Você está na página 1de 5

1.1.

- PARTIDAS EJECUTADAS DURANTE EL PERIODO


METRAD
O
P U TOTAL S/.
METRAD
O
TOTAL S/.
01
01.01 Und 6.00 1,050.00 6,300.00
01.02 Kg ####### 0.18 155,466.61
01.03 Glb 1.00 ####### 13,740.64
01.04 Und 1.00 1,149.33 1,149.33
02
02.01 m2 7,749.78 0.72 5,579.84 95.38 68.67
02.02 m2 7,749.78 1.67 12,942.13 95.38 159.28
02.03 m2 7,749.78 1.05 8,137.27 95.38 100.15
02.04 ml 3,001.17 4.16 12,484.87
02.05 und 74.00 118.30 8,754.20
02.06 und 70.80 142.94 10,120.15
02.07 und 39.60 53.19 2,106.32
02.08 und 39.60 366.00 14,493.60
03
03.01 m3 787.00 64.98 51,139.26 49.14 3,193.12
03.02 m3 1,668.12 40.93 68,276.15
03.03 m3 707.82 16.29 11,530.39 8.19 133.42
03.04 m3 5,981.50 7.90 47,253.85 4.68 36.97
03.05 m3 5,981.50 14.88 89,004.72 4.98 74.10
03.06 m3 1,069.15 27.71 29,626.15
03.07 m2 1,069.15 11.01 11,771.34
03.08 m3 4,200.37 19.65 82,537.27 80.73 1,586.34
03.09 m3 110.92 12.79 1,418.67
04
04.01 m3 412.74 419.55 173,165.07 4.65 1,950.91
04.02 m2 1,089.34 52.72 57,430.00 7.40 390.13
04.03 kg 2,521.07 5.13 12,933.09 18.60 95.42
04.04 kg 770.99 6.78 5,227.31
04.05 kg 1,828.46 4.48 8,191.50
04.06 ml 791.65 2.85 2,256.20 4.65 13.25
04.07 ml 270.88 3.69 999.55 31.00 114.39
04.08 m2 209.40 24.32 5,092.61
05
tem Partidas
Limpieza de Terreno manual
EXPEDIENTE AVANCE MES ANTERIOR
Un
d
OBRAS PROVISIONALES
Alquiler de oficina, almacn y campamentos
Trazo niveles y replanteo
Flete terrestre
Cartel de identificacin de obra de 8.50 m x 3.60 x
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
Corte de Terreno en forma manual en terreno rocoso
Corte de Terreno en forma manual en terreno
Relleno y compactado a nivel de sub rasante
Movilizacin y desmovilizacin de maquinarias
Cerco de seguridad y proteccin
Trazo y replanteo durante la obra
Nivelacin de las cajas de agua
Nivelacin de las cajas de desage
PAVIMENTO RGIDO
Perfilado y nivelacin de la sub rasante de las veredas
Relleno y conformacin de base para veredas e = 0,10
Eliminacin de material excedente D = 10 Km
Escarificado, perfilado y compactado de sub base
Conformacin de base
Nivelacin de buzones: corte
Nivelacin de buzones en general a nivel de rasante
Juntas de dilatacin e = 1/2, h = 8
Sealizacin de las marcas para trnsito peatonal
GRADERAS
Dowels de acero liso en juntas transversales de
Acero corrugado en juntas longitudinales de
Juntas de contraccin e = 1/2, h = 2
Concreto FC= 210 Kg/cm2 para pavimentos
Encofrado y desencofrado de pavimento
Dowels de acero liso en juntas transversales de
Demolicin de veredas de 0.10 m
1/5
05.01 m3 13.32 328.46 4,375.09 8.29 2,722.93
05.02 m2 66.15 30.80 2,037.42 7.65 235.62
05.03 ml 32.30 5.43 175.39
05.04 ml 53.35 2.85 152.05
06
06.01 m3 105.88 304.43 32,233.05 0.97 295.30
06.02 kg 986.35 4.70 4,635.85
06.03 ml 147.57 3.69 544.53 17.60 64.94
06.04 m2 670.67 26.63 17,859.94
07
07.01
07.01.01 m3 257.93 64.98 16,760.29
07.01.02 m3 1,698.58 40.93 69,522.88
07.01.03 m3 1,141.71 15.36 17,536.67
07.02
07.02.01 m3 66.44 236.60 15,719.70
07.02.02 m2 195.27 44.13 8,617.27
