Slide 1

Key Considerations for a Successful


Hyperion Planning Implementation
Edgewater Ranzal
UK Division
Mike Killeen
Vice President, Oracle Ace
&
Mija Deering
Principal Solutions Manager
UKOUG EPM & Hyperion Conference 2011
Slide 2
KEY PROJECT PHASES
RECOMMENDED BUILD TECHNIQUES
Application Definition & Plan Type Delineation
Define Dimensionality
Master Data & Data Integration
Building a Planning Model
Development of Forms
Development of Calculations
Process Flow / Control
Define Security
Tuning, Optimization & Maintenance
Typical Customization
TEN ELEVEN PLANNING TIPS TO REMEMBER
Agenda
Slide 3
Focus
Services
People
Methodology
Customers
Partnership
About Edgewater Ranzal
15 Years
700+ clients
1000+ projects
Slide 4
Rolled out Planning?
Pre System 9
System 9
Fusion
11.1.1.x
11.1.2.0
11.1.2.1
In the midst of a Planning project?
About to embark on a Planning project?
Are IT or Finance Professionals?
Quick Audience Poll
Slide 5
Key Project Phases
Slide 6
Ranzal Project Lifecycle Overview
Proposal &
Statement of Work
Kick-Off, Logistics,
Coordination & Plan
Manage schedule, scope, issues, risks, cost &
resources status reporting
Successes &
Lessons Learned
Project Planning & Management Approach
Pre-Engagement Project Initiation Project Execution Project Closure
What & How to
Deploy
Install, Configure &
Unit Test
Infrastructure,
System Integration &
Acceptance Testing
Training,
Documentation &
Knowledge Transfer
Implementation Approach
Design Build Test Rollout / Sustain
What is Wrong,
Right & Needed
Analyze
Define the
Change and
How to Manage
Define Future
Organization and
Understand Impact
Prepare for the
Change
Facilitate the
Change
Change Management Approach
Assess/Design Build Deploy Monitor Plan/Scope
Focus Points
Multiproduct
Experience
Knowledge
Transfer
Performance
Benchmarking
Understand
Priorities
Flexible
Approach
Modular
Scope
Prototyping
Leverage
Prior Work
Monitor the
Results
Slide 7
Typical Implementation
NEEDS AND
REQUIREMENTS
ANALYSIS
PLAN AND
DESIGN PHASE BUILD PHASE TEST PHASE
GO LIVE AND
ROLLOUT SUPPORT
CUSTOMIZED
TRAINING
Current state and
stakeholder needs
analysis
Identify process,
system, and
organizational
components
Define a project
roadmap
Determine
optimal level of
detail and
structure
Design docs
Detailed work
plan with
deliverables
Construct
templates and
models
Report / dash-
board build-out
Prototype
reviews
Develop data
interfaces
Upload test data
User validation
Calibrate models
Document final
process, system,
org
Develop easy to
use reference
guide
Develop custom
training and
exercises
Deliver user
training
Review Go Live
Checklist
Move solution
into production
Provide on-site
support
Semi-annual
audits and
process/model
reviews
Slide 8
Analyze
Requirements unknown or undefined
Existing business processes need to be
updated
Existing business processes not known or
documented
Desire to re-engineer to align with
business vision or industry best
practices
Deliverables
As-Is vs. To-Be Processes
Functional Requirements
Technical Requirements
Project Roadmap & Timeline (High Level)
Design
Key requirements are understood
Future business processes are
known
Basic understanding of technology
being used for build
Deliverables
Design Document
Proof of Concept / Prototype *
Infrastructure Architecture
Finalize Scope, Schedule & Budget
Project Strategies (Training, Testing,
etc)
Analyze vs. Design
Slide 9
Planning
Align Strategic & Operational Plans
Top Down and Bottom Up Planning
Leveraging Driver Based Planning
Focus on the Right Areas Materiality vs. Volatility
Reduce Cycle Times
Leverage Rolling Forecasting Processes
Reporting
Implement Reporting Governance Organization
Clearly Define Reporting Standards, Processes, Tools, and
Responsibilities
Establish Single Source of the Truth by Report Type
Provide Drill-Through Capability
Planning Leading Practice:
Does it improve productivity?
Does it make us more accurate?
Does it improve decision making
through greater insight?
Leading Practices in Analysis What Should We Do?
