1.00.00 SEdEkkL 1.01.00 This section covers the design and performance requirements of the following types of fire protection system (a.) Hydrant system (b.) High Velocity Water (HVW) Spray system for 2 no.s of 220/34.5kV 50MVA Power Transformers. (c.) Fire detection system (d.) Portable fire extinguishers (e.) Wheel/Trolly mounted fire extinguishers 1.02.00 SEdEkkL 0E5|Sd 6k|IEk|k 1.02.01 The main fire protection system shall consist of a fire water hydrant system serving the whole substation including Employer's transformer area/control room building and DG Set area. However, fire detection system inside the Employer's control room is covered under the scope of another contract. 1.02.02 All equipments/system components of complete fire detection & protection system shall have the approval from one of the following : a) Underwriters Laboratories of USA b) LPCB UK c) VDS d) FM-USA e) BIS (For the approval of pumps and valves). However, design and installation of complete system and requirements shall be approved by TAC accredited professional(s) India. 1.02.03 For situations, which are not covered by the standards, system shall be supplied and installed to ensure effective protection. 1.02.04 The complete fire detection and protection systems shall be as per the guidelines/codes/standards/rules of the TAC/NFPA/IS :3034/OISD etc and all the systems /equipments and installation shall be got approved from LPA /TAC accredited professionals by the bidder to enable Employer to obtain maximum applicable rebate on insurance premium. The responsibility of getting approval from LPA /TAC accredited professionals rests exclusively on contractor. Any other additional equipment not specifically mentioned
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 2 of 16
in the technical specification but are found necessary to meet the requirements of TAC and also for safe and sound operation of the plant are to be included at no extra cost to Employer. 1.03.00 watet supp|y system 1.03.01 Water for hydrant and HVW Spray system shall be supplied by one electrical motor driven pump with another driven by diesel engine, shall be used as standby. Two no of underground water storage tanks made of RCC shall be provided. The Capacity of water storage tanks shall be finalized by the bidder conforming to TAC Guidelines. Construction of Borewell for fire pump house water supply as per requirement is in the scope of bidder. 1.04.00 Ftessutisation system 1.04.01 This system consists of two (2) nos. electric motor driven jockey pumps (1 no. working + 1 no. stand-by). In the event of loss of pressure in the hydrant/spray system below a predetermined value, the jockey pump would start. Operation of all the pumps shall be automatic and pumps shall be brought into operation at preset pressure. Fire pumps shall only be stopped manually. Manual start/stop provision shall be provided in local control 2.00.00 h0kkdI 55IEN 2.01.01 System shall be pressurized continuously to normal working pressure. 2.01.02 System shall consist of Hydrant pumps, pressurisation arrangement, water mains network, hydrant valves, landing valve, water monitors, hoses, branch pipes, nozzle, hose boxes etc. 2.01.03 Category of Hazard and minimum terminal pressure shall be as per TAC norms. 2.01.04 Each of the landing valves and external hydrant valves associated with the switchyard area shall be provided with a hose box. Each hose box shall contain two (2) numbers of 15 m long hoses, branch pipes, couplings, nozzles, spanners, etc as per TAC guidelines. 2.01.05 Hydrant valves and hose couplings shall be of stainless steel construction confirming to relevant Indian/International Standard. 2.02.00 5pecilic data 2.02.01 All hydrant valves shall be of stainless steel construction female oblique type conforming to IS: 5290 or Equivalent. 2.02.02 Hoses shall be of non-percolating flexible type as per IS: 636 (Type-A) and or Equivalent.
