Você está na página 1de 6

ULS

SLS

Permanent Load (kN/m2)


G
1ST
2ND
19.09
16.44
16.44
Temporary Loads (kN/m2)
G
1ST
2ND
8.50
6.62
6.62

3RD
16.44

4TH
16.44

5TH
16.44

6TH
16.44

7TH
16.44

R
10.89

3RD
6.62

4TH
6.62

5TH
6.62

6TH
6.62

7TH
6.62

R
6.00

Stage
1

Operation
Pour Level 1

Level
1
G

% Transfer
0
100

Load in Floor Slab


Existing
Added
Total
0.00
0.00
0
8.50
6.62
15.12

Stage
2

Operation
Strike Level 1

Level
1
G

% Transfer
100
-100

Load in Floor Slab


Existing
Added
Total
0.00
6.62
6.62
15.12
-6.62
8.50

40%
45%

0%
68%
55%

% Design Strength
0%
79%

Stage
3

Operation
Pour Level 2

Level
2
1
G

% Transfer
0
70
30

Load in Floor Slab


Existing
Added
Total
0.00
0.00
0.00
6.62
4.63
11.25
8.50
1.99
10.49

Stage
4

Operation
Strike Level 2

Level
2
1
G

% Transfer
100
-70
-30

Load in Floor Slab


Existing
Added
Total
0.00
6.62
6.62
11.25
-4.63
6.62
10.49
-1.99
8.50

40%
40%
45%

Stage
5

Operation
Pour Level 3

Level
3
2
1
G

% Transfer
0
65
23
12

Load in Floor Slab


Existing
Added
Total
0.00
0.00
0.00
6.62
4.30
10.92
6.62
1.52
8.14
8.50
0.79
9.29

0%
66%
50%
49%

% Transfer
100
-65
-23
-12

Load in Floor Slab


Existing
Added
Total
0.00
6.62
6.62
10.92
-4.30
6.62
8.14
-1.52
6.62
9.29
-0.79
8.50

40%
40%
40%
45%

% Transfer
0
65
23
12
0

Load in Floor Slab


Existing
Added
Total
0.00
0.00
0.00
6.62
4.30
10.92
6.62
1.52
8.14
6.62
0.79
7.41
8.50
0.00
8.50

0%
66%
50%
45%
45%

Stage
6

Stage
7

Operation
Strike Level 3

Operation
Pour Level 4

Level
3
2
1
G

Level
4
3
2
1
G

Stage
8

Operation
Strike Level 4

Level
4
3
2
1
G

% Transfer
100
-65
-23
-12
0

Load in Floor Slab


Existing
Added
Total
0.00
6.62
6.62
10.92
-4.30
6.62
8.14
-1.52
6.62
7.41
-0.79
6.62
8.50
0.00
8.50

40%
40%
40%
40%
45%

Stage
9

Operation
Pour Level 5

Level
5
4
3
2
1
G

% Transfer
0
65
23
12
0
0

Load in Floor Slab


Existing
Added
Total
0.00
0.00
0.00
6.62
4.30
10.92
6.62
1.52
8.14
6.62
0.79
7.41
6.62
0.00
6.62
8.50
0.00
8.50

0%
66%
50%
45%
40%
45%

40%
40%
40%
40%
40%
45%

Stage
10

Operation
Strike Level 5

Level
5
4
3
2
1
G

% Transfer
100
-65
-23
-12
0
0

Load in Floor Slab


Existing
Added
Total
0.00
6.62
6.62
10.92
-4.30
6.62
8.14
-1.52
6.62
7.41
-0.79
6.62
6.62
0.00
6.62
8.50
0.00
8.50

Stage
11

Operation
Pour Level 6

Level
6
5
4
3
2
1
G

% Transfer
0
65
23
12
0
0
0

Load in Floor Slab


Existing
Added
Total
0.00
0.00
0.00
6.62
4.30
10.92
6.62
1.52
8.14
6.62
0.79
7.41
6.62
0.00
6.62
6.62
0.00
6.62
8.50
0.00
8.50

0%
66%
50%
45%
40%
40%
45%

Stage
12

Operation
Strike Level 6

Level
6
5
4
3
2
1
G

% Transfer
100
-65
-23
-12
0
0
0

Load in Floor Slab


Existing
Added
Total
0.00
6.62
6.62
10.92
-4.30
6.62
8.14
-1.52
6.62
7.41
-0.79
6.62
6.62
0.00
6.62
6.62
0.00
6.62
8.50
0.00
8.50

40%
40%
40%
40%
40%
40%
45%

Stage
13

Operation
Pour Level 7

Level
7
6
5
4
3
2
1
G

% Transfer
0
65
23
12
0
0
0
0

Load in Floor Slab


Existing
Added
Total
0.00
0.00
0.00
6.62
10.92
4.30
6.62
8.14
1.52
6.62
7.41
0.79
6.62
6.62
0.00
6.62
6.62
0.00
6.62
6.62
0.00
8.50
8.50
0.00

0%
66%
50%
45%
40%
40%
40%
45%

Stage
14

Operation
Strike Level 7

Level
7
6
5
4
3
2
1
G

% Transfer
100
-65
-23
-12
0
0
0
0

Load in Floor Slab


Existing
Added
Total
0.00
6.62
6.62
10.92
-4.30
6.62
8.14
-1.52
6.62
7.41
-0.79
6.62
6.62
0.00
6.62
6.62
0.00
6.62
6.62
0.00
6.62
8.5
0.00
8.50

40%
40%
40%
40%
40%
40%
40%
45%

Stage
15

Operation
Pour Roof
Level

Level
R
7
6
5
4
3
2
1
G

% Transfer
0
65
23
12
0
0
0
0
0

Stage
16

Operation
Strike Roof
Level

Level
R
7
6
5
4
3
2
1
G

% Transfer
100
-65
-23
-12
0
0
0
0
0

Load in Floor Slab


Existing
Added
Total
0.00
6.62
6.62
6.62
6.62
6.62
6.62
6.62
8.50

0.00
3.90
1.38
0.72
0.00
0.00
0.00
0.00
0.00

0.00
10.52
8.00
7.34
6.62
6.62
6.62
6.62
8.50

0%
64%
49%
45%
40%
40%
40%
40%
45%

Load in Floor Slab


Existing
Added
Total
0.00
6
6.00
10.52
-3.90
6.62
8
-1.38
6.62
7.34
-0.72
6.62
6.62
0.00
6.62
6.62
0.00
6.62
6.62
0.00
6.62
6.62
0.00
6.62
8.50
0.00
8.50

55%
40%
40%
40%
40%
40%
40%
40%
45%