&oreword

The commissioning is per'ormed a'ter the hardware installation

The commissioning ensures the ()C wor*s properly as designed

()C commissioning procedure

Commissioning ()C hardware

Commissioning so'tware loading

+eri'ying all inter'aces

+eri'ying ()C services

,ntegrating the ()C into -2000


%age. Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
(e'erences

()C Commissioning /uide


%age0 Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
123ectives

4pon completion o' this course, you will 2e a2le to5

6escri2e the procedure o' ()C commissioning

%er'orm the steps in ()C commissioning


%age7 Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
Contents
1. Introduction to RNC Commissioning
2. %rocedure o' ()C Commissioning
%age" Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
,ntroduction to ()C
Commissioning

6e'inition o' ()C Commissioning

The commissioning o' e8uipment, ()C loading, inter'aces,


and services a'ter hardware installation

To ensures that the ()C wor*s as designed

()C Commissioning %rere8uisites

%assing hardware installation acceptance and powering9on


test

At least one )ode and one set o' C) e8uipment availa2le


%age7 Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
,ntroduction to ()C
Commissioning

()C Commissioning %reparations

A- and L-T application so'tware are ready

License 'ile is ready

--L command script 'or initial con'iguration is ready


%age# Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
Contents
$. ,ntroduction to ()C commissioning
2. Procedure of RNC commissioning
%age: Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
Contents
2. %rocedure o' ()C commissioning
2.$ Commissioning ()C ;8uipment
2.2 +eri'ying inter'aces <,u2, ,u9C!, ,u9%!, ,ur=
2.. Handling Alarms 6uring ()C Commissioning
2.0 +eri'ying ()C !ervices
2.7 ,ntegrating the ()C into the -2000
2." Creating ()C !cheduled Tas*s
2.7 Chec*ing ()C Commissioning (esults
%age$0 Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
%rocedure o' ()C
commissioning

Commissioning ()C ;8uipment

!tep $ Commissioning A-

,nstall the A- application in the active wor*space

Chec* the operation o' the A- application

!tep 2 Commissioning L-T

,nstall L-T application

Connect L-T to the A-

!tart the local maintenance terminal


%age$$ Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
%rocedure o' ()C
commissioning

Commissioning ()C ;8uipment

!tep . Loading ()C so'tware and data 'ile

/enerating ()C data 'ile


> Clear the data in the A- data2ase <(!T 6ATA=
> /enerate the data 'ile in o''line state <!;T 1&&L,); ? &-T 6ATA=
DB
BAM
Format
FAM board
Reset
to load
Configuration
Management
module
MML
Configuration
command
*.dat
Configuration
console
%age$2 Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
%rocedure o' ()C
commissioning

Commissioning ()C ;8uipment

!tep . Loading ()C so'tware and data 'ile

!etting ()C loading parameter <!;T L16CT(L =

Loading ()C
> (eset ()C <(!T !@!=
> The 2oards automatically load so'tware and data 'ile 'rom the
A-
> !tart the loading progress window to monitor the loading
process
%age$. Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
%rocedure o' ()C
Commissioning

Commissioning ()C ;8uipment

!tep 0 +eri'ying the license

!ave the license in A- Active Aor*space ,nstallation


6irectoryB&T%BLicense

Activate the license <ACT L,C;)!;=

Chec* the license consistency 2etween host and A- <C-%


L,C;)!;=

6isplay the con'iguration o' license <6!% L,C;)!;=

!tep 7 +eri'ying !witchover etween Active and !tand2y


oards <!A% (6=
%age$0 Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
%rocedure o' ()C
Commissioning

+eri'ying inter'aces <,u2, ,u9C!, ,u9%!, ,ur=

The protocol structure o' terrestrial inter'aces


Transport
Networ
La!er
Transport Networ
"ser #lane
Control #lane
"ser #lane
Transport Networ
"ser #lane
Transport Networ
Control #lane
Radio
Networ
La!er
$ignaling
Bearer
#%!sical La!er
$ignaling
Bearer
Data
Bearer
Application
#rotocol
"ser Data
ALCA#
%age$7 Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
%rocedure o' ()C
Commissioning

+eri'ying inter'aces <,u2, ,u9C!, ,u9%!, ,ur=

Chec* the status o' di''erent o23ects

+eri'ying ,u2 inter'ace

Chec*ing physical lin* <6!% ;$T$, 6!% ;TH%1(T=

Chec*ing control plane <6!% !AALL)C, 6!% !CT%L)C, 6!%


,4C%=

Chec*ing user plane <6!% AAL2%ATH, 6!% ,%%ATH=


%age$" Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
%rocedure o' ()C
Commissioning

+eri'ying inter'aces

+eri'ying ,u2 inter'ace

Chec*ing management plane


> To 2e sure )ode can 2e operated at remote end

Chec*ing cell status <6!% C;LL=

+eri'ying ,u9C!, ,u9%! and ,ur inter'aces

The procedures and commands are similar with those in ,u2


inter'ace
%age$7 Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
%rocedure o' ()C
Commissioning

Handling Alarms 6uring ()C Commissioning

Clearing the alarms i' something wrong happen

+eri'ying ()C !ervices

To 2e sure ()C can provide services de'ined in license 'ile

asic services
> +oice service, C! stream service, %! service, mo2ility
management, and 1- management

&eature services
> ,nter9system handover, H!6%A service, H!4%A service, --!
service, and location service
%age$# Copyright 2007 Huawei Technologies Co., Ltd. All rights reserved.
%rocedure o' ()C
Commissioning

,ntegrating the ()C into the -2000

Creating ()C !cheduled Tas*s <2ac* up tas*s=

Chec*ing ()C Commissioning (esults


iManager
TM
M2000
DCN