Slide 10
What We Deliver Scope & Quality
Functional Requirements
Performance & Technical Requirements
Maintenance Requirements
Support Requirements
Prioritization of All of the Above
What it Costs Budget & Timeline
Timeline Impact
Resource & Cost Impact
Appetite for Risk & Appropriate Factors
Maximize Value!
Value = Num/Den
Numerator What We Deliver
Denominator Time & Cost
Leading Practices in Design How Should We Do It?
Slide 11
LACK OF AVAILABLE MASTER DATA & DATA
Clients often underestimate the effort required to source and validate data and master
data, and this is a frequent reason for project delays
The level of effort must be aligned with the quality of data, number of data sources,
and degree of change (e.g., new COA)
LACK OF RESOURCES
Technical It is critical to identify the administrators of the new systemearly on, and
ensure they are properly trained for rollout
Functional - Clients sometimes do not dedicate enough resources to the project effort
as the project is viewed as simply a technology implementation
LACK OF CLARITY OR CONSISTENCY IN BUSINESS PROCESSES
Planning systems by their nature attempt to predict the future. Clients sometimes have
difficulty identifying which disparate elements of their planning process should go into
the application, particularly if different areas of the organization have different models.
Defining what should NOT go into the model is as important as determining what goes
in (particular impact on Global Planning implementations)
Planning Implementation Risks
Slide 12
Phase 1 Focus on Scope and Push the Limits on Performance
Phase 2 Scale Back on Scope to enable better performance
Phase 3 Techniques and Technology Shift the Curve to support both
Tradeoffs in a Sample Project
Tradeoffs in a Sample Project
Slide 13
Clearly Defined and Communicated Project Goals
Key Stakeholder Participation and Approval
Finance and IT Involvement Throughout Entire Project
Clearly Defined, Reviewed, and Approved Application Design
Ownership and Accountability for Project Tasks
Thorough Quality Assurance and Testing
Communication of Company-wide Benefits
Proper Administrator and End User Training
Consistent Project Management
Critical Success Factors
Slide 14
Planning Design
Recommended Practices
Slide 15
Application Definition
Delineate Plan Types
Define Dimensionality
Master Data Integration
Data Integration
Building a Planning Model
Development of Forms
Development of Calculations
Process Flow / Control
Define Security
Basic Build Approach
Slide 16
Types of Applications
G&A Expenses
Cost Centers
Cost Allocations
Driver Based
Salary / Labor
Employee
Position
Variable vs. Fixed
Margin
Product / LOB
Customer / Segment
Capital
Asset Category
New vs. Existing Capital
Integrate w/ Source Capex
Project
Internal / External Projects
Resource Allocation
Balance Sheet / Cash Flow
Full Financials
Intercompany / Consolidations
Key Drivers, I/S Integration
Sales Pipeline
Sales Reps
Customers
Integration with CRM
Long Range / Strat Plans
Integrate w/ AOP / Forecast
Driver Based
Initialization of Future AOP
Slide 17
SINGLE APPLICATION BENEFITS (up to 3 Custom Plan Types + WFP/FACP)
Master Data is shared across an application
Common Versioning, Scenarios between plan types
Business Rule Efficiency within same app (XREF & XWRITE)
Shared Interface for forms and rules between plan types
Leverage common set of task lists, right click menus, smart lists, and personal
variables
MULTIPLE APPLICATION USE CASES
Common for separate operating units w/ disparate planning processes
Allows for distinct processing windows
US vs. Intl
Security Financials vs. Salary Detail
Planning doesnt support asymetrical security models
Ran out of plan types
Separate Workflow Processes (e.g. Geography vs. Functional)
PLANNING vs. ANALYSIS
Application Definition
Slide 18
WHAT ARE THE CAPEX / WORKFORCE MODULES?
A set of pre-built forms, rules, and menus for planning Salary and Capital
expenditures.
Pre-built functionality fully customizable
Out of the box functionality to calculate:
WFP Salaries, Payroll Taxes, Benefits, etc. Based on attributes associated with
the employee.
Capex Depreciation, Capital Spending by Asset Categorization.
EXPECTATIONS
No one will use the modules out of the box without any customization.
Key is to use out of the box functionality with the right blend of customization.
Expected customization includes:
Updating Smart List attributes for use within an organization
Modification to forms / rules to allow for budget & forecast processes that
converge.
