill produce acceptable hole dia"eter . Metric Sy te": 3S4 C=B; and $3N ;.2C No"inal $ia. B"" ; /. /0 /= /B /; 0. 0= 0B Min. $ia. B./0 "" ;./C /../C /0./; /=./; /B.2. /;.2. 0..2. 0=.2. 0B.2. Ma). $ia. B.2. "" ;.2B /..2B /0.=2 /=.=2 /B.B/ /;.B/ 0..B/ 0=.B/ 0B.B/

2. The general rule o! pace and edge di tance re&uire"ent !or "echanically e)panded anchor a !ollo%ing : ETen +/., anchor dia"eter bet%een edge. E T%o +0, ti"e anchor e"bed"ent bet%een pacing. 3! vibration or i"pact i applied' pacing hould be increa ed =. 7or(ing load o! anchor bolt The "a)i"u" pull out load + lated value , i "ea ured under the condition o! the anchor bolt i bro(en and pulled out !ro" concrete or olid "a onry. B= Threa e %o Model Length T..B2... 2.. c" T..;2... 2.. c" T./.2... 2.. c" Scre% Thread Spec. Cro E ectional Allo%able Load < JN MB ../D.c"0 /.// M; ..2=8c"0 0..= M/. ..CC/c"0 2.0=
Page 22 of 46

THANH LON+ ,IRE CO( LTD( T./02... T./B2... T.0.2... 2.. c" 2.. c" 2.. c"

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT =.8/ ;.;2 /2.;

M/0 M/B M0.

..;.0c"0 /.C.2c"0 0.2=Dc"0

C= A!ross Type Pipe C'a,p Model S9P .= S9P .B S9P /. S9P /0 S9P /= S9P 0. S9P 0= S9P 2. S9P =. S9P C. S9P B. S9P ;. S9P /.. S9P /D S9P 0C S9P =0 S9P B0 9 BOLT Mea ure"ent $N < 3nch /CA L@ 0.A 2<=@ 0CA /@ 20A /E/<=@ =.A /EL@ C.A 0@ BCA 0 6 L@ ;.A 2@ /..A =@ /0CA C5 /C.A B@ 0..A ;@ 0C.A /.@ E /<=@ E C<;@ /..A E /C.A E 4uter $ia. 0/.8 08.0 2=.. =0.8 =;.B B..C 8B.2 ;D./ //=.2 /2D.; /BC.0 0/B.2 0B8.= /D./ 0C //. /CD Allo%able Load Scre% Thread +JN, Speci!ication /.00 M/. /.00 M/. /.00 M/. /.00 M/. /.00 M/. /.00 M/. /.C0 M/. /.C0 M/. /.C0 M/. 0./0 M/0 0./0 M/0 0.C. M/B 2; 2.0C M/B /.00 M/. /.00 M/. /.C0 M/. 0./0 M/0 7 0C 0C 0C 0C 0C 0C 0C 0C 0C 20 20 2; 0C 0C 0C 20

Page 23 of 46

THANH LON+ ,IRE CO( LTD( /angers ? Supports

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Specifications /Standards:
P ! #t N 0 & ) $ * 1 4 4 0 2 2 ) $ * 1 4 4 0 2 8 ) $ * 1 4 4 0 3 5 ) $ * 1 4 4 0 4 2 ) $ * 1 4 4 0 4 8 ) $ * 1 4 4 0 6 0 ) $ * 1 4 4 0 . 5 ) $ * 1 4 4 0 / 0 ) $ * 1 4 4 1 1 5 ) $ * 1 4 4 1 4 0 ) $ * 1 4 4 1 6 0 ) $ * 1 4 4 2 1 / ) $ * 1 4 4 2 . 3 ) $ * 1 4 4 3 2 4 ) $ * 1 4 4 3 5 6 ) $ * 1 4 4 4 0 6 ) $ * 1 4 4 4 5 . ) $ * 1 4 4 5 0 8 ) $ * 1 4 4 6 1 0 S iz e 1 +2 , 3 +4 , 1 , 11 +4 , 11 +2 , 2 , 21 +2 , 3 , 4 , 5 , 6 , 8 , 1 0 , 1 2 , 1 4 , 1 6 , 1 8 , 2 0 , 2 4 , $ 1 0 1 0 1 0 1 0 1 0 1 0 1 2 1 2 1 2 1 2 1 2 1 6 2 0 2 0 2 0 2 0 2 4 2 4 2 4 D im e n % i0 n %(m m ) ' ( 2 1 6 5 2 . . . 3 4 8 5 4 3 / 3 4 8 1 0 0 6 0 1 1 0 . 6 1 2 . 8 / 1 4 0 1 1 5 1 6 5 1 4 0 1 / 0 1 6 8 2 2 0 2 1 / 2 / 5 2 . 3 3 . 0 3 2 4 4 2 0 3 5 6 4 5 5 4 0 6 5 0 5 4 5 . 5 5 5 5 0 8 6 0 5 6 1 0 . 1 0 ) 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 . 5 1 0 0 1 0 0 1 0 0 1 0 0 1 0 0 1 0 0 1 0 0

