Você está na página 1de 6

Gayan Rantharu Attanayake

" Maleen Nlwasa "


Kottala Poad,
Madanwala,
Hanguranketha,
Srl Lanka

Phone: (+94) 08l2 369 79l
Moblle: (+94) 0773 630 002

L Mall: rantharuQgmall.com
My Ob[ectlve

To succeed ln an envlronment of growth and excellence and earn a [ob
whlch provldes me [ob satlsfactlon and self development and help me
achleve personal as well as organlzatlonal goals.
My 8ellef

Lxperlence ls what you get when you don't get what you want
Areas cf xperience
Lnvlronment Health and Safety
Operatlons Management
Pro[ect Management
|ndustrlal Automatlon
Mechanlcal and Manufacturlng
Clvll and Steel Constructlons
Deslgn and Plannlng
Sustalnable Lnergy
PrcfessicnaI xperience and Significant Acbievements

Manager Dperaticns & Safety 8lueScope Lysaght Lanka (Pvt) Ltd. 20l2 Aprll - Present
Malntaln Hlgh safety envlronment wlthln organlzatlon and constructlon slte
|nvolve ln productlon, processlng and product dellvery actlvltles
Lnsure men and machlnes are utlllzed effectlvely and efflclently
Lnhanclng the Machlne capabllltles by dolng the development to exlstlng machlnes
Plannlng of Pactory development
|mprove the productlon capaclty by lmplementlng new machlnerles wlth the latest technologles
Pactory ard |mprovement
Organlze and plannlng the productlon staff for hlgher productlvlty
Tralnlng and development of the factory employee
|mplement of latest productlon concept to the exlstlng productlon procedure
|mprove the Lffectlveness and efflclency whlle mlnlmlzlng the wastages
Perlodlcally conductlng the safety tralnlng to all company staff
Monltorlng the energy utlllzatlon and flnd the ways to mlnlmlze the energy wastages

key Prcjects Ccmpeted

Lnergy audlt wlth an outsourced consultant and followlng up actlon plan to mlnlmlze the energy wastage
|mprove the efflclency of the exlstlng steel sheet cuttlng machlne
Deslgnlng of automated stacker unlt lmprove the productlon capaclty
Pactory expanslon pro[ect
8udgetlng and plannlng of lnstallatlon of new cold roller form machlne ln the factory
1ob rotatlon program for the factory employee
Tralnlng of factory employees for LPP system and made the process easler






20l4 1an

Assistance Manager Ccnstructicn 8lueScope Lysaght Lanka (Pvt) Ltd. 20ll 1uly - 20l2 Aprll
ngineer Ccnstructicn 8lueScope Lysaght Lanka (Pvt) Ltd. 20l0 1uly - 20ll 1uly
Malntaln Hlgh safety envlronment wlthln organlzatlon and constructlon slte
Preparatlon of lnltlal contractual documentatlon ( Contract Agreement)
Pecrultlng people and keeplng them ( Sub-Contractors)
Lffectlve pro[ect negotlatlon (Addltlonal works and varlatlons)
Uslng software tools for pro[ect management ( MS Pro[ect)
Accurate estlmatlon and cost control ( Labor allocatlon/ Loglstlc control / Payments )
Developlng pro[ect presentatlons and reports ( Dally and weekly progress report/ QAQC reports)
Personal and Pro[ect leadershlp ( Manage the staff and contractors)
Managlng rlsk and Maklng declslon ( Loglstlc lssues / Slte lssues)
Lffectlve problem Management ( Preventlve and Peactlve declslon for successful pro[ect progress)

key Prcject Ccmpeted
Oluvll ( l06 MT) Deslgn, Pabrlcatlon and Lrectlon PP8
Porelgn Mlnlstry Supply and Plxlng of roof sheetlng and accessorles
SLC Audltorlum Supply and Laylng of roof sheetlng
Colombo Dockyard Deslgn, Supply and Lrectlon of PP8
Lanka Salt ( 22MT) Pabrlcatlon and Lrectlon of roof structure
Aslan Palnts Deslgn and Supply of steel Mezzanlne structure
SLMCO ( 350 MT) Deslgn and Pabrlcatlon of Power house structures