Updating Master Data Employees, Asset Category, etc.
Adding a requisition number input field
Application Definition
Slide 19
WHEN DO I NEED A NEW PLAN TYPE
A model needs a different set of dimensionality
Revenue modeling for the organization is done by product and customer
Salary modeling is done by employee and position
Project Planning is done by Project Number
Capital modeling is done by asset classification
Inter-dimensional Irrelevance
Does my Core GL plan type need Product, Employee and / or Project #?
Impacts performance of forms, business rules, and reports.
Want to minimize number of stored dimensions for each plan type.
IMPACTS OF A NEW PLAN TYPE
Data Movements between Plan Types
Additional Essbase Cube to optimize
Master Data & Data Integration Considerations
Delineate Plan Types
Slide 20
DIMENSION
Stored hierarchies within an application
Core Accounts, Entities, Time, Years, Scenario, Versions
Revenue Core + Product, Customer, Sales Person
Capital Core + Asset Category, Project
Salary Core + Employee, Position
ATTRIBUTE
Associated with a base dimension
A dimension member can be associated with a single attribute member
from an attribute dimension.
Slowly Changing Attributes future
Examples
Start Date (Employee)
Address (Customer)
Brand (Product)
Growth, Productivity, Maintenance (Project)
Define Dimensionality
WARNING!
Attribute Limitations
No Security
Limited Selections
Limited Reporting
Performance
Slide 21
SMART LIST
A member in an outline (often an account)
that is represented as a drop down within
the data grid.
Smart Lists can be used to drive business
rules
Smart Lists cannot be sliced and diced like
dimensions *
Smart Lists can be reported on within
Hyperion Reports
Stored as numeric value in Essbase
Textual Value show in Planning Forms
Can be predefined in Essbase
Smart Lists No adapter, load right to
tables or use outline Load Utility
(depending on release level)
Define Dimensionality
Slide 22
DATA ELEMENT (TEXT / DATE)
Allow user to input text and date directly
into a cell in Planning
Can leverage in Hyperion Reports
Text stored as numeric lookup relationally
HSP_TEXT_CELL_VALUE
Date stored as number 20090101
Can be predefined in Essbase
No adapter, load right to tables or use
OutlineLoad Utility (depending on release
level)
Define Dimensionality
Slide 23
MASTER DATA MANAGEMENT VS. ETL TOOLS
They are not the same thing
A Master Data management tools provides you with a graphical interface to manage your Master
Data across disconnected applications.
An ETL tool moves data from one place to another
MASTER DATA MANAGEMENT TOOLS
EPMA
Essentially DRM for EPM Applications, w/additional deployment capabilities
Ability to synch Planning, HFM, HPCM & Essbase dimensions across multiple
applications
V11 More Stable (although not for Essbase)
Update via Interface Tables ETL, or Flat File
EPMA File Generator Creates ADS Files
DRM
Full blown Master Data management tool
Supports Master Data management across any toolset Hyperion, ERP, etc.
Agnostic read from any source, write to any source
Does not have adapters to source / target systems
Flat file extracts created from DRM to load into Planning
Master Data Integration
WARNING!
Planning vs. HFM
Entity Legal vs. Mgmt
Structure Version CY vs. NY
Slide 24
ETL TOOLS
ODI
HAL Replacement
Limited Use ODI Bundled with EPM toolset
Planning must be a source or target to use
Relational Staging Repository for work
ELT Extract, Load and Transfer Tool
DIM/Informatica - Near End of Life
Adapters that connect directly to Planning
Additional Licensing Costs
For Informatica shops
Functionally very similar to ODI
HAL - End of Life
Not an option for new clients
Still works in 11X for legacy clients
OTHER UPDATE METHODS
Outline Load Utility
Manual Update
SQL into EPMA Interface Tables & Batch Client
Master Data Integration
Slide 25
SOURCES
General Ledger Oracle EBS, Peoplesoft, JDE, SAP R/3, Lawson
Payroll Peoplesoft, Oracle, SAP, Ceridian, Lawson HRIS
Fixed Assets Oracle, Peoplesoft
Project Tracking Oracle Project, Peoplesoft, JDE
Billing System
Order Management
EDW
Manual Load File
INTEGRATION OPTIONS
Essbase Load Rules
SQL Interface
Flat Files
Outline Load Utility
FDQM
With or without ERPi
ODI / DIM / HAL
ETL Tools, use when there is heavy file manipulation
Data Integration
Slide 26
KEY CONSIDERATIONS
What data is needed to facilitate input?
