Você está na página 1de 8

TECHNOLOGY PROFESSIONAL:

Ericsson UTRAN Engineer: Experienced in Installation, Troubleshooting and


Implementation of Ericsson RNC 3820 , RXI 820, MGW, 3G and 2G BTS (RBS 6201, 6101,
6601, 6102) and Ericsson Mini-link-E and Traffic Nodes.
I have a very strong knowledge on the LTE, WCDMA and RAN interfaces and
protocol IU, IUB, IUR, MME, HSS, SGW, PGW and CPG.
MUB, MUR, MUT, IU-Cs, IU-Ps, Uu and EPS, SAE, EPC.
I have a very good knowledge of the connectivity packet platform (CPP) and how
this platform can help in distributing real-time telecommunication control system
and managed support system and how cell switching is used for communication
between boards and the sub-racks.
Configuring the transport Network and oam on Lte.
Setting Up S1 Link on Lte.
Configuring the Radio Network on Lte.
Tuning and Parameter Setting On Lte.
Commissioning and integrating new RNC with latest software W10.
Implementing IUB over IP for the NodeB using MPBN.
Implementing IP network for the MSC and SGSN.
Implementing MSC in Pool with RNC with several MSCs
Implemented the 14.4 Mbps Download Speed with 10E1 Capacity.
Adding New Sites in the RNC using OSS RAN explorer-ARW, BCT.
Configuring E1 Path, O&M Access, Site equipment and External Alarm
configuration in Ericsson 3G Cabinets (6201, 6101, 6601, 6102).
Alarm monitoring in NodeB, RNC, RXI and MGW using Element manager and
Moshell 8.0.
Implementing the Optimization and Customer requests
Exporting the 3G Network Dump and Converting to Excel Formats
Analyzing the Missing relations and Adding the GSM Relation for IRAT.
Analyzing, Troubleshooting the Problems in NodeB, RNC, RXI and MGW and
Escalating Related Team.
Delete and reconfiguring the sites Using Moshell Commands releasing from site
hang.
Restarting the ETM Board to release the IMA Hang.
Enabling UETR, CTR and Scanner for Call traces.
Performing PMR for All Networks to Analyzing the Drop calls and expanding the
Nodes.
Adding IUB Links, ATM Ports.
Adding UTRAN, GSM Relation for NodeB Sites using RAN Explorer.
Changing Scrambling codes for the NodeB Sites from the RNC.
Loading XML Script Files in RNC, NodeB.
Using Citrix OSS tools for Monitoring Alarm and troubleshooting, analyzing and
escalating the field maintenance Dept.
Preparing XML Script files for Ericsson 3G Cabinets (6201, 6101, 6102, and
6601).
Formatting GPB (Hard Disk), loading P7, W10 Softwares.
Replacing GPB (MP) Card in RNC&RBS Cabinet.
Upgrading softwares P6 to P7 to W10 (HSDPA) Technology.
Making Backup CVs and Creating New CVs using moshell and Element Manager.
Communicate with various departments e.g. ERICSSON RAN Manager,
Optimization Team, RNC Integrator, in resolution of Technical problem during
Migration or any Upgrading activity in RAN NODES.
Being innovative in suggesting new ideas on installation procedure matters,
which benefit the customer more.
Excellent knowledge of the network topology, its traffic handling capabilities and
traffic characteristics.
Adding additional E1 on the Imagroup to increase the capacity.
Implementing SGSNPOOL for the RNCs using M3UA Association.
Expanding the RNC with additional Subracks.
Preparing the MUX plan for the 3G IP Network According to the Capacity plan.
Do support and maintenance work for Node B with HSDPA install types
6101,6102,6601,6102, 6301,3206, 3116, 3216, 3303 and also do maintenance for
RNC remotely.
Doing daily, weekly report for Airtel and Ericsson.
Do Commissioning and integration, Testing and software loading on RBS 6201,
6102, 6101,6601,6301,3206,3216,3116,3303 into live network.
DT (Data Transcript) Preparing, Site Loading, FLP Loading for Ericsson BSC R7B,
2G Site integration and loading on the Ericsson BSC, s
Project Planning & Management: Proven ability to plan, organize and lead technical
projects/teams.
TECHNICAL EXPERTISE:
Equipments:
Ericsson RNC3820Ericsson RXI820E-MGWEricsson RBS 6201,6101,6102,6601
Ericsson BScsEricsson Mini-link
Ericsson Traffic Nodes Ericsson TEMS Investigation
Marconi STM-1
Software Tools:
MOSHELL8.0Citrix OSS-RC EM Application Decoder NexplorerCCR-toolMSM 6.4
OMT_R30 WINFIOL 6.4
o TEMS Investigation 5.1 3G Element Manager Filezilla FTP
Site Master ToolsHyper Terminal RTTSXMLUltraedit