Prcducticn and Safety ngineer 8lueScope Lysaght Lanka (Pvt) Ltd. 2008 1an - 20l0 1uly
Prcducticn
Achleve set Manufacturlng targets and performances
|nvolve ln productlon, processlng and product dellvery actlvltles
Lnsure men and machlnes are utlllzed effectlvely and efflclently
Monltor the fabrlcatlon of Pre Pabrlcated steel bulldlngs to malntaln the quallty standards and scheduled tlme

Maintenance
Mlnlmlze Machlnes' down tlme wlth proper preventlve malntenance plan
Malntaln the Pactory offlce and premlses wlthln the standard level
Appllcatlon of 5s system for a proper plant operatlon

Safety
Create and malntaln a hlgh level of safe envlronment
Develop and lmplement slte safety lmprovement plans
Provlde safety tralnlngs to the employees and malntaln tralnlng records
Manage Constructlon slte ln good safety envlronment
Provlde the safety clearance before lnltlatlng the constructlon at slte

SaIes and Prcject ngineer (uiIding ScIuticns) 8lueScope Lysaght Lanka (Pvt) Ltd 2006 1uly - 2008 1an
Supply and Lrectlon of Pre Lnglneered and Pre Pabrlcated steel bulldlngs
Develop strategles for new buslness opportunltles wlthln competltlve envlronment
|mplement new solutlons for customer satlsfactlon whlle conslderlng the crltlcal factors
Pabrlcatlon and erectlon of the steel structures as per the quallty standards
Keep the Safety Plrst envlronment whlle fabrlcatlon at the yard and erectlon at the slte
Achleved hlgh percentage from the overall team target
Completed Pre-Pabrlcated Steel Structure for Pubber Shoe factory at Ulapane |ndustrlal Lstate
Completed 200 houses low cost houses rooflng pro[ect for WcrId Visicn Lanka.
Completed pro[ect for Dcckyard PLC CcIcmbc.
Completed vocatlonal Tralnlng Centers for USAID. Thls pro[ect also for the Tsunaml affected




7empcrary Visiting Instructcr Paculty of Lnglneerlng Unlverslty of Puhuna 2005 - 2006

Conductlng of practlcal sesslons for the Thlrd year and Second year Undergraduates
Glvlng the theoretlcal knowledge wlth respect to those practlcal.
The practlcal sesslons were carrled out under Thermodynamlcs, Lnglneerlng Mechanlcs, Pluld mechanlcs
ducticn uaIificaticns
.Sc. ngineering (Hcns.) (MecbanicaI and Manufacturing) 2002 - 2006
Paculty of Lnglneerlng, Unlverslty of Puhuna,
Galle, Srl Lanka.
Student |D : PU/L/2002/03

MSc in SustainabIe nergy ngineering ( Reading ) 20l2 - 20l4
KTH Poyal |nstltute of Technology
Stolkholms
Sweden
Student |D : 800702A978

MSc in IndustriaI Autcmaticn ( Reading ) 20l3 - 20l5
Paculty of Lnglneerlng
Department of Llectrlcal
Unlverslty of Moratuwa
Student |D : l28802T

Career DeveIcpment Activities
Completed the workshop conducted by Nikini Autcmaticn on Siemens S7 - 300 S7P 7 on 7
th
- ll
th
Aprll 20l4

Partlclpated tralnlng program conducted at 7ataIueSccpe SteeI at biwadi India on operatlons
Management 1une 20l3

DipIcma in MecbanicaI CADD. Conducted by DS7 CADD Centre, Colombo ( October 20l0 - March 20ll)
workshop on PubIic Speaking and usiness tiquette. Conducted by kent Ridge on 5
th
1une 20l0

Partlclpated for tralnlng program conducted at 8lueScope Lysaght Malaysla. Thls tralnlng program was held to traln
the Lnglneers to deslgn Pre-Lnglneerd steel bulldlngs, llght welght steel structures and manufacturlng process from
start to flnal completlon. ( 26 1uly - l August 2009)

|ntroduced a New concept for 8lueScope Lysaght Lanka (Pvt) Ltd to fabrlcate Ligbt Weigbt and Lcw Ccst SteeI rccf
frame system. Thls system already belng done ln other countrles but new to our country (2009)