What data needs to be collected from end users?
Are there supporting drivers that must be input?
Are there calculations that need to be processed before input?
Read vs. Write on data form elements
Are there calculations that need to be processed after input? Before
Input?
Are the inputs and calculations consistent globally?
TIPS
Break the process into steps if possible
Use menus or task lists to drive navigation
Simplify the user experience, provide tools to facilitate navigation
Try not to clutter and overcomplicate a form
Be conscious of release level impact on Smart View vs. Web
Building a Planning Model
Slide 27
PERFORMANCE
Balance performance with functionality
Load Performance 3 seconds or less
Save Performance 3 seconds of less
Hone business rules
Focus on fewer blocks FIX (Entity), FIX (Scenario, Version)
Dont calculate more than you need to
Balance form calculations with an hourly sweep
Poorly performing business rules can stack up and kill Essbase performance
PERFORMANCE TIPS
Suppress Missing Rows vs. Suppress Blocks
Rows vs. Columns vs. Page
Isolate Performance Issue Form vs. Rules
Query Issue Size or Poorly Designed Essbase Cube?
Block Size Balancing Act Query vs. Calculations
Latest Release calculations on Forms
Development of Forms
Slide 28
DESIGN TIPS
Large Sparse Dims on Rows (Improvements to GUI in Talleyrand)
Turn on Attribute Display and Impact on Suppress Missing Block
Show member formulas
Development of Forms
Slide 29
DESIGN TIPS
Startup Message to Guide Blank Forms
Column Definition
Drivers & Commentary in BegBalance Member
Data Values in IDESC (YearTotal)
Development of Forms
Slide 30
Use Flag Members to drive form layout
Smart List to drive Flag
UDAs to drive form definition
Flag Member Set flag based on UDA definition and Smart List Selection
Development of Forms
Slide 31
Simple Form
Enhanced Forms
Development of Forms
Slide 32
Composite Forms
Grid 1 General Information
Grid 2 Data Collection
Development of Forms
Slide 33
Control Navigation with a Menu
Development of Forms
Slide 34
TIPS & TRICKS
Calculations & Forms Should be Developed in Tandem
Robust Essbase Calculation Library
Calculation Manager
Graphical Web Based Rules Builder
Pre-built Templates
Requires EPMA Integration (Talleyrand support for Classic)
Ability to Convert HBR to CM Rules
Alternatives to Drive Calculations
Member Formulas
Business Rules / Calc Manager Rules
Essbase Member Calc Formula
Development of Forms
Slide 35
Essbase Member Formula
Simple Member Calculation
Dependencies - Outline Order Important
Calculations that dont require user input
Calculations dont require moving data between plan types
Can be run upon save of form Calc members on form
Development of Calculations
EXAMPLES
Ratios
Metrics
Modeling
TIP
Create Calc Mbrs
Put All Logic in
One member to
Eliminate order of
Operation issues
Slide 36
Business Rules
Allow for user input to the rule
Allow for passing through variables from the form to the rule
Multiple Members Calculated Upon Form Save with Dependencies
Can be launched on save, or from a right click menu
Typically more procedural than member formula
Leverage BR to move data between plan types @XREF or @XWRITE
Development of Calculations
Examples
Data Movement
Aggregations
Currency Conv.