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 3 of 16
2.02.03 Branch pipes shall be constructed of stainless steel SS-316 at both ends. One end of the branch pipe will receive the quick coupling while the nozzles will be fixed to the other end. 2.03.00 hose 6abinets 2.03.01 The external / internal hose cabinets shall be mounted on ground (outdoor /Wall mounted or column mounted type depending on site conditions. 2.03.02 External & Internal hose cabinets shall have a 6 mm thick glass panel in front door with the word FIRE painted on it with 150 mm (6) red letters. 2.03.03 External & Internal hose cabinets shall be made of 16 gauge or thicker M.S. Sheets. 2.03.04 The External & Internal hose cabinets shall have rubber bushings to prevent ingress of water and dust. 3.00.00 hvw 5ptay 5ystem 3.01.00 Seneta| 3.01.01 This specification covers specifications and broad design basis for 220/34.5kV, 2 x 50 MVA Power Transformers fire detection and protection system. 3.01.02 It shall consist of pressurization arrangements, water mains network, Deluge valves, alarm valves, flow switches Isolation valves, Y-type strainers, spray nozzles/projectors / spray nozzles piping network, detection system, instrumentation, local control panels, cables etc. 3.01.03 System shall be pressurized continuously to normal working pressure up to the Deluge valves and spray nozzles. 3.01.04 The system shall be automatic and shall be activated by a dedicated detection system to be provided for each of the equipment. 3.02.00 0esign Fhi|osophy (Ninimum kequitements[ 3.02.01 Minimum running water pressure at any projector/spray nozzle shall be not less than 3.5kg/Sqcm and not greater than 5.0 kg/Sqcm for HVW spray system. 3.02.02 Design discharge density shall be as per the rules of water spray system of Tariff Advisory Committee (TAC) and/or NFPA standards. 3.02.03 An isolation valve shall be provided at both upstream and downstream of each of the deluge valve and alarm valve. The size shall be same as that of the deluge valve and alarm valve. 3.02.04 The deluge valve (auto-resetting type) assembly shall consist of accessories such as water motor gong, alarm test valves, drain valves, strainers for these valves, hydraulic releasing system, solenoid valves, etc.
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 4 of 16
3.02.05 A strainer ('Y' type) shall be provided at upstream of deluge valve. 3.02.06 Strainer wire shall be SS (AISI 316), 30 SWG, 30 mesh. Strainer area shall be at least 4 times the pipe cross section at the pipe inlet. Pressure drop across strainer in clean condition shall not exceed 1.5 kg/cm2 at design flow of deluge valve. 3.02.07 Pressure gauges and pressure switches at upstream and downstream of deluge valves shall be provided. 2.02.12 The design features and make of all the projectors/ spray nozzles shall be UL/FM or equivalent approved / listed. 2.02.14 Pressure switches shall be provided in spray and detector piping to exhibit "FIRE" and "SPRAY ON" annunciations and interlock for tripping of respective equipment wherever applicable. 2.02.15 Wet type detector network with venting arrangement shall be provided for spray system using quartzoid bulb detectors. 2.02.16 Remote manual operation of the deluge valves shall be possible from the respective fire alarm cum control panel through the keyboard operation of PC monitoring station when the system is selected in remote manual mode. The remote manual selection for the operation of spray system on any equipment or any zone shall also be through the monitoring station of the respective panel. Apart from the automatic operation of the deluge valve, the system shall have provision for manual operation of the deluge valve by means of hand operated lever close to the deluge valve assembly. There shall also be a provision to operate deluge valve electrically from a nearby local panel. 4.00.00 F|kE wkIEk FNF5 8 FNF h05E 4.01.00 The Fire water pumps shall be of Horizontal centrifugal type 4.02.00 Maximum speed of all the pumps to be supplied for the Fire Protection System shall be 1500 rpm. However, for jockey pumps, a speed of even upto 3000 rpm is also acceptable. The motor driven pump and the corresponding diesel engine driven pump shall be completely interchangeable in respect of speed, impeller, diameter etc. 4.03.00 The Capacity (minimum), discharge pressure (minimum) of pumps shall be designed as per recommendations of TAC. 4.04.00 The operation of the pressurisation system shall be automatic and required instrumentation and control shall be provided. Re-circulation line with required valves be provided at for each set of the Pumps. 4.05.00 In the event of fire, pressure in the hydrant or spray system shall drop due to resulting flow. In this event, water loss in the system will be replenished by jockey pump. However, if this is inadequate to meet the demand and results in drop in system pressure further, at preset
