Float type switches shall be checked by manually operating the float mechanism. Switches shall be set to the specified value using the appropriate method of process simulation. Temperatures up to 600 Deg. C / 1112o F shall be simulated using a pneumatic calibrator and thereafter by a fluidised bath.
Float type switches shall be checked by manually operating the float mechanism. Switches shall be set to the specified value using the appropriate method of process simulation. Temperatures up to 600 Deg. C / 1112o F shall be simulated using a pneumatic calibrator and thereafter by a fluidised bath.
Float type switches shall be checked by manually operating the float mechanism. Switches shall be set to the specified value using the appropriate method of process simulation. Temperatures up to 600 Deg. C / 1112o F shall be simulated using a pneumatic calibrator and thereafter by a fluidised bath.
Float type switches shall be checked by manually operating the float
mechanism. Vendor Manuals and test procedures Vendor Manuals and test procedures TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE A6 Level Switches : Displacement type switches shall be tested in position using water as a test medium. Particular attention shall be paid where the specific gravity of the process medium is different to that of water. Vendor Manuals and test procedures Vendor Manuals and test procedures RE-TEST DATE A Pre- Loop Check - Works Inspection A5 Temperature Switches: Temperatures up to 600 Deg . C / 1112 F shall be simulated using a pneumatic calibrator DB-700A block calibrator and there after by a fluidised bath. ITEM No. SAEP-16 Sec. 4.1.13 Vendor Manuals and test procedures PASS A3 The operation of the switch contacts shall be checked using a continuity tester. Vendor Manuals and test procedures Switches shall be set to the specified value using the appropriate method of process simulation. Vendor Manuals and test procedures A9 The results shall be recorded and the switches colour coded. Vendor Manuals and test procedures A4 SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER Instrument Loop- Inputs- Transmitter Circuit Test PROJ ECT TITLE A8 Both making and breaking values of the switch contacts shall be recorded. Where the switch has a differential gap setting, this shall be checked against the respective data sheet. A7 A2 Pressure Switches: Pressures up to 7 Bar / 101.5 PSIG shall be simulated using a pneumatic calibrator and thereafter by a deadweight tester. A1 Ensure that actual field installation is completed in all aspects . WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR SATR-J-6502 1-Oct-05 INST PLANT NO. EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO. TRAVEL TIME SAUDI ARAMCO USE ONLY SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED? SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL Page 1 of 4 17. CONCLUSIONS Notes: a. Indicate in 1 report all instruments of a skid tested and passed . b. Rejected items should be listed in another report, unless they were corrected within the calibration period. c. Instruments repaired shall be indicated "Repaired and Accepted" in the test report. RESET 4 SET 4 RESET 3 SET 3 RESET 2 SET 2 Switch Point Input Value Operating value RESET 1 17. Test Equipment S. No and Calibration details 18. Test Procedure -Switch / Pulse Circuit ( Pressure / Temperature / Level / Float) Switch Loops: a) Check and verify the DCS configuration for applicable points. b) Simulate the contact operation (Make/Break) at the switch terminal block and verify the status in the DCS/ESD. However, ESD switch case actual pressure simulation to be provided. c) ESD hand switches, Start / Stop, Open / Close hand switches shall be checked by operating the switch mechanism. Calibration of Switches: 1. Switches shall be set to the specified value using the appropriate method of process simulation. 2. The operation of the switch contacts shallbe checked using a continuity tester. 3. Pressure Switches: Pressures up to 7 Bar / 101.5 PSIG shall be simulated using a pneumatic calibrator and therafter by a deadweight tester. 