PROFESSIONAL EXPERIENCE:
Confidential,GHANA
RNC INTEGRATOR RNC W10, NODEB W10 2011 April-Pre
Jobs Profile:
Integrating new RNC with W10b updated Software release.
Integrating RNC with MGW with ETMF4 Configuration
Integrating IP based control plane with MSC-S Via MPBN
Integrating IP based control and user plane with SGSN via MPBN Network using ETMFG
Board.
Integrating NODE B with IUB over IP Using ETMFX via MPBN.
Updating the license on RNC and Node B
Upgrading Software On RNC and Node B Locally or using OSS
Implementing MSCPOOL for the RNCs using M3UA Association
Preparing CCR-tool Scripts for RNC and Node B
Preparing Mo Script for RNC and Node B
Loading XML files using RAN Explorer.
Preparing the Utrancell relations relation according to the Excel sheet using XML tool.
Deleting and Reconfiguring the Sites Using Moshell Command for Maintenance purpose.
Executing customer Request to the Nodes.
Solving the customer problems like low coverage(increase the power)
Key Project & Accomplishments:
Client - Confidential, Ghana - One of the new mobile operators in Ghana.
Project Details Key member of the RAN Team for Integrating RNC,
troubleshooting and Supporting to the Customer.
With total 190 Sites and 2 RNC implemented IUB over IP

Confidential, GHANA
BACK OFFICE ENGINEER RNC,NODEB 2010 Dec-April
Jobs Profile:
Monitoring the Alarms in RNC,RXI and Node B Nodes
Troubleshooting the Problems and Escalating to customer.
Supporting the Customer to Solve the RNC Related Alarms.
Deleting and Reconfiguring the Sites Using Moshell Command for Maintenance purpose.
Executing customer Request to the Nodes.
Coordinating with NPI performance teams.
Coordinating with NRO to Upgrade the Software from P5 to P5.0.23 upgrade levels.
Monitoring Network performance every 3 hours.
Adding additional Ip Atmlink on the Node Bs and changing routing tables.
Remoduling the sites from one module other module due to load problem on the modules
this will reduce the load issues.
Preparing the Utrancell relations relation according to the Excel sheet using XML tool.
Loading XML files using RAN Explorer.
Changing the GPB, SPB Boards on the RNC due to hardware issue.
Escalating Emergency issue to ELS and follow up the status.
Installing license files
Analyzing the Ps drop and speech drop on the RNCs.
Sites re-parenting from Source RNC to Target RNC
Communicate with various departments e.g. ERICSSON log
Manager, Optimization Team, RNC Integrator, in resolution of Technical problem during
Migration or any Upgrading activity in RAN NODES.
Being innovative in suggesting new ideas on installation procedure matters, which benefit
the customer more.
Implemented SGSNPOOL for the RNCs using M3UA Association.
Being innovative in suggesting new ideas on installation procedure matters, which benefit
the customer more.
Key Project & Accomplishments:
Client - MTN, - One of the leading mobile operators in Ghana.
Project Details Key member of the RAN MS Team for Monitoring, troubleshooting
and Supporting to the Customer
With total 120 Sites and 3 RNC ATM Based
Implemented SGSNPOOL for the RNCs using M3UA Association