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 5 of 16
low pressure set point, electric driven pump of the respective system shall start automatically. 4.06.00 The diesel engine drive of the pump shall conform to the requirements of TAC. Diesel engine shall be provided with batteries (2x100%) and battery chargers (2x100%). 4.07.00 Battery of the diesel engine shall be lead acid type as per IS and shall be large enough to crank the engine twelve times successively, each for a duration of 10sec. without any charging in between. 4.08.00 Each engine shall be provided with fuel oil tank having adequate capacity to hold sufficient fuel oil for a minimum of twelve (12) hours of full load run. The fuel oil tank shall preferably be mounted on the engine. No fuel oil tank will be provided by the Employer. 4.09.00 The continuous engine brake horse power rating (after accounting for all auxiliary power consumption) and correction for temperature and altitude at the site conditions shall be atleast 20% greater than the requirement at the duty point of pump at rated RPM and in no case, less than the maximum power requirement at any condition within the operating range of the pump. 4.10.00 Continuous drive motor rating (at 50 deg.C ambient) shall be at least 10% (ten percent) above the maximum load demand of the pump in the entire operating range. 4.11.00 The pumps shall comply with the regulations of BIS and shall be approved by LPA /TAC accredited professionals before installation. 4.12.00 The fire water pump house layout shall have sufficient space for the maintenance of the pump and diesel engine. 4.13.00 Pumps shall be designed for continuous operation at its best efficiency point to meet the specific requirements of the system for which it is to be employed. 4.14.00 Pumps shall have continuously rising head characteristic from its operating point towards shut off without any zone of instability and power capacity characteristic shall be preferably non-overloading type. 4.15.00 Pump shall be capable of furnishing not less than 150% of rated capacity at a head of not less than 65% of the rated head. The shut-off head shall not exceed 120% of rated head in the case of horizontal pumps and 140% in the case of vertical turbine type pumps. Also, the jockey pumps shall be as per TAC requirements. 5.00.00 F|F|dS kd0 vkLvE5 5.01.00 SEdEkkL 5.01.01 Piping for all fire protection systems shall generally be laid over ground except in locations such as road/rail crossings where it may not be feasible to route over-ground. At rail/road crossings, fire water pipes shall be laid inside hume pipes of suitable ratings.
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 6 of 16
5.01.02 For calculating friction loss in piping system: WILLIAM & HAZEN formula shall be used with C value as 100. 5.01.03 Inserts/ Embedments required for all pipe/ valve / equipment supports shall provided by the agency providing Civil Works. However the Clamps, channels, bolts, nuts etc to support/mount piping/valves/equipments shall be supplied and erected by the Contractor. 5.02.00 Natetia| ol 6onsttuction 5.02.01 Mild steel as per IS:1239 (Part-I) medium grade (upto 150 NB) & as per IS:3589 Gr 410 (above 200 NB) or Equivalent for pipes normally filled with water. 5.02.02 Pipe thickness: a. For Pipe sizes upto 150 NB and above: As per IS:1239 Part-I medium grade. b. For Pipe sizes 200 NB & above shall confirm to IS: 3589 Grade 410. 5.02.03 To prevent soil corrosion buried pipes / pipes in trench shall be properly lagged with corrosion protective tapes of minimum thickness of 4 mm (in two layers) of coal tar type as per IS : 15337 or AWWA C 203. 5.02.04 All valves shall be as per applicable IS/BS codes & approved by LPA /TAC accredited professionals for specific fire protection system and shall be provided with locking arrangement (with locks) in open or close condition. Further, all gate/butterfly valves of size 200 mm & above shall be provided with spur gear reduction unit. 5.02.05 All the flanges and counter flanges shall conform to ANSI B 16.5 CI 150. 