4. Temperature Switches: Temperatures upto 600 Deg . C / 1112 Fshall be simulated using a pneumatic calibrator DB-700A block calibrator and there after by a fluidised bath. 5 Level Switches : Dispalcement type switches shall be tested in position using water as a test medium. Particular attention shall be paid where teh specific gravity of the process medium is different to that of water. 6. Float type swtiches shall be checked by manually operating the float mechanism. 7. Both making and breaking values of the seitch contacts shall be recored. Where the switch has has a differential gap setting, this shall be checked aganist the respective data sheet. 8. The results shallbe recorded and the switches colour coded. 16.RESULTS ITEM No. TEST RESULTS ACCEPTANCE CRITERIA REFERENCE N/A RE-INSP DATE PASS FAIL N/A RE-TEST DATE 16. Calibration Record and Test Equipment Model ITEM No. ACCEPTANCE CRITERIA PASS FAIL SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR Instrument Loop- Inputs- Switch / Pulse Circuit Test SATR-J-6502 1-Oct-05 INST Error SET 1 Page 2 of 4 ITEM No. TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR Instrument Loop- Inputs- Switch / Pulse Circuit Test SATR-J-6502 1-Oct-05 INST 5. SAEP-1636 Installation and Checkout Plan , 28 February, 2005 6. SAEP-1638 Site Acceptance Test Plan, 30 April, 2002 1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), J uly 1993 2. Schedule Q -- Quality Requirements (Pro Forma Contract), November 2003 3. SAES-J -901, Instrument Air Supply Systems, 30 J une 2003 4. SAEP-16- Project Execution Guide for Process Automation Systems,31 May 2003 After successful completion of each calibration, the instrument shall be marked with a colored label bearing date of the calibration and the initials of the witnessing party The color code shall be as follows: Blue- Pre Calibration Tested. Yellow - Installed & Pressure Tested. Green- cables or tubing tested. Red- Loop Check completed. 4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization Work Verified Saudi Aramco with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the PMT Representative T&I Witnessed QC Record Reviewed Name, Initials and Date: Witnessed Test Work / Rework May Proceed Name, Initials and Date: 2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling). 3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified QC Inspector PID Representative indicates compliance with appropriate standards or performance in a specified manner. Technician Performing Test* Name, Title, Department, Company, Initials and Date: Test Performed Successfully and Results are Acceptable: Name, Initials and Date: REMARKS: Attachment -1 Instrument Loop Check sheet NOTES: QC Supervisor Proponent and Others Contractor / Third-Party REFERENCE DOCUMENTS: 1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID). T&I Witnessed QC Record Reviewed Name, Sign and Date: Quality Record Approved: Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified Work Verified Y =YES N =NO F =FAILED *Person Responsible for Implementation of Test and Analysis of Results Page 3 of 4 Unit No.: System No.: Loop No. Loop Dwg. No.: DCS INSPECTION PERFORMED POINTING TAG YES NO N/A POINT DESCRIPTION YES NO N/A POINT CONFIGURATION YES NO N/A POINT RANGE ( YES NO N/A INPUT / OUTPUT FUNCTION YES NO N/A CONTROLLER ACTION ( YES NO N/A SCHEM. & ASSOCIATED GRAPHICS ( YES NO N/A ALARM (LL) YES NO N/A ALARM (L) YES NO N/A ALARM (HH) YES NO N/A ALARM (H) YES NO N/A DCS / FIELD INSPECTION PERFORMED MOTOR CONTROLS / SWITCHES / MOV'S / AOV'S GAS DETECTOR RESET ON BY PASS OFF ON / START RUNNING OFF / STOP STOPPED OPEN OPEN CLOSE CLOSE STOP CMDIS SIMULATION RESULTS TAG NO. : VALVE TAG NO.: SWITCH TAG NO. : PROCESS INPUT RANGE : SWITCH SET POINT : SWITCH ACTIVATES AT SWITCH ACTION AT SET POINT SWITCH RESET AT 25 25 0 0 75 75 50 50 75 75 100 100 25 25 50 50 INPUT TO DCS TRAVEL 0 0 INPUT OUTPUT (PPM/LEL) INPUT % PROCESS OUTPUT INPUT % VALVE SWITCH FUNCTION RESULT GAS DETECTOR NO.: YES NO N/A YES NO N/A SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER Instrument Loop- Inputs- Switch / Pulse Circuit Test COMMANDS INDICATION SATR-J-6502 1-Oct-05 INST Attachment 1-: INSTRUMENT LOOP CHECK SHEET Page 4 of 4