INSPECTION CHECKLISTS

Monolithic Slabs OR Slabs with Separate Footings and Knee


Walls
The inspection checklists are included below. The Job Ready Checklist includes
all items that must be installed or prepared on the jobsite by other trade
contractors before work can begin. The Job Complete Checklist provides the
mechanism by which the trade contractor certifies that work has been completed
and the builder and trade contractor agree that the work meets the expectations
set forth in the Scope of ork.
Disclaimer
!either the !"#$ Research Center% &nc.% nor any person acting on its behalf% makes any warranty% express or implied%
with respect to the use of any information% apparatus% method% or process disclosed in this publication or that such use
may not infringe privately owned rights% or assumes any liabilities with respect to the use of% or for damages resulting from
the use of% any information% apparatus% method or process disclosed in this publication% or is responsible for statements
made or opinions expressed by individual authors.
(Insert Builder/Trade Contractor Company Name & Logo)
Turn-down Slab Job Ready Checklis
!ll ie"s "us be ins#eced and si$ned o%% by builder and rade be%ore rade be$ins work-
&'C(C-)*
Disclaimer
!either the !"#$ Research Center% &nc.% nor any person acting on its behalf% makes any warranty% express or implied%
with respect to the use of any information% apparatus% method% or process disclosed in this publication or that such use
may not infringe privately owned rights% or assumes any liabilities with respect to the use of% or for damages resulting from
the use of% any information% apparatus% method or process disclosed in this publication% or is responsible for statements
made or opinions expressed by individual authors.
Builder: Lot:
Subdivision:
Date of initial inspection:
Builder Supervisor Name: Crew Leader Name:
Trade
Foreman
Trade
Super
Builder
Explain Needed Corrections
List Date Corrected
O O O!N!"
+escribe Curren Hos#o,

'.
Confirm site location via readable
sign identifying lot number and street
address is in place.

(.
)ull accessibility to the site is
established% including gravel pad or
clear driveway.

*. Silt fence is in place.

+.
,lans complete and show critical
dimensions. Redline changes
incorporated into a final plan set.
-erify last revision to plans% specs%
and options is current.

..
)ootings/foundation walls meet the
si0e and construction per plan.

1.
&f performed by others% drain tile
installed and connected per plan.

2.
Sewer% water% electrical and gas
laterals that enter the slab area are
complete. 3ocate and install sleeves
at uninstalled utility entrances.

4.
Temporary electrical service and
water is available.

!ddiional Correcion Ie"s,



Si$n here o acknowled$e ha all abo-e
ie"s ha-e been co"#leed and work is
ready o co""ence.
Trade Si$naure, +ae,
'uilder Si$naure, +ae,
(Insert Builder/Trade Contractor Company Name & Logo)
Turn down Slab Job Pre-Pour Checklis
Prior o #ourin$ o% slab/ he rade and builder "us -eri%y #ro#er insallaion and si$n o%%
on all ie"s as acce#able. Correcion ie"s needin$ correcion "us be re-ins#eced and
con%ir"ed-&'C(C-)*
Builder: Lot:
Subdivision:
Date of initial inspection
Builder Supervisor Name: Crew Leader Name:
Instructions: Check box if OK, circle box if correction is needed. Note specific correction action required.
When corrected, then check box.
Trade
Foreman
Trade
Super
Builder
Explain Needed Corrections
List Date Corrected
O O O!N"
+escribe Curren Hos#o,


'.
Re5uired prior inspections have been made and
approved 6e.g.% footing% rough mechanical%
insulation% vapor retarder% sand/stone% reinforcing
steel% wire mesh% and radon system7.

(.
,lacement of sub8slab plumbing or drain pipes%
radon pipe% and sump well% match the plans and
have received the necessary inspections. [BCQC-
23]

*.
"ll formwork is in place% properly s5uared up within
tolerances and braced per specs

"ctual measured diagonals9
::::::;::::::
+.
inter weather conditions or excessive heat
conditions are in place if applicable.