Made Presentatlons and small workshop to the 8lueScope Lysaght Lanka (Pvt) Ltd employees and the lndustry to
make them understand thls new steel bulldlng solutlons

Member of Safety Commlttee Meetlng at 8lueScope Lysaght Lanka (Pvt) Ltd

Successfully completed Customlzed Dutdccr PrcfessicnaI DeveIcpment (CDPD) conducted by
kent Ridge (Private) Limited (2009)

Tralnlng Program on Prcducticn and Dperaticns Management conducted by Department on Management of
Technology, University cf Mcratuwa ( August 2008)

Partlclpated for Arcbitecture and uiIding xbibiticn (AX) Maldlves organlzed by
MCS (MaIdives xbibiticn and Ccnference Services). (7-9 May 2008)





Completed a Certlflcate course ln Micrc ccntrcIIer Prcgramming 7ecbncIcgy at ranteI Lanka (Pvt) Ltd. (2007)

Successfully completed four days of Prcject Management 7raining ln Colombo, Srl Lanka for
Aslan 8&MM 8uslnesses, conducted by IueSccpe SteeI Sri Lanka (2006)

Attended the workshop "InteIIigent Systems" conducted by I Sri Lanka Secticn (2005)
Assoclate Member - |nstltutlon of Lnglneers, Srl Lanka (ISL)

Awarded Certlflcate of Proflclency as Skllled Craftsman ln the trade of Computer Appllcatlon Asslstance, conducted by
NAI7A Srl Lanka. (2000)

IndustriaI 7raining

CentraI Industries L7D (NaticnaI PVC) 2004 1anuary - 2004 March
|ndustrlal Automatlon
Pneumatlc Systems
Quallty Control

Lanka Asbck LeyIand L7D 2005 March - 2005 May
Automoblle Lnglneerlng
Malntenance
Organlzatlonal 8ehavlor
Hands on experience in automobile repairing and maintenance

Undergraduate Prcject

7bird Year Prcject Design cf a Pneumatic System
Appllcatlon of Pneumatlc and Hydraullc systems ln manufacturlng lndustrles.
Lnhanclng the output and efflclency to the overall productlon cycle by applylng automated systems

FinaI Year Prcject Design cf an Autcmated 7rimming Macbine fcr garment industry
Deslgnlng of a machlne to cut slmllar length of pleces automatlcally
Deslgned the machlne uslng CAD related software ( Pro/LNG|NLLP)
Applled a pneumatlc system to operate the system
Applled a mlcro controller system to synchronlze the system
Programmed the system as per the slgnal from the sensors and requlred tlme lntervals
Slmulatlon of the system

Ccmputer ased SkiIIs
Auto CAD
Solld works
Pro Lnglneer
Slamatlc
Proteus 8 Professlonal
STAAD Pro
wlnCC
Surf CAM
MATLA8
PLC Programmlng and Automatlon
CAD/ CAM Software
MS word




| hereby certlfy that above partlculars glven by me are true and correct to the best of knowledge.
ours Truly,
Peferee

CLng. K. 8alachandran
Managlng Dlrector
v.K.8. Lnglneerlng Consultants (Pvt) Ltd.,
No. 06. Pohlnl Poad,
Colombo 06,
Srl Lanka


Tel : (+94) 0777666l49
Pax : (+94) 0ll27l7604
L-mall: vkbenglneerlngQsltnet.lk


Lng. Sa[eewa 1ayawardana
Malntenance Manager
Trelleborg Lanka (Pvt) Ltd,
Levln Drlve,
Sapugaskanda, Makola,
Srl Lanka.

Tel : (+94) 07739l4442
Pax : (+94) 0ll4829409
L-mall: sa[eewa.[ayawardenaQtralleborg.com

Gayan Pantharu Attanayake


Lng. 1ayantha Samarakoon
Pro[ect Dlrector
South Lastern Unlverslty Development Pro[ect,
Mlnlstry of Hlgher Lducatlon,
No. l8, ward Place,
Colombo 7
Srl Lanka.