5.2

uP)C Pipes an Fittings 6nsta''ation "or#s a, Cutting o! pipe


Page 24 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

E All cutting "u t be done in %arehou e or in de ignated area at each !loor. All cutting "u t not be done at %or( area. E Cutting angle "u t be right angle. E 3n ide edge "u t be rea"ed "ooth by rea"er or and paper. b, Adhe ive -onding 7or( +!or uP1C Pipe,
1e#0 p0int St0ppe# -!#2ing S ell l!"e# $dhe%ive (0&1-0&2mm) b" -!#2ing

P34 %052et 806nd!#" 09 :0int

P34 Pipe

P34 %052et

P34 Pipe

$5t6!l P34 S052et (ength

De90#m!ti0n% 7l6idit" #egi0n ;egi0n 806nd!#" 09 :0int

Figure 17 Detai's of A hesi1e Bon ing @oint E *n ure pipe are in correct dia"eter' approval "aterial prior to tart %or( . Plain end hall be in pected %ith pecial attention' a the e end are the "o t u ceptible to da"age.

E Pipe hall not be rolled or (idded again t other pipe "aterial . Ma(e ure that the pipe are !ree !ro" debri and other !oreign "aterial . E Mar( the "ea ured length on the pipe by per"anent "ar(er pen. Cut the pipe u ing a po%er a% or a P1C cutter. -e ure to cut the pipe &uarely.

Page 25 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

E Cha"!er the corner and re"ove all burr by rea"er' !ile or and paper' clean a%ay du t' dirt and oil %ith a clean rug be!ore applying adhe ive.

E -e!ore jointing' in ert the pipe into the joint oc(et and con!ir" that the length !ro" Gero point to the end o! pipe i /<2 to 0<2 o! actual oc(et length.

E Attach "ar(ing on the pipe ur!ace by per"anent "ar(er pen. Mar(ing po ition hall be actual oc(et length !ro" the end o! pipe. 6nstru!tions on insta''ation of uP)C Pipe .ith g'ue paste7 The tube "u t be chec(ed' a hygiene' dry cleaning connection' i! per!or"ed on the !ini hing !loor "u t have pla tic cover' ply%ood to avoid du t. a, Poli hed top' tube edge' cleaning the ur!ace o! contact bet%een the tube and acce orie %ith andpaper "ooth.

Page 26 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

b, pencil' paper tape.

Mar(ed depth connection' chec( the length o! pipe %ith

c, F ing a pal"Etree ha &uic( glue pa te on the tube top "ar(ed and in ide !ace o! acce ory.

d, Accelerate &uic(' trongly lin(edEtipped to the po ition "ar(ed' traight pu h' do not rotate&

Page 24 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

e, F e clout to clean the e)ce

glue on connection

!, A!ter co"pleted in tallation' the connection "u t be dry' do not "ove %aiting glue dry !or about / "inute !or tube C."" bac(' 0 "inute !or the larger C."" tube and 2 "inute !ro" tube to tube /.. E /C. +u ing tool upport to connect pipe !ro" /C. on%ard ,

c, Pipe in tallation /, E posed pipe

Page 25 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

2) Concealed pipes
No$!C See shop drawing details for -arious pipe outlet heights as per san. fi>tures supplier re!ommendation.

Ta-'e $7 "a'' Opening Si8e for uP)C Pipes Pipe Size Opening Item (d) mm (b) mm 1 DN32 100 2 3 4 5 DN40 DN50 DN80 DN100 100 150 200 200

Depth (t) mm 45 50 65 100 120

Sleeve Size DN50 DN65 DN80 DN125 DN150

Page 2< of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

3=D2= mm th2

Page 3= of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Note7 /. J: to get approval !or !ire topping "aterial prior to in tallation. 0. Typical in tallation detail !or both !ire rated and co""on %all .

3=D2= mm th2.