07.03
07.03.01 m2 501.93 28.60 14,355.20
07.03.02 m3 644.27 336.17 216,584.25
07.03.03 m2 2,975.65 44.13 131,315.43
07.03.04 Kg ####### 4.63 156,797.59
07.03.05 ml 288.43 6.66 1,920.94
08
08.01 m3 45.53 296.48 13,498.73
08.02 m2 901.44 59.09 53,266.09
08.03 kg 1,659.74 4.70 7,800.78
09
09.01 m3 242.73 328.46 79,727.10
09.02 m2 444.60 30.80 13,693.68
09.03 Kg 1,070.04 4.70 5,029.19
09.04 ml 2,172.98 5.43 11,799.28
09.05 ml 510.85 2.85 1,455.92
10
10 m3 133.48 43.67 5,829.07 7.26 317.04
10 m2 812.74 10.93 8,883.25 18.14 198.27
10 m2 99.40 49.48 4,918.31 18.14 897.57
11
11 m2 2,680.12 6.87 18,412.42 67.55 464.07
11 m2 4,448.40 1.63 7,250.95 74.53 121.48
######### #######
Corte de Terreno en forma manual en terreno
Concreto FC= 175 Kg/cm2 para graderas
Encofrado y desencofrado de graderas
Bruas de 1.00 cm
Acero FY =4200 Kg/cm2 en sardineles
Juntas de dilatacin e = 1/2, h = 8
Encofrado y desencofrado de cunetas
Juntas de contraccin e = 1/2, h = 2
CUNETAS
Concreto FC= 175 Kg/cm2 para cunetas
Curado de losa con aditivo
Limpieza de pavimento
Bruas de 1.00 cm
Juntas de contraccin e = 1/2, h = 2
OBRAS DE CONCRETO SIMPLE
Concreto fc = 140 Kg/cm2 + 30% PG para muros de
contencin
Encofrado y desencofrado de muros
MUROS DE CONTENCIN
MOVIMIENTO DE TIERRAS
Corte de Terreno en forma manual en terreno rocoso
TOTAL COSTO DIRECTO
Acero FY =4200 Kg/cm2 en sardineles
VEREDAS
SARDINELES
Concreto fc = 175 kg/cm2 para sardineles
Encofrado y desencofrado de muros
Acero FY =4200 Kg/cm2 en muros de concreto
Juntas de dilatacin
OBRAS DE CONCRETO ARMADO
Solado de 10 cm 1:12
Concreto fc = 175 kg/cm2 para muros reforzados
Encofrado y desencofrado de sardineles
CURADO Y LIMPIEZA DE LOSA
Relleno con material propio seleccionado
Concreto fc = 175 kg/cm2 para veredas
Encofrado y desencofrado de veredas
Acero FY =4200 Kg/cm2 en veredas
Suministro y colocacin de plantones
JARDINERA
Relleno con material agrcola
Suministro y colocacin de grass
2/5
Distrito: #REF! Lugar: ####
Obra: Fecha:
Partida N de
N Veces LargoAncho Alto
02
02.01 95.38 m2
01 1.00 ### ### - 51.15
01 1.00 ### ### - 23.38
01 1.00 ### ### - 20.85
02.02 95.38 m2
02.03 95.38 m2
01 1.00 ### ### - 51.15
01 1.00 ### ### - 23.38
01 1.00 ### ### - 20.85
03
03.01 49.14 m3
01 1.00 ### A= 2.69 41.83
01 1.00 ### A= 1.84 4.60
01 1.00 ### A= 0.24 2.71
03.03 m3
8.19
01 1.00 ### A= 0.32 4.98
01 1.00 ### A= 1.06 2.65
01 1.00 ### A= 0.05 0.56
03.04 4.68 m3
01 1.00 ### ### 0.05 2.56
01 1.00 ### ### 0.05 1.17
01 1.00 ### ### 0.05 0.95
03.05 4.98 m3
01 1.00 ### ### 0.20 4.67
01 1.00 ### ### 0.10 0.31
03.08 80.73 m3
1.50 53.82 80.73
04
04.01 4.65 m3
01 1.00 ### ### 0.20 4.65
04.02 7.40 m2
01 2.00 ### - 0.20 6.20
01 4.00 ### - 0.20 1.20
04.03 18.60 kg
03 5.00 ### kg/m= 1.55 18.60
04.06 4.65 ml
03 1.00 ### - - 4.65
04.07 31.00 ml
02 1.00 ### - - 31.00
02 1.00 ### - - 3.00
Trazo niveles y replanteo
Baltazar Carrion
Pasaje
Baltazar Carrion
Pasaje
Graderias
PLANILLA DE METRADOS
: 31/10/2013
Descripcin
Medidas
Parcial Total Unid. Cantidad
#REF!
