Note: The azimuth lockdown bolts must be tightened before any
elevation adjustment is started. The narrow beamwidth of the
antennas makes it essential to completely tighten the Azimuth
lockdown bolts prior to adjusting Elevation, and vice versa.
a. Loosen the 3 Elevation lock
down bolts.
b. Adjust the Elevation via the
single Elevation adjust bolt, using
a 13mm box end or socket
wrench.
c. Tighten the 3 Elevation lock
down bolts.
After mounting antenna to the pole, install the E-Link ODU. First
apply a small amount of silicon grease to the rubber O ring on the
antenna feed. A tube of grease is supplied with the antenna.
Applying silicon grease aids in sliding the E-Link ODU on to the
antenna and helps seal against moisture. Slide the E-Link ODU
oriented for either V (Vertical) polarization or for H (Horizontal)
polarization as indicated by the lettering on the cover. Secure the
four captive latches/bales and snap into the locked position.
The radio has a M5 ground lug
located on the enclosure. Ensure
that this is connected by a 10AWG
wire to earth ground or building
ground.
The E-Link 1000LR requires 0.7amp @ -48 VDC input power. There
are two options for powering:
1. PoE via the Management cable.
2. Power over Coax via a Type N Connector.
Use surge protectors for either option. Both inputs can be connected
for redundant power input to the radio.
Assemble Management Interface cable
The radio comes with an Amphenol RJ45 (RJFRB6) weatherproof
housing. When using CAT5e cable use all the included parts as
shown in assembly instruction included with the housing. If using
CAT6 Ethernet cable, discard the 3 sealing parts included with this
housing and use the extra Blue seal provided in the E-Link install kit.
Assemble connector as shown above. If necessary the inner section
with tab can be removed to fit larger diameter cables.
a. Slide RJ45 into the housing until it
snaps into place.
b. Make sure the black standoffs are
holding the RJ45 in place. About 3/8
(9.5mm) of the RJ45 connector should be protruding out of the
plastic housing.
c. The housing should have a ~1/8 (3mm) gap between the screw
cap and base when properly tightened.
a. Connect all cables to the E-Link radio.
Drape cables with a drip loop to keep water from collecting
around connectors.
b. Align the link. E-Band
recommends that personnel be
present at both ends of the link,
equipped with either two-way
radios or cell phones for
communications during the
alignment process. Once the link
is aligned and operational,
recheck all hardware and torque
to 15 lb-ft (203.3 N-m).
Horizontal Polarization
4
5
9
6
7
8
Install the Gigabit SFP interface. Refer to
instruction sheet supplied with this kit.
2011 E-Band Communications Corporation www.e-band.com +1.858.408.0660 support@e-band.com 02-17-11
Single elevation adjust bolt
10
Vertical Polarization
Connect Input Power
Complete cable connections, align
link, and tighten hardware
Ground Radio
Elevation adjustment
Mount E-Link 1000LR