3. $estin& 4eneral re"uire#ents Noti!y to the con ultant ' dra%ing "anage"ent and "ea ure to the "e age tube are trying to "onitor the te t. The pipe te ted a!ter each pha e or part o! the pipeline and be!ore the pipeline are be hidden bac(ing up. :ydro tatic drainage y te" te t !or each horiGontally +e ti"ated per 2 !loor , ection by dividing the y te"

Fitting the te t plug on the "ounting bloc( top o! a pipe te ted& Te ting i done by !illing o! clean %ater into the pipe up to the highe t level. Mar( and chec( the %ater level a!ter the period tipulated %ithin 0= hour . Chec( and record the %ater level a!ter 0= hour ' in!or" to the con ultant ' client %ill chec( and ign on the in pection report i! no detected lea(age.

S9PPO%T 6NSTALLAT6ON :BA% /AN;E%S0 %AC<=

Page 31 of 46

THANH LON+ ,IRE CO( LTD( A= PATBPE CLA&P Model P..= P..B P./. P./0 P./= P.0. P.0= P.2. P.=. P.C. P.B. P.;. P..=G P..BG P./.G P./0G P./=G P.0.G P.0=G P.2.G P.=.G P..CG P.B.G P.;.G P..=* P.B/* P./.* P./0* P./=* P.0.*

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

4uter $ia.+"", 0/.8 "" 08.0 2= =0.8 =;.B B..C 8B.2 ;D./ //=.2 /2D.; /BC.0 0/B.2 0. 0C 20 =. C. B2 8C D. //. /0C /B. 0.. /D./ 0C.= 2/.; 2;./ C..; B2.C

Allo%able Load+JN, 9e"ar( /.8B /.8B 0.BC 0.BC 0.BC 2.C2 2.C2 The e erie u ed !or 2.C2 galvaniGed pipe. =./0 =./0 =.=/ =.=/ /.8B /.8B 0.BC 0.BC 0.BC 2.C2 The e erie u ed !or 2.C2 ea"le pipe. 2.C2 =./0 =./0 =.=/ =.=/ /.8B /.8B 0.BC The e erie u ed /.8B !or !ulgurite /.8B 2.C2

B= 9%ATBPE P6PE CLA&P Model F9.= F9.B F9/. F9/0 F9/= F90. F90= F92. F9=. Mea ure"ent $N 3NC: /C L@ 0. M@ 0C /@ 20 /E/<=@ =. /EL@ C. 0@ BC 0E/<0@ ;. 2@ /.. =@ Allo%able Load < JN C.= C.= C.= C.= C.= C.= C.= C.= C.=
Page 32 of 46

M /. /. /. /. /. /. /. /. /.

7 0C 0C 0C 0C 0C 0C 0C 0C 0C

C 2; 2; 2; 2; 2; 2; 2; 2; 2;

THANH LON+ ,IRE CO( LTD( F9C. F9B. F9;. F9/.. F9/0. /0C /C. 0.. 0C. 2.. C@ B@ ;@ /.@ /0@

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT /0 /0 /0 /0 /B 20 20 20 C. C. =; =; =; =; 8C

/. /. /. /. /B./

C= 9% Type Pipe C'a,p Model S9..= S9..B S9./. S9./0 S9./= S9.0. S9.0= S9.2. S9.=. S9.C. S9.B. Mea ure"ent $N < 3nch /CA L@ 0.A 2<=@ 0CA /@ 20A /E/<=@ =.A /E/<0@ C.A 0@ BCA 0EL@ ;.A 2@ /..A =@ /0CA C@ /C.A B@ 4uter $ia. "" 0/.8 08.0 2= =0.8 =;.B B..C 8B.2 ;D./ //=.2 /2D.; /BC.0 A C 0. 0. 0. 0. $ =. =. =. =. G 0.BN0C 2N0C =N20 =N2; Allo%able Load +JN, 0.=. 0.8. =.0. C./. 8.0. 8.0.

2<;@ ;. 2<;@ ;. 2<;@ ;. /<0@ ;.

5.$ Cast 6ron Pipes an Fittings 6nsta''ation a, Cutting o! Pipe E All cutting "u t be done in %arehou e or in de ignated area o! each !loor. All cutting "u t not be done at %or( area. E Cutting angle "u t be right angle. E Pipe hall be cut by po%er hac( a%' circular cutting "achine %ith abra ive %heel' hand hac( a% or &uare end a%ing vice only. E 3n ide edge hall be rea"ed "oothen by rea"er or and paper.

b, Coupling Koint

Page 33 of 46

THANH LON+ ,IRE CO( LTD( 1) Pipe !ith pipe

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

E Pu h the upplied co"plete connector on to the pipe end right up to the "iddle pacing ring o! the eal.