5.02.06 Unless otherwise specified all elbows / bends shall be long radius type. 5.02.07 For pipe fittings the material shall conform to ASTM A 234 Gr WPB or ASTM A 105 or equivalent and dimensional standard conforming to ANSI B16.11 (socket & threaded type), ANSI B 16.9 (for butt welded fittings) and ANSI B16.5 (for flanges and flanged fittings) as the case may be. Further, Galvanised malleable Cast Iron fittings as per IS 1879 or Cast Iron fittings as per BS-1641 are also acceptable. 5.02.08 The fittings shall be galvanized as per IS:4736 for galvanized pipe application. 5.02.09 In case of branching connections from GI mains for spray piping network, socket may be welded for more than two pipe reduction instead of standard tees. 5.02.10 Fabricated fittings shall not be acceptable up to pipe size of 300 NB. For sizes 350 NB and above, fittings may be fabricated as per BS:2633 / BS:534. 5.02.11 Set on set in type fittings shall not be acceptable. 5.02.12 Welding of Galvanised iron pipes/fittings would be permitted provided the same is carried out by means of special electrodes suitable for the above application and the same shall be
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 7 of 16
approved by Employer. After welding, welded portions shall be applied with three coats of Zinc silicate treatment /rich paint over one coat of suitable primer. Further the Contractor shall provide proper zinc paint at the point of welding. 5.02.13 Stooved coup|ing : Vendor may also use mechanical grooved couplings type fittings in GI pipe lines for HVW spray system. All materials and products shall be either Underwriters Laboratories (UL) Listed or Factory Mutual (FM) Approved and installed in accordance with NFPA Standard 13 / equivalent Standard. 5.02.14 The fittings shall be galvanized as per IS:4736 for galvanized pipe application. 5.02.15 In case of branching connections from GI mains for spray piping network, socket may be welded for more than two pipe reduction instead of standard tees. 5.02.16 Fabricated fittings shall not be acceptable up to pipe size of 300 NB. For sizes 350 NB and above, fittings may be fabricated as per BS:2633 / BS:534. 5.02.17 Set on set in type fittings shall not be acceptable. 5.02.18 Welding of Galvanised iron pipes/fittings would be permitted provided the same is carried out by means of special electrodes suitable for the above application and the same shall be approved by Employer. After welding, welded portions shall be applied with three coats of Zinc silicate treatment /rich paint over one coat of suitable primer. Further the Contractor shall provide proper zinc paint at the point of welding. 0.00.00 F|kE wkIEk 5I0kkSE 55IEN 6.01.00 Two numbers each of 50% capacity underground fire water storage tanks shall be provided by the bidder. The fire water storage tanks shall be with RCC. The grade of concrete shall be 1:1.5:3. Bidder shall ensure that the total capacity of fire water storage shall be as per the recommendation of TAC. 6.02.00 The discharge pipe each of the tank shall be interconnected through isolation valve. From the discharge headers, individual suction lines with isolation valve & strainer shall be provided for each of the pump. 6.03.00 Each tank shall be provided with Level indicators, ultrasonic type level transmitters. The instrumentation and control shall include annunciations of low-level, very low level, high level, automatic opening of make up water connection at low level, closure of valves at high level etc as per system requirement. 7.00.0 NLI|FkF05E d0IILE The multipurpose nozzle should be such that water under pressure is applied on fire in the form of a jet, spray or fog. Material of construction for multipurpose nozzle shall be as per manufacturers standard. 8.00.00 Fk|dI|dS
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 8 of 16
8.01.00 All the Equipments shall be protected against external corrosion by providing suitable painting. 8.02.00 The surfaces of stainless steel, Gunmetal, brass, bronze and non-metallic components shall not be applied with any painting. 8.03.00 The Contractor shall clean the external surfaces and internal surfaces before Erection by wire brushing and air blowing. The steel surface to be applied with painting shall be thoroughly cleaned before applying painting by brushing, shotblasting etc as per the agreed procedure. 8.04.00 Painting of all equipments /.components of FDPS package shall be as per manufacturers standard practice or as detailed below whichever is superior in quality.