Allocations
Eliminations
Slide 37
Essbase Member Calc Script
Write multiple member formulas in an Essbase member
Place member on form, and hide
Allows for procedural member formulas ala Business Rules
Run on save of form
Cannot allow user input to calc
Cannot move data between plan types
Development of Calculations
Slide 38
DESIGN CONSIDERATIONS
Minimize Calculations
Run Time Prompts Align w/ Page
IALLANCESTORS (RTPs) to aggregate instead of CALC DIM
Beware Run on Save / Load
Launch Rules from Right Click Menu
Sequences
Calculation in Current Plan Type
XREF Data to Core Plan Type
XREF Dangers
Slow across applications
Create Block Issues
Create Blocks in Business Rule
Schedule hourly sweep to catch any issues DATAEXPORT
Use new @XWRITE feature (push vs. pull)
Currency Conversion Limitations
Rates stored High (impact on block size)
Manual Input of Rates (or use Outline Load in 11.x)
Pros Entity has requirement to plan in different local currencies
Development of Calculations
TIP
Key Commands
@RELATIVE
@IALLANCESTORS
DATACOPY
Slide 39
Form / Folder Organization
Logically name forms and folders (use numbers)
Order based on Steps
Right Click Menus
Jump to other forms
Launch Rules
Launch Reports
Task Lists
Guide user through a task list
User can check off items as they complete
Review completed vs. outstanding tasks
Workflow
Being rewritten due to current limitations
Targeted for Talleyrand (next release)
Process Flow/Control
Slide 40
PROCESS
1. Setup Groups & Users in Shared Services
2. Assign Access in Planning & Workspace
3. Push Security to Essbase
SETUP USERS & GROUPS IN SHARED SERVICES
Define Groups
ALL_PLANNING_GROUP - Handles basic provisioning tasks Version, Scenario, Accounts
ENTITY_PLANNING_GROUPS - Most detail security occurs along the Entity dimension
FUNCTIONAL_PLANNING_GROUPS - In charge of a functional area for example margin detail
Assign Users to Groups
PITFALLS / SUGGESTIONS
Groups within Groups (based on release level)
AD Groups vs. Planning Level Groups
Form Security Read vs. Write
11X Apply Security to Folders
Define Security
Slide 41
Basic Planning Access
Planner Key role for input users
View User Read only user to planning content
Interactive User Create / Delete Forms
Mass Allocation Use the mass allocate features
Analytic Services Write Access
Direct write back to Essbase
Limitations with Period/Yr & Workflow
Essbase Access
Server Access Connectivity to server
App / DB access
Workspace Access
Shared Services
Slide 42
CSS Import Export
Use to bulk upload users / groups to Shared Services
Provision a few sample users, export them to expose the format, application, project, and
role names
Also used a lot in migrations from Pre-System 9
Create a bulk import
Automate Build & Backup of Planning Security
Export - HspExportSecurityCmd
Import - HspImportSecurityCmd
Security Utilities
Slide 43
NOTE: All optimization techniques focus on either volume or time. However, the
business usually mandates the time and the volume and IT will work to meet the
required rate.
Optimization
- MINIMIZE the time it takes to perform a specific
operation.
Rate = Volume/Time Time = Volume/Rate
or
Decrease Volume (do less) Increase Rate (do it faster)
What is Optimization?
Slide 44
Retrieval
Time:
Assumption: Essbase retrieval is FAST so focus on calc optimization
- Trade Off -
Finding the Balance is the KEY!
Testing early on with a realistic data set is on the
critical path for every project in order to assess and
validate this balance
Calc
Time
Usage of Attribute
Dimensions
Dense/Sparse
Configuration to support
calculations
Dynamic Calcs
Allocation of Memory to
Caches
Transparent Partitions
Optimization Priorities Balance Query & Calc
Slide 45
Optimize Outline (BSO)
Block Size Impact on Calcs vs. Reports
Larger Blocks typically faster calcs
Smaller Blocks typically faster reports
Outline Order Impact on Calcs vs. Report
Other Techniques
Transparent Partitioning and @XREFs minimize data
Tuning Parameters CALCLOCKBLOCK and Data Cache
Dynamic Calcs implement best practices (defined later)
Sample Application Optimization Techniques
Slide 46
Dynamic Calc Usage
OUTLINE
METRICS
Dollars
Nbr Employees
Avg $ Per Employee (formula)
YEAR
QTR 1
Jan
Feb
Mar
Scenario
Actual
Budget
PctVar
Product
Prod1
Prod2
Prod3
Upper Level Members of Dense Dimensions
Level Zero Members with Formulas
Two Pass Members