Confidential, NIGERIA
UTRAN Engineer-O&M:-RNC,NODE B2010 Aug2010 September
Monitoring and troubleshooting 3G Nodes.Responsiple for coordinating with FM
team.
RNC and Node B Customer Support to the customer IndoSat.
Jobs Profile:
Monitoring the Alarms in RNC,RXI and Node B Nodes
Troubleshooting the Problems and Escalating to Field Dept.
Supporting the Customer to Solve the RNC Related Alarms.
Deleting and Reconfiguring the Sites Using Moshell Command for Maintenance purpose.
Executing customer Request to the Nodes.
Solving the customer problems like low coverage(increase the power)
Coordinating with NPI teams.
Coordinating with NRO to Upgrade the Software from P4 to P5.
Monitoring Network performance every 3 hours.
Configured the IMA Adaption on the Network successfully.
Performed UETR, CTR and Scanner for Call & UE traces.
Hardware replacement, Troubleshooting and Hardware Upgrade.
Responsible to implement troubleshooting techniques for RAN Nodes system to customer
and the local operator staff.
Provide OJT for Customer Front Office and Back Office Engineers
Key Project & Accomplishments:
Client MTN , Nigeria - One of the leading mobile operators in Nigeria. With total 300
Sites and 4 RNC ATM Based
o Project Details Key member of the UTRAN HLS team for Monitoring,
troubleshooting and Supporting to the Customer.
Confidential, NIGERIA
NMC/BACK OFFICE Engineer:-RNC, RXI, NODE B 2009 May 2010 July
Planned and executed WCDMA project Ericsson RNC, RXI, RBS 3202, 3206 with
HSDPA Technology. Monitoring and Troubleshooting 2.1GHZ.Responsiple for
Making Video Test Calls and Downloading Speeds.
Alarm monitoring, Troubleshooting and Clearing the Alarms and Escalating to
Field Dept.
RNC, RXI and MGW Customer Support to the Saudi Telecom.
Jobs Profile:
Monitoring the Alarms in RNC,RXI,MGW,MSC Server and Nodes
Troubleshooting the Problems and Escalating to Field Dept.
Supporting the Customer to Solve the RNC Related Alarms.
Deleting and Reconfiguring the Sites Using Moshell Command for Maintenance purpose.
Using UER Moshell Commands for Call traces.
Using Cell Barred Commands to Control the Traffics.
Enabling Cell Reserved Commands for Blocking (Disabling Call Establishment) the Sector.
Enabling UETR, CTR and Scanner for Call traces.
Performing PMR for All Networks to Analyzing the Drop Calls, and Expanding the Networks.
Requesting MDT to Upgrading the Softwares, changing the Scrambling Codes and other
Troubleshooting Problems.
Opening CSR with ELS for Additional Support.
Creating the Outage Ticket using RTTS with Related Teams.
Key Project & Accomplishments:
Client Zain , NIGERIA - One of the leading mobile operators in the Middle East Countries.
With total 150 Sites and 2 RNC ATM Based
Project Details Key member of the Business Continuity Project team for
Monitoring and troubleshooting 3G Technology.

Confidential, NIGERIA
Utran Engineer: RNC, RXI, BSC, NodeB, RBS 2009 March 2009 May
Planned and executed WCDMA project Ericsson RBS 3202,3206, 3401 with HSDPA
Technology including Installation, Troubleshooting and Implementation in
2.1GHZ.Responsible for Making Video Test Calls, Checking Handovers between
the Sectors and WCDMA to GSM with WCDMA Phones.
Testing Downloading Data rate with Air card 800 Series Watcher with HSDPA
Technology.
Planned and executed key
project Ericsson RBS 2206 with EDGE Technology including Installation, Troubleshooting
and Implementation in the 900 MHz & 1800 MHz. Responsible for Making Test Calls,
Checking Handovers between the Sectors, Checking Diversity Call Test, and Checking
GPRS & MMS Facilities with the help of Ericsson TEMS Pocket.
Job Profile:
Setup The New Ethernet IP Address.
Running the Command Files with Initial Configuration.
Making CV Backups.
Loading XML Script Files in NodeB.
Upgrading P3 to P4 (HSDPA) Technology
Alarm monitoring in NodeB, RNC, RXI and MGW using Element manager and Moshell 7.0.
Creating New Sites, Changing Parameters Using RAN Explorer.
Enabling UETR, Scanner for Call Traces.
Key Project & Accomplishments:
Client - MTN, NIGERIA -One of the leading mobile operator in African.
Project Details Key member of the team that Adding 3G Technology BTS to
Ericsson RBS 3202, 3206, 3303.
Project Details Key member of the team that upgrading from GPRS to EDGE Technology
by swapping the Siemens BTS to Ericsson RBS 2206.
Coordinated, planning, swapped & implemented Ericsson RBS 2206 around 368 sites in the
duration of 4 Months.
Operation and Maintenance Support for 2G and 3G Network.
BSc Support, DT Preparing, Site Loading, for Ericsson BSC R11.
Installing and Commissioning Minilink-E, Traffic Nodes and.
This position is essential to be able to manage key performance of 3G networks,
- Understand the system concepts, redundancy and configurations in CPP.
- Use the applications in OSS-RC, Element Manager and Command Line Interface (COLI) that are important
during a troubleshooting procedure.
- Investigate the purpose and the location of the various types of logs in a CPP based node.
- Be able to tie together the Performance Statistics and Performance Monitoring in the process of
troubleshooting in WRAN Network.