Tel : (+94) 07777l2783
Pax : (+94) 0ll2697239
L-mall: [aasQkth.se



Lng. Puchlra Abeyweera
Program Coordlnator
SLL worldwlde MSc Programme,
Paculty of Lnglneerlng Technology,
The Open Unlverslty of Srl Lanka,
Nawala, Nugegoda
Srl Lanka.

Tel : (+94) 07l6853609
Pax : (+94) 0ll2436858
L-mall: ruchlraQkth.se

PerscnaI PrcfiIe
Name ln Pull : Attanayake Mudlyanselage Gayan Pantharu Attanayake
Tltle : Mr.
Date of blrth : 02
nd
1uly l980

PerscnaI Interest
Muslc
Chess
Crlcket
Gardenlng
Apr 22, 20l4
Dear Slr




| graduated from Paculty of Lnglneerlng Unlverslty of Puhuna ln the fleld of Mechanlcal and Manufacturlng. | have seven
years of lndustrlal experlence ln the flelds of Mechanlcal , Automatlon, Pro[ect Management, Manufacturlng and
Marketlng.

At the moment | am employlng ln a Multlnatlonal Steel Company as Manager- Operatlons and Safety. | am handllng 25
permanent employees and 30 contract labors. My task ls to achleve the glven target whlle malntalnlng the all other cost
ln a glven benchmark. My duty lnvolves Safety, Productlon, Schedullng, |nventory control, Paw materlal forecast, Machlne
malntenance, tralnlng and Development of the employee, etc. |n-between, | am carrylng out pro[ect to lmprove the
productlvlty of the company. | carrled out an energy audlt, whlch help to reduce unnecessary electrlclty blll by
lmplementlng a capacltlve bank. | lmplemented an automated steel sheet stacklng machlne whlch helps to reduce one
labor from a partlcular roll form machlne. | tralned factory employee to handle the Tally system whlch help to reduce the
stock lssues.

As an Asslstance Manager- Constructlons, | was lnvolvlng wlth several steel bulldlng pro[ects slmultaneously. The pro[ects
are based on Deslgn, Detall, Pabrlcatlon, Supply and Lrectlon of Pre-Pabrlcated steel structures. So my lnvolvement ls to
malntaln proper flow on the each stage from Start to Lnd. | have completed and handed-over several pro[ects wlthln the
constructlon lndustry.

| have employed ln the same company as Safety and Productlon Lnglneer. | gave my fullest support to develop the
productlon capaclty. Malntalnlng machlnery lnslde the plant by reduclng the breakdown and lmprove the productlon
capaclty whlle keeplng the good safety envlronment ln the factory premlses was my key focus wlth my employment.

|n my lndustrlal pro[ect | have done a pro[ect at Ceylon Dockyard PLC. The pro[ect ls to deslgn and lnstallatlon of moblle
sheds for shlp repalrs. | have deslgn the steel structure and the electrlcal movlng machlnery whlch flx on to the steel
structure.

At the moment | am followlng MSc course ln |ndustrlal Automatlon conducted by Unlverslty of Moratuwa and MSc ln
Sustalnable Lnergy Lnglneerlng conducted by Unlverslty of KTH Sweden. These courses help me to lmprove my
knowledge on Automatlon technologles and Lnergy fleld.

| have a sound knowledge ln Mechanlcal Deslgn uslng computer alded software. | have followed a Dlploma ln Mechanlcal
CADD course whlch has glven me a solld background on Mechanlcal deslgn ln 3D envlronment. | have studled Plnlte
Llement Analysls method and Slmulatlon whlch wlll be beneflclal for my future career.

| hope my callber wlll be good enough to apply for thls vacancy. The knowledge and experlence what | have, wlll be
surely benefltted to your company.

ours Slncerely

Gayan Pantharu Attanayake

APPL|CAT|ON POP THL POST OP ASS|STANT PPODUCT|ON MANAGLP

Você também pode gostar