..
!ecessary forms% re8bar% tie8down hardware is
accordance with drawings and specifications.

1.
Concrete truck clean8out location is identified and is
accessible.

2. "ll sub8slab trade work installed and inspected.

4. <xcavations beneath the slab properly compacted.

=. >ravel base is properly installed.

'?. "ll materials are on site and protected.

''. Sub8slab insulation is in place per plans.

'(. Termite barrier is in place% if applicable.

!ddiional Correcion Ie"s,



Si$n here o acknowled$e ha all abo-e ie"s ha-e
been co"#leed
Trade Si$naure, +ae,
'uilder Si$naure, +ae,
Disclaimer
!either the !"#$ Research Center% &nc.% nor any person acting on its behalf% makes any warranty% express or implied%
with respect to the use of any information% apparatus% method% or process disclosed in this publication or that such use
may not infringe privately owned rights% or assumes any liabilities with respect to the use of% or for damages resulting from
the use of% any information% apparatus% method or process disclosed in this publication% or is responsible for statements
made or opinions expressed by individual authors.
(Insert Builder/Trade Contractor Company Name & Logo)
Turn down Slab Job Co"#lee Checklis
0#on co"#leion o% work/ he rade and builder "us -eri%y #ro#er insallaion and si$n o%%
on all ie"s as acce#able. Correcion ie"s needin$ correcion "us be re-ins#eced and
con%ir"ed-&'C(C-)*
Builder: Lot:
Subdivision:
Date of initial inspection
Builder Supervisor Name: Crew Leader Name:
Instructions: Check box if OK, circle box if correction is needed. Note specific correction action required.
When corrected, then check box.
Trade
Foreman
Trade
Super
Builder Explain Needed Corrections
List Date Corrected
O O O!N"
+escribe Curren Hos#o,

'.
>ravel sub base% specified insulation% and
polyethylene were installed per specification
and plan. [BCQC-23]

(.
Capillary break% insulation and
polyethylene7 were installed per plan
between footing and wall. [BCQC-23]

*.
@rain tile% washed stone% filter fabric% sump
crock is installed and connected per plan.

+.
Aept concrete delivery tickets show correct
mix

.. Results of slump test6s7 are noted.

1.
Slab is BlevelC without high or low spots%
pitting% or other surface defects.

2.
Slab elevation correct per site plan and
dimensions correct per plans.

4. Control joints installed or cut8in per plan.

=.
"nchor bolts% tie8downs or other hardware
are in place per plan.

'?. )orms stripped after concrete set up.

''. !o visible spalling of new concrete

'(. Site is cleaned per specifications.

'*. Concrete splatters and spills cleaned up.

'+. Streets are free of mud or concrete.

'..
"ll forms and excess materials are removed
from the site.

'1.
"ll debris in the proper recycling
receptacle6s7.

'2.
Tolerances/specifications provided per
scope.

!ddiional Correcion Ie"s,


Si$n here o acknowled$e ha all abo-e ie"s Trade Si$naure, +ae,
Disclaimer
!either the !"#$ Research Center% &nc.% nor any person acting on its behalf% makes any warranty% express or implied%
with respect to the use of any information% apparatus% method% or process disclosed in this publication or that such use
may not infringe privately owned rights% or assumes any liabilities with respect to the use of% or for damages resulting from
the use of% any information% apparatus% method or process disclosed in this publication% or is responsible for statements
made or opinions expressed by individual authors.
ha-e been co"#leed 'uilder Si$naure, +ae,
Disclaimer
!either the !"#$ Research Center% &nc.% nor any person acting on its behalf% makes any warranty% express or implied%
with respect to the use of any information% apparatus% method% or process disclosed in this publication or that such use
may not infringe privately owned rights% or assumes any liabilities with respect to the use of% or for damages resulting from
the use of% any information% apparatus% method or process disclosed in this publication% or is responsible for statements
made or opinions expressed by individual authors.