- Understand the system concepts, redundancy and configurations in CPP:
Use COLI/AMOS commands to understand Fault Tolerant Core (FTC) concept and Reliable Program
concept.
Understand how link redundancies work in both ATM and IP based transport interfaces and RBS file
System.
Explain Sync for Digital Unit V2 optical, DU Maintenance button and Configurations for DUW41/31/11
Describe AIR, AIR as mixed and related faults
Be able to perform an emergency recovery of a CPP based node from a backup placed outside of the node
Describe the Subscriber Capacity of RNC and RBS with New Hardware and Software.
Be able to interpret Managed Object attributes to explain how interfaces are configured from a CPP based
node using Element Manager and AMOS
RNC restart security protection and RNC in pool
Cross-Sector Antenna Sharing Redundancy (CSASR)
- Use the applications in OSS-RC, Element Manager and Command Line Interface (COLI) that are important
during a troubleshooting procedure:
Start and understand when to use the following applications in OSS-RC: Transport Network Viewer, Job
Manager, Alarm List Viewer/ Alarm Status Matrix, WCDMA RAN Performance Measurements, Common
Explorer GUI, Node Status Analyzer and Cabinet Equipment Viewer, Advanced Managed Object. Scripting
(AMOS) interface and Node Command Line Interface (NCLI).
Lock and restart boards and nodes including the soft/hard lock concepts.
Check the status of the Manage Object to find out the health of the node.
Understand when COLI is used and when Element Manager/NCLI are used.
Describe RBS Power Blossoming.
Describe Product Inventory improvements.
Understand the WCDMA RAN load expert.
Understand Supervision of SP pool and 4 Way Receiver Diversity with DUW.
Understand changes in FM Events and Changes ROP.
- Investigate the purpose and the location of the various types of logs in a CPP based node:
Know the location and purpose and read Alarm and Event logs.
Explain how Ericsson Local Support enables traces in the process of troubleshooting, and uses the target
monitor application to capture the traces.
Find out the location and purpose of Error Log, Post Mortem Dump(PMD) Log and Availability Log.
Find out the purpose and location of the Security and Audit trail logs.
Perform data collection to include in the Customer Service Request (CSR) when a problem is suspected in
the WRAN network.
Explain Trace improvement, UE-ID sent to RBS in all Radio link Setup messages.
Describe Trace Overload Protection and RNC Throughput Capacity.
Describe RBS MP Load sharing between DUW\\\'s.
xplain UE real-time Trace.
- Be able to tie together the Performance Statistics and Performance Monitoring in the process of
troubleshooting in WRAN Network:
Be able to initiate statistics from the OSS-RC.
Be able to initiate performance recording (e.g. UETR) from the OSS-RC.
Be able to read counter values and tie them to the situations in the network.
Explain Enhanced Health Check Filter File.
Describe alarm handling enhancements.
Describe Integration without Laptop.
Explain Flexible PM Statistics ROP time intervals.
Describe Battery Test and Hot Spot Finder.


Job requirement
- Very Good presentation skills.
- Very good MS user.
- Technically competent in GSM / UMTS / HSPA technology RAN aspects. Competency in aspects other
than RAN (e.g. Core, IP) is added advantage.
- In depth experience and skills in OSS management and functions, e.g., DT analysis, trace analysis, OSS
counter reporting and analysis.
- Ability to effectively use OSS and performance tools, e.g. NetAct Reporting Suite or equivalent, Netact
NSN and OSS Ericsson technology.
- Knowledge of NSN/Ericsson BSS / UTRAN parameters, counters, KPIs is required. Knowledge of other
vendors BSS / UTRAN parameters, counters, KPIs is added advantage.
- Knowledge of NSN/Ericsson products and features is added advantage.
- 5-10 years of work experience in relevant field.
- Bachelor in Communication Engineering
- Arabic (preferred)
- English (required)
- Kurdish (preferred)

Você também pode gostar