Você está na página 1de 3

Project

Area Revision
Equipment Page
Objectives Adequacy Check New Horizontal Separator
Operating pressure 900 psig Inside Diameter 42 in
Operating temperature 250
o
F Length T/T 16 ft
Gas
Flow rate 30 MMscfd Liquid level Oil
Molecular weight 31.47 LOSHH 27 in
z Factor 0.9800 LOSH 23 in
Viscosity 0.8 cP NOLL 10.5 in
Oil LOSL 7 in
Flow rate 1000 BOPD LOSLL 5 in
Density 47.10 lb/ft
3
Liquid level Water
Water LISHH 10.5 in
Flow rate 250 BWPD LISH 8 in
Density 57.38 lb/ft
3
NILL 7 in
LISL 6 in
LISLL 4 in
Weir Height 20.5 in
Nozzle size
Inlet 10 in
Gas outlet 10 in
Water outlet 3 in
Oil outlet 3 in
DESIGN CRITERIA
Type of wire mesh
K factor 0.35 ft/s (K factor is 0.22 - 0.39 ft/s) Ref. 2
Settling Time
LSH - TOV 12 in
LSH - LSL (working level) 5 minutes or min 12 in
LSL - BOV 6 in
Nozzle criteria
Inlet .v
2
4000 lb/ft/s
2
Gas outlet .v
2
2500 lb/ft/s
2
Liquid outlet velocity 6 ft/s
STANDARD & CODE
1 API 12J, Specification for Oil and Gas Separator
2 GPSA Engineering Data Book 12th edition 2004, Section 7
3 Deflector baffle equivalent to schoepentoeter
PROCESS CALCULATION
Schoepentoeter or equivalent
V-300
PROCESS DATA
1
VESSEL DIMENSION
Mesh Pad
HORIZONTAL SEPARATOR - ADEQUACY CHECK SHEET
Project
Area Revision
Equipment Page
PROPERTIES
Gas Oil Water Liquid Mixture
Mass flow rate lb/s 28.83 3.06 0.93 3.99 32.82
Actual flow rate ft
3
/s 7.48 0.06 0.02 0.08 7.56
Molecular weight 31.47 - - - -
z Factor 0.98 - - - -
Density lb/ft
3
3.86 47.10 57.38 49.15 4.34
Viscosity cP 0.80 - - - -
SEPARATOR SIZING
K factor correction 0.76 ft/s
Terminal velocity, V
t
6.37 ft/s
Horizontal gas velocity 1.30 ft/s
Liquid dropout time 0.21 s
LEVEL RETENTION TIME
ToV - LOSH 19 in 62.6112988 ft
3
12.85 min OK
LOSH - LISL (working level) 17 in 67.9872313 ft
3
13.95 min OK
LISL - BOV 6 in 12.1469316 ft
3
2.49 min OK
NOZZLE SIZING
Calculated Existing Existing .v
2
Remark
Inlet Schoepentoeter or equivalent 6.76 in 10 in 834 lb/ft/s
2
OK
Gas outlet 7.34 in 10 in 725 lb/ft/s
2
OK
Water outlet 2.00 in 3 in 6 lb/ft/s
2
OK
Oil outlet 2.00 in 3 in 6 lb/ft/s
2
OK
Separation is OK
Separation is OK
PROCESS CALCULATION
HORIZONTAL SEPARATOR - ADEQUACY CHECK SHEET
Remark Required
Gas cross section area, ft
2
0
V-300 2
Gas path length, ft 0.27 13.67
1.17
Available
4.52
Project
Area Revision
Equipment Page
SKETCH
LOSHH 27 in
LOSH 23 in Weir 21 in 42 in
LISHH 11 in NOLL 11 in
LISH 8 in LOSL 7 in
NILL 7 in LOSLL 5 in
LISL 6 in
LISLL 4 in
L1 = 13.7 ft 2.3 ft
Where:
N1 = Nozzle inlet
N2 = Nozzle gas outlet
N3 = Nozzle Water outlet
N4 = Nozzle Oil outlet
PROCESS CALCULATION
HORIZONTAL SEPARATOR - ADEQUACY CHECK SHEET
0
V-300 3
N2
N1
N4
0

N3