E Turn over the open hal! o! the ealing collar.

E 3n tall the ne)t pipe or !or"ed part !lu h %ith the pacing ring and !old bac( the turned over hal! o! the collar.

E Place the cla"ping leeve around the collar.

Page 34 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

E Alternatively tighten the t%o cla"ping cre% uni!or"ly and hard tight. The guiding and threaded plate o! the cla"p "u t co"e together parallel to avoid any de!or"ation .

2) Pipe !ith fitting E Pu h the upplied co"plete connector on to the pipe end right up to the "iddle pacing ring o! the eal.

E Pu h the pipe end !ro" the other end into the connector.

E Fir"ly tighten the he)agon oc(et cre% %ith a oc(et panner' hard ratchet or i"pact cre%driver' i! po ible to the point %here the t%o cla"ping ja% co"e together.

Page 35 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

/anger ? Supports

Specification & Technical Standard:


Part No. Pipe SiGe 3nche TAG/00.00 TAG/00.0; TAG/00.2C TAG/00.=. TAG/00.=; TAG/00.B. TAG/00.8C TAG/00.D. TAG/00/.C TAG/00//C TAG/00/=. TAG/00/B; /<0O 2<=O /O /E/<=O /E/<0O 0O 0E/<0O 2O 2E/<0O =O CO BO Jg 2)0C 2)0C 2)0C 2)0C 2)0C 2)0C =)0C =)0C =)0C B)20 B)20 B)20 Lo%er Steel 2)0C 2)0C 2)0C 2)0C 2)0C 2)0C =)0C =)0C =)0C B)20 B)20 B)20 $i"en ion +"", 9od :ole SiGe /. /. /. /. /. /. /. /. /. /. /0 /0 -olt SiGe M;)B. M;)B; M;)8; M;);0 M;);; M/.)//. M/.)/0C M/.P/=. M/.)/CC M/.P/8. M/0P/DC M/0)00C : 8. 8B ;0 D0 /.. //8 /=B /CC /82 /D; 020 0BB $ 00 0; 2C =0 =; B. 82 ;D /.C //C /=. /B;

Page 36 of 46

THANH LON+ ,IRE CO( LTD(


TAG/000/D TAG/00082 TAG/00202 TAG/002CC TAG/00=.B TAG/00=C8 TAG/00C.; TAG/00B/. TAG/008CC ;O /.O /0O /=O /BO /;O 0.O 0=O 2.O

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT


M/0)08C M/B)2B. M0.)=0. M0.)=CC M0=PC/. M0=)CCC M0=PB/. M0=P8/. M0=);D. 22; =/D =D. CCB B/. B8C 8/C ;C. DDC 0/D 082 202 2CC =.B =C8 C.; B/. 8CC

B)=. B)=. D)C. D)C. /0)BC /0)BC /0)8C /B)8C /D)8C

C)=. B)=. B)C. B)C. B)BC B)BC D)8C D)8C D)8C

/0 /B 0. 0. 0= 0= 2. 2. 2.

E1"an#ion 2ol$ an S/0! ul!

&a!hine S!re. $3N DBC Counter un( +Flat, :ead $3N DBB 9ai ed Counter un( :ead $3N 8D;C 9ai ed Chee e :ead

Stan ar Dia,eter M2 Q M; M2 Q M; M2 Q M;

Length B"" Q 8."" B"" Q 8."" B"" Q 8.""

Page 34 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

/e>agon Nuts Stan ar $3N D2= 3S4 =.20 FN3 CC;8 AS<NRS ///0

Dia,eter MB Q M0= MB Q M0= MB Q M0= MB Q M0= ;ra e

Length B or ; B or ; B or ; B or ;

ANS3 -/;.0.0 -S D/B FNC +Coar e Thread, FNF +Fine Thread, AS<NRA 0=C/

S@ Q /@ S@ Q /@ S@ Q /@ S@ Q /@ S@ Q /@

0 or C 0 or C 0 or C 0 or C 0 or C

TC Bo't

Shear Stu
Page 35 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Trea e Bar Stan ar Metric SiGe 3nche SiGe

Dia,eter MB Q M08 S@ Q /@

Length / "eter 6 0 "eter 2 !eet 6 B !eet

3() 4uali$5 Con$rol 3(* Mo/& -U"

