How to use this Risk Assessment Form 1. Detail the locations (actual workplace) of the hazard, risk or issue. 2. Describe the hazards, risks or issues. 3. Print your name and any names persons participatin in the assessment. !. "dentify the persons likely to be affected (e.. employees, public, etc.). #. Determine the $ikelihood that loss, damae or in%ury would occur as a result of the hazard or risk, usin the &isk 'alculator criteria for likelihood. (. Determine the 'onse)uence that would result of this loss, damae or in%ury did occur, usin the &isk 'alculator criteria for conse)uences. *. Determine the &isk +core by usin the &isk 'alculator and your $ikelihood and 'onse)uence scores. ,his will i-e you a risk score of ./treme (.), 0ih (0), 1oderate (1), or $ow ($). Place this in the column labelled Risk Score (Before Controls). 2. Determine the control measures to be implemented to control the hazards3risks, consider both short term (temporary) and lon term (permanent) control options. 4. 'onduct a second risk assessment to determine the risk score (usin the &isk 'alculator and repeatin steps #5*) after the control measure is identified and selected for implementation. ,his will enable you to determine if the risk score has been satisfactorily reduced. Place this risk score in the column labelled Risk Score (After Controls). 16. 7llocate a responsible person to ensure the control measures are implemented and a proposed date for their completion. 8our +uper-isor must -erify that these actions are completed. Note: If the risk score is not reduced to a Low (L or !edium (!" the risk assessment must #e si$ned off for appro%al #y your Super%isor #efore any work #e$ins& 1&'5+P9&152.3.1.1 'reated: 613266* ;ersion: 3 &e-iewed: 6232612 Pae 1 of ( RISK ASSESSMENT Date: 29/!/2!" De#$ri%tion o& ha'ard/ri#( )o$ation: +torytime session at <ordon =hite $ibrary =ednesday 16.36am > 11.66am: held in the children?s section of the library 9riday 4.36am > 16.66am: held in the children?s section of the library *er#on# )i(e)y to be a&&e$ted: .mployees Public @ther AAAAAAAAAAAAAAAAAAAAA De#$ri%tion o& the ha'ard/ri#(/i##+e: +torytime sessions attract sinificant numbers of children aed 25 # years and their siblins, parents and carers. .stimated numbers can rane from 36 > (6 adults and !6 > 166 children at any i-en session. *er#on# ,ond+$tin- the A##e##ment: Name: 1.'laire <randcourt 3 0elen Pae 2. $otte +%oeren Si-ned: 1.AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 2.AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA *o#ition Tit)e: 1. 8oun People?s +er-ices $ibrarian 2. 8oun People?s +er-ices $ibrary 7ssistant 1&'5+P9&152.3.1.1 'reated: 613266* ;ersion: 3 &e-iewed: 6232612 Pae 2 of ( RISK ASSESSMENT
9i/ Risk Process +pot 7ssess .-aluate +pot the hazard 7ssess the risk the hazard presents 9i/ the hazard by decidin on and implementin appropriate control measures .-aluate the effecti-eness of the control measures by monitorin and re-iewin them Ri#( S$ore Le-end .ierar$hy o& ,ontro) E ./treme risk, immediate action re)uired Le/e) ! ELIMINATI0N .liminate the work process, material or chemical completely . 