Sardinel
Pasaje
Sardinel
Graderias
Eliminacin de material excedente D = 10 Km
PAVIMENTO RGIDO
Pasaje
Pasaje
Eliminacin en terreno rocoso s
Baltazar Carrion
Dowels de acero liso en juntas transversales
Juntas de dilatacin e = 1/2, h = 8
Pasaje
Relleno y compactado a nivel de sub rasante
Escarificado, perfilado y compactado de sub
Encofrado y desencofrado de pavimento
Concreto FC= 210 Kg/cm2 para pavimentos
Juntas de contraccin e = 1/2, h = 2
Pasaje - longitudinal
Pasaje (5 m)
Baltazar Carrion
Pasaje (5 m)
Baltazar Carrion
TRABAJOS PRELIMINARES
Conformacin de base
Corte de Terreno en forma manual en terreno
Baltazar Carrion
Limpieza de Terreno manual
Sardinel
Trazo y replanteo durante la obra
Graderias
Sardinel
MOVIMIENTO DE TIERRAS
Graderias
Baltazar Carrion
Graderias
Baltazar Carrion
Sardinel
Baltazar Carrion
Pasaje
Pasaje - Transversal
Baltazar Carrion
Pasaje - longitudinal
Pasaje - Transversal
Baltazar Carrion
Partida N de
N Veces LargoAncho Alto
Descripcin
Medidas
Parcial Total Unid. Cantidad
05
05.01 8.29 m3
01 15.00 ### A = 0.07 2.63
D 01 4.00 ### A = 0.09 3.37
Descansos 01 2.00 ### ### 0.15 2.29
05.02 7.65 m2
01 17.00 ### - 0.18 7.65
06
06.01 0.97 m3
01 1.00 ### A = 0.04 0.97
06.03 17.60 ml
01 2.00 ### - - 17.60
09.01
09.01.01 5.63 m2
01 1.00 ### ### - 5.63
08
08.01 4.84 m3
01 1.00 ### A = 0.12 2.92
01 1.00 ### A = 0.17 1.92
08.02 52.50 m2
01 2.00 ### - 0.80 38.96
01 2.00 ### - 0.60 13.54
08.03 83.46 kg
01 83.00 ### kg/ml 0.56 32.54
01 4.00 ### kg/ml 0.25 24.35
01 39.00 ### kg/ml 0.56 15.29
01 4.00 ### kg/ml 0.25 11.28
10
10.01 7.26 m3
01 1.00 A= ### 0.40 7.26
10.02 18.14 m2
01 1.00 A= ### - 18.14
10.03 18.14 m2
01 1.00 A= ### - 18.14
11
11.01 67.55 m2
01 2.00 ### - 0.20 6.20
01 4.00 ### - 0.20 1.20
01 17.00 ### - 0.18 7.65
01 2.00 ### - 0.80 38.96
01 2.00 ### - 0.60 13.54
11.02 74.53 m2
Encofrado y desencofrado de sardineles
Baltazar Carrion
Area verde
Suministro y colocacin de plantones
Concreto fc = 175 kg/cm2 para sardineles
SARDINELES
Baltazar Carrion
Gradas
Solado de 10 cm 1:12
Baltazar Carrion
T-01
T-02
Baltazar Carrion
T-01
T-02
Baltazar Carrion
Gradas
Curado con aditivo
Acero FY =4200 Kg/cm2 en sardineles
CURADO Y LIMPIEZA
JARDINERA
Relleno con material agrcola
Suministro y colocacin de grass
Limpieza
Baltazar Carrion
Area verde
Baltazar Carrion
Area verde
Baltazar Carrion
T-01 - VERTICAL
T-01 - HORIZONTAL
T-02 - VERTICAL
T-02 - HORIZONTAL
Baltazar Carrion - Pavimento
Pasaje - longitudinal
Pasaje - Transversal
Baltazar Carrion - Graderias
Gradas
Baltazar Carrion - Sardineles
Concreto FC= 175 Kg/cm2 para cunetas
Concreto FC= 175 Kg/cm2 para graderas
CUNETAS
GRADERAS
Encofrado y desencofrado de graderas
T-01
T-02
Baltazar Carrion
OBRAS DE CONCRETO ARMADO
Juntas de dilatacin e = 1/2, h = 8
Baltazar Carrion
Gradas
Baltazar Carrion
Gradas
Baltazar Carrion
Gradas
Partida N de
N Veces LargoAncho Alto
Descripcin
Medidas
Parcial Total Unid. Cantidad
01 1.00 ### ### - 51.15
01 1.00 ### ### - 23.38 Graderias
Pasaje