;96DEL6NES FO% &OC<A9P 6NSTALLAT6ON


1& P%EPA%AT6ON "O%<S7 1.1 /an Ao1er fro, !i1i' se!tion. Thang Long ubcontractor %ill receive all %or(ing area co"pleted by con truction group and a %ell a chec( all area be!ore receiving:
Page 3< of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

- All area "u t be cleaned and !ree !ro" debri . - All "ar(ing and neare t re!erence groove < line "u t be "ar(ed by civil contractor. /.0 Preparation of .or#. a, Too's an e+uip,ents. - Line "ar(ing tool - 9uling pen - Spring %ind tape - Cutting "achine +cut bric( %all, - :a""er - Chipping gun - Ladder -= &ateria'. - uP1C # PP9 Pipe - Latch - So!t "aterial !or opening. != Line ,ar#ing - F e ruling pen "ar(ing 0 point !or center line o! cutting line: / point at higher level and / point at lo%er level. - F e line "ar(ing tool in "a(ing center line !or pipe . - 4!! et !ro" center to right and le!t o! center line 2."". - Mar( 0 line !or trench o! pipe +Line No.0' No.2, - -a e on re!erence level' "ar( high level and lo% level o! trench.

Page 4= of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

= Cutting .a''. - Chec( cutting "achine and other e&uip"ent . - Cut bric( %all !ollo% to line "ar( No.0' 2' =' C. - Chip bric( %all in ide "ar(ing area. - Clean area be!ore continuing the %or( .
Page 41 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

2. 6NSTALLAT6ON7 - Cut the pipe a per approved di"en ion and %ith hop dra%ing. - 3n tall the pipe in ide the %all. - F e pring %ind tape to chec( and adju t di"en ion a per hop dra%ing di"en ion. - F e latch to !i) the pipe to the %all. +re!er to belo% !igure, - 3n tall o!t bloc( at the end o! pipe to "a(e opening a!ter civil contractor render the %all. +re!er to belo% !igure, 3. 6NSPECT6ON7 a. Di,ensions7 - $i tance !ro" e)i ting %all +or re!erence groove, to center o! pipe: at high level and lo% level point. - Chec( level o! o!t bloc( !or above opening. - Chec( level o! o!t bloc( !or belo% opening. -. )isua' !he!#7 - Solidi!y o! pipe !i)ing. - Seal pipe to en ure that binder can5t !illed in ide the pipe %hen pla tering. !. Other re+uire,ents7 - 3n ide the pipe "u t be cleaned be!ore in tallation. - To en ure don5t have crippling train o! G.3 pipe a!ter !i)ing. 4& /an Ao1er to after insta''ation finishe . 7or(ing area "u t be cleaned a!ter !ini h in tallation. To en ure that don5t to da"age other in tallation o! y te" %hen proce ing in tallation. :andEover !or other ection. C.2 List of Testing an Co,,issioning Tas#s Test &etho an Test P'an0 Test %e!or For,s0 6nspe!tion For,s /. Te t Method Scope o! Te ting

Page 42 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Scope o! te ting hall be ho%n !ollo%ing Table /.


Tabl! *( S/o"! of T!#$ing Syste# Met od 5ud&#ent Standard

Cold and :ot %ater pipe

Soil' 7a te' 1ent and $rainage pipe

Pipe lea(age te t + by %ater'/.. p i 0 hour , Not le than /0.C bar or one and a hal! ti"e the "a)i"u" pre ure %hichever i greater. +See pec . Section /2.2, 7ater !illing te t + by %ater , +Fill %ith %ater to top o! highe t part o! in tall area' 0= hour ,

The pre ure drop hall not drop "ore than CT +See pec . Section /2.2, 7ater level %ill not change.

:ydraulic te t +by %ater, E T%o +0, type o! %ater pu"p hall be u ed !or te ting'