0ih risks, prioritised action re)uired Le/e) 2 S1STIT1TI0N &eplace the work process, material or hazardous chemical with a safer one M 1oderate risk, planned action re)uired IS0LATI0N "solate the person(s) from the process, material or hazardous chemical L $ow risk, actioned by routine procedures ENGINEERING Desin or re5desin the work process, material or work en-ironment. Le/e) " ADMINSTRATI0N $imit e/posure to the risk by %ob rotation, work procedure and3or pro-idin ade)uate trainin **E Bse of personal protecti-e e)uipment (PP.) Re&eren$e No2 .a'ard Ri#( S$ore 34e&ore ,ontro)#5 ,ontro) Mea#+re/,orre$ti/e A$tion Short Term 3ST5/ Lon- Term 3LT5 ,ontro) Mea#+re Le/e) o& .ierar$hy o& ,ontro) Ri#( S$ore 3A&ter ,ontro)#5 Re#%on#ib)e *er#on *ro%o#ed Date to ,om%)ete A$t+a) Date ,om%)et e 6eri&ied 4y @-ercrowdin of the desinated space $ +et up children?s area ensurin sufficient space, appropriate access, seatin etc 1o-e children?s tables for craft acti-ities > ensure e/its, thorouhfares and shel-es remain +, $e-el 3 $ 8P+ staff conductin +torytime session Daily > prior to session 1&'5+P9&152.3.1.1 'reated: 613266* ;ersion: 3 &e-iewed: 6232612 Pae 3 of ( Re&eren$e No2 .a'ard Ri#( S$ore 34e&ore ,ontro)#5 ,ontro) Mea#+re/,orre$ti/e A$tion Short Term 3ST5/ Lon- Term 3LT5 ,ontro) Mea#+re Le/e) o& .ierar$hy o& ,ontro) Ri#( S$ore 3A&ter ,ontro)#5 Re#%on#ib)e *er#on *ro%o#ed Date to ,om%)ete A$t+a) Date ,om%)et e 6eri&ied 4y accessible ,rippin o-er ob%ects Presence of forein ob%ects "n%ury with broken or ill5maintained e)uipment $ Public space re)uires fre)uent inspection and assessment 'onduct Cwalk throuhD to assess entire area for potential trip hazards, forein ob%ects, broken e)uipment etc +, $e-el 3 $ 8P+ staff conductin +torytime session Daily > prior to session 7ccess to .merency ./its, thorouhfares, ser-ices and collection compromised $ =hen mo-in furniture ensure .merency ./its, thorouhfares and access to ser-ices and collections remain clear and accessible Parents encouraed to park prams3strollers etc in desinated areas. +, $e-el 3 $ 8P+ staff conductin +torytime session Parents3 carers attendin session Daily > prior to session and durin session 1&'5+P9&152.3.1.1 'reated: 613266* ;ersion: 3 &e-iewed: 6232612 Pae ! of ( Re&eren$e No2 .a'ard Ri#( S$ore 34e&ore ,ontro)#5 ,ontro) Mea#+re/,orre$ti/e A$tion Short Term 3ST5/ Lon- Term 3LT5 ,ontro) Mea#+re Le/e) o& .ierar$hy o& ,ontro) Ri#( S$ore 3A&ter ,ontro)#5 Re#%on#ib)e *er#on *ro%o#ed Date to ,om%)ete A$t+a) Date ,om%)et e 6eri&ied 4y @-ercrowdin $ +taff awareness of fire safety limits for each Eranch +taff aware of and recei-ed trainin in .merency .-acuation procedures for each Eranch $, $e-el 3 $ 8P+ staff conductin +torytime session 7nnual and onoin trainin 'hildren?s area a safe and secure location $ 1aintain 'hildren?s area as a safe and secure location 7ccess to outside areas, ad%oinin staff areas, storae cupboards etc remain closed and locked +, $e-el 3 $ 8P+ staff conductin +torytime session Parents3 carers attendin session Daily > prior to session 'hild causin disturbance or damae $ Parents3carers are responsible for the direct super-ision of children in their care +, $e-el 3 $ Parents3 carers attendin session Daily "n%ury or damae when usin craft materials or e)uipment $ "f scissors or small craft ob%ects are used for craft acti-ities, parents3carers to ensure children are super-ised carefully. +, $e-el 3 $ 8P+ staff conductin +torytime session Parents3 7s re)uired 1&'5+P9&152.3.1.1 'reated: 613266* ;ersion: 3 &e-iewed: 6232612 Pae # of ( Re&eren$e No2 .a'ard Ri#( S$ore 34e&ore ,ontro)#5 ,ontro) Mea#+re/,orre$ti/e A$tion Short Term 3ST5/ Lon- Term 3LT5 ,ontro) Mea#+re Le/e) o& .ierar$hy o& ,ontro) Ri#( S$ore 3A&ter ,ontro)#5 Re#%on#ib)e *er#on *ro%o#ed Date to ,om%)ete A$t+a) Date ,om%)et e 6eri&ied 4y carers attendin session Note: If the risk score is not reduced to a Low (L or !edium (!" the risk assessment must #e si$ned off for appro%al #y your Super%isor #efore any work #e$ins& Date: AAA3AAA3AAA +uper-isor Fame: AAAAAAAAAAAAAAAAAAAAAAA +uper-isor +inature: AAAAAAAAAAAAAAAAAAAAAA 1&'5+P9&152.3.1.1 'reated: 613266* ;ersion: 3 &e-iewed: 6232612 Pae ( of (