Envitonment Faint scheme Iota| 0FI Normal / Mild Corrosive Environment Primer- zinc filled epoxy Finish Aliphatic Polyurethane (shade RAL3000)(P.O Red) Min 125 microns Corrosive Environment (as in coastal areas) Primer- zinc filled epoxy Intermediate Epoxy MIO Finish Aliphatic Polyurethane (shade RAL3000)(P.O Red) Min 200 microns 9.00.00 ELE6Ik|6 N0I0k5 9.01.00 Seneta| kequitements 9.01.01 For the purpose of design of equipment/systems, an ambient temperature of 50 deg. Centigrade and relative humidity of 95% shall be considered. The equipment shall operate in a highly polluted environment 9.01.02 All equipments shall be suitable for rated frequency of 50 Hz with a variation of +3% & -5%, and 10% combined variation of voltage and frequency unless specifically brought out in the specification. 9.01.03 Contractor shall provide fully compatible electrical system, equipments, accessories and services. 9.01.04 All the equipment, material and systems shall, in general, conform to the latest edition of relevant National and international Codes & Standards, especially the Indian Statutory Regulations.
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 9 of 16
9.01.05 It shall be designed to limit voltage variations as given below under worst operating condition : 415/240V +/- 10% 9.01.06 The voltage level for motors shall be as follows :- 9.01.06.1 Upto 0.2 KW : 240V, Single phase AC, or 415V, Three phase AC 9.01.06.2 Above 0.2KW to 200 KW : 415V, Three phase AC 9.01.07 Fault level shall be 45 KA RMS 1 second for 415V system. 415V system shall be solidly grounded . 9.01.08 Paint shade shall be RAL 5012 (Blue) for indoor and outdoor equipment. 9.01.09 The responsibility of coordination with other agencies and obtaining all necessary clearances shall be of the contractor. 9.01.10 Degree of Protection Degree of protection for various enclosures as per IS:13947 shall be as follows :- i) Indoor motors IP 54 ii) Outdoor motors IP 55 9.02.00 600E5 kd0 5Ikd0kk05 1.) Three phase induction motors : IS:325, IEC:34 2.) Single phase AC motors : IS:996, IEC:34 9.03.00 IFE 9.03.01 AC Motors: 9.03.01.1 Squirrel cage induction motor suitable for direct-on-line starting. 9.04.00 kkI|dS 9.04.01.1 Continuously rated (S1). 9.04.01.2 maximum continuous motor ratings shall be at least 10% above the maximum load demand of the driven equipment under entire operating range including voltage and frequency variations. 9.05.00 IENFEkkIkE k|5E Air cooled motors
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 10 of 16
70 deg. C by resistance method for both class B&F insulation. 9.06.00 0FEkkI|0dkL kEq|kENEdI5 9.06.01 5tatting Iime 9.06.01.1 For motors with starting time upto 20 seconds at minimum permissible voltage during starting, the locked rotor withstand time under hot condition at highest voltage limit shall be at least 2.5 second more than starting time . 9.06.01.2 For motors with starting time more than 20 second and upto 45 seconds at minimum permissible voltage during starting, the locked rotor withstand time under hot condition at highest voltage limit shall be at least 5 second more than starting time. 9.06.01.3 Speed switches mounted on the motor shaft shall be provided in cases where above requirements are not met. 9.07.00 Iotque kequitements 9.07.01 Accelerating torque at any speed with the lowest permissible starting voltage shall be at least 10% motor full load torque. 9.07.02 Pull out torque at rated voltage shall not be less than 205% of full load torque. It shall be 275% for crane duty motors. 9.08.00 5tatting vo|tage tequitement (a) 85% upto 110KW (b) 80% from 111KW to 200KW 9.09.00 0E5|Sd kd0 60d5Ik6I|0dkL FEkIkE5 9.09.01 Suitable single phase space heaters shall be provided on motors rated 30KW and above to maintain windings in dry condition when motor is standstill. Separate terminal box for space heaters & RTDs shall be provided. 9.09.02 All motors shall be either Totally enclosed fan cooled (TEFC) or Totally enclosed tube ventilated (TETV) or Closed air circuit air cooled (CACA) type. 9.09.03 Winding and Insulation (a) Type : Non-hygroscopic, oil resistant, flame resistant (b) Starting duty : Two hot starts in succession, with motor initially at normal running temperature. (d) 415V AC : Class B