E Portable "otoriGed pu"p and "anual hand pu"p. E T%o +0, %ater pre ure gauge hall be in talled at the te t point o! the pipe !or "onitoring the te t pre ure in the pipe. 9ange o! pre ure gauge hall be !ollo% a' a, . bar Q 0C bar: 7ater Supply Sy te"

b, . bar Q /C bar: :ot 7ater Supply y te"' Plu"bing and Sanitary Fi)ture ' 7ater Supply y te". AirEbleeding valve hall be provided to relea e the re"aining air in ide the pipe. To tart up the te ting' !ir t !ill up the pipe %ith %ater: Step / E F e the Portable "otoriGed pu"p to increa e the pre ure in ide the pipe al"o t to the pre ure re&uired. Step 0 E F e the Manual hand pu"p to increa e the pre ure to the !inal te t pre ure re&uired by chec(ing on the pre ure gauge . A!ter /C "inute later !ro" !ini hing increa ing to the !inal te t pre ure re&uired' relea e the re"aining air in ide the pipe. Then increa e the pre ure to the !inal te t pre ure re&uired by the Manual hand pu"p again. The te t duration i at lea t +0=, hour ' the pre ure drop hall not drop "ore than CT +See pec . Section /2.2,

Page 43 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

A!ter approval o! the lea(age te t' relea e the te t pipe pre ure to . bar and drain out the %ater in the pipe. 7ater Filling Te t E7ater !illing te t hall be applied to Soil' 7a te' 1ent and drainage pipe. E7ater !illing te t hall be done !or !loor by !loor a!ter pipe in tallation i !ini h. E -e!ore %ater !illing te t' all bend ' change in direction' end o! run and all other opening hould be plugged or capped %ith te t plug or te t cap . E 3n tall te t tee /... "" !ro" !ini hed !loor level E 3 olate each !loor or ection being te ted by in erting te t plug through te t tee in talled in the tac( " E 4nce the tac( i !illed %ith %ater to 0... ""' an in pector "a(e a vi ual in pection o! the ection being te ted to chec( !or lea( . E 9ecord the interval bet%een pipe edge and %ater ur!ace and %ater level hall be "ar(ed on pipe ur!ace. 0= hour or longer later' chec( interval change by vi ual chec(. The change %ater level hall not be approved. E 4nce the y te" ha been ucce !ully te ted' it hould be drained and the ne)t ection hould be prepared !or te t. E Te ting o! drainage y te" hall be carried out in ection by dividing the y te" horiGontally. *ach ection hall co"pri e pipe %or( and !itting !or three +2, !loor re&uired !or te ting. 0.3n pection and Te t Plan Te t report hall be prepared and !iled. Copie o! te t report hall be ub"itted a re&uired. See Appendi) !or 3TP For" 6 Cold and :ot 7ater Pipe 6 :ydraulic Lea( Te t and Soil<7a te<1ent<$rainage Pipe 6 Lea(age Te t +7ater !illing,.

Page 44 of 46

THANH LON+ ,IRE CO( LTD( 10.0 Safety P'an

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Thang Long hall carry out it %or( in the a!e t "anner po ible. Kob haGard analy e hall be prepared and approved prior to etting out %ith peci!ic ta ( to per!or". The health o! the %or(er hall be a para"ount concern o! the Co"pany. Safety &easures General Sa!ety hall be in !ir t priority during con truction' a!ety ta!! hall be pre ent on ite at all ti"e to upervi e and to re"ind %or(er to ob erve a!ety re&uire"ent . Stop %or( order hall en!orce once it doe not "eet the a!ety re&uire"ent. The labor !orce doing the in tallation %or( hall have undergone a!ety orientation and hall have been !a"iliariGed %ith the procedure related to their %or( Sa!ety hall be trictly ob erved. All a!ety e&uip"ent uch a clothe ' hoe ' hel"et' glove ' a!ety belt %ill be provided and regularly chec( during con truction. Ju"ho *ngineer hall in pect all SubEcontractor5 tool prior to be u e on ite. Ju"ho *ngineer hall be pre ent !or all the a!ety ite in pection. *&uip"ent intended !or u e hall have been in pected and tagged ?Sa!e !or F e@.

Safety on Installation of Pipe on High Elevation 3n talled hanger and upport in tallation o! pipe. hould be in pected !ir t and be approved be!ore

Prior to in tallation o! pipe on high elevation' an appropriate li!ting gear hould be u e !or li!ting pipe. A co"petent e)a"iner hould deter"ine the appropriate li!ting gear !or uch %eight o! pipe be!ore li!ting o! pipe hould proceed.
11.=

Appen i>

/. 3TP !or" no. 3TPEME0:.2E :ydraulic Te t 0. 3TP !or" no. 3TPEME0:.0E Lea(age Te t

Page 45 of 46

THANH LON+ ,IRE CO( LTD(

METHOD STATEMENT for Plumbing an Drainag! Pi"ing In#$alla$ion %or&#

SUNRISE CITY PLOT V PROJECT

Page 46 of 46