Upper Level Sparse Dimension Members with a Few
Children
Typical Dynamic Calc Usage
Slide 47
For Dense Dimensions, keep Number of Children to a parent < 100 if
possible (avoid flat lists)
For Sparse Dimensions, keep number of children to a parent < 7, and
avoid multiple levels of dynamic calc if possible
Great idea for 1 to 2 level small sparse dimensions
Avoid dynamic calculation commands that will cause the calculations to
execute in CELL mode vs. BLOCK mode
Multiple IF statements for a subset of the block may evaluate
faster then @CURRMBR
Minimize Dependent Dynamic Calculations, either hierarchical or formula
based
Pay attention to Deep, Ragged Chart of Account Structures
consider formulas for certain upper level members
Recreate calc logic as performance optimizer (maintenance impact)
Consider nearly all two pass calcs as dynamic
Exception smaller KPI/metrics cubes where all dimensions are
stored
Dynamic Calc Usage (continued)
Slide 48
Dynamic Calc Trick (Dense)
Eliminate Dependencies on other dynamic
calcs in formulas or hierarchies
Total Expenses = @SUM(@RELATIVE(TOTAL EXPENSES, 0))
Total Expenses
Non Operating Expense (and all of its hierarchies)
Operating Expenses (and all of its hierarchies)
is FASTER than
Slide 49
Dynamic Calc Trick (Sparse)
Stagger Dynamic Calc at Multiple Level of Hierarchies,
and Supplement with Multiple Loads (e.g. Add to
Existing Values)
Scenario (Label Only, Sparse)
Actual (Dynamic Calc)
Actual_Load (Stored)(+)
Actual_EDW (Dynamic Calc) (~)
Actual_EDW_A (Stored) (+)
Actual_EDW_B (Stored) (+)
Actual_EDW_C (Stored) (+)
Actual_GL (Dynamic Calc) (~)
Actual_GL_JDE (Stored) (+)
Actual_GL_PS (Stored) (+)
Actual_Adj (Stored)(+)
Use Add to existing Values to Load Here
in Rule
Slide 50
Maintenance Routines
Defragmentation Routines
Outline (predominantly ASO)
Database (index/page files)
Log Purging Operations
Application Server
Agent and Event Logs on Essbase Server
Planning Audit Logs
Recycling of Services to Clear Memory (BEA J2EE)
Reboot Machines Monthly
Archiving off of Older Data Sets
History Cubes
Read Only Reporting Cubes (ASO) vs. Read/Write Modeling
Cubes
Typical Maintenance Routines
Slide 51
Maintenance Routines
Bulk Load of Supporting Details a must for Pillar Migrations
Essbase CDF via Business Rule - Copy Supporting Details/Cell Text
Incorporate into Business Rules with Run Time Prompts
Better then Copy Data or Copy Versions
Key Planning Table -
Essbase CDF via Business Rules launch external processes
Essbase CDF solve simultaneous equations vs. Looping (debt/interest
modeling)
Custom SQL Views in Planning RDBMS against Web Analysis or OBIEE
Audit Reporting
Search Capability for Supporting Details
Custom Security Reports
Currency Conversion
Typical Planning Customizations
Tip! Use Essbase CDFs, and the relational repository to
Customize will be easier to upgrade later on
Slide 52
Maintenance Routines
1. Consider alternatives to out of Box Planning Currency Conversion &
Target Scenarios (storing data high)
2. Load and Validate Dims & Data in Essbase, then port to Planning
3. Separate Business Rule Functionality Modeling, Data Movement, Agg
4. Ensure Developers have test user ids to validate functionality and
view of forms Administrator masks a multitude of sins
5. Separate Essbase ASO Reporting Cube optimize read vs. write
6. Model it in excel before you model it in Planning
7. Understand impact of Scenarios (Management Cycles) vs. Versions
(Iterations of a Management Cycle)
8. Use Suppress Empty Blocks in Form Design
9. Convert Actual Data to Plan View to accommodate different levels of
grain and simply form design
10. Push data between plan types on change, dont pull always
11. Establish thresholds for business rule performance in multi-user
environment e.g. one minute for a rule is too slow in a multi user
environment
Eleven Planning Tips to Remember
Slide 53
Closing
Contact
Mike Killeen
VP of Technology, Oracle Ace
Edgewater Ranzal
E-mail: mkilleen@ranzal.com
Ranzal Differentiators
Technology Excellence
Delivery Quality
Industry Expertise
Client Focus
Solid Business Methodology
Strong Customer References
Relationship with Oracle / Hyperion
Vertical Expertise from Edgewater
North American and European Presence
Webinars http://www.ranzal.com/news.htm
Come Visit us in Booth 5 in the Exhibition Hall
Contact
Mija Deering
Principal Solutions Manager
Edgewater Ranzal
E-mail: mdeering@ranzal.com