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 11 of 16
motors 9.09.04 Noise level and vibration shall be limited within the limits prescribed in IS: 12065 & IS: 12075 respectively. Motors shall withstand vibrations produced by driven equipment. Motor body shall have two earthing points on opposite sides. 9.09.05 All motors shall be so designed that maximum inrush currents and locked rotor and pullout torque developed by them at extreme voltage and frequency variations do not endanger the motor and driven equipment. 9.09.06 The motors shall be suitable for bus transfer schemes provided on the 415V systems without any injurious effect on its life. 9.09.07 The ratio of locked rotor KVA at rated voltage to rated KW shall not exceed the following (without any further tolerance) (A) UPTO 110KW 11.0 9.10.00 IFE IE5I 9.10.01 LT MOTORS 9.10.02 LT motors shall be of type tested quality. For each type & rating of LT motors rated above 50 KW, the contractor shall submit for Owners approval the reports of all the type tests as per relevant standards and carried out within last ten years from the date of bid opening. These reports should be for the tests conducted on the equipment similar to those proposed to be supplied under this contract and the test(s) should have been either conducted at an independent laboratory or should have been witnessed by a client. 9.10.03 In case the Contractor is not able to submit report of the type test(s) conducted within last ten years from the date of bid opening, or in case the type test report(s) are not found to be meeting the specification requirements, the Contractor shall conduct all such tests under this contract free of cost to the Owner and submit the reports for approval. 9.11.00 All acceptance and routine tests as per the specification and relevant standards shall be carried out. Charges for these shall be deemed to be included in the equipment price. TABLE - I DIMENSIONS OF TERMINAL BOXES FOR LV MOTORS Notot N6k in kw Ninimum distance between centte ol stud and g|and p|ate in mm UP to 3 KW As per manufacturer's practice. Above 3 KW - upto 85
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 12 of 16
7 KW Above 7 KW - upto 13 KW 115 Above 13 KW - upto 24 KW 167 Above 24 KW - upto 37 KW 196 Above 37 KW - upto 55 KW 249 Above 55 KW - upto 90 KW 277 Above 90 KW - upto 125 KW 331 Above 125 KW-upto 200 KW 203 For HT motors the distance between gland plate and the terminal studs shall not be less than 500 mm.
d0IE: Minimum inter-phase and phase-earth air clearances for LT motors with lugs installed shall be as follows: Notot N6k 6|eatance Upto 110KW 10.0mm Above 110KW and Upto 150KW 12.5mm Above 150KW 19.0mm 10.00.00 60dIk0L kd0 |d5IkNEdIkI|0d 10.01.00 Seneta| kequitements 10.02.00 The Contractor shall provide Independent Control & Instrumentation system for control, monitoring and operation of associated drives and auxiliaries in all regimes of operation in safe and most efficient manner including Panels/ Desks, Process Connection and Piping, charges & batteries, associated Instrumentation Cables etc. as identified in the specification.
CLAUSE.NO FIRE FIGHTING SYSTEM Construct ion of 220 kV S/S and Associ ated System at Pakri Barwadih BID DOC NO. : NESCL/ JH (CM&CW)/ CS-PB-818
IE6hd|6kL 5FE6|F|6kI|0d5 v0LNE-||, FkkI - ||
6hkFIEk- N0 Fire Fighting Syst em
Page 13 of 16
10.03.0 Bidder shall include in his proposal and shall furnish all equipment, devices and services which may not be specifically stated in the specification but are needed for completeness of the equipment/systems furnished by the Bidder and for meeting the intent and requirements of the specification. 10.04.0 The reference ambient temperature outside panel shall be taken as 50 0 C and relative humidity 100%